Sei sulla pagina 1di 212

jehL Fo tofh tha

jugLjgl iy tu mltiz

RATES FOR LABOUR

TWAD BOARD RATES FOR LABOUR Schedule Item No. 1 2 3 4 5 6 7 Driller Assistant Driller Special heavy labour for driving sheet pile Boring Attendant Water Meter Reader Helper for Rig a. Electrician with LEE/DEE and 'C' certificate b. Electrician with LEE/ DEE C. Electrician with ITI and 'C' Certificate d. Electrician with ITI 'and B' Certificate e. Electrician with ITI 8 9 10 a. Pump Operator with ITI b. Pump Operator without ITI Laboratory Attender SSLC/ 10th Std passed a. Filter Bed Operator with D.M.E. b. Filter Bed Operator with ITI c. Filter Bed operator without I.T.I. 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Cleaner for Treatment Unit, Pump and vehicles Boring Mechanic for Hand Boring set Turn Cock (Experience in pipe line Operation and maintenance Fitter (Pipe laying / Bar bending) I class Fitter (Pipe laying / Bar bending) II class Sewer Cleaner Store Attender SSLC /10th Std Passed Divers and well sinkers Hammer Man (Geophysical survey) Geological Assistant Maintenance Assistant Plant Operator, SSLC passed with 3 years experience Reverse Osmosis (R.O.) Plant Operator SSLC passed with 3 years experience Mechanic withITI a. Carpenter I class b. Carpenter II class a. Cleaner I Gr. b. Cleaner II Gr. a. Fitter I class b. Fitter II class Floor Polisher Gardener Head Mazdoor for well sinking
10

Description

Unit Day Day Day Day Day Day Day Day Day Day Day Day Day Day Day Day Day Day Day Day Day Day Day Day Day Day Day Day Day Day Day Day Day Day Day Day Day Day Day Day

Rate in Rupees (2013-14) 337.00 277.00 337.00 247.00 235.00 247.00 431.00 412.00 370.00 337.00 337.00 337.00 287.00 235.00 412.00 337.00 287.00 235.00 287.00 235.00 316.00 293.00 235.00 235.00 431.00 235.00 346.00 247.00 277.00 337.00 337.00 355.00 326.00 191.00 180.00 322.00 300.00 281.00 213.00 236.00

Schedule Item No. 31 32 33 a. Driver (Light duty)

Description

Unit Day Day Day Day Day Day Day Day Day Day Day Day Day Day Day Day Day Day Day Day Day Day Day Day Day Day

Rate in Rupees (2013-14) 281.00 300.00 213.00 271.00 300.00 363.00 326.00 363.00 326.00 228.00 206.00 236.00 280.00 258.00 293.00 271.00 258.00 316.00 293.00 236.00 280.00 258.00 280.00 258.00 326.00 467.00

b. Driver (Heavy duty) Jumper Mazdoor a. Maistry, Road Inspector & Work Inspector b. Maistry, Road Inspector & Work Inspector (Degree holder) a. Mason for Brick work - I class b. Mason for Brick work - II class 35 36 a. Mason for stone work - I class b. Mason for stone work - II class a. Mazdoor Category I b. Mazdoor Category II c. Head Mazdoor 37 38 39 40 41 42 43 44 45 a. Moplah - I class a. Moplah - II class a. Painter/Varnisher-I Class b. Painter/Varnisher-II Class Pile Driver a. Plumber I class b. Plumber II class Pump Driver a. Stone cutter- I class b. Stone cutter- II class a. Welder/ Bracer - I Class b. Welder/ Bracer - II Class Well sinking Diver working with Helmet (above two metres depth of water) Technical Assistant a. Technical Assistant Gr.I (BE passed) b. Technical Assistant- Gr.II (Diploma in Engg. Passed/ B.E. failed/ Degree in Geology for ground water) c. Technical Assistant Gr.III (Diploma in Engg. Failed / ITI (Civil) passed 46 a. Laboratory Assistant. Gr.I (Post Graduate in Science) b. Laboratory Assistant. Gr.II (Degree in Science / Degree in Geology for ground water) c. Laboratory Assistant Grade III (with Degree qualification to work as works clerk) 47 a. Mazdoor employed for Geological maping b. Mazdoor employed for Pitting, Trenching, Sampling and Drilling works c. Mazdoor employed for Geophysical Investigation works d. Head Mazdoor to supervise exploratory works
11

34

Day Day Day Day Day Day Day Day Day

420.00 355.00 355.00 326.00 293.00 228.00 228.00 228.00 241.00

Schedule Description Item No. 48 Mixer Operator (including concrete mixer ) 49 50 51 Mixer Driver Compressor Operator Computer Operator a. Gr.I [B.E. (Computer Science)/ M.Sc (Computer Science)] b. Gr.II [B.Sc., (Computer Science)/Diploma in Computer Science] Stone & Crusher Operator Heavy Mazdoor Wireman Grade I/ Electrician Grade I Wireman Grade II/ Electrician Grade II Electrical Helper Laboratory Attendant Electrical Maistry Axe Mazdoor Blacksmith - 1st class Blacksmith - 2nd class Boat Mazdoor Bullocks pair with driver (with bandy) Bullocks single with driver (with bandy) Caulker Ferry Mazdoor Hammer Mazdoor Mechanic - 1st class Mechanic - 2nd class Navagonies or Javali Man - 1st class Sawyer Smith 1st class Smith 2nd class Sprayer Mazdoor (for bitumen, tar etc.,) Syrang-1st class Syrang-2 nd class Thatcher Tinker 1 st class Tinker 2 nd class Turner 1 st class Turner 2 nd class Time Keeper Ist class Time Keeper 2nd class Well Diver for removing silt - 1 st class Well Diver for removing silt - 2nd class
12

Unit Day Day Day

Rate in Rupees (2013-14) 248.00 236.00 248.00

Day Day Day Day Day Day Day Day Day Day Day Day Day Day Day Day Day Day Day Day Day Day Day Day Day Day Day Day Day Day Day Day Day Day Day Day

467.00 420.00 248.00 248.00 317.00 300.00 226.00 202.00 346.00 213.00 281.00 258.00 236.00 420.00 303.00 236.00 236.00 226.00 281.00 258.00 236.00 258.00 280.00 258.00 213.00 280.00 258.00 226.00 226.00 213.00 258.00 236.00 280.00 258.00 280.00 258.00

52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85

Schedule Item No. 86 87 88 89 90 91 Well sinker - 1st class

Description

Unit Day Day Day Day Day Day

Rate in Rupees (2013-14) 316.00 293.00 236.00 293.00 420.00 450.00

Well sinker - 2nd class Wodder Cinema Operator (ITI Passed) B.Sc., (Agriculture) Passed Irrigation Community Organiser Grade I [B.E(Agri) passed/B.Sc.,(Agri)Passed/PG (Geology) & Rural Development] Irrigation Community Organiser Grade II [B.E(Agri) failed / B.Sc.,(Agri)failed /Diploma in Agri. Passed)] Heat Master Operator Raker Lift Operator Sound Service Operator

92 93 94 95 96

Day Day Day Day Day

375.00 236.00 236.00 271.00 226.00

13

RATES FOR MATERIALS

1.0 PVC PIPE WITH EXCISE DUTY AS PER IS 4985 / 2000


Sl. No Description Unit Rate for 2013-14 in Rupees

I Quarter II Quarter III Quarter IV Quarter I 4KSC 1 63mm Metre 47.50 2 75mm Metre 66.50 3 90mm Metre 93.00 4 110mm Metre 135.50 5 125mm Metre 175.50 6 140mm Metre 219.50 7 160mm Metre 287.00 8 180mm Metre 366.50 9 200mm Metre 451.00 10 225mm Metre 578.50 11 250mm Metre 703.50 12 280mm Metre 1014.50 13 315mm Metre 1128.50 II 6KSC 1 50mm Metre 40.50 2 63mm Metre 66.50 3 75mm Metre 93.00 4 90mm Metre 136.00 5 110mm Metre 194.00 6 125mm Metre 258.00 7 140mm Metre 318.50 8 160mm Metre 410.50 9 180mm Metre 526.00 10 200mm Metre 656.00 11 225mm Metre 836.50 12 250mm Metre 1040.50 13 280mm Metre 1307.00 14 315mm Metre 1660.00 III 10KSC 1 50mm Metre 66.00 2 63mm Metre 103.50 3 75mm Metre 147.00 4 90mm Metre 208.50 5 110mm Metre 310.00 6 125mm Metre 400.50 7 140mm Metre 502.50 8 160mm Metre 658.00 9 180mm Metre 827.00 10 200mm Metre 1058.00 11 225mm Metre 1344.50 12 250mm Metre 1663.00 13 280mm Metre 2083.00 14 315mm Metre 2636.00 Note : The rates are inclusive of all taxes, duties and transportation charges anywhere in Tamilnadu. Excise Duty-12.36, VAT-5%.

1.1
Sl. No I 1 2 3 4 5 6 7 8 9 10 11 12 13 II 1 2 3 4 5 6 7 8 9 10 11 12 13 14 III 1 2 3 4 5 6 7 8 9 10 11 12 13 14

PVC PIPE WITHOUT EXCISE DUTY AS PER IS 4985/2000


Unit I Quarter Rate for 2013-14 in Rupees II Quarter III Quarter IV Quarter

Description 4KSC 63mm 75mm 90mm 110mm 125mm 140mm 160mm 180mm 200mm 225mm 250mm 280mm 315mm 6KSC 50mm 63mm 75mm 90mm 110mm 125mm 140mm 160mm 180mm 200mm 225mm 250mm 280mm 315mm 10KSC 50mm 63mm 75mm 90mm 110mm 125mm 140mm 160mm 180mm 200mm 225mm 250mm 280mm 315mm

Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre

43.00 59.50 82.00 119.50 154.50 192.00 251.50 322.50 397.00 510.50 622.00 785.50 996.50 35.00 60.00 82.00 118.00 170.00 226.00 282.00 363.50 460.50 578.50 740.50 921.50 1159.50 1466.50 58.00 91.50 129.50 184.00 273.50 354.50 441.00 578.50 728.50 934.00 1186.50 1468.00 1842.00 2329.00

Note : The rates are inclusive of VAT at 5% and transportation charges anywhere in Tamilnadu. .

1.2 Sl. No

PVC CASING PIPE with Excise Duty AS PER IS 12818 / 1992 Unit I Quarter Metre Metre Metre Metre Metre Metre 509.00 615.00 725.50 937.00 1120.50 1325.50 Rate for 2013-14 in Rupees II Quarter III Quarter IV Quarter

Description

1 150mm CS 2 150mm CM 3 150mm RS 4 200mm CS 5 200mm CM 6 200mm RS

Sl. No

1.3 PVC CASING PIPE without Excise Duty AS PER IS 12818 / 1992 Rate for 2013-14 in Rupees Description Unit I Quarter II Quarter III Quarter IV Quarter Metre Metre Metre Metre Metre Metre 429.50 515.50 613.00 793.50 935.00 1122.00

1 150mm CS 2 150mm CM 3 150mm RS 4 200mm CS 5 200mm CM 6 200mm RS

CS - Casing Shallow depth CM - Casing Medium depth RS - Ribbed screen pipe

1.4 UPVC- non pressure pipes as per IS 15328/2003 Sl No. I Rate for 2013-14 in Rupees Description Unit With Excise duty Without Excise duty

SN8-SDR 34(S 16.5) 1 110mm 2 125mm 3 160mm 4 200mm 5 250mm 6 315mm 7 400mm Metre Metre Metre Metre Metre Metre Metre 178.00 240.00 381.00 593.00 917.00 1454.00 2338.00 163.00 221.00 351.00 548.00 849.00 1344.00 2159.00

II

SN4-SDR 41(S 20) 1 125mm 2 160mm 3 200mm 4 250mm 5 315mm 6 400mm Metre Metre Metre Metre Metre Metre 205.00 325.00 496.00 781.00 1223.00 1971.00 163.00 221.00 351.00 548.00 849.00 1344.00

III

SN2-SDR 51(S 25) 1 160mm 2 200mm 3 250mm 4 315mm 5 400mm Metre Metre Metre Metre Metre 262.00 403.00 626.00 990.00 1581.00 242.00 370.00 578.00 914.00 1461.00

Note: The above rates are inclusive of all taxes , duties and transportation charges anywhere in Tamilnadu.Excise duty at 12.36% and VAT at 5%.

1.5 Sl.No. 1

PVC SPECIALS AS PER IS Unit 3 Rate for 2013-14 in Rupees 4

Description 2 PVC THREADED COUPLER

1 2 3 4 5 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 1 2 3 4 5 6 7 8 9 10 11 12

63 mm x 50 mm 75 mm x 50 mm 90 mm x 80 mm 110 mm x 100 mm 140 mm x 125 mm UNEQUAL TEE 63 mm x 50 mm 75 mm X 50 mm 90 mm x 50 mm 90 mm x 63 mm 90 mm x 75 mm 110 mm x 50 mm 110mm x 63 mm 110 mm x 90mm 140mm x 50 mm 140 mm x 63 mm 140 mm x 90 mm 140 mm x 110 mm 160 mm x 50 mm 160 mm x 63 mm 160 mm x 90 mm 160 mm x 110mm 160 mm x140 mm PVC REDUCER COUPLER 63 mm x 50 mm 75 mm x 63 mm 90 mm x 63 mm 90 mm x 75 mm 110 mm x 63 mm 110 mm x 75 mm 110 mm x 90 mm 140 mm x 63 mm 140 mm x 90 mm 140 mm x 110 mm 160 mm x 110 mm 160 mm x 140 mm

Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each

33.00 53.00 72.00 125.00 181.00 53.00 109.00 155.00 155.00 155.00 233.00 233.00 233.00 387.00 387.00 387.00 397.00 473.00 473.00 473.00 473.00 473.00 26.00 36.00 56.00 56.00 75.00 75.00 98.00 112.00 113.00 117.00 183.00 198.00

Sl.No.

Description PVC REDUCER MULTI STAGE

Unit

Rate for 2013-14 in Rupees 81.00 157.00 157.00 177.00 179.00 48.00 73.00 112.00 179.00 272.00 72.00 88.00 100.00 114.00 177.00 231.00

1 2 3 4 5 1 2 3 4 5 1 2 3 4 5 6

90 mm x 63 mm 110 mm x 63 mm 110 mm x 75 mm 110 mm x 90 mm 140 mm x 90 mm PVC REDUCER FABRICATED 75 mm x 63 mm 90 mm x 75 mm 110 mm x 90 mm 140 mm x 110 mm 160 mm x 140 mm SADDLE PIECE 63 mm x 20 mm 75 mm x 20 mm 90 mm x 20 mm 110 mm x 20 mm 140 mm x 20 mm 160 mm x 20 mm

Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each

Note: The above rates are inclusive of all taxes, duties and transportation charges anywhere in Tamilnadu.Excise duty 12.36% and VAT 5%.

Sl.N o. 1 2 3 4 5 6 7 8 9

Description

1.5 PVC SPECIALS AS PER IS cont.. Rate for 2013-14 in Rupees


20mm 25mm 32mm 40mm 50mm 63mm 75mm 90mm 110mm 140mm 160mm 200mm

PVC Couplers fabricated 4 KSC PVC Couplers fabricated 6 KSC PVC Bends fabricated4 KSC PVC Bends fabricated 6 KSC PVC Equal Tee Fabricated 4 KSC PVC Equal Tee Fabricated BIS 10124/1982 PartV 6 KSC PVC Couplers (Mould) BIS 7834/1975 Part VI PVC Elbow (Mould) BIS 7834/1975 Part VI

5.00

8.00

10.00 18.00 18.00 23.00 27.00 38.00 30.00 48.00 29.00 36.00 39.00 86.00

23.00 26.00 62.00 38.00

30.00 40.00

59.00 116.00 147.00 61.00 137.00 196.00

248.00 402.00

96.00 122.00 384.00 624.00 1183.00 94.00 157.00 224.00 270.00 337.00 417.00 482.00 438.00 988.00 317.00 319.00 319.00

85.00 118.00 196.00 515.00 841.00 1703.00 95.00 156.00 254.00 328.00 351.00 60.00 94.00 131.00 231.00 312.00

9.00 18.00 23.00 40.00

8.00 10.00 13.00 25.00 48.00 52.00

77.00 114.00 176.00 295.00 363.00

PVC Equal tee (Mould) BIS 7834/1975 10 PVC Male Threaded Adopter 11 PVC End Cap

9.00 17.00 25.00 27.00 53.00 96.00 112.00 182.00 290.00 711.00 792.00 26.00 29.00 4.00 5.00 9.00 10.00 12.00 23.00 30.00 38.00 65.00 113.00 173.00 196.00 55.00 86.00 148.00 209.00

29.00 31.00 39.00 57.00 86.00 148.00 213.00 12 PVC Tail piece without flange (BIS marks) Note: The above rates are inclusive of all taxes,duties and transportation charges anywhere inTamilnadu. Excise duty 12.36% and VAT 5%.

2.0 HDPE PIPES - PE 100 with excise duty AS PER IS 4984/1995 Rate for 2013-14 in Rupees Sl No Description Unit I Quarter PN 6 50 mm 63 mm 75 mm 90 mm 110 mm 125 mm 140 mm 160 mm 180 mm 200 mm 225 mm 250 mm 280 mm 315 mm 355 mm 400 mm 450 mm 500 mm 560 mm 630 mm PN 8 50 mm 63 mm 75 mm 90 mm 110 mm 125 mm 140 mm 160 mm 180 mm 200 mm 225 mm 250 mm 280 mm 315 mm 355 mm 400 mm 450 mm 500 mm 560 mm 630 mm II Quarter III Quarter IV Quarter

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre

55.00 81.00 118.50 165.50 242.00 313.50 395.50 516.00 650.00 801.00 999.50 1248.00 1567.00 1983.00 2513.00 3251.00 4112.00 5083.00 6605.50 8364.50 66.00 104.50 146.50 212.00 313.50 405.50 509.00 663.50 834.00 1031.00 1308.50 1609.50 2019.50 2554.00 3233.00 4189.00 5263.00 6506.50 8530.00 10753.50

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

PN 10 50 mm 63 mm 75 mm 90 mm 110 mm 125 mm 140 mm 160 mm 180 mm 200 mm 225 mm 250 mm 280 mm 315 mm 355 mm 400 mm 450 mm 500 mm 560 mm 630 mm PN 12.5 50 mm 63 mm 75 mm 90 mm 110 mm 125 mm 140 mm 160 mm 180 mm 200 mm 225 mm 250 mm 280 mm 315 mm 355 mm 400 mm 450 mm 500 mm 560 mm 630 mm

metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre

80.50 127.00 180.00 257.50 379.50 490.00 611.50 799.50 1016.50 1165.00 1579.00 1947.50 2436.50 3089.00 3926.50 5086.00 6418.50 7849.00 10308.50 13063.00 99.50 154.50 221.50 318.00 469.50 605.50 761.00 991.50 1255.50 1550.00 1961.50 2412.50 3025.50 3829.50 4862.50 6304.00 8030.00 10030.00 12406.50 15702.00

PN 16 1 50 mm metre 117.50 2 63 mm metre 188.50 3 75 mm metre 265.50 4 90 mm metre 383.00 5 110 mm metre 568.50 6 125 mm metre 736.50 7 140 mm metre 919.00 8 160 mm metre 1206.00 9 180 mm metre 1522.00 10 200 mm metre 1877.50 11 225 mm metre 2375.50 12 250 mm metre 2931.00 13 280 mm metre 3673.50 14 315 mm metre 4646.00 15 355 mm metre 5891.50 16 400 mm metre 7639.00 17 450 mm metre 9746.00 18 500 mm metre 12336.00 Note: The above rates are inclusive of all taxes, duties and transportation charges anywhere in Tamilnadu.Excise duty 12.36% and VAT 5%.

10

2.1 HDPE PIPES - PE 100 without excise duty AS PER IS 4984/1995 Rate for 2013-14 in Rupees I Quarter 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 PN 6 50 mm 63 mm 75 mm 90 mm 110 mm 125 mm 140 mm 160 mm 180 mm 200 mm 225 mm 250 mm 280 mm 315 mm 355 mm 400 mm 450 mm 500 mm 560 mm 630 mm PN 8 50 mm 63 mm 75 mm 90 mm 110 mm 125 mm 140 mm 160 mm 180 mm 200 mm 225 mm 250 mm 280 mm 315 mm 355 mm 400 mm 450 mm 500 mm 560 mm 630 mm metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre 47.00 74.00 104.50 145.00 214.50 278.00 348.50 454.50 572.00 707.00 897.00 1100.50 1380.00 1747.50 2213.00 2862.00 3620.00 4476.00 5808.50 7354.00 0.00 59.00 92.50 130.00 186.50 278.50 357.50 447.50 585.00 737.50 908.50 1151.50 1418.00 1778.50 2250.50 2847.50 3690.00 4635.00 5729.50 7498.00 9459.00 II Quarter III Quarter IV Quarter

Sl No

Description

Unit

11

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

PN 10 50 mm 63 mm 75 mm 90 mm 110 mm 125 mm 140 mm 160 mm 180 mm 200 mm 225 mm 250 mm 280 mm 315 mm 355 mm 400 mm 450 mm 500 mm 560 mm 630 mm PN 12.5 50 mm 63 mm 75 mm 90 mm 110 mm 125 mm 140 mm 160 mm 180 mm 200 mm 225 mm 250 mm 280 mm 315 mm 355 mm 400 mm 450 mm 500 mm 560 mm 630 mm

metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre

0.00 72.00 111.50 159.50 226.50 335.50 432.00 539.00 705.00 896.00 1027.00 1391.00 1715.00 2148.00 2720.50 3459.50 4479.00 5652.50 6983.00 9066.00 11483.50 0.00 86.00 137.00 192.00 280.50 415.50 533.00 668.00 873.50 1103.00 1361.00 1725.00 2120.00 2661.50 3369.50 4274.50 5543.00 7060.50 8704.50 10909.00 13804.50

12

PN 16 0.00 1 50 mm metre 104.00 2 63 mm metre 181.00 3 75 mm metre 233.00 4 90 mm metre 336.00 5 110 mm metre 501.50 6 125 mm metre 647.00 7 140 mm metre 810.00 8 160 mm metre 1060.50 9 180 mm metre 1337.50 10 200 mm metre 1650.50 11 225 mm metre 2089.50 12 250 mm metre 2577.50 13 280 mm metre 3230.00 14 315 mm metre 4084.50 15 355 mm metre 5180.50 16 400 mm metre 6717.00 17 450 mm metre 8570.00 18 500 mm metre 10822.00 Note: The above rates are inclusive of VAT at 5% and transportation charges anywhere in Tamilnadu.

13

2.2 SPECIALS FOR HDPE PIPES AS PER IS Sl No 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Description PN 6 125 mm 140 mm 160 mm 180 mm 200 mm 225 mm 250 mm 280 mm 315 mm 355 mm 400 mm 450 mm 500 mm 560 mm 630 mm PN 8 125 mm 140 mm 160 mm 180 mm 200 mm 225 mm 250 mm 280 mm 315 mm 355 mm 400 mm 450 mm 500 mm 560 mm 630 mm PN 10 50 mm 63 mm 75 mm 90 mm 110 mm 125 mm 140 mm 160 mm 180 mm 200 mm 225 mm 250 mm 280 mm 315 mm 355 mm 400 mm 450 mm 500 mm 560 mm 630 mm Unit each each each each each each each each each each each each each each each each each each each each each each each each each each each each each each each each each each each each each each each each each each each each each each each each each each Rate for 2013-14 in Rupees Equal Tee 90 Degree Bend 295.00 406.00 588.00 820.00 1113.00 1529.00 2083.00 2919.00 6258.00 8380.00 11866.00 15742.00 24873.00 30745.00 35637.00 398.00 532.00 757.00 1058.00 1430.00 1954.00 2629.00 3637.00 7558.00 10777.00 15731.00 22409.00 30736.00 43194.00 61502.00 68.00 109.00 120.00 202.00 324.00 502.00 655.00 926.00 1296.00 1743.00 2376.00 3173.00 4356.00 9649.00 12223.00 17932.00 22937.00 30755.00 52215.00 74445.00 325.00 447.00 657.00 933.00 1244.00 1755.00 2386.00 3316.00 4573.00 6397.00 9355.00 13281.00 25016.00 31270.00 39712.00 488.00 668.00 967.00 1349.00 1802.00 2513.00 3390.00 4685.00 6418.00 8928.00 12947.00 18286.00 33075.00 41410.00 52728.00 72.00 108.00 177.00 282.00 438.00 653.00 889.00 1277.00 1767.00 2358.00 3268.00 4393.00 6053.00 8262.00 11460.00 16541.00 23290.00 41135.00 69428.00 98947.00

14

Sl No 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

Description

Unit

Rate for 2013-14 in Rupees Equal Tee 90 Degree Bend

PN 12.5 125 mm each 586.00 835.00 140 mm each 818.00 1178.00 160 mm each 1171.00 1754.00 180 mm each 1625.00 2514.00 200 mm each 2174.00 3444.00 225 mm each 3094.00 4532.00 250 mm each 3952.00 6185.00 280 mm each 5656.00 8717.00 315 mm each 11999.00 11445.00 355 mm each 15876.00 16375.00 400 mm each 22416.00 21896.00 450 mm each 32670.00 41443.00 500 mm each 44776.00 59428.00 560 mm each 62836.00 83429.00 630 mm each 89491.00 118773.00 PN 16 1 50 mm each 111.00 116.00 2 63 mm each 173.00 170.00 3 75 mm each 202.00 290.00 4 90 mm each 311.00 443.00 5 110 mm each 568.00 806.00 6 125 mm each 612.00 1014.00 7 140 mm each 857.00 1427.00 8 160 mm each 1487.00 2171.00 9 180 mm each 2007.00 3106.00 10 200 mm each 2691.00 4263.00 11 225 mm each 3830.00 5607.00 12 250 mm each 4898.00 7666.00 13 280 mm each 7003.00 10793.00 14 315 mm each 14859.00 14768.00 15 355 mm each 19670.00 21139.00 16 400 mm each 27829.00 36867.00 17 450 mm each 39657.00 50197.00 18 500 mm each 54365.00 72003.00 Note: The above rates are inclusive of VAT at 5% and transportation charges anywhere in Tamilnadu. Excise duty at 12.36%.

15

2.3 JOINTING OF HDPE PIPES Sl No 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Description 50 mm 63 mm 75 mm 90 mm 110 mm 125 mm 140 mm 160 mm 180 mm 200 mm 225 mm 250 mm 280 mm 315 mm 355 mm 400 mm 450 mm 500 mm 560 mm 630 mm Unit Joint Joint Joint Joint Joint Joint Joint Joint Joint Joint Joint Joint Joint Joint Joint Joint Joint Joint Joint Joint Rate for 2013-14 in Rupees 45.00 57.00 68.00 81.00 99.00 112.00 127.00 144.00 162.00 180.00 202.00 224.00 252.00 284.00 319.00 360.00 405.00 449.00 635.00 727.00

16

3.0 A.C.PRESSURE PIPES AS PER IS 1592 / 2003 (Without Excise Duty)

Sl.No I 1 2 3 4 5 6 7 8 9 10 II 1 2 3 4 5 6 7 8 9 10

Description Class 15 80mm 100mm 125mm 150mm 200mm 250mm 300mm 350mm 400mm 450mm Class 20 80mm 100mm 125mm 150mm 200mm 250mm 300mm 350mm 400mm 450mm

Unit

Rate for 2013-14 in Rupees

Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre

190.00 251.00 327.00 470.00 805.00 1021.00 1432.00 1796.00 2338.00 2751.00 211.00 318.00 406.00 586.00 1024.00 1312.00 1848.00 2333.00 3046.00 3643.00

Note: Excise duty shall be charged extra at 12.36% for non fly ash pipes. The above rates are inclusive of Vat at 5% and transportation charges anywhere in Tamilnadu.

17

3.1 A.C. COUPLER AS PER IS 1592 /2003 (Without Excise Duty) Sl.No I 1 2 3 4 5 6 7 8 9 10 II 1 2 3 4 5 6 7 8 9 10 Description Class 15 80mm 100mm 125mm 150mm 200mm 250mm 300mm 350mm 400mm 450mm Class 20 80mm 100mm 125mm 150mm 200mm 250mm 300mm 350mm 400mm 450mm Each Each Each Each Each Each Each Each Each Each 168.00 213.00 278.00 392.00 571.00 747.00 971.00 1251.00 1818.00 2222.00 Each Each Each Each Each Each Each Each Each Each 165.00 210.00 265.00 367.00 521.00 616.00 780.00 993.00 1432.00 1733.00 Unit Rate for 2013-14 in Rupees

Note: Excise duty shall be charged extra at 12.36% for non fly ash pipes. The above rates are inclusive of Vat at 5% and transportation charges anywhere in Tamilnadu.

18

3.2 C.I.D.JOINTS AS PER IS 8794 / 1988

Sl.No I 1 2 3 4 5 6 7 8 9 10 II 1 2 3 4 5 6 7 8 9 10

Description Class 15 80mm 100mm 125mm 150mm 200mm 250mm 300mm 350mm 400mm 450mm Class 20 80mm 100mm 125mm 150mm 200mm 250mm 300mm 350mm 400mm 450mm

Unit

Rate for 2013-14 in Rupees

Each Each Each Each Each Each Each Each Each Each

330.00 413.00 519.00 666.00 968.00 1263.00 1520.00 2561.00 3192.00 3835.00

Each Each Each Each Each Each Each Each Each Each

337.00 417.00 560.00 674.00 1031.00 1357.00 1324.00 2723.00 3270.00 3862.00

Note: Excise Duty is applicable on CID Joints. The above rates are inclusive of Vat at 5% and transportation charges anywhere in Tamilnadu.

19

4.0 C.I. SPUN PIPES AS PER IS 1536/2001


Sl.No. Size of pipes Unit Rate for 2013-14 in Rupees With Without Excise Excise Duty Duty 1127.00 1366.00 1702.00 2036.00 2970.00 4004.00 5165.00 6641.00 8083.00 9794.00 11624.00 15331.00 20328.00 22824.00 1223.00 1502.00 1856.00 2230.00 3226.00 4361.00 5646.00 7204.00 8834.00 10757.00 12664.00 16735.00 22206.00 24865.00 1312.00 1597.00 1999.00 2402.00 3488.00 4716.00 6115.00 7810.00 9536.00 11604.00 13702.00 18131.00 23992.00 26896.00 1040.00 1262.00 1571.00 1880.00 2743.00 3698.00 4771.00 6136.00 7468.00 9049.00 10741.00 14164.00 18780.00 21086.00 1129.00 1387.00 1715.00 2060.00 2981.00 4028.00 5216.00 6655.00 8161.00 9938.00 11700.00 15462.00 20516.00 22974.00 1213.00 1477.00 1847.00 2220.00 3222.00 4357.00 5651.00 7216.00 8810.00 10722.00 12660.00 16750.00 22165.00 24847.00

I
1 2 3 4 5 6 7 8 9 10 11 12 13 14 II 1 2 3 4 5 6 7 8 9 10 11 12 13 14 III 1 2 3 4 5 6 7 8 9 10 11 12 13 14

LA Class
80mm 100mm 125mm 150mm 200mm 250mm 300mm 350mm 400mm 450mm 500mm 600mm 700mm 750mm Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre

A Class
80mm 100mm 125mm 150mm 200mm 250mm 300mm 350mm 400mm 450mm 500mm 600mm 700mm 750mm 80mm 100mm 125mm 150mm 200mm 250mm 300mm 350mm 400mm 450mm 500mm 600mm 700mm 750mm

B Class

Note:The above rates are inclusive of VAT at 5% and transportation charges anywhere in Tamilnadu.Excise duty at 12.36%

20

4.1

C.I D/F PIPES AS PER IS 7181/1986 & IS 1537 Rate for 2013-14 in Rupees With Excise Duty Without Excise duty

Sl. No

Size

Unit

I 1 2 3 II 1 2 3

STANDARD 80mm to 200mm 250mm to 400mm 450mm to 750mm NON-STANDARD 80mm to 200mm 250mm to 400mm 450mm to 750mm Kg Kg Kg 67.00 68.00 70.00 61.00 64.00 65.00 Kg Kg Kg 67.00 68.00 70.00 61.00 64.00 65.00

4.2 CI D/F SPECIALS & S/S SPECIALS AS PER IS 1538/1986 Rate for 2013-14 in Rupees With Excise Without Excise Duty duty

Sl. No

Size

Unit

I 1 2 3 II. 1 2 3

STANDARD 80mm to 200mm 250mm to 400mm 450mm to 750mm NON-STANDARD 80mm to 200mm 250mm to 400mm 450mm to 750mm Kg Kg Kg 67.00 68.00 70.00 61.00 64.00 65.00 Kg Kg Kg 67.00 68.00 70.00 61.00 64.00 65.00

Note: The above rates are inclusive of VAT at 5% and transportation charges anywhere in Tamilnadu.Excise duty at 12.36

21

5.0

G I PIPES (MEDIUM) AS PER IS 1239/PART I/90 Rate for 2013-14 in Rupees

Sl No

Description

Unit

With Excise Duty

Without Excise Duty 72.000 95.000 138.000 174.000 202.000 275.000 352.000 435.000 620.000 891.000

1 2 3 4 5 6 7 8 9 10

15mm 20mm 25mm 32mm 40mm 50mm 65mm 80mm 100mm 125mm

metre metre metre metre metre metre metre metre metre metre

78.00 103.00 149.00 188.00 219.00 297.00 380.00 471.00 672.00 964.00

11 150mm metre 1077.00 996.000 Note: The above rates are inclusive of VAT at 5% and transportation charges anywhere in Tamilnadu.Excise duty 12.36%.

22

5.1 Sl.No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

G.I. SPECIALS AS PER IS Unit Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Rates for 2013-14 in Rupees 337.00 337.00 337.00 209.00 209.00 209.00 209.00 145.00 145.00 145.00 145.00 79.00 79.00 79.00 53.00 53.00 243.00 243.00 243.00 134.00 102.00 102.00 102.00 76.00 76.00 76.00 76.00 51.00 51.00 51.00 33.00 33.00

Description GI REDUCER (HEAVY) 100 mm x 80 mm 100 mm x 65 mm 100 mm x 50 mm 80 mm x 65 mm 80 mm x 50 mm 80 mm x 40 mm 80 mm x 32 mm 65 mm x 50 mm 65 mm x 40 mm 65 mm x 32 mm 65 mm x 20 mm 50 mm x 40 mm 50 mm x 32 mm 50 mm x 20 mm 40 mm x 32 mm 40 mm x 20 mm GI REDUCER (MEDIUM) 100 mm x 80 mm 100 mm x 65mm 100 mm x 50 mm 80 mm x 65 mm 80 mm x 50 mm 80 mm x 40 mm 80 mm x 32 mm 65 mm x 50 mm 65 mm x 40 mm 65 mm x 32 mm 65 mm x 20 mm 50 mm x 40 mm 50 mm x 32 mm 50 mm x 20 mm 40 mm x 32 mm 40 mm x 20 mm G I UNEQUAL TEE (HEAVY) 100 mm x 80 mm 100 mm x 65mm 100 mm x 50 mm 80 mm x 65 mm 80 mm x 50 mm 80 mm x 40 mm 80 mm x 32 mm

1 2 3 4 5 6 7

Each Each Each Each Each Each Each

654.00 654.00 654.00 381.00 381.00 381.00 381.00

23

Sl.No. 8 9 10 11 12 13 14 15 16 17 65 65 65 65 50 50 50 40 40 32 mm mm mm mm mm mm mm mm mm mm x x x x x x x x x x

Description 50 40 32 20 40 32 20 32 20 20 mm mm mm mm mm mm mm mm mm mm

Unit Each Each Each Each Each Each Each Each Each Each

Rates for 2013-14 in Rupees 280.00 280.00 280.00 280.00 167.00 167.00 167.00 105.00 105.00 75.00

G.I UNEQUAL TEE(MEDIUM) 1 100 mm x 80 mm Each 371.00 2 100 mm x 65mm Each 371.00 3 100 mm x 50 mm Each 371.00 4 80 mm x 65 mm Each 183.00 5 80 mm x 50 mm Each 183.00 6 80 mm x 40 mm Each 183.00 7 80 mm x 32 mm Each 183.00 8 65 mm x 50 mm Each 128.00 9 65 mm x 40 mm Each 128.00 10 65 mm x 32 mm Each 128.00 11 65 mm x 20 mm Each 128.00 12 50 mm x 40 mm Each 76.00 13 50 mm x 32 mm Each 76.00 14 50 mm x 20 mm Each 76.00 15 40 mm x 32 mm Each 54.00 16 40 mm x 20 mm Each 54.00 17 32 mm x 20 mm Each 54.00 MS BOLTS AND NUTS 1 16 mm dia x 65 to 90 mm length fully threaded bolts and nuts with 2 Nos. Kg. 63.00 20mm dia and above x 90mm 2 to 120mm length fully threaded Kg. 66.00 RUBBER INSERTION SHEET 1 3 Ply R.I. Sheet Kg. 55.00 AC COWL 1 80 mm dia Each 24.00 2 100 mm dia Each 41.00 Note: The above rates are inclusive of all taxes, duties and transportation charges.Excise duty 12.36% and VAT at 5%.

24

5.1 G.I. SPECIALS AS PER IS Sl.No. Description 15mm 17.00 24.00 14.00 -37.00 14.00 37.00 7.00 15.00 45.00 238.00 113.00 -20.00 26.00 15.00 9.00 14.00 -20mm 22.00 30.00 15.00 -46.00 25.00 48.00 13.00 25.00 46.00 358.00 151.00 -22.00 36.00 37.00 13.00 17.00 -25mm 33.00 43.00 20.00 -74.00 25.00 70.00 13.00 39.00 77.00 527.00 274.00 -37.00 53.00 40.00 18.00 30.00 --

CONTINUED. Rate for 2013-14 in Rupees 32mm 54.00 63.00 36.00 -120.00 39.00 112.00 23.00 48.00 108.00 -411.00 -58.00 79.00 47.00 27.00 70.00 -40mm 68.00 93.00 54.00 -155.00 51.00 147.00 23.00 63.00 138.00 -611.00 -77.00 104.00 90.00 36.00 89.00 15.00 50mm 104.00 154.00 81.00 50.00 234.00 69.00 235.00 43.00 95.00 196.00 -882.00 9.00 113.00 153.00 107.00 48.00 123.00 23.00 65mm 186.00 299.00 143.00 61.00 376.00 123.00 -60.00 176.00 385.00 -1168.00 9.00 203.00 273.00 153.00 84.00 256.00 30.00 27.00 64.00 ---80mm 274.00 344.00 170.00 68.00 572.00 169.00 -85.00 244.00 512.00 -1487.00 13.00 305.00 365.00 204.00 109.00 256.00 38.00 33.00 74.00 -396.00 330.00 100mm 492.00 615.00 341.00 114.00 753.00 251.00 -120.00 428.00 762.00 -2352.00 -526.00 688.00 290.00 144.00 356.00 68.00 64.00 99.00 ----

1 G.I. Equal Elbow plain 2 G.I. Equal Tee plain 3 G.I. Coupling 4 G.I. Flange set 5 G.I. Cross 6 7 8 9 10 G.I. Hex Nipple G.I.Three Way Elbow G.I.Plug Dia Head Taper Thread G.I.Bend G.I.Union

11 G.M. Ferrule 12 G.I.stop cock 13 14 15 16 17 18 19 20 21 22 23 24 Rubber sheet for Flange set G.I. Reduced Elbow Plain G.I.Reduced Tee Plain G.I. Reduced Socket Plain G.I. Check Nut G.I.Reduced Nipple G.I. Dummy (Heavy)

G.I.Dummy (Medium) M.S.Saddle Piece Waste Not Tap C.I.Footvalve with stainer M.S.Clampset Note: The above rates are inclusive of Excise Duty 12.36% and VAT at 5%.

----13.00 20.00 -----58.00 -83.00 ---------266.00 ------all taxes , duties and transportation charges anywhere in Tamilnadu

25

5.2 G.M GATE VALVES AS PER IS Sl.No. Description 15mm 1 2 G.M. Gate valves G.M. Non Return valves --20mm 342.00 -25mm 461.00 -Rate for 2013-14 in Rupees 32mm 604.00 -40mm 822.00 -50mm 1340.00 1328.00 65mm 2089.00 1328.00 80mm 3287.00 2132.00 100mm 5640.00 --

Note: The above rates are inclusive of all taxes , duties and transportation charges anywhere in Tamilnadu Excise Duty 12.36% and VAT at 5%.

26

6.0 DUCTILE IRON SOCKET/SPIGOT PIPES FOR CLASS K7 AS PER IS 8329/2000 Rate for 2013-14 in Rupees With Excise Without Excise Duty Duty 961.00 1351.00 1789.00 2354.00 3000.00 3710.00 4464.00 5277.00 6207.00 8249.00 11249.00 13004.00 15447.00 18354.00 21544.00 880.00 1237.00 1638.00 2156.00 2747.00 3397.00 4088.00 4834.00 5684.00 7555.00 10302.00 11910.00 14147.00 16809.00 19731.00

Sl No

Description

Unit

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

100 mm 150 mm 200 mm 250 mm 300 mm 350mm 400 mm 450 mm 500 mm 600 mm 700 mm 750 mm 800 mm 900 mm 1000 mm

metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre

Note: The above rates are inclusive of VAT at 5% and transportation charges anywhere in Tamilnadu.Excise duty 12.36%.

27

6.1 DUCTILE IRON SOCKET/SPIGOT PIPES FOR CLASS K9 AS PER IS 8329/2000 Rate for 2013-14 in Rupees With Excise Duty 1062.00 1494.00 2090.00 2796.00 3547.00 4395.00 5254.00 6251.00 7284.00 9662.00 12441.00 14037.00 16156.00 19204.00 22545.00 Without Excise Duty 973.00 1369.00 1914.00 2563.00 3250.00 4026.00 4814.00 5728.00 6674.00 8854.00 11399.00 12862.00 14803.00 17594.00 20657.00

Sl No

Description

Unit

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

100 mm 150 mm 200 mm 250 mm 300 mm 350mm 400 mm 450 mm 500 mm 600 mm 700 mm 750 mm 800 mm 900 mm 1000 mm

metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre

Note: The above rates are inclusive of VAT at 5% and transportation charges anywhere in Tamilnadu.Excise duty 12.36%.

28

6.2 DUCTILE IRON CLASS K9 FLANGED PIPES AS PER IS 8329/2000 Sl No I) Description Unit Rate for 2013-14 in Rupees With Excise Duty 5288.00 7178.00 10556.00 14620.00 19283.00 24233.00 32232.00 41039.00 49856.00 59603.00 80512.00 100116.00 111857.00 123598.00 148226.00 184253.00 Without Excise Duty 4844.00 6575.00 9669.00 13392.00 17663.00 22198.00 29524.00 37591.00 45667.00 54594.00 73746.00 91704.00 102458.00 113214.00 135771.00 168771.00

4 m length of pipes 1 80 mm 2 3 4 5 6 7 8 9 10 11 12 13 100 mm 150 mm 200 mm 250 mm 300 mm 350mm 400 mm 450 mm 500 mm 600 mm 700 mm 750 mm 800 mm 900 mm 1000mm 5 m length of pipes 80 mm

Each 6117.00 5603.00 Each 8798.00 8060.00 2 100 mm Each 12658.00 11594.00 3 150 mm Each 16915.00 15494.00 4 200 mm Each 22336.00 20460.00 5 250 mm Each 28084.00 25724.00 6 300 mm 7 Each 38974.00 35700.00 350 mm Each 47652.00 43686.00 8 400 mm Each 56896.00 52115.00 9 450 mm Each 67909.00 62204.00 10 500 mm Each 92884.00 85080.00 11 600 mm Each 114004.00 104426.00 12 700 mm 13 Each 127386.00 116682.00 750 mm Each 140770.00 128941.00 14 800 mm Each 168935.00 154741.00 15 900 mm Each 209195.00 191618.00 16 1000 mm Note: The above rates are inclusive of VAT at 5% and transportation charges anywhere in Tamilnadu.Excise duty 12.36%.

14 15 16 II) 1

Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each

29

6.3 DUCTILE IRON SPECIALS AS PER IS 9523/2000 Rate for 2013-14 in Rupees

Sl No

Description ALL SOCKET

Unit

1 2 3 4 5 6 7 8

100mm - 200 mm dia 250 mm - 300 mm dia 350 mm - 450 mm dia 500 mm - 600 mm dia 700 mm - 750 mm 800mm 900 mm 1000 mm ALL FLANGE

Kg Kg Kg Kg Kg Kg Kg Kg

97.00 97.00 101.00 108.00 172.00 172.00 182.00 198.00

1 2 3 4 5 6 7 8

100mm - 200 mm dia 250 mm - 300 mm dia 350 mm - 450 mm dia 500 mm - 600 mm dia 700 mm - 750 mm 800 mm 900 mm 1000 mm

Kg Kg Kg Kg Kg Kg Kg Kg

97.00 97.00 101.00 108.00 182.00 182.00 198.00 198.00

Note: In respect of flanged and spigot, flanged and socketted type specials, the rate applicable for flanged type specials is allowed. Note: The above rates are inclusive of excise duty at 12.36% , VAT at 5% and transportation charges anywhere in Tamilnadu.

30

7.0

PSC PIPES AS PER IS 784 / 2001 Rate for 2013-14 in Rupees With Excise duty 4 1694.00 1882.00 2122.00 2147.00 2559.00 3072.00 3641.00 4564.00 5209.00 6360.00 7613.00 1905.00 2090.00 2353.00 2429.00 2831.00 3640.00 4060.00 4961.00 5917.00 7033.00 8574.00 1916.00 2148.00 2365.00 2448.00 2912.00 3671.00 4263.00 5060.00 6077.00 7205.00 8753.00 1941.00 2182.00 2408.00 2505.00 2941.00 3721.00 Without Excise duty 5 1565.00 1739.00 1959.00 1982.00 2364.00 2839.00 3364.00 4217.00 4813.00 5876.00 7033.00 1760.00 1931.00 2175.00 2243.00 2615.00 3363.00 3752.00 4583.00 5467.00 6497.00 7921.00 1770.00 1983.00 2184.00 2261.00 2689.00 3392.00 3938.00 4674.00 5613.00 6657.00 8087.00 1793.00 2017.00 2224.00 2315.00 2717.00 3439.00

Sl.No. 1 I. 1 2 3 4 5 6 7 8 9 10 11 II 1 2 3 4 5 6 7 8 9 10 11 III 1 2 3 4 5 6 7 8 9 10 11 IV 1 2 3 4 5 6

Description 2 4 KSC 350 mm 400 mm 450 mm 500 mm 600 mm 700 mm 800 mm 900 mm 1000 mm 1100 mm 1200 mm 6 KSC 350 mm 400 mm 450 mm 500 mm 600 mm 700 mm 800 mm 900 mm 1000 mm 1100 mm 1200 mm 8 KSC 350 mm 400 mm 450 mm 500 mm 600 mm 700 mm 800 mm 900 mm 1000 mm 1100 mm 1200 mm 10 KSC 350 mm 400 mm 450 mm 500 mm 600 mm 700 mm

Unit 3 Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre

31

Sl.No. 7 8 9 10 11 V 1 2 3 4 5 6 7 8 9 10 11 VI 1 2 3 4 5 6 7 8 9 10 11 VII 1 2 3 4 5 6 7 8 9 10 11

Description 800 mm 900 mm 1000 mm 1100 mm 1200 mm 12 KSC 350 mm 400 mm 450 mm 500 mm 600 mm 700 mm 800 mm 900 mm 1000 mm 1100 mm 1200 mm 14 KSC 350 mm 400 mm 450 mm 500 mm 600 mm 700 mm 800 mm 900 mm 1000 mm 1100 mm 1200 mm 16 KSC 350 mm 400 mm 450 mm 500 mm 600 mm 700 mm 800 mm 900 mm 1000 mm 1100 mm 1200 mm

Unit Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre

Rate for 2013-14 in Rupees With Excise duty 4362.00 5168.00 6212.00 7461.00 9017.00 1981.00 2217.00 2461.00 2568.00 3028.00 3607.00 4487.00 5303.00 6439.00 7768.00 9331.00 2010.00 2268.00 2526.00 2670.00 3152.00 3834.00 4661.00 5613.00 6780.00 8066.00 9690.00 2095.00 2315.00 2589.00 2764.00 3227.00 3890.00 4867.00 5956.00 7205.00 8404.00 10128.00 Without Excise duty 4030.00 4774.00 5738.00 6893.00 8332.00 1830.00 2050.00 2273.00 2374.00 2798.00 3332.00 4146.00 4899.00 5948.00 7178.00 8622.00 1856.00 2096.00 2333.00 2466.00 2913.00 3543.00 4306.00 5187.00 6264.00 7453.00 8952.00 1934.00 2139.00 2392.00 2554.00 2981.00 3595.00 4495.00 5501.00 6657.00 7765.00 9359.00

Note: The above rates are inclusive of VAT at 5% and transportation charges anywhere in Tamilnadu.Excise duty 12.36%.

32

8.0

BAR WRAPPED STEEL CYLINDER PIPES AS PER IS 15155 Rate for 2013-2014 in Rupees With Excise Without Excise Duty Duty 2827.00 3126.00 3398.00 3813.00 4930.00 5661.00 6505.00 8432.00 9631.00 12270.00 13385.00 17373.00 18578.00 19190.00 2850.00 3146.00 3421.00 3841.00 4968.00 5688.00 6533.00 8462.00 9839.00 12475.00 13557.00 17404.00 18628.00 19239.00 2879.00 3176.00 3448.00 3875.00 5007.00 5718.00 6567.00 8496.00 10045.00 2611.00 2889.00 3138.00 3523.00 4555.00 5229.00 6008.00 7791.00 8900.00 11336.00 12366.00 16051.00 17162.00 17729.00 2632.00 2906.00 3162.00 3548.00 4591.00 5255.00 6036.00 7819.00 9089.00 11526.00 12524.00 16079.00 17210.00 17774.00 2660.00 2933.00 3187.00 3579.00 4626.00 5284.00 6067.00 7849.00 9280.00

Sl. No.

Description 4 Ksc Pipe 350mm 400mm 450mm 500mm 600mm 700mm 800mm 900mm 1000mm 1100mm 1200mm 1300mm 1400mm 1500mm 6 Ksc Pipe 350mm 400mm 450mm 500mm 600mm 700mm 800mm 900mm 1000mm 1100mm 1200mm 1300mm 1400mm 1500mm 8 Ksc Pipe 350mm 400mm 450mm 500mm 600mm 700mm 800mm 900mm 1000mm

Unit

1 2 3 4 5 6 7 8 9 10 11 12 13 14 1 2 3 4 5 6 7 8 9 10 11 12 13 14 1 2 3 4 5 6 7 8 9

Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre

33

Sl. No. 10 11 12 13 14 1 2 3 4 5 6 7 8 9 10 11 12 13 14 1 2 3 4 5 6 7 8 9 10 11 12 13 14 1 2 3

Description 1100mm 1200mm 1300mm 1400mm 1500mm 10 Ksc Pipe 350mm 400mm 450mm 500mm 600mm 700mm 800mm 900mm 1000mm 1100mm 1200mm 1300mm 1400mm 1500mm 12 Ksc Pipe 350mm 400mm 450mm 500mm 600mm 700mm 800mm 900mm 1000mm 1100mm 1200mm 1300mm 1400mm 1500mm 14 Ksc Pipe 350mm 400mm 450mm

Unit Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre Metre

Rate for 2013-2014 in Rupees With Excise Without Excise Duty Duty 12678.00 13725.00 17443.00 18678.00 19293.00 2913.00 3213.00 3484.00 3912.00 5048.00 5757.00 6606.00 8528.00 10252.00 12881.00 13899.00 17481.00 18767.00 19367.00 2949.00 3257.00 3524.00 3955.00 5095.00 5802.00 6878.00 8572.00 10456.00 13088.00 14069.00 17519.00 18843.00 19443.00 2998.00 3303.00 3571.00 11712.00 12680.00 16115.00 17257.00 17823.00 2690.00 2968.00 3218.00 3615.00 4664.00 5320.00 6103.00 7879.00 9472.00 11901.00 12840.00 16149.00 17338.00 17893.00 2726.00 3008.00 3254.00 3654.00 4708.00 5361.00 6355.00 7920.00 9659.00 12092.00 12998.00 16187.00 17409.00 17964.00 2771.00 3051.00 3298.00

34

Sl. No. 4 5 6 7 8 9 10 11 12 13 14

Description

Unit

Rate for 2013-2014 in Rupees With Excise Without Excise Duty Duty

500mm Metre 4002.00 3696.00 600mm Metre 5147.00 4755.00 700mm Metre 6221.00 5748.00 800mm Metre 7574.00 6995.00 900mm Metre 9308.00 8601.00 1000mm Metre 10596.00 9790.00 1100mm Metre 13226.00 12220.00 1200mm Metre 14507.00 13403.00 1300mm Metre 18289.00 16898.00 1400mm Metre 20037.00 18513.00 1500mm Metre 20494.00 18934.00 16 Ksc Pipe 1 350mm Metre 3050.00 2818.00 2 400mm Metre 3357.00 3102.00 3 450mm Metre 3624.00 3348.00 4 500mm Metre 4089.00 3777.00 5 600mm Metre 5451.00 5037.00 6 700mm Metre 6649.00 6144.00 7 800mm Metre 7968.00 7361.00 8 900mm Metre 9546.00 8818.00 9 1000mm Metre 10735.00 9918.00 10 1100mm Metre 13364.00 12348.00 11 1200mm Metre 14942.00 13804.00 12 1300mm Metre 18930.00 17488.00 13 1400mm Metre 20618.00 19048.00 14 1500mm Metre 21544.00 19905.00 18 Ksc Pipe Metre 1 350mm 3105.00 2868.00 2 400mm Metre 3419.00 3158.00 3 450mm Metre 3722.00 3439.00 4 500mm Metre 4353.00 4022.00 5 600mm Metre 5667.00 5235.00 6 700mm Metre 7174.00 6628.00 7 800mm Metre 8613.00 7958.00 8 900mm Metre 10618.00 9810.00 9 1000mm Metre 13583.00 12550.00 10 1100mm Metre 16211.00 14978.00 11 1200mm Metre 18394.00 16994.00 12 1300mm Metre 19864.00 18351.00 13 1400mm Metre 23226.00 21459.00 14 1500mm Metre 23852.00 22037.00 Note: The above rates are inclusive of VAT at 5% and transportation charges anywhere in Tamilnadu. Excise duty at 12.36%.

35

9.0

GRP PIPES AS PER IS 12709 / 1994 (WATER SUPPLY)


Rate for 2013-14 in Rupees Stiffness class 2500N/Sqm With Excise Without Duty Excise Duty Stiffness class 5000N/Sqm With Excise Without Duty Excise Duty

Sl .No

Description

Unit

3 BAR 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 1 2 3 4 5 6 7 8 9 200mm 250mm 300mm 350mm 400mm 450mm 500mm 600mm 700mm 800mm 900mm 1000mm 1100mm 1200mm 1300mm 1400mm 1500mm 1600mm 1700mm 1800mm 1900mm 2000mm 2100mm 2200mm 2300mm 2400mm 200mm 250mm 300mm 350mm 400mm 450mm 500mm 600mm 700mm metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre 1270.00 1801.00 2131.00 2614.00 2827.00 3270.00 3659.00 4906.00 6142.00 7372.00 9349.00 11204.00 13408.00 15249.00 16576.00 20018.00 22704.00 24834.00 27085.00 32885.00 36286.00 38789.00 42465.00 45200.00 49153.00 52134.00 6 BAR 1297.00 1826.00 2171.00 2632.00 2888.00 3297.00 3713.00 4990.00 6233.00 1150.00 1632.00 1930.00 2367.00 2561.00 2962.00 3315.00 4444.00 5563.00 6678.00 8468.00 10149.00 12143.00 13813.00 15014.00 18131.00 20564.00 22494.00 24533.00 29787.00 32866.00 35133.00 38463.00 40940.00 44519.00 47221.00 1174.00 1655.00 1967.00 2384.00 2615.00 2986.00 3363.00 4521.00 5645.00 1427.00 1946.00 2295.00 2841.00 3099.00 3597.00 4098.00 5522.00 6956.00 8420.00 10697.00 12847.00 15279.00 17405.00 19308.00 22776.00 25940.00 28540.00 31268.00 37380.00 41412.00 44600.00 48766.00 52201.00 --1454.00 1972.00 2306.00 2850.00 3108.00 3612.00 4132.00 5531.00 6974.00 1294.00 1762.00 2079.00 2573.00 2807.00 3258.00 3712.00 5002.00 6300.00 7626.00 9689.00 11637.00 13838.00 15764.00 17488.00 20630.00 23496.00 25850.00 28321.00 33956.00 37509.00 40397.00 44171.00 47281.00 --1317.00 1787.00 2089.00 2582.00 2815.00 3271.00 3743.00 5010.00 6316.00

36

Rate for 2013-14 in Rupees Sl .No Description Unit Stiffness class 2500N/Sqm With Excise Without Duty Excise Duty Stiffness class 5000N/Sqm With Excise Without Duty Excise Duty

10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

800mm 900mm 1000mm 1100mm 1200mm 1300mm 1400mm 1500mm 1600mm 1700mm 1800mm 1900mm 2000mm 2100mm 2200mm 2300mm 2400mm 200mm 250mm 300mm 350mm 400mm 450mm 500mm 600mm 700mm 800mm 900mm 1000mm 1100mm 1200mm 1300mm 1400mm 1500mm 1600mm 1700mm 1800mm

metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre

7454.00 9440.00 11320.00 13480.00 15279.00 16976.00 20024.00 22830.00 24950.00 27266.00 32951.00 36377.00 38882.00 42586.00 45440.00 49245.00 52228.00 9 BAR 1323.00 1879.00 2218.00 2710.00 2959.00 3422.00 3850.00 5162.00 6462.00 7806.00 9884.00 11815.00 14027.00 15942.00 17820.00 21061.00 23898.00 26237.00 28717.00 34654.00

6751.00 8550.00 10253.00 12209.00 13838.00 15376.00 18137.00 20678.00 22599.00 24696.00 29844.00 32947.00 35217.00 38574.00 41158.00 44604.00 47306.00 1197.00 1702.00 2008.00 2455.00 2679.00 3099.00 3486.00 4675.00 5854.00 7071.00 8952.00 10701.00 12704.00 14440.00 16140.00 19076.00 21646.00 23765.00 26011.00 31388.00

8442.00 10724.00 12869.00 15337.00 17514.00 19342.00 22796.00 25966.00 28555.00 31312.00 37546.00 41434.00 44631.00 48790.00 52294.00 --1482.00 2001.00 2343.00 2900.00 3203.00 3715.00 4221.00 5624.00 7079.00 8599.00 10856.00 13059.00 15576.00 17838.00 19721.00 23221.00 26515.00 29062.00 32228.00 38516.00

7646.00 9712.00 11657.00 13892.00 15863.00 17520.00 20648.00 23519.00 25864.00 28361.00 34009.00 37529.00 40425.00 44192.00 47366.00 --1343.00 1813.00 2122.00 2627.00 2901.00 3365.00 3823.00 5094.00 6411.00 7789.00 9833.00 11829.00 14109.00 16157.00 17863.00 21032.00 24016.00 26322.00 29191.00 34886.00

37

Rate for 2013-14 in Rupees Sl .No Description Unit Stiffness class 2500N/Sqm With Excise Without Duty Excise Duty Stiffness class 5000N/Sqm With Excise Without Duty Excise Duty

21 22 23 24 25 26 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 1 2 3 4 5 6

1900mm 2000mm 2100mm 2200mm 2300mm 2400mm 200mm 250mm 300mm 350mm 400mm 450mm 500mm 600mm 700mm 800mm 900mm 1000mm 1100mm 1200mm 1300mm 1400mm 1500mm 1600mm 1700mm 1800mm 1900mm 2000mm 2100mm 2200mm 200mm 250mm 300mm 350mm 400mm 450mm

metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre

38094.00 34504.00 40875.00 37023.00 44618.00 40413.00 47568.00 43085.00 51589.00 46728.00 55115.00 49921.00 12 BAR 1350.00 1222.00 1906.00 1726.00 2308.00 2091.00 2808.00 2543.00 3063.00 2776.00 3538.00 3206.00 4031.00 3650.00 5413.00 4903.00 6753.00 6116.00 8137.00 7370.00 10312.00 9340.00 12384.00 11217.00 14861.00 13461.00 16970.00 15371.00 18634.00 16878.00 22008.00 19934.00 25113.00 22746.00 27533.00 24938.00 30180.00 27336.00 36297.00 32876.00 39830.00 36076.00 42805.00 38773.00 46837.00 42423.00 50096.00 45374.00 15 BAR 1375.00 1931.00 2387.00 2904.00 3168.00 3705.00 1245.00 1749.00 2161.00 2630.00 2870.00 3356.00

42477.00 45812.00 ----1511.00 2029.00 2375.00 2955.00 3223.00 3779.00 4292.00 5814.00 7343.00 8869.00 11403.00 13503.00 16314.00 18644.00 20604.00 24299.00 27606.00 30308.00 33348.00 39867.00 43828.00 64388.00 --1539.00 2058.00 2443.00 3055.00 3351.00 3926.00

38474.00 41495.00 ----1369.00 1838.00 2152.00 2677.00 2919.00 3423.00 3887.00 5265.00 6651.00 8034.00 10329.00 12231.00 14777.00 16887.00 18662.00 22010.00 25005.00 27452.00 30205.00 36109.00 39698.00 58319.00 --1394.00 1864.00 2212.00 2767.00 3036.00 3556.00

38

Rate for 2013-14 in Rupees Sl .No Description Unit Stiffness class 2500N/Sqm With Excise Without Duty Excise Duty Stiffness class 5000N/Sqm With Excise Without Duty Excise Duty

7 500mm metre 4213.00 3816.00 4451.00 4031.00 8 600mm metre 5721.00 5182.00 6054.00 5484.00 9 700mm metre 7150.00 6476.00 7639.00 6919.00 10 800mm metre 8679.00 7861.00 9335.00 8455.00 11 900mm metre 11009.00 9971.00 11821.00 10707.00 12 1000mm metre 13176.00 11935.00 14204.00 12867.00 13 1100mm metre 15836.00 14343.00 17022.00 15418.00 14 1200mm metre 18027.00 16329.00 19546.00 17704.00 15 1300mm metre 19960.00 18079.00 21526.00 19499.00 16 1400mm metre 23506.00 21291.00 25366.00 22976.00 17 1500mm metre 26658.00 24146.00 28828.00 26111.00 18 1600mm metre 29322.00 26560.00 31758.00 28765.00 19 1700mm metre 32560.00 29490.00 34915.00 31624.00 20 1800mm metre 38814.00 35157.00 41616.00 37694.00 21 1900mm metre 42923.00 38877.00 --22 2000mm metre 46148.00 41798.00 --Note: The above rates are inclusive of VAT at 5%, transportation charges anywhere in Tamilnadu and cost of coupling and specials.Excise duty at 12.36%.

39

10.0 M.S. PIPES- SPIRAL/LONGITUDIDNAL WELDING AS PER IS 3589/2001 WITH INTERNAL LINING AND EXTERNAL COATING (WITH EXCISE DUTY) Rate for 2013-14 in Rupees
Bare pipe CML CMC Internal External CTE External Transporat per meter Internal external food grade epoxy external Polyethy ion any Dia meter 6mm to 20mm epoxy Coating coating & line where in Sl. & thickness 12mm thick per coating 406 wrapping Sheeting Tamilnadu No. of pipe in thick per meter 406 micr. per meter per per meter mm meter micr.per per meter meter meter

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23

168.3X2.6 168.3X3.2 168.3X4 168.3X4.5 219.1X2.6 219.1X3.6 219.1X4.5 219.1X6.3 273X3.6 273X4 273X5 273X6.3 323.9X4 323.9X4.5 323.9X5.6 323.9X7.1 355.6X4 355.6X5 355.6X5.6 355.6X8 406.4X4 406.4X5 406.4X6.3

500.00 613.00 764.00 859.00 656.00 901.00 1123.00 1562.00 1128.00 1251.00 1557.00 1954.00 1487.00 1671.00 2072.00 2614.00 1638.00 2039.00 2279.00 3237.00 1873.00 2336.00 2935.00

263.00 260.00 257.00 256.00 344.00 341.00 338.00 333.00 427.00 426.00 423.00 419.00 508.00 507.00 504.00 499.00 559.00 555.00 554.00 546.00 641.00 637.00 633.00

439.00 439.00 439.00 439.00 554.00 554.00 554.00 554.00 677.00 677.00 677.00 677.00 793.00 793.00 793.00 793.00 865.00 865.00 865.00 865.00 980.00 980.00 980.00

422.00 420.00 415.00 413.00 554.00 550.00 545.00 535.00 690.00 689.00 683.00 676.00 821.00 817.00 812.00 804.00 901.00 898.00 893.00 881.00 1033.00 1028.00 1021.00

546.00 546.00 546.00 546.00 710.00 710.00 710.00 710.00 886.00 886.00 886.00 886.00 1013.00 1013.00 1013.00 1013.00 1153.00 1153.00 1153.00 1153.00 1319.00 1319.00 1319.00

470.00 470.00 470.00 470.00 613.00 613.00 613.00 613.00 763.00 763.00 763.00 763.00 905.00 905.00 905.00 905.00 993.00 993.00 993.00 993.00 1136.00 1136.00 1136.00

582.00 582.00 582.00 582.00 758.00 758.00 758.00 758.00 944.00 944.00 944.00 944.00 1121.00 1121.00 1121.00 1121.00 1231.00 1231.00 1231.00 1231.00 1406.00 1406.00 1406.00

222.00 222.00 222.00 222.00 222.00 222.00 222.00 222.00 222.00 222.00 222.00 222.00 222.00 222.00 222.00 222.00 222.00 222.00 222.00 222.00 222.00 222.00 222.00

40

Rate for 2013-14 in Rupees


Bare pipe CML CMC Internal External CTE External Transporat per meter Internal external food grade epoxy external Polyethy ion any Dia meter 6mm to 20mm epoxy Coating coating & line where in Sl. & thickness 12mm thick per coating 406 wrapping Sheeting Tamilnadu No. of pipe in thick per meter 406 micr. per meter per per meter mm meter micr.per per meter meter meter

24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48

406.4X8.8 457X4 457X5 457X6.3 457X10 508X5 508X5.6 508X6.3 508X11 610X5.8 610X6.3 610X12.5 711X6.3 711X7.1 711X14.2 813X7.1 813X8 813X18 914X8 914X8.8 914X10 914X17.5 1016X8.8 1016X10 1016X20

4073.00 2109.00 2629.00 3303.00 5191.00 2999.00 3338.00 3773.00 6530.00 4160.00 4547.00 8900.00 5272.00 5950.00 11803.00 6820.00 7691.00 17075.00 8658.00 9481.00 10787.00 18720.00 10593.00 11996.00 23750.00

625.00 722.00 719.00 714.00 704.00 801.00 799.00 797.00 781.00 963.00 961.00 941.00 1124.00 1120.00 1098.00 1285.00 1282.00 1251.00 1444.00 1442.00 1439.00 1414.00 1605.00 1602.00 1570.00

980.00 1001.00 1001.00 1001.00 1001.00 1112.00 1112.00 1112.00 1112.00 1336.00 1336.00 1336.00 1556.00 1556.00 1556.00 1780.00 1780.00 1780.00 2000.00 2000.00 2000.00 2000.00 2224.00 2224.00 2224.00

1009.00 1015.00 1010.00 1004.00 988.00 1126.00 1123.00 1120.00 1099.00 1352.00 1351.00 1322.00 1579.00 1576.00 1543.00 1806.00 1802.00 1757.00 2030.00 2027.00 2021.00 1987.00 2257.00 2252.00 2207.00

1319.00 1482.00 1482.00 1482.00 1482.00 1648.00 1648.00 1648.00 1648.00 1978.00 1978.00 1978.00 2305.00 2305.00 2305.00 2638.00 2638.00 2638.00 2965.00 2965.00 2965.00 2965.00 3295.00 3295.00 3295.00

1136.00 934.00 934.00 934.00 934.00 1038.00 1038.00 1038.00 1038.00 1246.00 1246.00 1246.00 1453.00 1453.00 1453.00 1661.00 1661.00 1661.00 1867.00 1867.00 1867.00 1867.00 2076.00 2076.00 2076.00

1406.00 1582.00 1582.00 1582.00 1582.00 1758.00 1758.00 1758.00 1758.00 2111.00 2111.00 2111.00 2460.00 2460.00 2460.00 2814.00 2814.00 2814.00 3162.00 3162.00 3162.00 3162.00 3516.00 3516.00 3516.00

222.00 222.00 222.00 222.00 222.00 266.00 266.00 266.00 266.00 333.00 333.00 333.00 333.00 333.00 333.00 443.00 443.00 443.00 666.00 666.00 666.00 666.00 1330.00 1330.00 1330.00

41

Rate for 2013-14 in Rupees


Bare pipe CML CMC Internal External CTE External Transporat per meter Internal external food grade epoxy external Polyethy ion any Dia meter 6mm to 20mm epoxy Coating coating & line where in Sl. & thickness 12mm thick per coating 406 wrapping Sheeting Tamilnadu No. of pipe in thick per meter 406 micr. per meter per per meter mm meter micr.per per meter meter meter

49 50 51 52 53 54 55 56

1067X8.8 1067X10 1067X11 1118X8.8 1118X10 1118X11 1219X10 1219X11

11125.00 12625.00 13834.00 11657.00 13205.00 14511.00 14415.00 15866.00

1687.00 1684.00 1680.00 1769.00 1766.00 1763.00 1929.00 1925.00 1920.00 2246.00 2242.00 2569.00 2564.00 2896.00 2891.00 2886.00 3217.00 3212.00 3204.00 3539.00 3530.00 3523.00 4020.00 4013.00 4005.00

2335.00 2335.00 2335.00 2448.00 2448.00 2448.00 2668.00 2668.00 2668.00 3112.00 3112.00 3560.00 3560.00 4004.00 4004.00 4004.00 4448.00 4448.00 4448.00 4892.00 4892.00 4892.00 5560.00 5560.00 5560.00

2372.00 2368.00 2363.00 2488.00 2483.00 2478.00 2711.00 2706.00 2700.00 3158.00 3151.00 3612.00 3604.00 4072.00 4063.00 4056.00 4522.00 4516.00 4504.00 4974.00 4963.00 4952.00 5652.00 5642.00 5630.00

3461.00 3461.00 3461.00 3628.00 3628.00 3628.00 3955.00 3955.00 3955.00 4613.00 4613.00 5275.00 5275.00 5933.00 5933.00 5933.00 6590.00 6590.00 6590.00 7250.00 7250.00 7250.00 8240.00 8240.00 8240.00

2180.00 2180.00 2180.00 2284.00 2284.00 2284.00 2491.00 2491.00 2491.00 2905.00 2905.00 3322.00 3322.00 3737.00 3737.00 3737.00 4152.00 4152.00 4152.00 4566.00 4566.00 4566.00 5190.00 5190.00 5190.00

3692.00 3692.00 3692.00 3868.00 3868.00 3868.00 4218.00 4218.00 4218.00 4920.00 4920.00 5626.00 5626.00 6328.00 6328.00 6328.00 7031.00 7031.00 7031.00 7734.00 7734.00 7734.00 8789.00 8789.00 8789.00

1330.00 1330.00 1330.00 1330.00 1330.00 1330.00 1330.00 1330.00 1330.00 1330.00 1330.00 1596.00 1596.00 1596.00 1596.00 1596.00 1914.00 1914.00 1914.00 1914.00 1914.00 1914.00 2107.00 2107.00 2107.00

57 1219X12.5 17994.00 58 1422X12.5 21041.00 59 1422X14.2 23847.00 60 1626X14.2 27281.00 61 1626X16 30716.00

62 1829X14.2 30764.00 63 1829X16 34585.00

64 1829X17.5 37826.00 65 2032X16 38455.00

66 2032X17.5 42034.00 67 2032X20 47984.00

68 2235X17.5 46291.00 69 2235X20 52869.00

70 2235X22.2 58577.00 71 2540X20 60125.00

72 2540X22.2 66655.00 73 2540X25 75023.00

Note: The above rates are inclusive of Excise duty at 12.36% and VAT at 5%.

42

10.1 M.S. PIPES- SPIRAL/LONGITUDIDNAL WELDING AS PER IS 3589/2001 WITH INTERNAL LINING AND EXTERNAL COATING (WITHOUT EXCISE DUTY)
Rate for 2013-14 in Rupees
Internal CML food External CMC Internal grade epoxy external Bare pipe 6mm to epoxy Coating 20mm per meter 12mm coating 406 micr. thick per thick per 406 per meter meter micr.per meter meter 445.00 546.00 680.00 764.00 584.00 802.00 1000.00 1390.00 1004.00 1113.00 1386.00 1739.00 1323.00 1487.00 1844.00 2327.00 1457.00 1814.00 2029.00 2881.00 1667.00 2079.00 2612.00 3625.00 238.00 236.00 234.00 233.00 312.00 309.00 307.00 301.00 387.00 386.00 383.00 380.00 461.00 460.00 457.00 453.00 507.00 503.00 502.00 495.00 581.00 578.00 574.00 567.00 398.00 398.00 398.00 398.00 502.00 502.00 502.00 502.00 613.00 613.00 613.00 613.00 718.00 718.00 718.00 718.00 784.00 784.00 784.00 784.00 888.00 888.00 888.00 888.00 383.00 380.00 377.00 374.00 503.00 498.00 494.00 486.00 625.00 624.00 619.00 613.00 744.00 742.00 737.00 728.00 817.00 814.00 810.00 799.00 937.00 932.00 926.00 914.00 496.00 496.00 496.00 496.00 644.00 644.00 644.00 644.00 803.00 803.00 803.00 803.00 918.00 918.00 918.00 918.00 1046.00 1046.00 1046.00 1046.00 1195.00 1195.00 1195.00 1195.00 CTE external coating & wrapping per meter External Transporati Polyethy on any line where in Sheeting Tamilnadu per meter per meter

Sl.No

Dia meter & thickness of pipe in mm

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

168.3X2.6 168.3X3.2 168.3X4 168.3X4.5 219.1X2.6 219.1X3.6 219.1X4.5 219.1X6.3 273X3.6 273X4 273X5 273X6.3 323.9X4 323.9X4.5 323.9X5.6 323.9X7.1 355.6X4 355.6X5 355.6X5.6 355.6X8 406.4X4 406.4X5 406.4X6.3 406.4X8.8

426.00 426.00 426.00 426.00 555.00 555.00 555.00 555.00 692.00 692.00 692.00 692.00 821.00 821.00 821.00 821.00 901.00 901.00 901.00 901.00 1030.00 1030.00 1030.00 1030.00

528.00 528.00 528.00 528.00 688.00 688.00 688.00 688.00 856.00 856.00 856.00 856.00 1016.00 1016.00 1016.00 1016.00 1116.00 1116.00 1116.00 1116.00 1276.00 1276.00 1276.00 1276.00

222.00 222.00 222.00 222.00 222.00 222.00 222.00 222.00 222.00 222.00 222.00 222.00 222.00 222.00 222.00 222.00 222.00 222.00 222.00 222.00 222.00 222.00 222.00 222.00

43

Rate for 2013-14 in Rupees


Internal CML food External CMC Internal grade epoxy external Bare pipe 6mm to epoxy Coating 20mm per meter 12mm coating 406 micr. thick per thick per 406 per meter meter micr.per meter meter 1877.00 2339.00 2940.00 4620.00 2669.00 2970.00 3358.00 5812.00 3702.00 4047.00 7921.00 4692.00 5295.00 10504.00 6070.00 6845.00 15197.00 7706.00 8438.00 9556.00 16660.00 9428.00 10676.00 21138.00 9902.00 11236.00 12312.00 10375.00 11753.00 12915.00 12829.00 655.00 652.00 648.00 637.00 727.00 725.00 722.00 709.00 873.00 872.00 853.00 1019.00 1015.00 995.00 1166.00 1162.00 1134.00 1309.00 1307.00 1304.00 1282.00 1455.00 1452.00 1423.00 1530.00 1527.00 1524.00 1604.00 1601.00 1599.00 1748.00 906.00 906.00 906.00 906.00 1007.00 1007.00 1007.00 1007.00 1209.00 1209.00 1209.00 1409.00 1409.00 1409.00 1612.00 1612.00 1612.00 1811.00 1811.00 1811.00 1811.00 2014.00 2014.00 2014.00 2115.00 2115.00 2115.00 2216.00 2216.00 2216.00 2416.00 920.00 916.00 911.00 895.00 1020.00 1018.00 1015.00 996.00 1226.00 1224.00 1199.00 1432.00 1428.00 1399.00 1637.00 1633.00 1592.00 1841.00 1837.00 1832.00 1801.00 2046.00 2041.00 2000.00 2150.00 2146.00 2142.00 2255.00 2250.00 2246.00 2458.00 1344.00 1344.00 1344.00 1344.00 1494.00 1494.00 1494.00 1494.00 1793.00 1793.00 1793.00 2090.00 2090.00 2090.00 2392.00 2392.00 2392.00 2688.00 2688.00 2688.00 2688.00 2988.00 2988.00 2988.00 3138.00 3138.00 3138.00 3288.00 3288.00 3288.00 3586.00 CTE external coating & wrapping per meter External Transporati Polyethy on any line where in Sheeting Tamilnadu per meter per meter

Sl.No

Dia meter & thickness of pipe in mm

25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55

457X4 457X5 457X6.3 457X10 508X5 508X5.6 508X6.3 508X11 610X5.8 610X6.3 610X12.5 711X6.3 711X7.1 711X14.2 813X7.1 813X8 813X18 914X8 914X8.8 914X10 914X17.5 1016X8.8 1016X10 1016X20 1067X8.8 1067X10 1067X11 1118X8.8 1118X10 1118X11 1219X10

847.00 847.00 847.00 847.00 941.00 941.00 941.00 941.00 1130.00 1130.00 1130.00 1318.00 1318.00 1318.00 1507.00 1507.00 1507.00 1694.00 1694.00 1694.00 1694.00 1883.00 1883.00 1883.00 1977.00 1977.00 1977.00 2072.00 2072.00 2072.00 2259.00

1434.00 1434.00 1434.00 1434.00 1594.00 1594.00 1594.00 1594.00 1913.00 1913.00 1913.00 2230.00 2230.00 2230.00 2551.00 2551.00 2551.00 2867.00 2867.00 2867.00 2867.00 3187.00 3187.00 3187.00 3347.00 3347.00 3347.00 3506.00 3506.00 3506.00 3824.00

222.00 222.00 222.00 222.00 266.00 266.00 266.00 266.00 333.00 333.00 333.00 333.00 333.00 333.00 443.00 443.00 443.00 666.00 666.00 666.00 666.00 1330.00 1330.00 1330.00 1330.00 1330.00 1330.00 1330.00 1330.00 1330.00 1330.00

44

Rate for 2013-14 in Rupees


Internal CML food External CMC Internal grade epoxy external Bare pipe 6mm to epoxy Coating 20mm per meter 12mm coating 406 micr. thick per thick per 406 per meter meter micr.per meter meter 14120.00 16015.00 18727.00 21224.00 24280.00 27337.00 27380.00 30781.00 33665.00 34225.00 37410.00 42706.00 41199.00 47054.00 52134.00 53511.00 59323.00 66771.00 1745.00 1741.00 2037.00 2032.00 2329.00 2325.00 2625.00 2621.00 2617.00 2917.00 2913.00 2904.00 3209.00 3200.00 3194.00 3646.00 3638.00 3631.00 2416.00 2416.00 2818.00 2818.00 3222.00 3222.00 3625.00 3625.00 3625.00 4028.00 4028.00 4028.00 4430.00 4430.00 4430.00 5035.00 5035.00 5035.00 2453.00 2447.00 2863.00 2856.00 3274.00 3266.00 3690.00 3683.00 3677.00 4099.00 4093.00 4082.00 4508.00 4499.00 4489.00 5124.00 5114.00 5102.00 3586.00 3586.00 4182.00 4182.00 4782.00 4782.00 5378.00 5378.00 5378.00 5976.00 5976.00 5976.00 6574.00 6574.00 6574.00 7470.00 7470.00 7470.00 CTE external coating & wrapping per meter External Transporati Polyethy on any line where in Sheeting Tamilnadu per meter per meter

Sl.No

Dia meter & thickness of pipe in mm

56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73

1219X11 1219X12.5 1422X12.5 1422X14.2 1626X14.2 1626X16 1829X14.2 1829X16 1829X17.5 2032X16 2032X17.5 2032X20 2235X17.5 2235X20 2235X22.2 2540X20 2540X22.2 2540X25

2259.00 2259.00 2635.00 2635.00 3013.00 3013.00 3389.00 3389.00 3389.00 3765.00 3765.00 3765.00 4142.00 4142.00 4142.00 4707.00 4707.00 4707.00

3824.00 3824.00 4460.00 4460.00 5100.00 5100.00 5737.00 5737.00 5737.00 6374.00 6374.00 6374.00 7012.00 7012.00 7012.00 7975.00 7975.00 7975.00

1330.00 1330.00 1330.00 1330.00 1596.00 1596.00 1596.00 1596.00 1596.00 1914.00 1914.00 1914.00 1914.00 1914.00 1914.00 2107.00 2107.00 2107.00

Note: The above rates are inclusive of VAT at 5%.

45

10.2 MS SPECIALS AS PER IS 7323 Rate for 2013-14 in Rupees 76.00

Sl.No. 1

Description MS specials with inside lining / epoxy coating and outside coating with cement mortar 25mm thick. MS specials without inside lining and outside coating MS specials without inside lining and outside coating but with anti rust painting.

Unit Kg

2 3

Kg Kg

68.00 71.00

Note: The above rates are inclusive of VAT and transportation charges anywhere in Tamilnadu. Excise duty - 12.36% and VAT - 5%.

10.3 MS CASING PIPE

Sl.No.

Description Supply and delivery of MS Casing pipes confirming to IS

Unit

Rate for 2013-14 in Rupees

1 2 3

100 mm 125 mm 150 mm

Metre Metre Metre

686.00 858.00 1030.00

Note: The above rates are inclusive of VAT and transportation charges anywhere in Tamilnadu. Excise duty - 12.36% and VAT - 5%.

46

11.0

RCC NON PRESSURE SPUN PIPE AS PER IS 458/2003

RCC non pressure spun pipe with socket and spigot ends as per IS 458/2003 manufactured with sulphate resistence cement with 12 mm HI -alumina lining with rubber ring joints. Rate for 2013-14 in Rupees Sl. No. 1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 Internal Dia. 2 200mm 250mm 300mm 350mm 400mm 450mm 500mm 600mm 700mm 800mm 900mm 1000mm 1100mm 1200mm 1400mm 1500mm 1600mm Unit 3 One metre One metre One metre One metre One metre One metre One metre One metre One metre One metre One metre One metre One metre One metre One metre One metre One metre NP2 Class 4 536.00 633.00 846.00 1132.00 1457.00 1889.00 2288.00 2449.00 3604.00 4196.00 4629.00 5489.00 6544.00 7509.00 8982.00 17657.00 20539.00 NP3 Class 5 549.00 666.00 880.00 1164.00 1609.00 2045.00 2317.00 2664.00 4065.00 4860.00 5604.00 6201.00 8858.00 10812.00 13383.00 18442.00 21298.00 NP4 Class 6 572.00 701.00 927.00 1229.00 1676.00 2232.00 2575.00 2968.00 4204.00 5243.00 6062.00 7165.00 9864.00 11904.00 15934.00 19300.00 22301.00

Note: . The rate is inclusive of VAT at 5 % and transportation charges anywhere in Tamilnadu.Excise duty at 12.36% extra

47

11.1

RUBBER GASKETS AS PER IS 5382/1985

Sl. No. 1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Description 2 200mm 250mm 300mm 350mm 400mm 450mm 500mm 600mm 700mm 800mm 900mm 1000mm 1100mm 1200mm 1400mm 1500mm 1600mm

Unit 3 Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each 4

Rate for 2013-14 in Rupees NP2 NP3 5 39.00 46.00 54.00 66.00 85.00 100.00 106.00 152.00 192.00 226.00 284.00 297.00 331.00 351.00 596.00 780.00 NP4 6 46.00 54.00 60.00 72.00 92.00 106.00 112.00 160.00 206.00 232.00 291.00 310.00 337.00 364.00 609.00 795.00

34.00 39.00 46.00 54.00 60.00 66.00 72.00 119.00 165.00 185.00 226.00 291.00 324.00 337.00 489.00 767.00

846.00 873.00 899.00 Note: The rate is inclusive of Excise duty at 12.36%, VAT at 5% and transportation charges anywhere in Tamilnadu.

48

12.0 CI D/F SLUICE VALVE WITH CAP/ WHEEL AS PER IS 14846/2000 PN 1.0 WITH ISI MARKING Sl. No. 1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 Description 2 50 mm 65mm 80mm 100mm 125mm 150mm 200mm 250mm 300mm 350mm 400mm 450mm 500mm 600mm 700mm 750mm 800mm 900mm 1000mm 1100mm 1200mm Unit 3 Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Rate for 2013-14 in Rupees With Excise Duty Without Excise Duty 4 2927.00 3523.00 3688.00 4915.00 6154.00 7411.00 12938.00 20645.00 25722.00 42829.00 53534.00 65556.00 84457.00 121056.00 226380.00 261125.00 327118.00 419531.00 527388.00 760146.00 819623.00 5 2653.00 3085.00 3343.00 4456.00 5579.00 6719.00 11730.00 18716.00 23321.00 38831.00 48535.00 59435.00 76571.00 109752.00 205241.00 236741.00 296570.00 380354.00 478140.00 689162.00 743086.00

Note: The above rates are inclusive of VAT at 5% and transportation charges anywhere in Tamilnadu.Excise duty at 12.36%.

49

12.1 C.I. D/F REFLUX VALVE AS PER I.S. 5312/ PART I/ 84 PN 1.0 WITH BYE-PASS ARRANGEMENTS WITH ISI MARKING Rate for 2013-14 in Rupees Sl. No. 1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Description 2 50 mm 65 mm 80 mm 100 mm 125 mm 150 mm 200 mm 250 mm 300 mm 350 mm 400 mm 450 mm 500 mm 600 mm Unit 3 Each Each Each Each Each Each Each Each Each Each Each Each Each Each With excise duty 4 2929.00 3428.00 4160.00 5366.00 6691.00 8137.00 16318.00 24056.00 31442.00 49452.00 75532.00 91073.00 131225.00 176268.00 Without excise duty 5 2656.00 3108.00 3773.00 4866.00 6066.00 7378.00 14794.00 21810.00 28507.00 44834.00 68478.00 82568.00 118970.00 159808.00

Note: The above rates are inclusive of VAT at 5% and transportation charges anywhere in Tamilnadu.Excise duty at 12.36%

50

12.2 C.I. DOUBLE AIR VALVE AS PER ISI 14845 Rate for 2013-14 in Rupees Sl. No. 1 1 2 3 4 5 6 7 8 Description 2 40 mm 50 mm 65 mm 80 mm 100 mm 125 mm 150mm 200mm Unit 3 Each Each Each Each Each Each Each Each With excise duty 4 4265.00 5266.00 6041.00 7120.00 9694.00 16813.00 19430.00 29413.00 Without excise duty 5 3866.00 4775.00 5477.00 6455.00 8789.00 15242.00 17615.00 26666.00

Note: The above rates are inclusive of VAT at 5% and transportation charges anywhere in Tamilnadu. Excise duty at 12.36%. 12.3 CI SINGLE AIR VALVE AS PER ISI 14845 Rate for 2013-14 in Rupees Sl. No 1 1 2 3 4 5 6 7 8 9 10 Description 2 15mm 20 mm 25 mm 40 mm 50 mm 65 mm 80 mm 100 mm 125mm 150 mm Unit 3 Each Each Each Each Each Each Each Each Each Each With excise duty 4 843.00 939.00 1216.00 1519.00 1683.00 1962.00 2253.00 2455.00 4233.00 6053.00 Without excise duty 5 765.00 853.00 1102.00 1377.00 1526.00 1781.00 2044.00 2225.00 3837.00 5489.00

Note: The above rates are inclusive of VAT at 5% and transportation charges anywhere in Tamilnadu. Excise duty at 12.36%.

51

12.4 DI SINGLE CHAMBER AIR RELEASE VALVE

Manufacture, Supply and Delivery of Tamper proof DI single chamber air release valves with pressure range from PN 1.0 to 2.5 with body and cover made of Ductile Iron of Grade GGG 40 conforming to IS 1865 with Food Grade Epoxy Powder coating(EP-P) inside a

Sl.No. 1 2 3 4 5

Description 50mm 80mm 100mm 150mm 200mm

Unit each each each each each

Rate for 2013-14 in Rupees 22812.00 30434.00 35532.00 43256.00 56074.00

Note: The rates are inclusive of Transportation charges. Excise duty at 12.36% and VAT at 5% extra.

52

12.5 CI SLUICE VALVES NON RAISING SPINDLE TYPES TO PRESSURE RATING OF 1.6 PN TO BE USED IN PUMP HOUSES (LONG BODY/ LONG FACE TO FACE) Conforming to IS. Sl.No. 1 1 2 3 4 5 6 7 8 9 10 11 100mm 125mm 150mm 200mm 250mm 300mm 350mm 400mm 450mm 500mm 600mm Description 2 Unit 3 1No. 1No. 1No. 1No. 1No. 1No. 1No. 1No. 1No. 1No. 1No. Rate for 2013-14 in Rupees 4 6062 7512 9753 16717 22523 31086 50234 78155 95685 105305 175421

With With With With With

spur spur spur spur spur

gear gear gear gear gear

arrangements arrangements arrangements arrangements arrangements

Note: The rate is inclusive of taxes, duties and handling charges.Excise duty at 12.36% ,VAT at 5%

12.6 BUTTERFLY VALVES WITH TOP AND BOTTOM OF S.S. 410 SHAFT, WAFER LINER/ WITH REDUCTION GEAR UNIT INCLUDING ALL TAXES, DUTIES AND HANDLING CHARGES (Conforming to BS 5155 & IS

12.6.1 Sl.No. 1 2 3 4 5

WAFER LINER Description 100mm 150mm 200mm 250mm 300mm Unit 1 1 1 1 1 No No No No No Rate for 2013-14 in Rupees 2343.00 3321.00 9218.00 11901.00 15989.00

53

12.6.2 Sl.No. 1 2 3 4

D/F GEAR OPERATED Description 400mm 450mm 500mm 600mm Unit 1 1 1 1 No No No No Rate for 2013-14 in Rupees 72830 76383 79935 110132

Conforming to standard BS 5155 Butterfly valve with Body, Disc and retainer of Cast Iron Grade F.260 with EDPM rubber sleeve. Internal hardware shall be confirming to AISI 304. External hardware Carbon Steel shall be confirming to IS 1367. Top and bottom shaft stainless steel to AISI 410. Body and disc should be tested (Hydro test) to 15 kg/sq.cm. 12.7 NON RETURN VALVES 12.7.1 WAFER TYPE (DUAL PLATE CHECK VALVE) CONFORMING TO IS Sl. No. 1 1 2 3 4 5 100mm 150mm 200mm 250mm 300mm 12.7.2 Sl. No. Description 2 Unit 3 1 No 1 No 1 No 1 No 1 No Rate for 2013-14 in Rupees 4 2826 6599 11541 20554 25690

DOUBLE FLANGED (DUAL PLATE CHECK VALVE) Unit

Rate for 2013-14 in Rupees 1 2 3 4 1 400mm 1 No. 64053 2 450mm 1 No. 80556 3 500mm 1 No. 88450 4 600mm 1 No. 107827 Construction conforming to standard API 594. Body should confirm cast iron Grade FG 260 (IS 210), Disc plates confirming to ASTM A216, hinch pin/ stop pin/ spring should be of SS to AISI 410/304. Body seat should be of EDPM rubber. The body should be tested to 15 kg/ sq.cm and seat should be tested to 10 kg/ sq.cm Description

54

12.7.3

D/F NON RETURN VALVE (OUT DOOR USE)

CI SINGLE DOOR/ MULTY DOOR NON RETURN VALVE CONFORMING TO IS 5312 TO BE FIXED AFTER WATER METER/ FLOW RECORDER ON PUMPING MAIN NEAR PUMP HOUSE WITH DASH POT ARRANGEMENT FOR 90% FAST CLOSING & 10% SLOW CLOSING. Rate for 2013-14 in Rupees 1 2 3 4 300mm 1 1 No. 57988 350mm 2 1 No. 85431 400mm 3 1 No. 107379 450mm 4 1 No. 141976 500mm 5 1 No. 171862 600mm 6 1 No. 238293 700/750mm 7 1 No. 373770 800mm 8 1 No. 433915 12.8 KINETIC AIR VALVES FOR HANDLING MORE VOLUMES OFAIR IN PUMPING MAIN, DOUBLE ORIFICE KINETIC AIR VALVE CONFIRMING TO IS 4845 TAMPER PROOF DESIGN (PN-1) Rate for 2013-14 Sl.No. Description Unit in Rupees 1 50mm 1 No 10428 2 80mm 1 No 12029 3 100mm 1 No 14853 4 150mm 1 No 31870 5 200mm 1 No 46912 Sl.No. Description Unit Note: Excise Duty at 12.36%, VAT at 14.5% extra

55

12.9 DI D/F GATE VALVES SUPPLY AND DELIVERY OF DI D/F GATE VALVES (SOFT SEATED) RESILIENT SEATED SOFT SEALING GATE VALVES (SLUICE VALVES) WITH BODY BONNET OF DUCTILE CAST IRON OF GRADE GGG40, WEDGE FULLY RU BBER LINED WITH EPDM, REPLACEABLE SPINDLE NUT, WITHOUT GLAND PACKING AND WITH 3 ORING PROTECTION ON THE SHAFT AND SEALS OF NBR AND THE VALVES SHOULD BE OF VACLUM TIGHT AND 100% LEAK PROOF WITH FACE TO FACE DIMENTIONS AS EPR BS5163-89/ ISI 4846-2000/ DIN 3202 F 4. ALL THE VALVES SHOULD BE WITH ELECTROSTATIC POWDER COATING BOTH INSIDE AND OUTSIDE WITH POCKET LESS STRAIGHT THRO' BODY PASSAGE. ALL LTHE VALVES ARE TO BE COMPATIBLE FOR BURRIED APPLICATION WITH PRESSURE RATING PN 10/16

Sl.No. 1 2 3 4 5 6 7 8 50mm 80mm 100mm 150mm 200mm 250mm 300mm 350mm

Description

Unit 1 No 1 No 1 No 1 No 1 No 1 No 1 No 1 No

Rate for 2013-14 in Rupees 7686 9490 12510 19697 32734 47522 68516 207449

217579 9 1 No 400mm Note: The rates are inclusive of duties, all taxes, transportation charges etc.Excise duty 10.3%, VAT 5%

56

12.10 DI D/F BUTTERFLY VALVES SUPPLY AND DELIVERY OF DI D/F BUTTERFLY VALVES WITH GGG 400/12 OR EQUIVALENT GRADE AS PER IS3896 (PART 2) 1985 AND SUBSEQUENT REVISIONS DOUBLE ECENTRICALLY DISC WITH RENEVABLE SOFT SEAL ON THE DISC AND BODY SEAT FACE OF STAINLESS STEEL / NICKEL WELD OVERLAY MICROFINISHED WITH POWDER OR LIQUID EPOXY COATING WITH MINIMUM THICKNESS OF 250 MICRONS APPLIED ON BOTH BODY AND DISC INSIDE AND OUTSIDE FACE TO FACE DIMENSIONS AS PER AWWA C 504 OR BS 5155 OR IS 13095

Sl.No.

Description

Unit

Rate for 2013-14 in Rupees PN 10 121401 169404 172061 225511 351721 442975 553631 713049 941158 1104554 transportation charges PN 20 166707 189168 203098 271880 404476 509420 636677 820371 1082332 1107501

400mm 1 450mm 2 500mm 3 600mm 4 700mm 5 800mm 6 900mm 7 1000mm 8 1100mm 9 1200mm 10 Note: The rates are inclusive of duties, all etc.Excise duty 12.36%, VAT 5%

1 No 1 No 1 No 1 No 1 No 1 No 1 No 1 No 1 No 1 No taxes,

12.11 OHT FLOW CONTROL VALVE Supply and delivery of the following sizes of OHT flow control valve with female BSP treaded ends, (20mm length) with Stainless Steel Body as per ANSI 202 Grade, Plug, Flange Nylon 66, (to be tested at NABL accredited lab.) Triangular notch type flow control path with opening reference scale arrangements for flow notch and Upstream & Downstream pressure checking spring loaded mouth arrangements. Working Pressure 10 KSC, (FCRI, Palgaut pressure test and flow test to be furnished). Rate for 2013-14 in Rupees

Sl. No. a.

Size

Unit

40mm (1 lpm to 400lpm 4,575.00 each adjustable type arrangements) 100mm (20 lpm TO 2000 16,100.00 b each lpm adjustable type arrangements) Note: The above rates are inclusive all taxes and transportation charges.

57

13.0

SALT GLAZED STONEWARE PIPE AS PER IS 651-1992 OF 0.6 M LENGTH Description 2 100mm 150mm 200mm 250mm 300mm Unit 3 Each Each Each Each Each Rate for 2013-14 in Rupees 4 67.00 111.00 188.00 322.00 546.00

Sl.No. 1 1 2 3 4 5

Note: Excise duty 'Nil'. The rate is inclusive of VAT at 5% and transportation charges anywhere in Tamilnadu. 14.0 SULPHATE RESISTANT CEMENT AS PER IS 12330/1988 Sl.No. 1 1 Description Unit Rate for 2013-14 in Rupees 4

2 3 Sulphate Resistant Cement as per IS 6660.00 MT 12330/1988 and as amended from time to time. Note: The rate is inclusive of duties all taxes and at F.O.R destination

15.0 FIBER REINFORCED CONCRETE FRAME AND COVER AS PER TYPE HD - 20, IS 12592, PART 1 & 2 Rate for 2013-14 Sl.No. Description Unit in Rupees 1 2 3 4 1 2 3 4 56cm dia heavy duty 56cm dia extra heavy duty 60 cm dia heavy duty Each Each Each 2281.00 2581.00 2856.00

60 cm dia extra heavy 3161.00 Each duty Note: Excise duty 'Nil'. The rate is inclusive of VAT at 14.5% and transportation charges anywhere in Tamilnadu.

58

16.0 WATER METER CONFORMING TO ISO 4064 & DIRT BOX STRAINER Supply and delivery of Woltman model with removal mechanism water meters confirming to ISO 4064 part I, II,III class B with life cycle test certificate from FCRI or any Govt . Organisation . The water meters shall have magnetic drivers or mechanical drivers and shall be versatile for installation in any position . The meters shall be hydrodynamically, hydrostatically balanced. The runner, runner chamber, pointers of the meter shall be as per ISO 4064 class B specification. Dry dial excavated counter housing fully protected against flooding ensuring easy reading in all climates. Rate for 2013-14 in Rupees Sl.No Description Unit Water meter 1 1 2 3 4 5 6 7 8 9 10 11 12 13 2 15 mm 20mm 25mm 40mm 50mm 80mm 100mm 150mm 200mm 250mm 300mm 400mm 500mm 3 Each Each Each Each Each Each Each Each Each Each Each Each Each 4 990 1250 3425 6640 9548 12653 16232 26496 29838 65736 102795 177729 201579 Dirt Box 5 2437 4467 5280 8045 9736 20940 40608 70049 105582 Erection Charges 6 2213.00 2700.00 4275.00 5475.00 6225.00 7200.00 7238.00 7500.00 7500.00

Note: 1.Excise Duty' Nil' for Watermeter and Dirtbox Strainer. 2.The rate is inclusive of TNVAT at 5% and transportation charges anywhere in Tamilnadu. 3.Erection charges includes earth work excavation,labour charges, cutting and threading, conveyance,

59

16.1 SUPPLY, DELIVERY, FIXING TESTING AND COMMISSIONING OF BEST EFFICIANT ORIFICE TYPE ELECTRONIC WATER METER USING DIFFERENCIAL PRESSURE SENSING ELEMENT WITH FLANGE INSERTABLE ORIFICE PLATE SUITABLE FOR D,D/2 TAPPING AS PER BS 1042 SPECIFICATION.THE METER SHOULD BE SUITABLE TO BE CONNECTED TO CONVERTOR TO GIVE A REMOTE INDICATION OF TOTALISATION AND FLOW RATE WITH A OPTION FOR COMPUTER CONNECTIVITY INCLUDING SENSOR AND TOTALISER INCLUDING ALL TAXES, DUTIES AND HANDLING CHARGES.

Sl.No.

Description 150 to 450mm

Unit

Rate for 2013-14 in Rupees 212000.00 230000.00 257000.00

1 475 to 750mm 2 775 to 1200mm 3

1 NO. 1 NO. 1 NO.

Note: The rate includes Excise duty at 12.36%, VAT at 5% handling and installation charges.

60

19.0 HDPE TANK Rate for 2013-14 in Rupees

Sl.No. 1

Description Supply and delivery and fixing of HDPE tank as per IS 12701 / 1996 including loading, unloading, transportation and labour charges for fixing of the GI pipes and specials for pipe connection works including cutting, threading and fixing charges etc., 200 litres 500 litres 1000 litres

Unit

1 No. 1 No. 1 No.

1,260 2,940 6,195

21.0 MS KIOSK Sl. No. 1 Description Supply and delivery of MS Kiosk of size 0.75m x 0.45m x 0.75m made up of MS angle of size 50mm x 50mmx 4mm alround covered with 16 gauge MS sheet and kiosk door made up of MS plates of size 25 mm x 3 mm including cutting, welding, grinding, locking arrange Unit Rate for 2013-14 in Rupees

1 No

6100.00

61

22.0 MS LADDER Sl.No. 1 Description Of Work Fabrication,supply, delivery and fixing of outside M.S. Ladder of 45cm clear wide made out of 50mm x 50 mm x 6mm M.S. angle for sides and steps in 16mm MS plain rods fixed at 30 cm C/C welded jointed etc., providing with suitable side supports, clamps and locking arrangements provided with two coats of approved enamel paint over one coat of redoxide paint, for providing access to roof top of OHT of suitable inclined length, including bottom anchorage and transportation and as directed by TWAD Board officers. The rate includes concrete bed block in CC 1:2:4 using 20mm HBGS at top and bottom of suitable size with necessry anchor bolts. Unit Rate for 2013-14 in Rupees.

10,000 Litres - 16500.00 30,000 litres - 16500.00 1 No. 60,000 Litres - 18000.00 1,00,000 Litres - 18000.00

23.0 MS DOOR / WINDOW/VENTILATOR Sl.No. Description of Work Unit Rate for 2013-14 in Rupees.

i ii. iii. iv. v vi. vii viii ix x

Supply and Delivery Fabrication of MS doors and windows with outer frame and shutter frame in MS angle of size 40mm x 40mm x 6 mm with MS flat 25mm x 25mm x 6mm and MS sheet of 18 gauge including ventilating arrangements using 20mm square MS rods with locking arrangements including two coats of approved enamel paint over coat of red oxide including cost of angles, plates, sheets, fabrication charges, cost of hold fast and transportation charges etc., complete. Fully panelled Double leaf - Door 1.00 x 2.50 m Supply and delivery of MS Kiosk of size 0.75m x 0.45m x 0.75m made up of MS Fully panelled Double leaf - Door Fully panelled Single leaf - Door Fully panelled Single leaf - Door Fully panelled Single leaf - Door Fully panelled Single leaf - Door Fully panelled Double leaf - Window ( without Ventilator) Fully panelled Double leaf - Window ( without Ventilator) Ventilator 1.00m x2.10 m 1.00m x2.00 m 0.75 m x2.10 m 0.90 m x 2.00 m 0.90 m x 2.10 m 1.00 m x2.00 m 1.20 m x0.90 m 0.60 m x 0.90 m 0.45 m x0.60 m

5500.00 4800.00 3500.00 2950.00 3150.00 3500.00 3282.00 2600.00 1900.00 1200.00

62

24.0 Water Disinfection Equipment using Silver-Ionisation process Specification:Supply,delivery,erection and commissioning of the following capacity of micro processor based water disinfection equipment using silver ionization process based on Oligodynamic technology, suitable to provide directly to pumping main, or to sump or to overhead tank, with by-pass arrangements, controlling valves, micro processor based control panel, in-built transformer, relay miniature circuit breaker, tool kits, spares etc. The water chambers are made of corrosion free stainless steel confirm to SS 304 investment casting, capable to withstand a pressure of 10 Ksc with inbuilt electrodes mounted on powder coated mild steel cabinet of 20gg thickness with universal lock and key for safety. The control panel should have pump active indication to show that the water is flowing inside the chamber, electrode OK indication- to show that the electrode is working, Electrode high indication to show that electrode is clogged and electrode low indication to show that electrode is nearing completion, for easy maintenance of the equipment. The silver ions produced by the electrode is totally non toxic at the dosed levels, as permitted by BIS standard and the residual effect of the disinfectant is long lasting for more than 2 days.The equipment is powered by a single phase 220V/50Hz power supply and provided with an on site disinfectant analysing kit with consumables to do a minimum of 10 tests. The efficacy of the equipment must be proved by the reputed laboratories like NEERI, Nagpur,ITRC,Luknow. Capacity of water disinfection equipment in litres/ hour 1000 2000 3000 5000 10000 15000 25000 50000 100000 200000 300000 400000 500000 Rate for 2013-14 in Rupees. 16,500.00 19800.00 43687.00 45702.00 82613.00 88214.00 177870.00 326519.00 443405.00 863940.00 1295910.00 1727880.00 2159850.00

Sl. No. 1 2 3 4 5 6 7 8 9 10 11 12 13

unit each each each each each each each each each each each each each

Note :1. Excise Duty is 'Nil'. The rate is inclusive of transportation and Sales tax etc., 2.The rate is inclusive of electrodes in-built with equipment.

63

24.1 REPLACEMENT ELECTRODE FOR WATER DISINFECTION EQUIPME NT USING SILVER IONIZATION Specification: Supply and delivery of electrode assembly suitable for water disinfection equipment using silver ionization process using pure silver metal electrode and fixed on PVC/Nylon sheets and nuts with electrical leads for the following capacities. The supply should be with the quality test certificate from approved organisations. Life of electrodes in million litre at dosage 0.01mg/lt 1 2 3 4 5 6 7 8 9 10 11 12 13 0.005mg/lt Rate for 2013-14 in Rupees

Sl.No

Capapcity LPH

1,000 1882.00 2,000 3,137.00 3,000 6 12 4,782.00 5,000 8 16 5,313.00 10,000 9 18 5,844.00 15,000 15 30 7,970.00 25,000 30 60 21,252.00 50,000 60 120 42,504.00 1,00,000 120 240 85,008.00 2,00,000 240 480 1,70,016.00 3,00,000 360 720 2,55,024.00 4,00,000 480 960 3,40,032.00 5,00,000 600 1,200 4,25,040.00 The above rates are inclusive of VAT at 5% and transportation charges anywhere in Tamilnadu. Excise Duty 'Nil' 24.2 ELECTRO CHLORINATOR BASED ON COMMON SALT Sl.No. 1 2 3 4 5 6 7 8 9 10 Capacity in litres per day 50,000 1,00,000 1,50,000 2,00,000 2,50,000 3,00,000 3,50,000 4,00,000 4,50,000 Rate for 2013-14 in Rupees. 35,200.00 44,562.00 60,500.00 68,740.00 83,270.00 92,015.00 1,00,705.00 1,08,625.00 1,14,944.00

5,00,000 1,16,490.00 The above rates are inclusive of excise duty at 12.36%, VAT at 5% and transportation charges anywhere in Tamilnadu.

64

25.0 PROVIDING EPOXY COATING TO REINFORCEMENT STEEL BARS

Sl No.

Description Providing Fusion Bonded Epoxy coating not less than 175microns thickness and upto 300 microns to reinforcement of all diameters as per IS 13620/1993 including testing of coating at plant.The cost is inclusive of cost on account of careful handling, PVC coated binding wires, touchup material supplied by coating agency, repair work, loading, unloading and strengthening of bent rods etc., complete as per specification and as directed by the Engineer in charge. (inclusive of all taxes)

unit

Rate for 2013-14 in Rupees.

a. b.

for 8mm to 16mm for 20mm to 32mm

MT MT

13559.00 9950.00

Note : Transportation charges included.

65

26.0 MECHANICAL JOINT COLLARS Sl No. Description Supply and Delivery of MJ Collars. 1 2 3 4 5 6 7 8 9 10 100mm 150mm 200mm 250mm 300mm 350mm 400mm 450mm 500mm 600mm Each Each Each Each Each Each Each Each Each Each 2205.00 3507.00 4578.00 6374.00 8274.00 11813.00 14070.00 16275.00 21000.00 26513.00 unit Rate for 2013-14 in Rupees.

The above rates are inclusive of Excise duty 12.36% and VAT at 5% 26.1 JOINTING OF MECHANICAL JOINT COLLARS Sl No. Description Labour charges for jointing of mechanical joint collar, nuts, gasket and fixing in position as directed by departmental officers. 1 2 3 4 5 6 7 100mm 150mm 200mm 250mm 400mm 450mm 600mm Joint Joint Joint Joint Joint Joint Joint 57.00 137.00 142.00 210.00 441.00 488.00 966.00 unit Rate for 2013-14 in Rupees.

66

27.0 DISJOINTING OF GI PIPES Sl No. Description Disjointing of GI pipes as directed by the departmental officers 1 2 Upto 80mm Above 80mm Each Each Unit Rate for 2013-14 in Rupees.

32.00 44.00

27.1 WELDING OF G.I. PIPES

Sl No. 1

Description Welding of GI pipes as directed by the departmental officers for the sizes

unit

Rate for 2013-14 in Rupees.

a)

Upto 80 mm

one welding joint

108.00

b)

100 mm to 150 mm

one welding joint

122.00

67

RATES FOR PUMPSETS

For

individual

specifications Equipments,

for the

various items regarding pump sets & Electrical specifications already given in the Manual for Pump sets should be followed.

1.0 Sl. No. 1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 Note:

CENTRIFUGAL MONOBLOC PUMPSET WITH ISI MARK AS PER IS 9079/1989 WITHOUT PANEL BOARD (3 PHASE) Duty lpm x m 2 100x20 150x20 200x20 250x20 300x20 350x20 400x20 450x20 500x20 700x20 50x35 100x35 150x35 200x35 250x35 300x35 350x35 400x35 450x35 500x35 50x50 100x50 150x50 200x50 250x50 300x50 350x50 400x50 H.P. of Pumpset 3 1.5 1.5 2 3 3 3 3 3 5 5 1.5 3 5 5 5 5 7.5 7.5 7.5 7.5 5 5 5 7.5 7.5 7.5 10 10 Unit 4 1 No 1 No 1 No 1 No 1 No 1 No 1 No 1 No 1 No 1 No 1 No 1 No 1 No 1 No 1 No 1 No 1 No 1 No 1 No 1 No 1 No 1 No 1 No 1 No 1 No 1 No 1 No 1 No 1 No Rate for 2013-14 in Rupees 5 7266.00 10704.00 11123.00 12310.00 14231.00 14231.00 14766.00 14766.00 14766.00 17502.00 11553.00 13129.00 18260.00 20557.00 20557.00 22822.00 22822.00 23933.00 24055.00 24055.00 20556.00 20556.00 22409.00 22409.00 22409.00 24651.00 28078.00 28078.00 35141.00

500x60 10 Rates are excluding excise duty and VAT. Excise duty at 6.18% as extra VAT at 5% on Rate +Excise Duty as extra

81

2.0

SINGLE PHASE SUBMERSIBLE PUMPSET AS PER IS 8034 WITHOUT PANEL BOARD WITHOUT PANEL BOARD Duty lpm x m 2 15x40 15x50 15x60 15x70 15x80 15x90 15x100 15x125 15X150 20x40 20x50 20x60 20x70 20x80 20x90 20x100 20X125 H.P. of Pumpset 3 0.5 0.5 0.5 0.75 1 1 1 1.5 2 0.5 0.5 0.75 0.75 1 1 1 1.5 Rate for 2013-14 in Rupees 5 11120.00 8809.00 11154.00 12888.00 12888.00 12888.00 16055.00 18239.00 19635.00 11154.00 8809.00 11154.00 12888.00 12888.00 14333.00 17094.00 18239.00 19520.00

Sl. No. 1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 Note:

Unit 4 1 No 1 No 1 No 1 No 1 No 1 No 1 No 1 No 1 No 1 No 1 No 1 No 1 No 1 No 1 No 1 No 1 No

20X150 2 1 No Rates are excluding excise duty and VAT Excise duty at 6.18% as extra VAT at 5% on Rate + excise duty as extra

3.0

3 PHASE SUBMERSIBLE PUMPSET SUITABLE FOR 100MM DIA BOREWELL WITH ISI MARK IS 8034 WITHOUT PANEL BOARD Duty lpm x m 2 30x40 30x50 30x60 30x70 30x80 30x90 30x100 30x125 40x40 40x50 40x60 40x70 40x80 40x90 40x100 H.P. of Pumpset 3 0.5 0.75 0.75 0.75 1 1 1.5 2 0.75 0.75 1 1 1 1.5 1.5 Rate for 2013-14 in Rupees 5 11546.00 11654.00 12231.00 12888.00 15559.00 16979.00 16979.00 18596.00 11546.00 12231.00 12231.00 15998.00 17525.00 18649.00 18649.00

Sl. No. 1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 Note:

Unit 4 1 No 1 No 1 No 1 No 1 No 1 No 1 No 1 No 1 No 1 No 1 No 1 No 1 No 1 No 1 No

Rates are excluding excise duty and VAT. Excise duty at 4.12% as extra. VAT at 5% on Rate + excise duty as extra.

3.1 3 PHASE SUBMERSIBLE PUMPSET SUITABLE FOR 150MM DIA BOREWELL WITH ISI MARK IS 8034 WITHOUT PANEL BOARD Duty lpm x m 2 50x40 50x50 50x60 50X75 50x100 50x125 50x175 50x200 50x225 50x250 50x275 75x40 75x50 75x60 75x75 75x100 75x125 75x150 75x175 75x200 75x225 75x250 75x275 100x30 100x40 100x50 100x60 100x75 100x100 H.P. of Pumpset 3 2 2 2 3 3 4 5 6 7 10 10 2 2 3 3 4 4 5 6 7.5 10 10 10 1.5 2 3 3 3 4 Rate for 2013-14 in Rupees 5 16496.00 17312.00 18162.00 19363.00 26565.00 26591.00 34188.00 37422.00 48187.00 48759.00 56183.00 16774.00 17312.00 18162.00 20711.00 26565.00 31231.00 33611.00 27531.00 36758.00 48673.00 56183.00 54942.00 15862.00 16774.00 19257.00 19363.00 23972.00 27583.00

Sl.No. 1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29

Unit 4 1 No 1 No 1 No 1 No 1 No 1 No 1 No 1 No 1 No 1 No 1 No 1 No 1 No 1 No 1 No 1 No 1 No 1 No 1 No 1 No 1 No 1 No 1 No 1 No 1 No 1 No 1 No 1 No 1 No

Sl.No. 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62

Duty lpm x m 100x125 100x175 100x200 100x225 100x250 125x25 125x40 125x50 125x60 125x75 125x100 125x125 125x200 125x225 150x25 150x40 150x50 150x60 150x75 150x100 150x125 175x40 175x50 175x60 175x75 175x100 200x25 200x40 200x50 200x60 200x75 200x100 200x125

H.P. of Pumpset 5 7.5 10 10 10 1.5 3 3 3 3 4 6 10 10 1.5 3 3 3 4 5 6 3 3 3 4 6 2 3 4 5 5 6 7.5

Unit 1 No 1 No 1 No 1 No 1 No 1 No 1 No 1 No 1 No 1 No 1 No 1 No 1 No 1 No 1 No 1 No 1 No 1 No 1 No 1 No 1 No 1 No 1 No 1 No 1 No 1 No 1 No 1 No 1 No 1 No 1 No 1 No 1 No

Rate for 2013-14 in Rupees 32176.00 30681.00 36758.00 48673.00 50368.00 15862.00 16774.00 19257.00 21653.00 23175.00 28446.00 33611.00 45246.00 50368.00 15862.00 16774.00 17312.00 21653.00 23175.00 31231.00 33611.00 16774.00 21153.00 21653.00 21653.00 31231.00 15862.00 16774.00 21435.00 23849.00 23972.00 31231.00 34709.00

Sl. No. 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 Note:

Duty lpm x m

H.P. of Pumpset

Unit

Rate for 2013-14 in Rupees 30146.00 40604.00 40604.00 40604.00 30146.00 40604.00 40604.00 40604.00 40604.00 40604.00 40604.00 40604.00 45980.00 48258.00 54390.00 83050.00 51030.00 83050.00 90530.00 87194.00 55770.00 80190.00 93720.00 170941.00 84150.00 93720.00 93720.00 93720.00 93720.00 93720.00 93720.00 93720.00

700x40 10 1 No 700x60 10 1 No 700x80 10 1 No 700x100 10 1 No 800x40 10 1 No 800x60 10 1 No 800x80 10 1 No 800x100 10 1 No 900x40 10 1 No 900x60 10 1 No 900x80 10 1 No 900x100 10 1 No 1000x40 15 1 No 1000x60 15 1 No 1000x80 20 1 No 1000x100 35 1 No 1250x40 20 1 No 1250x60 25 1 No 1250x80 35 1 No 1250x100 35 1 No 1500x40 20 1 No 1500x60 30 1 No 1500x80 40 1 No 1500x100 50 1 No 2000x40 30 1 No 2000x60 45 1 No 2000x80 50 1 No 2000x100 60 1 No 2500x40 35 1 No 2500x60 60 1 No 2500x80 75 1 No 2500x100 90 1 No Rates are excluding excise duty and VAT. Excise duty at 6.18% as extra. VAT at 5% on Rate + excise duty as extra

4.0

OPENWELL SUBMERSIBLE PUMPSET WITH ISI MARK IS 14220 WITHOUT PANEL BOARD Duty lpm x m 2 50x25 50x40 50x50 50x60 50x75 50x100 50x125 75x25 75x40 75x50 75x60 75x75 75x100 75x125 75x150 100x25 100x40 100x50 100x60 100x75 100x100 100x125 125x25 125x40 125x50 125x75 125x100 125x125 150x25 150x40 150x50 150x60 150x75 150x100 150x125 175x25 175x40 175x50 H.P. of Pumpset 3 1 1 1.5 2 4 5 6 1 1.5 2 2 4 5 6 7.5 1 2 3 4 4 5 6 3 3 3 4 5 6 3 3 3 4 4 5 7.5 3 3 3 Unit 4 1 No 1 No 1 No 1 No 1 No 1 No 1 No 1 No 1 No 1 No 1 No 1 No 1 No 1 No 1 No 1 No 1 No 1 No 1 No 1 No 1 No 1 No 1 No 1 No 1 No 1 No 1 No 1 No 1 No 1 No 1 No 1 No 1 No 1 No 1 No 1 No 1 No 1 No Rate for 2013-14 in Rupees 5 13804.00 13804.00 16393.00 20502.00 29875.00 36511.00 44290.00 13804.00 15684.00 17536.00 20502.00 29875.00 36511.00 43749.00 55882.00 14930.00 17536.00 17556.00 29875.00 29875.00 36511.00 44290.00 14930.00 17556.00 22806.00 29875.00 36511.00 44290.00 14930.00 17556.00 17556.00 30165.00 29875.00 36511.00 55882.00 14930.00 17556.00 22806.00

Sl. No. 1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38

Sl. No. 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80

Duty lpm x m 175x60 175x75 175x100 200x25 200x40 200x50 200x60 200x75 200x100 200x125 250x25 250x40 250x50 250x60 250x75 250x100 250x125 300x25 300x40 300x50 300x60 300x75 300x100 350x25 350x40 350x50 350x60 350x75 350x100 400x25 400x40 400x50 400x60 400x75 500x25 500x40 500x50 500x75 600x25 600x40 600x50 600x75

H.P. of Pumpset 4 5 6 3 4 4 4 6 7.5 10 3 4 5 5 7.5 7.5 10 3 5 5 6 10 10 3 5 7.5 7.5 10 10 3 5 5 7.5 10 5 5 5 10 5 7.5 7.5 10

Unit 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No

Rate for 2013-14 in Rupees 29875.00 29875.00 36511.00 14930.00 17556.00 17556.00 29875.00 29875.00 36511.00 66194.00 14930.00 17556.00 22806.00 29875.00 36511.00 40604.00 81197.00 14930.00 17556.00 22806.00 29875.00 36511.00 40604.00 17556.00 25687.00 22806.00 29875.00 36511.00 40604.00 17556.00 25687.00 22806.00 32256.00 40604.00 17556.00 25687.00 22806.00 40604.00 17556.00 25687.00 32256.00 40604.00

Sl. No. 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 Note:

Duty lpm x m

H.P. of Pumpset

Unit

Rate for 2013-14 in Rupees 30146.00 40604.00 40604.00 40604.00 30146.00 40604.00 40604.00 40604.00 40604.00 40604.00 40604.00 40604.00 45980.00 48258.00 54390.00 83050.00 51030.00 83050.00 90530.00 87194.00 55770.00 80190.00 93720.00 170941.00 84150.00 93720.00 93720.00 93720.00 93720.00 93720.00 93720.00 93720.00

700x40 10 1 No 700x60 10 1 No 700x80 10 1 No 700x100 10 1 No 800x40 10 1 No 800x60 10 1 No 800x80 10 1 No 800x100 10 1 No 900x40 10 1 No 900x60 10 1 No 900x80 10 1 No 900x100 10 1 No 1000x40 15 1 No 1000x60 15 1 No 1000x80 20 1 No 1000x100 35 1 No 1250x40 20 1 No 1250x60 25 1 No 1250x80 35 1 No 1250x100 35 1 No 1500x40 20 1 No 1500x60 30 1 No 1500x80 40 1 No 1500x100 50 1 No 2000x40 30 1 No 2000x60 45 1 No 2000x80 50 1 No 2000x100 60 1 No 2500x40 35 1 No 2500x60 60 1 No 2500x80 75 1 No 2500x100 90 1 No Rates are excluding excise duty and VAT. Excise duty at 6.18% as extra. VAT at 5% on Rate + excise duty as extra

Sl.N o.

Pump Capacity in LPM 1 2 3 4 5 6 7 8 9 1500 2500 3000 3500 4000 5000 6000 7000 8000 9000 10000 15000 20000 25000 30000

5. HORIZONTAL SPLIT CASTING CENTRIFUGAL PUMP (1500 RPM) (BRONZE IMPELLER AND SS10 SHAFT) Rupees in Lakhs
Rate for 2013-14 in Rupees Head in Metres

10 11 12 13 14 15

25 30 35 40 45 50 55 60 70 2.04 2.04 2.41 2.41 2.43 3.09 3.13 3.16 3.34 2.04 2.04 2.49 2.58 3.13 3.15 3.13 4.04 3.7 2.15 2.04 2.58 2.58 2.8 2.9 2.9 4.13 4.13 2.04 2.04 2.58 2.58 3.66 3.76 4.18 4.34 4.4 2.36 2.36 2.58 2.58 3.34 3.76 4.06 4.13 4.23 2.73 2.73 2.73 2.96 3.89 4.28 4.31 4.75 4.93 2.58 2.58 3.83 3.89 3.89 4.35 4.67 5.13 5.38 3.55 3.68 3.89 3.89 4.26 4.44 4.54 5.13 5.14 3.56 3.39 3.69 4.44 4.44 4.44 4.63 4.76 8.74 3.56 3.8 3.83 4.44 4.46 4.45 4.51 4.61 9.34 3.56 3.9 3.84 4.46 4.74 4.64 4.64 8.49 10.71 4.38 4.53 4.4 5.41 5.41 6.54 7.15 9.34 10.71 4.81 4.9 4.91 11.39 12.53 12.53 12.53 12.53 12.53 12.25 12.53 12.53 12.53 12.53 12.53 12.53 12.53 12.53 12.46 12.94 13.55 13.55 13.55 13.55 13.55 16.25 17.88

80 3.34 3.83 3.96 4.79 4.23 4.93 5.38

90 3.74 3.83 3.99 4.79 4.23 4.93 5.38

10.71 10.71 12.53 12.53

10.79 10.79 12.53 12.53

Note: 1) The rates are inclusive of MS base plate, flexible tyre coupling and foundation bolts. 2) The rates are inclusive of all duties taxes handling charges and at F.O.R. destination. 3) Efficiency may be taken from Rupees in Lakhs

6.HORIZONTAL SQUIRREL CAGE MOTOR 1500 RPM AC 3 Phase /415 V/ Horizontal SPDP 4 Pole Squirrel cage Induction motor for HSC Centrifugal pumps Sl. No 1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Note: KW 2 9.3 11 15 18.5 22 30 37 45 55 75 90 110 125 132 150 160 180 187 200 220 250 280 300 HP 3 12.5 15 20 25 30 40 50 60 75 100 120 150 170 180 200 215 240 250 270 300 335 375 400 Rate for 2013-14 in Rupees 4 81563.00 85811.00 106868.00 137750.00 151500.00 175363.00 218923.00 282338.00 261250.00 408375.00 430375.00 542625.00 698125.00 739500.00 746750.00 818500.00 871750.00 912250.00 978500.00 1281625.00 1461192.00 2025125.00 2172750.00

The above rates are inclusive of excise duty, taxes, handling charges etc., Excise duty at 12.36,VAT at 5%

7.HORIZONTAL SQUIRREL CAGE MOTOR 1000 RPM AC 3 Phase /415 V/ Horizontal SPDP 6 Pole Squirrel cage Induction moror for HSC Centrifugal pumps Sl.No 1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 Note: KW 2 9.3 11 15 18.5 22 30 37 45 55 75 90 110 125 132 150 160 180 187 200 220 250 HP 3 12.5 15 20 25 30 40 50 60 75 100 120 150 170 180 200 215 240 250 270 300 335 Rate for 2013-14 in Rupees 4 74534 78320 110379 130356 167790 209291 261602 322264 369206 443155 502690 645431 767925 767925 819718 884035 1237200 1256988 1360531 1539083 1723007

The rates are inclusive of excise duty,taxes, handling charges etc., Excise duty at 12.36%,VAT at 5%.

10.0 IRON CORE OIL COOLED TRANSFORMERS WITH COPPER WINDING CONFIRMING TO IS 2026 Rate for 2013-14 in Rupees Sl.no Rating in KVA 11KV 1 1 2 3 4 5 2 160 200 250 315 400 3 219600.00 243000.00 265500.00 327600.00 392400.00 22 KV 4 234000.00 261000.00 288000.00 344700.00 445500.00 11KV/22KV 5 261000.00 288000.00 315000.00 378000.00 479700.00

Note :- Excise duty at 12.36 % and TNVAT at 5% and handling charges are extra. 10.1 OIL NATURAL AND AIR NATURAL COOLED COPPER WINDING H.T. TRANSFORMER CONFORMING TO IS 2026 Rate for 2013-14 in Rupees Sl.No. 1 1 2 3 4 Rating in KVA 11KV/433V 2 500 630 750/800 1000 3 524700.00 653400.00 803000.00 957000.00 22KV/433V 4 564300.00 693000.00 882000.00 1035000.00

Note : Excise duty at 12.36%, TNVAT at 5% and handling charges are extra

11.0 SINGLE PHASE PANEL BOARD WITH TWO LEVEL GUARD AND AUTO START Sl. No. 1 2 3
Note

HP 1 1.5 2

Unit
1 No. 1 No 1 No

Rate for 2013-14 in Rupees 4065.00 4453.00 5082.00

1) The rate are excluding excise duty and taxes 2) Excise duty Nil and VAT at 5 % extra over the above rate. 3)The above rates are inclusive of two level guard worth Rs.550/- and auto star facility worth Rs. 400/4) Timer is not recommended for this panel board. 2) Panel board should be provided as per specification given in Board circular No. 23/DCE/QATA/2004/Dt. 23.8.2004

11.1 3 PHASE PANEL BOARD- D.O.L. WITH TWO LEVEL GUARD AND AUTO START Sl. No. 1 2 3 4 5 6
Note

HP 1 2 3 4 5 6

Unit 1 No. 1 No 1 No 1 No. 1 No 1 No

Rate for 2013-14 in Rupees 9020.00 9020.00 9020.00 9020.00 9020.00 9020.00

1) The rate are excluding excise duty and taxes 2) Excise duty Nil and VAT at 5 % extra over the above rate. 3)The above rates are inclusive of two level guard worth Rs.550/- and auto star facility worth Rs. 400/4)For Timer facility if necessoryRs. 4000 may be added as extra. 2) Panel board should be provided as per specification given in Board circular No. 23/DCE/QATA/2004/Dt. 23.8.2004

11.2 3 PHASE PANEL BOARD-STAR DELTA WITH TWO LEVEL GUARD AND AUTO START Sl. No. 1 2 3 4 5 6 7
Note

HP 6 7.5 10 12.5 15 20 25

Unit 1 No. 1 No 1 No 1 No. 1 No 1 No 1 No

Rate for 2013-14 in Rupees 10660.00 12870.00 15015.00 15675.00 15675.00 16500.00 16500.00

1) The rate are excluding excise duty and taxes. 2) Excise duty Nil and VAT at 5 % extra over the above rate. 3)The above rates are inclusive of two level guard worth Rs.550/- and auto star facility worth Rs. 400/-. 4) Timer is not recommended for this panel board. 2) Panel board should be provided as per specification given in Board circular No. 23/DCE/QATA/2004/Dt. 23.8.2004.

11.3 DOL STARTER WITH SINGLE PHASING PREVNTOR WITH AMMETER CONFORMING TO IS 13947 WITH AUTO RESTART FACILITY FOR PUMP HOUSES WHERE PANEL BOARDS ARE AVAILABLE Up to 10 HP rating Rs. 4416 (The above rates are inclusive of all taxes ,duties and handling charges Excise duty at 10.3 %,VAT 5 %)

11.4 FLEX COMPENSATED MAGNETIC AMPLIFIER SOFT STARTER SUITABLE FOR L.T.SQUIRREL CAGE MOTOR Sl. No. 1 1 2 3 4 5 6 7 8 Description 2 30 to 37 38 to 75 76 to 135 136 to 160 161 to 250 251 to 300 301 to 500 501 to 750 Unit
3

Rate for 2013-14 in Rupees


4

1 1 1 1 1 1 1 1

No No No No No No No No

167600.00 273200.00 409600.00 467000.00 640800.00 758400.00 1170800.00 1512200.00

11.5 FLEX COMPENSATED MAGNETIC AMPLIFIER SOFT STARTER SUITABLE FOR H.T.SQUIRREL CAGE MOTOR Sl. No. 1 1 2 3 4 5 6 7 8 9 10
Note: **

Description 2 250 300 350 400 500 600 700 800 900 1000

Unit
3

Rate for 2013-14 in Rupees


4

1 1 1 1 1 1 1 1 1 1

No No No No No No No No No No

635600.00 698900.00 741100.00 790000.00 825500.00 931900.00 974000.00 1016200.00 1102400.00 1185000.00

1)The rates are inclusive of excise duty taxes etc. 2) DOL starters are to be adopted up to 6 HP 3) Air break fully automatic star delta starters are suggested for above 6 HP upto 20HP except submersible pumpsets for which fully automatic ATS starters a 4) FCMA soft starter are to be adopted for 100 HP and above. 5)Excise duty at 12.36% VAT at 5%

12.0 L.T. CABLES 3,3.5,4 CORE 1.1 KV GRADE ARMOURED ALUMINIUM CONDUCTOR CABLE CONFORMING TO IS 1554 PART I WITH ISI MARKING Sl.NO. 1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 Description 2 4sq.mm 6sq.mm 10sq.mm 16sq.mm 25sq.mm 35sq.mm 50sq.mm 70sq.mm 95sq.mm 120sq.mm 150sq.mm 185sq.mm 240sq.mm 300sq.mm 400sq.mm Unit 3 metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre Rate for 2013-14 in Rupees 3 Core 4 42.00 51.00 58.00 61.00 76.00 93.00 123.00 163.00 213.00 256.00 312.00 385.00 486.00 590.00 755.00 3.5 Core 5 ----89.00 108.00 140.00 195.00 240.00 303.00 359.00 437.00 554.00 675.00 861.00 4 Core 6 49.00 56.00 66.00 73.00 97.00 123.00 158.00 210.00 268.00 330.00 403.00 493.00 625.00 764.00 978.00

Note: Excise duty 12.36% and VAT at 5% are extra 12.1 PVC INSULATED AND SHEATHED 3 CORE FLAT TYPE COPPER CABLE CONFORMING TO IS 694/1990 Description 1.5 sq.mm 2.5 sq.mm 4.0 sq.mm 6.0 sq.mm 10.0 sq.mm 16.0 sq.mm Unit meter meter meter meter meter meter Rate for 2013-14 in Rupees With excise duty 36.00 59.00 85.00 126.00 214.00 330.00 Without excise duty 32.00 52.00 76.00 113.00 192.00 296.00

Sl.No. 1 2 3 4 5 6 Note:

Excise duty at 12.36% and VAT at 5% are extra.

12.2 12.3

RATE FOR CABLE JOINTS INCLUDING JOINTING MATERIALS AND LABOUR The cost of cable per meter will be the cost per joint CABLE LAYING Rate for 2013-14 in Rupees For laying below GL including earth work per meter 90.00 130.00 190.00 For laying in trenches inside the pump room or in air per meter 60.00 86.00 150.00

Sl.No. 1 2 3 12.4 Sl.No. 1 2 3 Note:

Description up to 95 sq. mm 95 to 240 sq.mm 240 to 400 sq.mm CABLE CLAMPS Description up to 95 sq. mm 95 to 240 sq.mm

Unit each each

Rate for 2013-14 in Rupees 180.00 220.00

each 320.00 240 to 400 sq.mm 1.For every 3 metre length one set of clamp is to be provided 2.Suitable number of clamps are to be arrived at according to the length 3.Provision for cable trench and delivery pipe ducting are to be provided in pump house detailed estimate.

H.T. CABLE PVC INSULATED ARMOURED ALUMINIUM CONDUCTOR CABLE Rate for 2013-14 in Rupees Sl.No. Description Unit 11KV 1 2 3 4 5 6 3 C 240 sq.mm 3 C 185 sq.mm 3 C 150 sq.mm 3 C 120 sq.mm 3 C 95 sq.mm 3 C 70 sq.mm metre metre metre metre metre metre 787.00 656.00 557.00 495.00 420.00 376.00 12KV 962.00 813.00 723.00 650.00 589.00 519.00

13.0 Sl. No. 1

VACCUM PUMP SET WITH ACCESSORIES Description Rate for 5 HP Model/ Rotary type Vaccum pumpsets (Pumpset + GI Pipes + Fittings + Starters + Valves + 100 Lr.Tank) including Transportation, handling charges all taxes and duties Rate for 10 HP Vaccum pumpset with all above Accessories 150mm dia Pressure Gauge and Vaccum guage including all accessories as per specification (For Suction and Delivery to be mounted on wall on Teak Wood Board) 14.0 Unit Rate for 2013-14 in Rupees

1 No

212129.00

2 3

1 No

242077.00

1 No

3744.00

MOULDED CASE CIRCUIT BREAKER(MCCB) Rate for 2013-14 in Rupees 3POLE 8857.00 10500.00 13000.00 23553.00 23553.00 28500.00 30000.00 33188.00 45000.00 70000.00 79000.00 4 POLE 11000.00 13000.00 17424.00 24684.00 28314.00 33000.00 34500.00 40000.00 59968.00 90000.00 115000.00

Sl.N o. 1 2 3 4 5 6 7 8 9 10 11

Range 32-100 125 160 200 250 320 400 630 800 1000 1250

90000.00 145000.00 12 1600 NOTE: 1) The rates are inclusive of all taxes, duties and handling charges and F.O.R. destination. 2) The rate for MCB for single phase useage the PWD schedule of rates shall be referred. 3) Add 35% cost of MCCB/ACB/ MCB towards the cost of fabrication other fittings and labour 4) Upto 15 KW distribution box shall be used for more than one outgoing loads and for rates PWD schedule rates shall be referred.

15.0 RATE FOR MIXED DIE ELECTRIC CAPACITOR WITH TNEB TEST CERTIFICATE WITH ACCESSORIES INCLUDING BANKING CONFORM TO IS 2834. Rs.400/- per KVAR (includign all taxes, duties and handling charges). Note: a. The rate for mixed Die Electric Capacitor with Test Certificate given as Rs.400/- per KVAR is inclusive of all taxes and duties and inclusive of Banking charges, such as providing of copper bus bars with provision for adding atleast 2 capacitors at later date, cable entry box, fabricating charges etc. complete. This rate is not applicable for replacement of capacitors which do not require banking and fabrication works. 16.0 Sl.N o. 1 Description Up to 50HP/37 KW (which includes LT meter panel board 6 Nos. suitable fuse carriers 75 HP/56 KW (which includes LT meter panel board 6 Nos. suitable fuse carriers 75HP-150HP/56-112 KW (which includes LT meter panel board 6 Nos. suitable fuse carriers IN HT supply using LT metering board (Above 150 HP below 200 HP) 112-150 KW LT METERING BOX Unit Rate for 2013-14 in Rupees 18750.00 24470.00 30580.00

1 No. 1 No. 1 No.

2 3

1 No.

50000.00

17.0 TRANSFORMER SUB STATION RELATED WORKS Sl.No. Description Designing and preparation of CEIG drawings, obtaining Approval and safety certificate including submission of Completion report and rectification report. Supply, delivery of 6 pole structure materials with suitable Size RSJ along with all structure material are as under. For 11 KV Sub station For 22 KV Sub station Construction of transformer plinth Chain link fencing with gate including the TNEB 2 poles Spreading of materials as per CEIG requirements Transformer yard earthing Upto 250 KVA Transformer sub station Above 250 KVA Transformer sub station erection charges Unit Rate for 2013-14 in Rupees

1 No.

50000.00

2 a b 3 4 5 a b 6

1 No. 1 No. 1 No. 1 No.

250000.00 350000.00 17480.00 45000.00

1 No. 1 No. 1 No.

25000.00 50000.00 15890.00

Note: Provision for cement concrete flooring has to be made at the sub astation yard

17.1

AIR CIRCUIT BREAKER Rate for 2013-14 in Rupees 3POLE 4 POLE 170400.00 179700.00 209400.00 246400.00 300300.00 384100.00 473000.00

Sl.No. 1 2 3 4 5 6 7 Note:

Range in AMPS 1000 1250 1600 2000 2500 3200 4000

138500.00 146700.00 162800.00 203500.00 245600.00 311200.00 385300.00

The rates are inclusive of all taxes, duties, handling charges and F.O.R. destination.

18.0 Sl.No.

SAFETY APPLIANCES Description Unit Rate for 2013-14 in Rupees 410.00 590.00 1650.00 660.00 500.00 650.00 2750.00

1 2 3 4 5 6 7

Electrical gloves tested to 11 KV /22 KV with wooden box dusted with french chalk powder Electrical quality 6mm thick rubber mat 5 kg capacity ISI marked Dry chemical powder fire extinguisher Fire Bucket-3 Nos Hooked to MS stand Laminated shock treatment chart Wooden First Aid Box Rechargeable Emergency fluorescent lamp) H.T. SUPPLY Wooden ladder 3M Ht. Earth Discharge Rod lamp( 600mm

1 No. 1 No. 1 No. 1 No. 1 No. 1 No. 1 No.

8 9 Note:

1 No. 1 No.

990.00 830.00

The rates are inclusive of all taxes,duties, handling charges and F.O.R destination

19.0 Sl.No.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

TOOLS Unit 1 No. 1 No. 1 No. 1 1 1 1 No. No. No. No. Rate for 2013-14 in Rupees 500.00 700.00 41.00 70.00 137.00 198.00 250.00 300.00 3000.00 1750.00 600.00 594.00 487.00 422.00 430.00 144.00 90.00 2500.00 1500.00 372.00 750.00 1798.00 1080.00 450.00 242.00 372.00 317.00 350.00 540.00 540.00

Description 6 Chain wrench best India make 8Chain Wrench Best India Make Connector Screw Driver 901 Taparia Make 200mm Screw Driver 825 Taparia Make 300mm Screw Driver 829 Taparia Make 400mm Screw Driver 930 Taparia Make 200mm Cutting Plier Taparia Make 800gm Ball Pane Hammer with Handle Taparia Make Digital Tong Tester CE Make Digital Multi Meter CE Make 15 Screw Spanner Taparia Make 12 Bearing Puller Lever Type Grease Gun 12Screw Spanner Crow Bar 5 1 Cold Chisel Hacksaw Frame with Blade Electrical Air Blower Digital Tachometer Hand Crimpling Tool 8 DE Spanner set 6 to 32 Jhalani Make Rings spanner set 6 to 32 Jhalani Make Pipe Wrench 24 Jhalani Make Pipe Wrench 14 Jhalani Make 12 Flat rough File Scissors Make 12 Flat smooth File Scissors Make 12Round File Rough Scissors 12 Round File Smooth Scissors Make 12Half Round File Rough Scissors Make 12Half Round File Smooth Scissors Make

1 No. 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No.

1 No.

Note: The rates are inclusive of all taxes,duties, handling charges and F.O.R destination

20.0 PUMP ROOM WIRING AND OTHER ITEMS Sl.No. Description Providing lighting wiring using MS conduit pipes and specials with 2 runs 1.5 sq.mm PVC copper wire and 1 run 12 swg GI wire for earthing for light, fans and 5A plug points including switch box 5A switch sockets ceiling rose and consumables Supply of portable hand lamp with 100w bulb, lamp guard and wooden handle and 25M long flexible cable. Supply of pedestal fan Unit Rate for 2013-14 in Rupees

1 No.

750.00

2 3

1 No. 1 No.

830.00 2860.00

Note:

1)Add 35% for wiring on the total fittings cost. 2)The above rates are inclusive of all taxes duties handling charges and F.O.R destination. 3)Excise duty at 12.36% VAT 5%. 21.0 TWIN GI EARTHING

Sl.No.
1 2 3 4

Description

Unit

Rate for 2013-14 in Rupees

1500.00 Upto 25 HP installation 1 No. 2000.00 Above 25-60 HP 1 No. 3000.00 Above 60-150 HP 1 No. 5000.00 Above 150 HP 1 No. Note: In case of collector well the collctor well distance from the bank of the rivr should be ascertained to find out the weight of GI strip to be usd only in the foot bridge and rate rate of Rs.47/- per Kg should be adopted for estimation and this amount should be added with the above rates.

22.0 H.O.T. CRANE AND ACCESSORIES

Sl.No.

Description 2T capacity hand operated over head Travelling (HOT) crane suitable for a span upto 6 Mtrs, and travel length upto 10 Mtrs. with clear lift upto 6 Mtrs. including gear type chain pulley block and geared Travelling trolley complete with all accessories.

Unit

Rate for 2013-14 in Rupees

1 No.

302570.00

2T HOT crane with above specifications upto 1 No. 8 M Span 2T HOT crane with above specifications upto 3 1 No. 10 M Span 3T capacity hand operated over head Travelling (HOT) crane suitable for a span upto 6 Mtrs, and travel length upto 10 Mtrs. 4 1 No. with clear lift upto 6 M including gear type chain pulley block and geared Travelling trolley complete with all accessories. 3T HOT crane with above specifications upto 5 1 No. 8 M Span 3T HOT crane with above specifications upto 6 1 No. 10 M Span 5T capacity hand operated over head Travelling (HOT) crane suitable for a span 7 upto 6 Mtrs, and travel length upto 10 M with 1 No. clear lift upto 6 M including gear type chain pulley block and geared Travelling trolley complete with with all accessories. 5T HOT crane above specifications upto 8 1 No. 8 M Span 5T HOT crane with above specifications upto 9 1 No. 1M Span Note: The rates are inclusive of all taxes,duties, handling charges.
2

312380.00 333640.00

325470.00

335280.00 348360.00

420320.00

449760.00 479200.00

23.0 CARRYING ENERGY EFFICIANCY IMPROVEMENT JOB BY APPLICATION OF GLASS FLAK COATING FOR HORIZANDAL SPLIT CASE PUMPS Rupees in Thousands Rate for 2013-14 in Rupees Sl.No Capacity in LPM 25 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 1500 2500 3000 3500 4000 5000 6000 7000 8000 9000 10000 15000 20000 25000 30000
31 37 39 39 39 40 44 54 72 79 87 104 129 137 158

HEAD IN METRES 30
31 37 39 39 39 44 44 59 72 79 91 110 137 158 158

35
31 37 39 39 42 44 44 68 72 87 91 110 137 158 161

40
31 38 39 39 42 44 54 68 79 87 91 110 137 159 161

45
31 39 39 40 44 44 54 72 79 87 91 110 137 159 168

50

55

60

70

80

90

44 44 54 54 72 79 87 91 110 137 159 168

44 44 54 59 72 79 87 91 110 137 159 168

44 44 54 59 72 79 87 91 110 137 159 168 72 79 87 91 110 137 159 168 137 158 168 188 137 158 168 188 72

Note: The rates for testing and repairs, if any required, for pump sets will be extra.

23.1 CARRYING ENERGY EFFICIENCY IMPROVEMENT JOB BY APPLICATION OF GLASS FLAK COATING FOR MIXED FLOW PUMPS Sl.No Capacity in Cum/Hr. Rate for 2013-14 in Rupees Head in meters 10 15 1 400 40000 40000 2 500 40000 40000 3 600 43000 43000 4 700 45000 45000 5 800 47000 47000 6 900 47000 47000 7 1000 57000 57000 8 1100 57000 57000 9 1200 77000 77000 10 1300 77000 77000 11 1400 98000 98000 12 1500 98000 98000 Note:The rates for testing and repairs, if any required, for pump sets will be extra.

23.2 CARRYING ENERGY EFFICIANCY IMPROVEMENT JOB BY APPLICATION OF GLASS FLAK COATING FOR VERTICAL TURBINE PUMPS Rate for 2013-14 in Rupees Capacity in LPM 2500 3000 3500 4000 5000 6000 7000 8000 9000 10000 15000 20000 25000 30000 HEAD IN METERS 15 60000 60000 60000 64000 64000 70000 79000 88000 88000 99000 109000 120000 130000 140000 20 59300 59300 59300 63260 63260 69200 78110 86970 86970 97860 107760 118650 128550 138450 25 30 35 84050 84050 84050 89000 89000 93900 103800 113700 113700 118650 133500 143400 158250 168150 40 45 50 93900 108750 118650 126570 126570 133500 138450 148350 148350 158250 168150 178050 182950 192850 55 60 108750 123600 133500 148350 148350 158250 168150 178050 178050 182950 192850 202750 212650 222550 70 80 90 108600 178050 182950 192850 192850 202750 212650 222550 222550 232450 242350 252550 262150 272050

Sl.No 1 2 3 4 5 6 7 8 9 10 11 12 13 14

Note: The rates for testing and repairs, if any required, for pump sets will be extra.

RATES FOR BUILDING MATERIALS

1
BUILDING MATERIALS 1. Cement Rs. 5,500/ per metric tonne (Rupees Five Thousand and Five Hundred only)

The rate for cement is inclusive of all taxes, freight charges etc., at Stockyard/ Dealers Godown. Necessary lead charges (i.e. excluding loading and unloading charges) as applicable as per conveyance table, may be allowed from the Stockyard / Dealers Godown to the site of work, if duly certified by an officer not below the rank of Assistant Executive Engineer. However, in the case, if the source is specified as Stockyard the same shall be decided and approved by the Superintending Engineers concerned. 2. Steel Rods of all sizes - Rs.48, 000/- per metric tonne (Rupees Forty Eight thousand only) The rate for steel is inclusive of all taxes, freight charges, etc., at Stockyard/ Dealers Godown. Necessary lead charges (i.e. excluding loading and unloading charges) as applicable as per conveyance table, may be allowed from the Stockyard/ Dealers Godown to the site of work, if duly certified by an officer not below the rank of Assistant Executive Engineer. However, in the case, if the source is specified as Stockyard the same shall be decided and approved by the Superintending Engineers concerned. The above rates for cement and steel are with effect from for adoption in the estimate.
(The above rates are subject to revision as and when revised by the PWD authorities)

.06.2013

BUILDING MATERIALS
Sl. No. Description Unit Rates in Rupees (2013-14)

3 a. b. 4 a. b. 5 a b. c. 6 a. b. 7 a. b. c. 8 a. b. 9 a. b. 0 a. b. 11 a. b. 12 a. b. c. d. e. f. g.

Bricks-II Class Table Moulded (Chamber burnt) 9 x 4 x 3 1000 Nos. 9 x 4 3/8 x 2 1000 Nos. Bricks-II Class (Ground Moulded Chamber Burnt) 9x4 x3 1000 Nos. 9x4 3/8 x 2 Bricks-III burnt) Class (country bricks, Kiln 1000 Nos. 1000 Nos. 1000 Nos. 1000 Nos. 1000 Nos. 1000 Nos.

5500.00 5290.00

4740.00 4600.00

22 x 11 x 5 cm (8 x 4 x 2) 22 x 11 x 5.7 cm (8 x 4 x 2 ) 22 x 11 x 7cm (8 x 4 x 2 ) Fly Ash bricks 230 x 110 x 70mm 230 x 110 x 75mm

3005.00 3140.00 3985.00 4600.00 4740.00

Bricks country (specially moulded for well steining) 8 x 4 x 2 1000 Nos. Perforated Bricks 19 x 9 x 9cm Terrace Bricks 15 x 7.5 x 2.5cm Flat Tiles 15cm x 15cm x 12mm 15cm x 15cm x 20mm Brick Jelly 40mm Size 20mm size Pressed Tiles 20cm x 20cm x 2cm 23cm x 23cm x 2cm Pan Tiles 23cm x 8cm x 1.7cm 16.5cm x 8cm x 1.7cm Best Mangalore Tiles st 1 Class A Class AA Best Mangalore Ridge Tiles Best Mangalore Ceiling Tiles Best Mangalore Glass roofing tiles Best Mangalore Ventilating tiles (single) Best Mangalore Ventilating tiles (double) 1000 Nos. 1000 Nos. 1000 Nos. 1000 Nos. 1000 Nos. 1000 Nos. cu.m. cu.m.

1770.00 2695.00 693.00 652.00 773.00 495.00 550.00 8710.00 12340.00

1000 Nos. 1000 Nos. 1000 Nos. 1000 Nos. 1000 Nos. 1000 Nos. Each Each Each

339.00 282.00 8145.00 8295.00 23790.00 5000.00 236.00 35.75 44.80

Sl. No.

Description

Unit

Rates in Rupees (2013-14)

13 a. b. 14 a. b. c. d. e.

Mosaic Flooring tiles GREY 25cm x 25cm x 2cm 20cm x 20cm x 2cm Mosaic (other colour) 25cm x 25cm x 2cm 20cm x 20cm x 2cm Mosaic (Green) 20cm x 20cm x 2cm Mosaic (Green) 25cm x 25cm x 2cm Mosaic Chequered Tile of Grey colour size 25 cm x 25 cm x 2 cm Stone and Road materials Rough stone for Masonry works (Hard Granite) Rough stone for revetment works Jeddy size for revetment (Hard granite) Cut stone pillar of size 0.15 x 0.15 x 2.1M From boulders without blasting for revetment From boulders without blasting for masonry Course Rubble stone for masonry works Course Rubble stone for Arch works Chisel dressed stone 70cm x 30cm x 29cm 37cm x 30cm x 29cm Hammer dressed stone, 37cm x 30cm x 29cm Cut stone fully dressed to size on all faces Cut stone roughly dressed Ashlar arch stone fully dressed to size all faces Flooring stone SS size (not less than 10cm thick) Stone slab for culvert (3 faces, one line dressed) Above 1.2m Up to 1.2m Stone slab for culvert (3 faces, two line dressed) For lintel coping (3 faces, two line dressed) Bond stones Kilometre stone 1.65 x 0.45 x 0.15m Hecta metre stone 0.90 x 0.10 x 0.10m 0.75 x 0.23 x 0.10m Each Each 92.00 170.00 Each cu.m. cu.m. cu.m. sq.m. 92.00 4735.00 3265.00 3600.00 265.00 Each Each 132.00 119.00 1000 Nos. 1000 Nos. 1000 Nos. 1000 Nos. 1000 Nos. 1000 Nos. 1000 Nos. 10980.00 6995.00 15100.00 8925.00 10980.00 17175.00 13730.00

15 16 17 18 19 20 21 22 23 a. b. 24 a. 25 26 27 28 29 a. b. 30 31 32 33 34 a. b.

cu.m. cu.m. cu.m. Each cu.m. cu.m. cu.m. cu.m.

332.00 288.00 317.00 124.00 85.25 111.00 266.00 288.00

cu.m. cu.m. cu.m. cu.m. cu.m. Each

3435.00 3115.00 3830.00 3830.00 455.00 328.00

Sl. No.

Description

Unit

Rates in Rupees (2013-14)

35 a. b. c. d. e. f. g.

Demarcation stone (Two line dressed for top 30cm) 0.75 x 0.15 x 0.15m 0.90 x 0.23 x 0.23m 0.75 x 0.23 x 0.23m 0.90 x 0.15 x 0.15m Demarcation Stone with letters cut 0.75 x 0.15 x 0.15m Edge stone 0.45 x 0.15 x 0.15m T.R.S. Bench Mark Stone neatly dressed the exposed surface to a height of 15cm including cutting letters 0.15 x 0.15 x 0.60m 0.10 x 0.10 x 0.25m

Each Each Each Each Each Each

69.00 88.50 81.95 75.90 92.40 42.35

i) ii)

Each Each Each

106.00 77.00 122.00

36. a. Guard Stone (Two line dressed for 45cm) 23cm dia 1.0m long b. Guard stone (Top 0.70m chisel dressed and 0.50m bottom roughly dressed) 0.23m x 0.23m x 1.20m long (Two line dressed top 45cm) 23cm dia 1.0m long Guard stone (Top 0.70m chisel dressed and 0.50m bottom roughly dressed) 0.23m x 0.23m x 0.9m long (Two line dressed top 45cm) 23cm dia 0.90m long Guard stone (Top 0.70m chisel dressed and 0.50m bottom roughly dressed) 0.15m x 0.15m x 0.90m long (Two line dressed top 45cm) 23cm dia 0.90m long Guard stone 90cm long 23cm dia Hard broken Granite stone jelly (I.S.S.) machine crushed / Hand broken. 90mm size 80mm size 63mm size 50mm size 40mm size 25mm size 20mm size 12mm size 10mm size 6mm size 3mm size Quartz metal 50mm 40mm Soft broken stone 63mm 40mm Laterite 40mm to 75mm size

Each

130.00

c.

Each

122.00

d.

Each

85.25

e. 37

Each

63.25

i. ii. iii. iv. v. vi. vii. viii. ix. x. xi. 38 i. ii. 39 i. ii. 40

cu.m. cu.m. cu.m. cu.m. cu.m. cu.m. cu.m. cu.m. cu.m. cu.m. cu.m. cu.m. cu.m. cu.m. cu.m. cu.m.

319.00 358.00 412.00 478.00 742.00 638.00 1034.00 958.00 705.00 478.00 431.00 72.60 73.70 56.00 62.70 72.60

Sl. No.

Description

Unit

Rates in Rupees (2013-14)

41 b. b. c.

Kankar 40mm to 75mm size Soling stones 15cm cube (blasted) Well Gravel Screened Kankar Gravel

cu.m. cu.m. cu.m. cu.m. cu.m. cu.m. cu.m. cu.m. cu.m. cu.m. cu.m. cu.m. cu.m. sq.m sq.m sq.m cu.m. cu.m. cu.m.

72.60 84.70 138.60 130.00 107.80 79.20 72.60 92.40 71.50 367.00 110.00 110.00 28.60 342.00 330.00 304.00 1180.00 869.00 77.00

42.a Soling stones 15cm cube (un blasted) 43.a Gravel

44.a Quarry rubbish b. c. d 45 46 47 ii) iii) 49 50 51 Stone dust Pond Ash (wet /dry) Crushed Stone Sand Sand for Mortar Sand for Filling Clay for puddle and masonry Cuddapah slab 38mm/40mm thick Cuddapah slab 20mm/30mm thick LIME Shell Lime (Slacked and screened) Freshly Slacked and Screened Burnt Lime Stone Stone Lime or Lime Metal TIMBER AND ROOFING MATERIALS 52 53 54 55 56 i) ii) iii) iv) v) vi) vii) viii) ix) x) Teakwood scantlings (over 3m for joists and rafters) Malabar Teakwood scantlings (for principal rafters) - Malabar tiebeams and

48. i) Cuddapah slab 50mm thick

cu.m. cu.m. cu.m. cu.m.

97400.00 95830.00 93290.00 83000.00

Teakwood scantlings (over 2m and below 3m in length) - Malabar Teakwood scantlings(below 2m in length ) Malabar Teakwood planks Over 45cm wide and 12mm thick. Over 30cm and up to 45cm wide and 12mm thick Over 30cm and up to 45cm wide and 12mm to 25mm thick Over 30cm and up to 45cm wide and 25mm to 40mm thick Over 15cm and up to 30cm wide and 12mm thick Over 15cm and up to 30cm wide and 12mm to 25mm thick Over 15cm and upto 30cm wide and 25mm to 40mm thick Up to 15cm wide and 12mm thick Up to 15cm wide and 12mm to 25mm thick Up to 15cm wide and 25mm to 40mm thick

cu.m. cu.m. cu.m. cu.m. cu.m. cu.m. cu.m. cu.m. cu.m. cu.m.

102850.00 95460.00 89400.00 85780.00 83490.00 79370.00 77800.00 76350.00 76350.00 72110.00

Sl. No.

Description

Unit

Rates in Rupees (2013-14)

57 i) ii) 58 i) ii) 59 60 61 62 i) ii) iii) iv) b. c. 64 a. b. 65

Teak wood reepers 50mm x 25mm 50mm x 12mm Country wood Scantlings Up to 4m in length Over 4m in length Country wood scantlings (for tiebeams and principal rafters for trusses) Jack wood Scantlings (up to 4m) Silver Oak Scantling Country wood planks 40mm thick- upto 30cm wide 25mm thick - up to 30cm wide 40mm thick - over 30cm wide 25mm thick - over 30cm wide Silver Oak plank (40mm thick) Blue gum plank Country wood reepers 50mm x 25mm 50mm x 12mm Mango Plank RM RM cu.m. RM 100 Nos. 100 Nos. RM RM RM RM RM RM RM RM RM RM RM RM RM 29.00 21.10 14150.00 41.65 215.30 33.85 27.80 21.10 16.25 13.85 27.80 19.90 16.25 13.85 12.65 10.20 11.40 10.20 9.00 cu.m. cu.m. cu.m. cu.m. cu.m. cu.m. cu.m. 33030.00 33030.00 33030.00 33030.00 34600.00 14880.00 15240.00 cu.m. cu.m. cu.m. cu.m. cu.m. 28790.00 30250.00 30250.00 31700.00 13060.00 RM RM 63.80 51.70

63.a. Jack wood planks 25 to 40mm thick

66.a. Palmyrah rafter (50mm to 60mm wide and 125mm depth) b. c. 67 a. b. c. d. 68 A B C D E 69 70 71 i) ii) Palmyrah leaves Palmyrah leaves (Labour for cutting) Casurina Poles 13cm to 15cm diameter 10cm to 13cm diameter 8cm to 10cm diameter 5cm to 8cm diameter Eucalyptus Poles 13cm to 15cm dia 10cm to 13 cm dia 8 cm to 10 cm dia 5 cm to 8 cm dia Below 5 cm Eucalyptus Bullies 4cm to 5 cm dia & cross ties Casurina Bullies 4cm to 5cm dia & cross ties Bamboo large 10cm diameter and above 7.5cm to 10cm diameter

Sl. No.

Description

Unit

Rates in Rupees (2013-14)

METAL AND IRON WORKS 72 73 Mild steel plates or sheets BG 10 Mild Steel Angles 25mm x 25mm x 3mm Kg. Kg. Kg. Kg. sq.m. sq.m. sq.m. sq.m. sq.m. sq.m. Kg. 48.00 48.00 48.00 48.00 335.00 325.00 292.00 158.00 35.00 100.00 65.00

74.a) Binding wire (Black 18G) b) 75 76 i) ii) iii) 77 78 79 Note: Binding wire (Galvanised 18G) G.I. sheets 30cm wide and 1.6mm thick Weld mesh 7.5 x 2.5cm, 10 gauge 7.5cm x 5cm, 10 gauge 10cm x 10cm, 10 gauge Chicken Mesh Fly Proof Mesh Supplying mild steel grills for windows, ventilators, etc., including priming coat

1. For Road works, the Schedule of Rates of Highways Department may be adopted, in respect of materials for which rates are not available in this schedule of rates. 2. For all the materials viz. Bricks and Tile products, Stone Jelly, Gravel, Sand, Lime Stone etc., necessary incidental charges , loading charges and unloading charges have been included. Hence no separate incidental charges, loading and unloading chrges shall be allowed for the above materials.

RATES OF OTHER CONSTRUCTION MATERIALS Note: No extra on cost, conveyance charges shall be allowed for all the items included under this category. The rates approved therein are applicable at site of work. Sl. No. 1 2 3 4 i Name of Material Water proofing compound Mild Steel Flats of all sizes Mild Steel Square Rods of all sizes First Quality Design Ceramic tiles of All colours 305 mm x 305 mm x 6 mm 200 mm x 200 mm x 6 mm iii 5 i ii iii 6 i ii 7 i ii 8 i ii 9 10 11 12 200 mm x 100 mm x 6 mm First Quality Plain ceramic tiles of all colours 305 mm x 305 mm x 6 mm 200 mm x 200 mm x 6 mm 200 mm x 100 mm x 6 mm First quality White glazed tiles 150 mm x 150 mm x 6 mm 100 mm x 200 mm x 6 mm First quality colour glazed tiles 150 mm x 150 mm x 6 mm 100 mm x 200 mm x 6 mm First quality colour glazed tiles with printed design 150 mm x 150 mm x 6 mm 100 mm x 200 mm x 6 mm White Cement Colour Cement (White cement mixed with colouring pigments) Multi-colour marble chips of all Grades / Sizes White Marble slab (Adanga) 18 mm to 20 mm thick Each Each Kg Kg Bag 11.40 10.25 23.00 26.65 97.00 Each Each 9.65 8.45 Each Each 8.45 7.25 Each Each Each 36.30 16.25 8.45 Each Each Each 50.80 22.35 12.10 Unit Kg Kg Kg Rate in Rupees 42.35 48.00 48.00

Sl. No. i ii 13

Name of Material 4'0'' x 2'0'' and above 2'0'' x 2'0" or 2'0" x 1'0" or 1'0" x1'0" Granite tiles - (Superfine polished with Machine cut edges) of size 2'0" x 1'0" or 1'0" x 1'0" or 1'0" x 0'6", of 10 mm thick Jet Black Ruby Red, Raw Silk Sinthetic Grey, Paradise and Similar varieties. Granite slabs (Super fine polished with machine cut edges) of sizes 4'x2' and above 18mm to 20mm thick. Jet Black Ruby Red, Raw Silk Sinthetic Grey, Paradise and Similar varieties. Polished shahabad stone slabs of 20 mm thick with machine cut edges of size 2' 0" x 2'0" and above. Polished shahabad stone slabs 20 mm thick with machine cut edges of size below 2' 0" x 2'0". Polished Rajasthan Kota stone slabs of 20 mm thick with machine cut edges of size 2' 0" x 2'0" and above. Polished Rajasthan Kota stone slabs of 20 mm thick with machine cut edges of size below 2' 0" x 2'0". Dolphur stone slabs - semi polished with machine cut edges of all sizes 40 mm thick 20 mm thick Aluminium strips of size 40 mm wide x 1.5 mm thick Brass strips of size 40 mm wide x 1.5 mm thick Glass strips of size 40 mm wide and 4 mm thick Marblex Tiles 3 mm thick Red Oxide - Superior quality for floor finish

Unit sq.m. sq.m.

Rate in Rupees 935.00 511.00

a b c 14

sq.m. sq.m. sq.m.

902.00 781.00 726.00

a b c 15

sq.m. sq.m. sq.m. sq.m.

1815.00 1694.00 1331.00 363.00

16

sq.m.

302.00

17

sq.m.

533.00

18

sq.m.

467.00

19 a b 20 21 22 23 24

sq.m. sq.m. RM RM RM sq.m. Kg

398.00 363.00 30.00 60.00 15.00 605.00 127.00

Sl. No. 25 26 27 28 29 30 31 32 33 34 35 i ii iii 36 37 38 39 40 41 42 43 44 45 46 i ii

Name of Material Decorative pressed tiles of 12 mm thick of all sizes and shapes Exterior Emulsion Paint - Water based primer (Liquid) Alkali Resistant Distemper Primer Sandtex matt Vinaratex or equivalent Textured coat Best Lac Polish / French Polish Varnish Cotton Waste Cement based Hydraulically pressed Anti skid tiles (pattern design) - 20 mm thick Marble Powder Polishing Stone Rough Medium Fine / Nice Oxalic Acid Turpentine Mansion polish Poly Sulphide Primer for expansion joints Filler material Bond Breaker PVC Water Bar 150mm wide with singel bulb Plain G.I. sheet 0.8mm thick (22 Gauge) Phil Plug G.I. Screws 30mm x 6mm 19mm x 6mm

Unit sq.m. Litre Litre Litre sq.m. Litre Litre Kg sq.m. Kg

Rate in Rupees 1027.00 145.00 145.00 169.00 218.00 282.00 290.00 9.20 484.00 4.80

Each Each Each Kg Litre 400 gram Kg Kg sq.m. RM RM sq.m. Each

60.50 84.70 96.80 39.80 26.60 159.00 181.00 162.00 133.00 3.60 271.00 332.00 4.80

Each Each

1.20 0.75

Sl. No. 47 48 49 50 51 52 53 54 55 56 i ii 57 58 59

Name of Material G.I. Limpet / Cup Washers Bitumen washers 15mm dia Asbestos Cement pipe - 100mm dia A.C. shoe - 100mm dia A.C. Bend - 100mm dia A.C. Cylindrical Cowl - 100mm dia C.I. Brackets for A.C. pipe 100mm dia C.I. Grating - 100mm dia Asbestos cement fully corrugated sheet - 6mm thick Asbestos cement plain sheet 6mm thick 4mm thick Asbestos cement adjustable ridges G.I. "J" or "L" Bolts with nuts 6mm Dia Steel - special extruded sections for steel windows and ventilators conforming to I.S.S. 7452 / 1990 including Fabrication charges CRCA pressed steel Box section 18 Gauge or 1.25mm thick for Door frames including providing holes and fixing wooden blocks for fixing furniture and fittings With one coat of Red oxide priming coat. With powder coated primer Aluminium extruded sections (for Doors, windows, ventilartors, partitions, false ceiling etc.) including charges for Anodising for 15 micron thickness Natural colour matt finish. With powder coating of any colours. Alumninum Extruded Box Section for Staircase Hand Rails including charges for Adnodising for 15 micron thickness - Natural colour matt finish

Unit Each Each 3 RM Each Each Each Each Each sq.m.

Rate in Rupees 1.75 1.20 133.35 42.40 48.50 72.75 19.95 29.30 175.50

sq.m. sq.m. Pair Each Kg

157.60 109.10 181.85 3.60 63.30

60

a b 61

RM RM

427.00 455.00

a b 62

Kg Kg Kg

292.00 312.00 298.00

Sl. No. 63 64 65 66 67

Name of Material Rubber beading for aluminium glazed doors Rubber beading for aluminium glazed windows. PVC / Woollen felt for aluminium doors 6mm thick Pivot for Aluminium Door Hydraulic Door closer of various sizes of approved quality using Aluminium Extruded section body tubular type universal hydraulic door closer with double speed adjustment like HARDWYN (make) 'GAZEL' (or) equivalent (with ISI Monogram) Hydraulic Floor springs of various sizes double acton hydraulic floor spring of approved quality, brand, manufacture as per BIS standards for doors including cost of cutting floors as required, embedding in to floors and Stainles Steel Cover plates with Aluminium Pivet and single piece M.S. sheet outer box with side plate etc., capable of taking upto 130 Kg. weight from door shutter, like HARDWYN make (U-32) or its equivalent with ISI monogram. Lock for Aluminium doors Lock for Aluminium sliding windows Aluminium Grill of standard pattern (diamond shape) - 10mm thick including 'F' (or) 'H' Section. Aluminium shape) Section. Grill of standard pattern (diamond 6mm thick including 'F' (or) 'H'

Unit RM RM RM Set Each

Rate in Rupees 36.30 27.80 8.45 145.20 867.30

68

Each

2079.00

69 70 71

Each Each sq.m.

238.70 59.40 1870.00

72

sq.m.

1512.50

73 74 75 76 77

Bolts and Nuts 10mm dia for false ceiling Rawl Plugs for false ceiling PVC Roller for sliding windows Synthetic Resin - Fevicol or equivalent (Phenol Formal Dehide based Resin) Butt Hinges with nylon washers of various sizes. Length and width (with required screws). 125mm x 30mm 100mm x 30mm 75mm x 30mm

Each Each Each Kg

5.25 8.40 13.30 181.50

a b c

Each Each Each

69.85 56.10 38.50

Sl. No. d 78 a b c d e f g 79 a b c d 80 a b c 81 a b c 82 83 84 a 50mm x 30mm

Name of Material

Unit Each

Rate in Rupees 31.10

Tower Bolts of various lengths and diameter (with required screws) 400mm long and 12mm dia 300mm long and 12mm dia 250mm long and 12mm dia 200mm long and 12mm dia 150mm long and 12mm dia 100mm long and 10mm dia 75mm long and 10mm dia Aldrops of following lengths and diameter with required screws, bolts and nuts. 300mm long and 16mm dia 250mm long and 16mm dia 200mm long and 16mm dia 200mm long and 12mm dia Handles "D" type of various sizes with required screws 200mm long 150mm long 100mm long Ornamental handles of various sizes with required screws 200mm long 150mm long 100mm long Aluminium door stopper with rubber bush with required screws Rubber bush - 40 mm dia and 60 mm long with required screws Mortice Lock-(Godrej or equivalent) with required screws with 3 Keys With night latch Each 509.30 Each Each Each Each Each 152.35 101.60 56.10 44.40 24.20 Each Each Each Each 183.70 158.40 107.25 89.10 Each Each Each Each Each Each Each 132.00 101.60 76.20 64.05 50.60 44.40 31.10

Each Each Each

56.50 50.60 31.10

Sl. No. b c 85 a b 86 a b 87 a b c d 88

Name of Material Without night latch Wire nails Teakwood beading 15mm x 12mm 35mm x 12mm Teakwood Beading (ordinary) 30mm x 12mm 25mm x 12mm Teakwood beading - Ornamental / design 40mm x 12mm 40mm x 15mm 25mm x 12mm 15mm x 12mm Medium Density Fibre (MDF) Board - Exterior Grade, Both sides pre-laminated including external lipping with kiln dried soft wood 35mm thick Medium Density Fibre (MDF) Board - exterior Grade Both sides pre-laminated, 12mm thick MDF Board exterior Grade - Plain including external lipping with kiln dried soft wood 35mm thick 30mm thick Medium density fibre (MDF) Board 12 mm thick Exterior grade - with melamine finish. One side melamine finish Both sides melamine finish Medium density fibre (MDF) board - Exterior grade Plain - With teak wood external lipping alround 35mm thick 30mm thick Solid core Flush shutters with Teak ply on both side with teak wook lipping alround 35 mm thick

Unit Each Kg

Rate in Rupees 380.60 60.50

RM RM

14.40 36.30

RM RM

30.00 24.20

RM RM RM RM sq.m.

84.70 96.80 66.00 45.50 1936.00

89 90 i ii 91 a b 92 a b 93

sq.m.

935.00

sq.m. sq.m.

1573.00 1452.00

sq.m. sq.m.

995.00 1116.00

sq.m. sq.m. sq.m.

1694.00 1512.00 1996.00

Sl. No. 94

Name of Material Solid core Flush shutters with Teak ply on one side and commercial ply on other side with teak wood lipping alround 35 mm thick Solid core Flush shutters with commercial ply on both side with teak wood lipping alround 35 mm thick Solid PVC door shutters using 19 Gauge 19mm MS square tubes for styles and outer frames. 15mm MS square tubes for top, lock and bottom rails. The steel tubes shall be covered with 5mm thick solid PVC sheets. Shutter using 5mm thick solid PVC sheets for panelling shall rigidly fixed in position including necessary furniture and fittings. The over all size of styles shall be 50mm x 30mm. The over all size of top rail, Lock rail and bottom rail shall be 75mm x 30mm. The over all size of frames shall be 50mm x 45mm, with suitable rabate for housing the shutter. Solid panel PVC door with frame Solid panel PVC door without frame

Unit sq.m.

Rate in Rupees 1754.00

95

sq.m.

1512.00

96

a b

sq.m. sq.m. sq.m.

2875.00 2425.00 3755.00

97a FRP door Shutter with FRP door frames made out of FRP Sheets of 3mm thick of over all size 65mm x 50mm with rebate suitably reinforced using MS Angle / Flats, cost of holdfasts and solid core FRP shutter Panel of 5mm thick and hollow core frames of 3mm wall thickness for styles and rails etc., of sizes specified by Engineers.

Excluding door frames

sq.m. sq.m.

3115.00 2055.00

98a PVC panelled door shutters hollow type 200 mm x 20 mm panels with 1 mm wall thickness for panels and styles and rails of suitable size with 2 mm wall thickness suitably reinforced using MS Angle / Flat including cost of necessary Aluminium hinges and other furniture fittings. b 99 Excluding door frames RCC door frame of 100mm x 65mm cross sectional size with necessary rebate for housing the shutters, manufactured with cement concrete of grade not less than M20 using 10 mm and below graded stone jelly and using steel reinforcement as per C.E. (B) circular instructions.

sq.m. RM

1815.00 290.00

Sl. No.

Name of Material

Unit RM

Rate in Rupees 908.00

100 Stainless Steel (Salem Stainless Steel) Door Frame (Box Section using Stainless Steel Plate of 1 mm thick) of size 100 mm x 60 mm with a rebate of 30/ 35 mm x 15 mm on one side of the frame including supplying and fixing dovetail splayed end stainless steel Hold fast etc., 101 Stainless Steel (Salem Stainless Steel) Door Frame (Box Section using Stainless Steel Plate of 1.6mm thick) of size 100mm x 60mm with a rebate of 30/ 35mm x 15mm on one side of the frame including supplying and fixing dovetail splayed end stainless steel hold fast etc., 102 Supplying and erecting pull and push type rolling shutter with ISI make of approved size and section using 18 GI sheet. The shutter shall be painted with one coat of red oxide primer and the rate is inclusive of hood covers, transportation charges etc., A a b c B a b c ROLLING SHUTTERS (WITH ISI MONOGRAM) Manually operated (up to 8 m2 area) Gear operated type (from 8 m2 to 12 m2 area) Electrically operated type (exceeding 12m2 area) ROLLING GRILLS (WITH ISI MONOGRAM) Manually operated (up to 8 m2 area) Gear operated (from 8 m2 to 12 m2 area) Electrically operated (exceeding 12 m2 area)

RM

1270.00

sq.m. sq.m. sq.m.

2430.00 2700.00 2940.00

sq.m. sq.m. sq.m. 1 Kg or 6 RM sq.m. sq.m. sq.m. sq.m.

2480.00 2777.00 3090.00 69.30 178.50 242.00 326.70 387.20

103 Barbed Wire - 10 Gauge - Two ply and four pronged (Galvanised) 104 Chain link - 2" x 2" using 10 Gauge Galvanised Iron Wire (of all sizes) 105 Pin Headed / Fluted / Figured Glass 3mm thick 106 Plain Glass - 4mm thick 107 Plain Sheet Glass - 5.5mm thick 108 Metal screws (for Aluminium Doors, windows etc.) i 75mm x 8mm

Each

2.30

Sl. No. ii iii iv 38mm x 6mm 19mm x 8mm 19mm x 6mm

Name of Material

Unit Each Each Each Kg Kg Kg Litre Litre Litre Litre Litre Litre Each Each Each Each Set 100 gram Each

Rate in Rupees 1.65 1.15 0.85 53.10 78.50 90.60 156.75 315.15 156.75 254.10 145.50 242.55 211.00 169.00 302.00 217.00 12.10 18.15 3.60

109 Cement paint (First quality) 110 Oil Bound Distemper 111 Acrylic Distemper 112 Primer for Plastic Emulsion paint 113 Plastic Emulsion paint (First quality) 114 Wood Primer 115 Synthetic Enamel paint for Wood work 116 Red Oxide primer for Iron work 117 Synthetic Enamel paint for Iron work 118 Brass chromium plated screw down Tap 15 / 12mm Dia (Heavy Type) 119 Chromium plated stop cock 15mm Dia 120 Brass chromium plated pillar Tap (Heavy type)15/12mm Dia 121 Brass chromium plated shower Rose - 100mm Dia 122 Wooden plug, clamp and screws 123 Shellac 124 Thread Ball 125 Oriya Type Indian Water closet 580mm x 440mm with "P" or "S" Trap i ii White Colour

Set Set

1089.00 1390.00

126 European Water closet with "P" or "S" Trap with Double Flapped seat and seat cover with Brass Hinges and 10 litre capacity PVC low level flusing tank with all internal fittings i ii White Colour Set Set 2785.00 3150.00

Sl. No.

Name of Material

Unit

Rate in Rupees

127 European water closet with "P" or "S" Trap with Double falpped seat and seat cover with Brass Hinges and 12.5 litre capacity Porcelin low level flusing tank with all internal fittings i ii White Colour Set Set 3925.00 4730.0

128 Wash Hand Basin of size 550mm x 400mm with all accessories such as cast iron brackets, 32mm dia C.P. waste coupling, rubber plug and chain, 32mm dia 'B' Class G.I. waste pipe, 15mm dia G.M. wheel valve, 15mm dia nylon connection, 15mm dia brass nipples, 15mm C.P. pillar tap etc. i ii iii iv White without pedastal White with pedastal Colour without pedastal Colour with pedastal Set Set Set Set Set 1510.00 1815.00 2024.00 2235.00 1936.00

129 White Porcelin Sink of size 600mm x 450mm x 200mm with 32mm dia 'B' Class G.I. waste water pipe and 32mm dia C.P. waste coupling. 130 Cuddapah Slab Sink of size 600mm x 450mm x 200mm with 32mm dia 'B' Class G.I. waste water pipe & 32mm dia C.P. waste coupling. 131 Cuddapah Slab Sink of size 600mm x 600mm x 200mm with 32mm dia 'B' Class G.I. waste water pipe & 32mm dia C.P. waste coupling. 132 Lipped Mouth Porcelin Flat Back Urinal with all accessories such as 32mm dia Bell mouth PVC connection, 15mm dia G.M. wheel value, 15mm dia 'B' Class G.I. waste water pipe, 15mm dia nylon connection, 15 mm dia brass nipple etc., i ii White Colour 150mm x 150mm x

Set

663.00

Set

877.00

Set Set

847.00 970.00

133 Porcelin soap dish of size 50mm i ii White Colour plated

Each Each soap tray of size Each Set Set

178.00 242.00 149.00 242.00 121.00

134 Brass chromium 150mm x 100mm

135 Brass chromium plated towel rail 60cm long and 20mm dia with brackets 136 Anodised Aluminium Towel Rail 60cm long and 20mm dia with Brackets. 137 PVC / Fibre Glass framed 5.5mm thick mirror, shelf type with Hard Board Backing

Sl. No. i ii

Name of Material 600mm x 450mm 500mm x 400mm

Unit Each Each Each

Rate in Rupees 449.00 363.00 169.00

138 Stone ware gully trap of size 150mm x 100m with cast Iron Double Gratings 139 Cast Iron Nahini / Floor Trap with stainless Steel Grating i 100mm x 75mm ii 75mm x 50mm 140 PVC Nahini / Floor Trap with PVC Grating i ii 100mm x 75mm 75mm x 50mm

Each Each

277.00 217.00

Each Each Kg Kg sq.m. Kg sq.m.

150.00 132.00 12.00 10.80 10.80 38.75 242.00

141 Spun Yarn 142 Hemp Yarn 143 Gunny Tape / Kithan 144 Tar 145 Bitumen Felt 15 mm thick pad 146 Supplying, fabricating, erecting and fixing gyp board false ceiling upto a ceiling height of 4.5m from floor level. a b Using plain sheets (10mm thick) Using perforated sheets (10mm thick)

sq.m. sq.m.

727.00 944.00

147 Supplying and laying Glass wool for insulation including necessary packing materials. a b Using 50mm thick Glass wool Using 25mm thick Glass wool sq.m. sq.m. 372.00 199.00

Sl. No.

Description of Materials
WATER SUPPLY AND SANITARY ARRANGEMENTS

Unit

Rate in Rupees (2013-14)


10 kg. per cm
2

148 (WITH ISI MONOGRAM) 1 a b c d e PVC Pipes 15 mm Dia 20 mm Dia 25 mm Dia 32 mm Dia 40 mm Dia

PVC ITEMS FINOLEX (OR) EQUIVALANT

RM RM RM RM RM

14.40 21.30 36.30 54.20 84.80

Note (1) For Rainwater down fall pipe works, only PVC Pipe of working Pressure of 4 kg. per sq.cm. shall be adopted. (2) For Sanitary arrangement items of works, only PVC Pipe of working Pressure of 6 kg. per sq.cm. shall be adopted. (3) For Water Supply arrangement items of works, only PVC Pipe of working Pressure of 10 kg. per sq.cm. shall be adopted. 149 PVC Specials for water supply arrangements A a b c d e B a b c d e C a b c d e Coupler 15 mm Dia 20 mm Dia 25 mm Dia 32 mm Dia 40 mm Dia Elbow 15 mm Dia 20 mm Dia 25 mm Dia 32 mm Dia 40 mm Dia BEND 15 mm Dia 20 mm Dia 25 mm Dia 32 mm Dia 40 mm Dia Each Each Each Each Each 6.05 7.25 9.65 14.40 19.35 Each Each Each Each Each 5.35 6.05 8.45 12.10 16.90 Each Each Each Each Each 3.60 4.15 4.80 6.05 9.00

Sl. No. D a b c d e E a F a b c d e G a b c d e H a b c d e J a b Tee

Description of Materials

Unit

Rate in Rupees (2013-14)


10 kg. per cm
2

15 mm Dia 20 mm Dia 25 mm Dia 32 mm Dia 40 mm Dia End Cap 15 mm Dia Reducer 20 mm x 15 mm 25 mm x 20 mm 32 mm x 25 mm 40 mm x 32 mm 50 mm x 40 mm Reducer Tee 20 mm x 15 mm 25 mm x 20 mm 32 mm x 25 mm 40 mm x 32 mm 50 mm x 40 mm Reducer Elbow 20 mm x 15 mm 25 mm x 20 mm 32 mm x 25 mm 40 mm x 32 mm 50 mm x 40 mm Jet Nipple 25 mm Dia 32 mm Dia

Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each

7.25 8.45 12.10 14.50 24.20 3.60 4.80 5.35 8.45 11.40 19.35 7.25 8.45 12.10 14.50 24.20 6.05 7.25 9.65 12.10 18.15 15.70 20.55

Rate in Rupees (2013-14) Sl. No. Description of Materials Unit "O" Ring By pasting Jointing

150

PVC SPECIALS FOR SANITARY ARRANGEMENTS FINOLEX (OR) EQUIVALENT (WITH ISI MONOGRAM) Elbow 75 mm 90 mm 110 mm 160 mm Door Elbow 75 mm 90 mm 110 mm 160 mm Tee 75 mm 90 mm 110 mm 160 mm Tee with Door (Single) 75 mm 90 mm 110 mm 160 mm Tee with Door (Double) 75 mm 90 mm 110 mm 160 mm Bend 75 mm 90 mm 110 mm 160 mm "Y" 75 mm 90 mm Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each

A a b c d B a b c d C a b c d D a b c d E a b c d F a b c d G a b

66.30 84.80 102.70 114.80

54.20 66.30 84.80 97.00

84.80 109.10 133.20 157.60

60.60 72.70 114.80 133.30

90.60 114.80 151.20 169.70

84.80 102.70 139.10 151.20

114.80 139.10 175.50 211.80

109.10 121.00 163.30 194.00

145.50 199.70 242.50 278.80

139.10 181.80 230.30 247.00

72.70 90.60 109.10 121.10

60.60 72.70 90.60 102.70

97.00 121.10

90.60 109.10

Rate in Rupees (2013-14) Sl. No. Description of Materials Unit "O" Ring By pasting Jointing

c d H a b c d I a b c d J a b c d K a b c d L a b c d f M a b N a b c

110 mm 160 mm "Y" with Door (single) 75 mm 90 mm 110 mm 160 mm "Y" with Door (Double) 75 mm 90 mm 110 mm 160 mm Double Tee with Door (Single) 75 mm 90 mm 110 mm 160 mm Double "Y" with Door (single) 75 mm 90 mm 110 mm 160 mm Reducer 75 mm x 63 mm 110 mm x 63 mm 110 mm x 75 mm 110 mm x 90 mm 160 mm x 110 mm Shoe 110 mm dia 160 mm dia Vent Cowl 50 mm dia 75 mm dia 110 mm dia

Each Each

157.60 175.50

145.50 157.60

Each Each Each Each

114.80 145.50 194.00 224.00

109.10 127.00 169.70 199.70

Each Each Each Each

157.60 211.80 254.60 308.00

151.20 194.00 242.00 278.60

Each Each Each Each

199.70 230.30 271.30 303.10

163.30 187.60 236.10 266.70

Each Each Each Each

218.20 242.50 278.80 339.50

181.80 206.10 260.30 303.10

Each Each Each Each Each

66.30 84.80 97.00 109.00 127.00

54.20 72.70 84.80 97.00 121.00

Each Each

72.70 109.00

Each Each Each

30.00 48.50 72.70

Rate in Rupees (2013-14) Sl. No. Description of Materials Unit "O" Ring By pasting Jointing

OTHER ITEMS : 151 152 153 154 PVC screw down tap heavy type 20 mm dia PVC screw down tap heavy type 15 mm dia PVC Adhesive (solution) PVC low level flushing tank with all internal fittings - (wall mounting type) White - 10 litre capacity White - 7.5 litre capacity Colour - 10 litre capacity Colour - 7.5 litre capacity Set Set Set Set Each Each 100 gm

78.10 60.50 36.30

a b c d

908.00 696.00 1030.00 817.00 9.00

155

PVC water tank

Litre

NEW ITEMS Sl. No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 a b 15 16 17 18 Rate in Rupees. 900.00 483.00 28.35 420.00 105.00 236.00 2.10 4.20 21.00 8.40 1.05 5.25 1890.00

Description of Material Virtrified Tiles of size 600 x 600 x 8 mm Pre-polished concrete anti-skid step tiles of 20 mm thick Colour designed glazed tiles 300 x 200 x 6mm Squatting Urinal CI Brackets for fixing the sink Swan Neck Tap Brass Screws (30 x 6 mm) Brass Screws (75 x 10 mm) Special clamp, teak wood plugs and screws PVC clamp, teak wood plugs and screws Teak Wood plug Teak Wood plug (50 x 50 x 100 mm) Manhole Cover 60 x 60 cm (heavy duty) with frame Welding charges 50 mm 40 mm Add for painting / tarring for Hex Nipple Labour charges for fixing cuddapah slab to cup board Hire charges for polishing machinery Electricity charges

Unit Sq.m Sq.m Each Set Set Each Each Each Set Set Each Each Each

Each Each Each Sq.m Day Unit

1.55 1.25 2.10 31.50 157.50 9.00

RATES FOR ELECTRICAL ITEMS

ELECTRICAL ITEMS OF WORKS


ELECTRICAL LAMPS, FITTINGS AND CONNECTED ACCESSORIES Note
Item No. No extra on cost, conveyance charges shall be allowed for all the items included under this category. The rates approved therein are applicable at site of work.

Description

Unit

Rate in Rupees

PART-A
1 a. b c. d. e f. 2 3
3 a)

INCANDESCENT BULBS 230V/ 250V GRADE BC/ES WITH ISI 15 Watts 25 Watts 40 Watts 60 Watts 100 Watts 200 Watts INCANDESCENT BULB 230V/250V GRADE BC/ ES Colour 15 Watts Blended lamp 160 Watts PL LAMP (PHILIPS/ OSRAM) 9 Watts 11 Watts 18 Watts 36 Watts FLUORESCENT TUBULAR LAMPS WITH ISI MARK Cool Day light 2 Ft. 20 Watts Cool Day light 4 Ft. 40 Watts Cool Day light 4 Ft. 36 Watts MERCURY VAPOUR DISCHARGE LAMP 230V GRADE 3 PIN BC 80 Watts 125 Watts 250 Watts 400 Watts BOX TYPE SINGLE FLUORESCENT FITTING WITH COPPER CHOKE AND CONDENSOR COMPLETE WITH ISI MARK 4 Ft. 40 Watts with ballast 4 Ft. 40 Watts Box type with Ballast (Philips/ Crompton /Wipro)

Each Each Each Each Each Each Each Each Each Each Each Each

11.0 11.0 11.00 11.00 11.00 22.00 13.50 266.00 82.50 88.00 138.50 154.00

a. b c. d. 4 a. b c. 5

Each Each Each

41.50 41.50 40.50

a. b. c. d. 6

Each Each Each Each

191.00 200.00 489.00 689.00

a. b.

Each Each

353.00 519.00

Item No.

Description BOX TYPE TWIN FLUORESCENT FITTING WITH COPPER CHOKE AND CONDENSOR[HPF] COMPLETE WITH ISI MARK 4 Ft. 40 Watts 4 Ft. 40 Watts Box type (Philips/ Crompton ) With Ballast INDUSTRIAL TYPE FLUORESCENT FITTING STOVE ENAMELLED WITH COPPER CHOKE AND CONDENSOR (HPF) 4 ft. 40W Single type suitable for 1 No. tube Twin type suitable for 2 Nos. tube DECORATIVE AND SINGLE FLUORESCENT TYPE FITTING WITH COPPER CHOKE AND CONDENSOR (HPF) COMPLETE SUITABLE FOR ONE NUMBER FLUORESCENT TUBE WITH ISI MARK 4 Ft. 40 Watts with Perspex DECORATIVE TWIN FLUORESCENT TYPE FITTING WITH COPPER CHOKE AND CONDENSOR COMPLETE SUITABLE FOR 2 NUMBERS FLUORESCENT TUBES 4 Ft. 40W Twin Mirror optic Recessed mounting fitting 4 Ft. 40W Twin Mirror optic Suspension type fitting. (Philips/ Crompton /Wipro) 4 Ft 40W Twin Mirror Optic Recessed mounting type fitting(Philips/ Crompton/ Wipro) SINGLE TYPE STREET LIGHT FLUORESCENT FITTING SUITABLE FOR THE ONE NO. FLUORESCENT TUBE WITH COPPER CHOKE AND CONDENSOR COMPLETE 4 Ft. 40 Watts type TWIN TYPE STREET LIGHTS FLUORESCENT FITTING SUITABLE FOR 2 Nos. FLUORESCENT TUBES WITH COPPER CHOKE AND CONDENSOR COMPLETE 4 Ft. 40 Watts type

Unit

Rate in Rupees

a. b. 8

Each Each

663.00 865.00

a. b. 9

Each Each

975.00 1,200.00

a. 10

Deleted

a. b. c. 11

Each Each Each

1,680.00 3,030.00 2,220.00

a. 12

Each

740.00

Each

995.00

Item No.

Description POST TOP LANTERN FITTING OF (INTEGRAL TYPE) WITH COPPER CHOKE AND CONDENSOR & NECESSARY ACCESSORIES (PHILIPS/ CROMPTON GREAVES/WIPRO)(SPHERICAL / RIBBED /CONICAL ACRYLIC COVER) Suitable for 125 Watts M.V lamp Suitable for 70 Watts S.V. Lamp Post top lantern fitting with SC holder suitable for 160 W blended lamp/ incandescent lamp STARTERS FOR FLUORESCENT TUBES Starters of capacity 20 Watts Starters of capacity 40 Watts POLYSTER FILLED COPPER CHOKE 250V/ 50 HZ GRADE SUITABLE FOR (PHILIPS/ CROMPTON /WIPRO) 20 Watts fluorescent tube 40 Watts fluorescent tube 36/40W Electronic ballast for flu. Tube(Philips/ Crompton ) 36/40W Electronic ballast for flu. Tube (Indo Asean/ Equivalent) CONDENSOR FOR S.V/ M.V LAMP 8 Mfd for 80 Watts Bulb 10 Mfd for 125 watts Bulb 15 Mfd for 250 Watts Bulb 20 Mfd for 400 watts Bulb Battern type Bakelite holder for lamp Water tight bulk head fitting suitable for 100/60 watts lamp with guard heavy type (PHILIPS/ BAJAJ/ CROMPTON GREAVES) Ceiling Rose Ceiling fixtures 250/300mm complete with Gallery etc. Clear glass opac/ crystal suitable for 40/60 Watts Bulb Ceiling luminaire with mirror optics suitable for 2 Nos. 9 Watts/11 Watts (Philips/Crompton/Bajaj) (FOR ITEMS 6 TO 13, 20 & 22 , THE RATES ARE EXCLUSIVE OF COST OF TUBES AND LAMPS) Fan clamp (dia 12mm) with 6mm MS side plates & 45 cm cross arm

Unit

Rate in Rupees

13

a. b. c. 14 a b. 15

Each Each Each

3,580.00 3,770.00 2,060.00

Each Each

11.00 11.00

a. b. c. d. 16 a. b. c. d. 17 18

Each Each Each Each

196.00 196.00 324.00 264.00

Each Each Each Each Each Each

124.50 148.30 198.00 273.00 19.80 330.00

19 20 a. b.

Each Each Each

16.50 195.00 1,230.00

21

Each

132.00

Item No.

Description CALL BELLS Call bell/ Buzzar 6mm suitable for AC/DC Push bell Gong bell 9 size suitable for 250 V Gong bell 12 size suitable for 250V WATER HEATER WITH ISI MARK Automatic Electrical Water Heater with Copper container with Glass Wool/ Puf insulation with MS powder coated shell suitable for 25 Litres capacity 230V/1000W Automatic Electrical Water Heater with copper container with Glass Wool/ Puf insulation with MS powder coated shell suitable for 25 Litres capacity 230V/1000W(Venus/Racold) Automatic Electrical Water Heater with Copper container with Glass Wool/ Puf insulation with MS powder coated shell suitable for 35 litres capacity 230V/1000W Automatic Electrical Water Heater with Copper container with Glass Wool/ Puf insulation with MS powder coated shell suitable for 35 litres capacity 230V/1000W(Venus/Racold) PART B

Unit

Rate in Rupees

22 a. b. c. d. 23 a.

Each Each Each Each Each

49.50 19.80 495.00 716.00 5,770.00

b.

Each

7,790.00

c.

Each

6,690.00

d.

Each

8,950.00

1 a. b. c. d. e. f. II a. b. c. d.

FANS CONFORMING TO ISS 374 / 1979 AC Ceiling fan complete 1200mm (48) sweep with 300mm Down rod.(without regulator) AC Ceiling fan complete 1400mm (56) sweep with 300mm Down rod. (Without regulator) Stepped electronic 300W/450W square type fan regulator (Anchor Deluxe/Equivalent) Dimmer type electronic 300W/450W square type fan regulator (Anchor Deluxe/Equivalent) AC Ceiling fan complete 1200mm (48) sweep with 300mm Down rod.(without regulator) (Crompton make) AC Ceiling fan complete 1400mm (56) sweep with 300mm Down rod (Without regulator) (Crompton make) EXHAUST FANS AC Exhaust fan 225 mm (9) sweep (Light duty) AC Exhaust fan 300 mm (12) sweep (Light duty) AC Exhaust fan 375 mm (15) sweep (Light duty) AC Exhaust fan 450 mm (18) sweep (Light duty) Each Each Each Each 1,220.00 1,395.00 1,440.00 2,020.00 Each Each Each Each Each Each 1,320.00 1,415.00 224.00 179.00 1,495.00 1,615.00

Item No.

Description AC Exhaust fan 375 mm (15) sweep (Heavy duty) AC Exhaust fan 450 mm (18) sweep (Heavy duty) LOUVER SHUTTERS ARRANGEMENTS MS/Fibre Louvers shutters arrangements for 300mm AC Exhaust fan MS/Fibre Louvers shutters arrangements for 375mm AC Exhaust fan MS/Fibre Louvers shutters arrangements for 450mm AC Exhaust fan PART C SWITCHES 5 Amps (Flush type) 5 Amps (Flush type stair case) DOUBLE POLE SWITCHES(GEM / HPL / HAVELLS /EQUIVALENT) 16 Amps DP switch with metal clad (front handle) 32 Amps DP switch with metal clad (front handle) 16 Amps DP switch with metal clad (side handle) 32Amps DP switch with metal clad (side handle) TRIPLE POLE SWITCHES (SIDE HANDLE) (STANDARD /HPL/HAVELLS/ EQUIVALENT) 100 Amps TPN switch with HRC fuses sheet steel double break 125 Amps TPN switch with HRC fuses sheet steel double break 200 Amps TPN switch with HRC fuses sheet steel double break 315 Amps TPN switch with HRC fuses sheet steel double break 400 Amps TPN switch with HRC fuses sheet steel double break 16 Amps TPN metal clad switch with rewirable fuse units 32 Amps TPN metal clad switch with rewirable fuse units 63 Amps TPN metal clad switch with rewirable fuse units 100 Amps metal clad switch with rewirable fuse units

Unit

Rate in Rupees

e f III a. b. c.

Each Each

2,650.00 3,300.00

Each Each Each

264.00 280.00 313.00

I a. b. II a. b. c. d. III a. b. c. d. e f g h I

Dozen Dozen

203.00 253.00

Each Each Each Each

476.00 975.00 394.00 885.00

Each Each Each Each Each Each Each Each Each

6,690.00 7,330.00 9,470.00 13,500.00 17,300.00 1,015.00 1,500.00 3,270.00 6,430.00

Item No.

Description 200 Amps metal clad switch with rewirable fuse units SWITCH DISCONNECTOR FUSE UNITS IN SHEET STEEL ENCLOSURE (SDF) (L&T/SIEMENS) 63 A TPN switch disconnector fuse units in sheet steel enclosure with HRC fuses double break 100 A TPN switch disconnnector fuse units in sheet steel enclosure with HRC fuses double break 125 A TPN switch disconnnector fuse units in sheet steel enclosure with HRC fuses double break. 200 A TPN switch disconnnector fuse units in sheet steel enclosure with HRC fuses double break 250 A TPN switch disconnnector fuse units in sheet steel enclosure with HRC fuses double break 315 A TPN switch disconnnector fuse units in sheet steel enclosure with HRC fuses double break 400 A TPN switch disconnnector fuse units in sheet steel enclosure with HRC fuses double break SWITCH DISCONNECTOR FUSE UNITS IN OPEN EXECUTION (INTERIOR FOR CUBICAL) (L&T/SIEMENS) 63A TPN Switch disconnector fuse units interior only with HRC fuses double break 100 A TPN switch disconnnector fuse units interior only with HRC fuses double break. 125 A TPN switch disconnector fuse units interior only with HRC fuses double break. 200 A TPN switch disconnector fuse units interior only with HRC fuses double break. 250 A TPN switch disconnector fuse units interior only with HRC fuses double break. 315 A TPN switch disconnector fuse units interior only with HRC fuses double break. 400 A TPN switch disconnector fuse units interior only with HRC fuses double break. FUSE UNITS (ANCHOR /EQUIVALENT) 16 Amps Porcelain fuse unit (500v) 32 Amps Porcelain fuse unit (500v) 63 Amps Porcelain fuse unit (500v) 100 Amps Porcelain fuse unit (500v) 200 Amps Porcelain fuse unit (500v)

Unit

Rate in Rupees

j IV A 1 2 3 4 5 6 7 IV B 1 2 3 4 5 6 7 V a. b. c. d. e.

Each

9,750.00

Each Each Each Each Each Each Each

4,130.00 6,950.00 8,200.00 10,300.00 12,850.00 15,400.00 17,700.00

Each Each Each Each Each Each Each

2,730.00 4,970.00 6,770.00 8,740.00 11,400.00 14,300.00 16,900.00

Each Each Each Each Each

55.00 97.50 218.00 392.00 634.00

Item No.

Description SINGLE PHASE DBS (GEM /EQUIVALENT) 4 way DB 16 Amps /way with fuse & neutral Each (250v) 6 way DB 16 Amps /way with fuse & neutral Each (250v) 8 way DB 16 Amps /way with fuse & neutral Each (250v) THREE PHASE DBS(GEM /EQUIVALENT) 4 way TPDB 16A/way with fuse & neutral link 6 way TPDB 16A/way with fuse & neutral link 8 way TPDB 16A/way with fuse & neutral link 4 way TPDB 32A/way with fuse & neutral link 6 way TPDB 32A/way with fuse & neutral link 8 way TPDB 32A/way with fuse & neutral link 4 way TPDB 63A/way with fuse & neutral link 6 way TPDB 63A/way with fuse & neutral link CHANGE OVER SWITCHES(GEM /HAVELLS / HPL/STANDARD /EQUIVALENT) 16 Amps three phase 500 V 4 pole change over switch 32 Amps three phase 500 V 4 pole change over switch 63 Amps three phase 500 V 4 pole change over switch 100 Amps three phase 500 V 4 pole change over switch 200 Amps three phase 500 V 4 pole change over switch PART 'D' 5 Amps 3 pin and 2 pin combined flush type wall socket only. 5 Amps /15 amps.3 pin flush type wall socket only. 5 Amps 3 pin top 15 Amps 3 pin top 15 Amps flush type switch 10 Amps M.C plug with 3 pin top 20 Amps M.C plug with 3 pin top

Unit

Rate in Rupees

VI a. b. c. VII a. b. c. d. e. f. g. h. VIII a. b. c. d. e. Ia b. c. d. e. f. g.

Each Each Each

529.00 719.00 892.00

Each Each Each Each Each Each Each Each

2,085.00 2,860.00 3,460.00 2,640.00 3,520.00 4,460.00 6,160.00 7,930.00

Each Each Each Each Each Each Each Each Each Each Each Each

1,440.00 1,700.00 3,710.00 5,900.00 11,100.00 27.70 62.30 39.20 55.40 64.60 207.00 236.00

Item No.

Description

Unit

Rate in Rupees

II A SINGLE PHASE WATT HOUR METERS [HPL/EQUIVALENT) a. b. c. AC single phase 230v/250v/50 HZ 5 Amps Watt Hour Meter AC single phase 230v/250v/50 HZ 10 Amps Watt Hour meter AC single phase 230v/250v/50 HZ 20 Amps Watt Hour meter Each Each Each 1,100.00 1,100.00 1,100.00

II.B THREE PHASE WATT HOUR METERS (ANCHOR / EQUIVALENT) a. b. c. AC 3 phase 400v 50 HZ unbalanced load 4 wire 10 Amps watt hour meter AC 3 phase 400v 50 HZ unbalanced load 4 wire 25 Amps watt hour meter AC 3 phase 400v 50 HZ unbalanced load 4 wire 50 Amps watt hour meter PART E I SERVICE CONNECTION ACCESSORIES LT. 1100V PVC ALUMINIUM CONDUCTOR ARMOURED UNDER GROUND CABLE WITH ISI MARK 2 Core 6 sq.mm PVC armoured UG cable 2 Core 10 sq.mm PVC armoured UG cable 2 Core 16 sq.mm PVC armoured UG cable 2 Core 25 sq.mm PVC armoured UG cable PVC INSULATED SINGLE CORE MULTI STRAND FIRE RETARDANT FLEXIBLE COPPER CABLE WITH ISI MARK CONFORMING TO IS 694/ 1990 14/0.3 ( 1.0sq.mm ) 22/0.3 ( 1.5 sq.mm ) 36/0.3 ( 2.5 sq.mm ) 56/0.3 ( 4.0 sq.mm ) 84/0.3 ( 6.0sq.mm ) 140/0.3 ( 10.0 sq.mm ) 101/0.45 ( 16.0 sq.mm ) 168/0.45 ( 25.0 sq.mm ) CONDUCTOR Hard drawn copper conductor(Gauge No.8 & 6) 14 SWG TC wire KG KG 519.00 531.00 Metre Metre Metre Metre 97.30 118.50 128.50 146.00 Each Each Each 2,270.00 2,270.00 2,880.00

a. b. c. d. II

a. b. c. d. e. f. g. h. III a. b.

Metre Metre Metre Metre Metre Metre Metre Metre

8.95 14.05 21.80 34.60 51.20 76.80 125.50 277.00

Item No.

Description GI No.8 wire and No. 6 wire CABLE GLANDS Cable gland suitable for 2 core 4 sq.mm UG cable Cable gland suitable for 2 core 6 sq.mm UG cable Cable gland suitable for 2 core 10 sq.mm UG cable Cable gland suitable for 2 core 16 sq.mm UG cable Cable gland suitable for 2 core 25 sq.mm UG cable Cable gland suitable for 3 core 25 sq.mm UG cable Cable gland suitable for 3 core 35 sq.mm UG cable Cable gland suitable for 3 core 50 sq.mm UG cable Cable gland suitable for 3 core 70 sq.mm UG cable Cable gland suitable for 3 core 95 sq.mm UG cable Cable gland suitable for 3 core 120 sq.mm UG cable Cable gland suitable for 3 core 150 sq.mm UGcable Cable gland suitable for 3 core 185 sq.mm UGCable Cable gland suitable for 3 core 240 sq.mm UG cable Cable gland suitable for 3 core 300 sq.mm UGcable Cable gland suitable for 3 core 400 sq.mm UGcable Cable gland suitable for 3 core 500 sq.mm UG cable Cable gland suitable for 4 core 6 sq.mm UG cable Cable gland suitable for 4 core 10 sq.mm UG cable Cable gland suitable for 4 core 25 sq.mm UG cable FUSE WIRE(COPPER) 5 Amps fuse wire 10 Amps fuse wire 20 Amps fuse wire NEUTRAL LINK 15 AMPS 4 way Neutral Link 6 way Neutral Link 8 way Neutral Link 12 way Neutral Link

Unit

Rate in Rupees

c. IV a b c d e f g h I. j. k. l. m. n. o. p. q. r. s. t. V a. b. c. VI a b c d

KG

88.00

Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Kg Kg Kg Each Each Each Each

19.50 24.20 28.80 42.60 50.80 50.80 64.60 64.60 79.60 97.00 123.50 162.50 192.50 192.50 230.00 328.00 382.00 24.20 28.80 50.80 519.00 519.00 519.00 26.50 39.30 49.00 71.00

Item No.

Description PART " F " M.S. BOX WITH PAINTING (16 SWG)

Unit

Rate in Rupees

a b c d

M.S Box of Size (100 x 100 x 75mm) M.S Box of Size (150 x 100 x 75mm) M.S Box of Size (200 x 150 x 75mm) M.S Box complete with lock & key arrangements with painting of size (300 x 200 x 100 mm) PART " G " MS ANGLES 1 " x 1" x 1/4" (37.5 x 37.5 x 6.24 mm) (1M= 3.25 Kg) 1"x 1" x " (37.5 x 37.5 x 12.5mm) 2" x 2" x " (50 x 50 x 12.5 mm)

Each Each Each Each

48.50 67.00 109.00 330.00

I a b c

KG KG KG

50.40 50.40 50.40

II a b III a b c d IV a

ALUMINIUM FLAT Aluminium Flat (1"x 1/4") (25x 6.25 mm) Aluminium Flat ( 1"x1/8") COPPER FLAT Copper Flat (25 x 3 mm) Copper Flat (25 x 6 mm) Copper Flat (33 x 6 mm) Copper Flat (50 x 6 mm) POWER CAPACITOR Power capacitor for power factor improvement with oil filled with discharge resistance 3 phase 415/440V 50 HZ conforming to ISS:2384 with ISI marking PART- H CONDUIT MATERIALS 16 Gauge Conduit pipe 16 mm (5/8") Heavy Gauge Conduit pipe 19 mm (3/4") Heavy Gauge Conduit pipe 25 mm (1") Heavy Gauge Conduit pipe 32 mm (1") Heavy Gauge Conduit pipe 38 mm (1") Heavy Gauge Metre Metre Metre Metre Metre 33.00 34.10 41.90 55.00 65.00 KG KG KG KG 519.00 519.00 519.00 519.00 KG KG 192.00 192.00

KVAR

363.00

I a b c d e

Item No.

Description

Unit

Rate in Rupees

II a b c d e f III a b c d e f IV a b c d e f g. I a b c d e f

CONDUIT TEE BENDS Conduit Tee bends 16 mm (5/8") Conduit Tee bends 19 mm (3/4") Conduit Tee bends 25 mm (1") Conduit Tee bends 32 mm (1") Conduit Tee bends 38 mm (1") Conduit Tee bends 50 mm (2") CONDUIT BENDS 16 Gauge Conduit solid bends 16 mm (5/8") Conduit solid bends 19 mm (3/4") Conduit solid bends 25 mm (1") Conduit solid bends 32 mm (1") Conduit solid bends 38 mm (1") Conduit solid bends 50 mm (2") CONDUIT INSPECTION BEND 16 Gauge Conduit Inspection bends 16 mm (5/8") Conduit Inspection bends 19 mm (3/4") Conduit Inspection bends 25 mm (1") Conduit Inspection bends 32 mm (1 ") Conduit Inspection bends 38mm (1") Conduit Inspection bends 50mm (2") Conduit Inspection bends 65mm (2") PART `I' PVC (RIGID) PIPES (1.8 MM THICK)WITH ISI MARK PVC rigid pipes 16mm (5/8") PVC rigid pipes 20mm (3/4") PVC rigid pipes 25mm (1") PVC rigid pipes 32mm (1") PVC rigid pipes 40mm (1") PVC rigid pipes 50mm (2") Metre Metre Metre Metre Metre Metre 14.20 20.40 30.30 45.90 65.40 98.00 Dozen Dozen Dozen Dozen Dozen Dozen Dozen 88.00 91.00 116.00 140.00 181.00 205.00 264.00 Dozen Dozen Dozen Dozen Dozen Dozen 88.00 98.00 115.00 136.00 193.00 236.00 Dozen Dozen Dozen Dozen Dozen Dozen 93.00 94.00 112.00 116.00 145.00 181.00

Item No.

Description PVC RIGID BENDS PVC rigid bends 16mm (5/8") PVC rigid bends 20mm (3/4") PVC rigid bends 25mm (1") PVC rigid bends 32mm (1") PVC rigid bends 40mm (1") PVC rigid bends 50mm (2") PVC COUPLES PVC Couples 16mm (5/8") PVC Couples 19mm (3/4") PVC Couples 25mm (1") PVC Couples 32mm (1") PVC Couples 38mm (1") PVC Couples 50mm (2") PVC TEES PVC Tees 16mm (5/8") PVC Tees 19mm (3/4") PVC Tees 25mm (1") PVC Tees 32mm (1") PVC Tees 38mm (1") PVC Tees 50mm (2") PVC Saddles PVC Saddles 16 mm (5/8") PVC Saddles 19mm (3/4") PVC Saddles 25mm (1") PVC Saddles 32mm (1") PVC Saddles 38mm (1") PVC Saddles 50mm (2")

Unit

Rate in Rupees

II a b c d e f III a b c d e f IV a b c d e f V a b c d e f

Each Each Each Each Each Each

3.30 3.30 4.50 7.95 19.80 24.10

Dozen Dozen Dozen Dozen Dozen Dozen

14.20 14.20 27.50 62.70 135.00 141.00

Dozen Dozen Dozen Dozen Dozen Dozen

14.20 16.40 20.90 93.60 301.00 330.00

Dozen Dozen Dozen Dozen Dozen Dozen

3.30 3.80 4.40 5.50 6.60 13.20

Item No.

Description PVC JUNCTION BOXES Junction boxes 1,2,3 & 4 way 16 mm (5/8") Junction boxes 1,2,3 & 4 way 19 mm (3/4") Junction boxes 1,2,3 & 4 way 25 mm (1") Junction boxes 1,2,3 & 4 way 32 mm (1") Junction boxes 1,2,3 & 4 way 38 mm (1") PVC Hylem sheets Hylem sheet 3 mm thick

Unit

Rate in Rupees

VI a b c d e VII a

Dozen Dozen Dozen Dozen Dozen

44.00 44.00 51.70 115.00 137.00

Sq.m

672.00

VIII Insulation Tape PVC a b c PVC Insulation Tape (19mm) Empire Tape (12 mm) Empire Tape (19 mm) PART `J' TEAK WOOD MATERIALS T.W. BOX CONCEALED TYPE a b c d e f I a b c d e f g h I. j k l T.W. Box concealed type 12"x8"x3" T.W.Box concealed type 8"x6"x3" T.W. Box concealed type 6"x4"x3 T.W. Box concealed type 4"x4"x3 T.W. plugs 1" x 1" x2" T.W. Round blocks PART`K' CRIMPING LUGS SUITABLE FOR THE FOLLOWING SIZES Size 4.0 Sq.mm 6.0 Sq.mm 10.0 Sq.mm 16.0 Sq.mm 25.0 Sq.mm 35.0 Sq.mm 50.0 Sq.mm 70.0 Sq.mm 95.0 Sq.mm 120.0 Sq.mm 150.0 Sq.mm 185.0 Sq.mm each each each each each each each each each each each each
Aluminium Copper

Roll/10 mts Roll/10 mts Roll/10 mts

16.40 22.00 26.40

Each Each Each Each 1000 Nos. 100 Nos.

82.60 44.00 19.80 16.40 341.00 660.00

1.60 1.80 2.30 2.30 3.45 4.60 6.90 9.20 10.40 13.85 18.45 24.20

4.60 4.60 5.75 6.90 11.55 12.65 14.95 24.20 30.00 41.50 53.10 80.80

Item No.

Description 225.0 Sq.mm 240.0 Sq.mm 300.0 Sq.mm 400.0 Sq.mm CABLE ROUTE INDICATOR Cable route indicator for L.T/ cable Cable route indicator for H.T/ cable BRASS SCREWS PART`L' each each each each

Unit

Rate in Rupees

m n o p II a b I. a b c d e f g II III a b c d e f g IV a b c d e f V

35.80 39.25 54.25 80.80 Each box Each box

115.00 115.00 155.80 236.00 77.00 77.00

Brass Screws (20mm) " No.6 Brass Screws (25mm) 1" No.6 Brass Screws (40mm) 1" No.6 Brass Screws (20mm) 3/4" No.8 Brass Screws (25mm) 1" No.8 Brass Screws (50mm)2" No.10 Brass screws (75mm)3" No.10 Coach screws 2"x" (50 x 6.25mm) CONDUIT SADDLES Conduit Saddles 16mm (5/8") Conduit Saddles 19mm (3/4") Conduit Saddles 25mm (1") Conduit Saddles 32mm (1") Conduit Saddles 38mm (1") Conduit Saddles 50mm (2") Conduit Saddles 65mm (2") SODIUM VAPOUR FITTINGS & LAMP (For External Electrification & Campus lighting) 250 Watts Sodium Vapour fittings 250 Watts Sodium Vapour lamp 150 Watts Sodium Vapour fittings 150 Watts Sodium Vapour lamp 70 Watts Sodium Vapour fittings 70 Watts Sodium Vapour lamp SODIUM VAPOUR LAMP FITTING SINGLE PIECE DIE CAST ALUMINIUM HOUSING & LAMP FOR HEAVY TRAFFIC ROADS (PHILIPS/ CROMPTON CREAVES/ WIPRO/BAJAJ) 400 Watts sodium vapour fittings 400 Watts sodium vapour lamp 250 Watts sodium vapour fittings 250 Watts sodium vapour lamp 150 Watts sodium vapour fittings

Gross Gross Gross Gross Gross Gross Gross Dozen Gross Gross Gross Gross Gross Gross Gross

71.50 77.00 82.50 71.50 77.00 159.00 236.00 14.25 44.00 46.80 55.00 71.50 88.00 99.00 113.00

Each Each Each Each Each Each

3490.00 770.00 3440.00 660.00 2780.00 440.00

a b c d e

Each Each Each Each Each

10460.00 1080.00 7100.00 880.00 6670.00

Item No.

Description 150 Watts sodium vapour lamp 70 Watts sodium vapour fittings 70 Watts sodium vapour lamps MINIATURE CIRCUIT BREAKERS 240 V/415 V 50HZ AC SUPPLY SUITABLE FOR BOTH LIGHTING AND MOTOR CIRCUITS. Single pole 6A to 32A,10 KA Single pole 40A , 10 KA Single pole & Neutral 6A to 32A, 10 KA Single pole & Neutral 40A, 10 KA Double pole 6A to 32A, 10 KA Double pole 40A, 10 KA Triple pole 6A to 32A, 10 KA Triple pole 63A , 10 KA Triple pole & Neutral 6A to 32A, 10 KA Triple pole & Neutral 63A, 10 KA Four pole 6A to 32A, 10 KA Four pole 63A, 10 KA MCB ISOLATORS Legrand(MDS)/Hager(L&T) DP 310.00 428.00 573.00 TP 517.00 740.00 860.00 FP 592.00 950.00 1040.00 Each Each Each Each Each Each Each Each Each Each Each Each

Unit

Rate in Rupees

f g h VI

Each Each Each


Legrand /Hager

716.00 2860.00 495.00


All other ISI makes with ISI (Std.)/ HPL/ Havells/ equivalent)

a b c d e f g h I j k l VII

202.50 412.50 588.00 953.00 588.00 953.00 946.00 1450.00 1250.00 1870.00 1250.00 1870.00

148.00 308.50 446.00 617.00 490.00 670.00 738.00 1185.00 963.00 1490.00 1030.00 1580.00

All other Makes with ISI (Standard)/HPL/Havells/equivalent) DP 297.00 376.00 TP 544.00 592.00 773.00 FP 664.00 693.00 845.00

a b c

32A each 40 A each 63 A each

d 100 A each -687.00 1100.00 486.00 VIII PLUG AND SOCKETS IN SHEET STEEL ENCLOSURE WITHOUT MCBS

Legrand All other Makes (MDS)/ with ISI (Std)/ Hager (L&T) HPL/ Havels/ equivalent)

a. b. c. d e f

10A 20A 20A 20A 32A 63A

single Pole Single pole Double Pole Triple Pole Triple Pole triple pole

Each Each Each Each Each Each

974.00 1045.00 1130.00 1920.00 2280.00 9270.00

580.00 585.00 -1110.00 1500.00 -

Item No.

Description

Unit

Rate in Rupees

IX-1 RCCB/ ELCB

Legrand All other ISI (MDS)/ makes with ISI Hager (L&T) (Std.)/ HPL/ Havells/ equivalent)

a b c

10 Amps 30 MA DP 25 Amps 30 MA DP 40 Amps 30 MA DP

Each Each Each

2750.00 2270.00 2510.00

2020.00 1740.00 1840.00

IX-2 RCCB/ELCB (FOUR POLE) a 25 Amps 30 MA b c X a b c d e f g 40 Amps 30 MA 63 Amps 30 MA HRC FUSES 16 Amps 32 Amps 63 Amps 125 Amps 160 Amps 200 Amps 250 Amps

Each Each Each

3120.00 3160.00 3650.00

2140.00 2190.00 2490.00

Each Each Each Each Each Each Each

64.60 66.90 138.00 323.00 403.00 415.00 577.00

34.60 57.70 72.50 161.00 217.00 217.00 321.00

XI VERTICAL THREE PHASE DISTRIBUTION BOARD WITH MCBS 4 Way / 8 way / 12 Way Vertical TPMCB sheet steel distribution boards Flush type/Surface type fitted with Bus bars and Neutral links with single / Three phase MCB out goings and separate 4 way provision for accommodating one No. 4 pole incoming MCB / Isolator and another separate 4 way provision for accommodating one No. 4 pole ELCB/ RCD with label holder and provisions for taking up cable for size not less than 35 sq.mm I MODULE TYPE WITH IP 20 PROTECTION Legrand No. of ways No. of ways No.of (MDS) incomer incomer outgoing /HAGER MCB/Isolator ELCB/RCD ways ( L & T) Rate in Rs. 4 4 12 5360/4 4 24 6620/4 4 36 9630/-

Description

All other makes with ISI (Std/ HPL / Havells / equivalent) Rate in Rs.

4 Ways 3 Phase DB 8 Ways 3 Phase DB 12 Ways 3 Phase DB

3900/5220/6350/-

II.TPMCB DB WITH METAL/ACRYLIC DOOR COVER WITH IP 42 PROTECTION


other Legrand (MDS)/ HAGER All makes with (L&T) No. of ways ISI (Std / No. of ways No.of incomer HPL/ Havells With incomer outgoing With metal ACRYLIC / ELCB/ MCB/Isolator ways equivalent) Door (Rate in door RCD Rupees) (Rates in ( Rate in Rupees) Rupees)

Description

4 Ways 3 Phase DB 8 Ways 3 Phase DB 12 Ways 3 Phase DB

4 4 4

4 4 4

12 24 36

6220/7880/10500/-

7500/9550/12700/-

5110/6290/7730/-

III.INDUSTRIAL TYPE TPMCB DB WITH IP 54 PROTECTION


No. of ways No. of ways No.of incomer incomer outgoing MCB/Isolator ways ELCB/RCD 4 4 4 4 4 4 12 24 36 Legrand (MDS) /HAGER ( L & T) Rate in Rs.

Description

4 Ways 3 Phase DB 8 Ways 3 Phase DB 12 Ways 3 Phase DB

11600/14000/18800/-

XII HORIZONTAL THREE PHASE DISTRIBUTION BOARD WITH MCBS 4 way / 6 way / 8 way / 12 way TPMCB sheet steel distribution boards Flush type / Surface type fitted with Bus bars and Neutral links with single/ Three phase MCB outgoings and separate 4 way provision for accommodating one No. 4 pole incoming MCB / Isolator and another separate 4 way provision for accommodating one No. 4 pole ELCB / RCD with label holder and provisions for taking up cable for size not less than 35 sq.mm I MODULE TYPE WITH IP 20 PROTECTION Legrand All other makes with ISI No. of ways No. of ways No.of (Std) / HPL (MDS) incomer /Havells/equivalent ) incomer outgoing /HAGER MCB/Isolator ways ( L & T) Rate Rate in Rs. ELCB/RCD in Rs. 4 4 12 1920/1200/4 4 4 4 4 4 18 24 36 2380/2830/4230/1510/1830/2500/-

Description

4 Ways 3 Phase DB 6 Ways 3 Phase DB 8 Ways 3 Phase DB 12 Ways 3 Phase DB

II.TPMCB DB WITH METAL / ACRYLIC DOOR COVER WITH IP 42 PROTECTION


Legrand (MDS)/ HAGER All other (L&T) makes with No. of ways No. of ways No.of ISI (Std) incomer With /HPL/Havell incomer outgoing With metal ACRYLIC ELCB/ s/equivalent MCB/Isolator ways Door (Rate in door RCD ) (Rate in Rupees) (Rates in Rupees) Rupees)

Description

4 Ways 3 Phase DB 6 Ways 3 Phase DB 8 Ways 3 Phase DB 12 Ways 3 Phase DB

4 4 4 4

4 4 4 4

12 18 24 36

2600/3210/3850/5680/-

3030/3720/4440/6760/-

2060/2610/3200/4140/-

III.INDUSTRIAL TYPE TPMCB DB WITH IP 54 PROTECTION Description 4 Ways 3 Phase DB 6 Ways 3 Phase DB 8 Ways 3 Phase DB 12 Ways 3 Phase DB No. of ways No.of ways No.of incomer incomer outgoing MCB/Isolator ELCB/RCD ways 4 4 12 4 4 18 4 4 24 4 4 36 Legrand (MDS) /HAGER ( L & T) Rate in Rs. 7340/8840/9650/13400/-

XIII 7 SEGMENT (3 TIER) 3 PHASE DISTRIBUTION BOARD WITH MCB 4 Way/6 way/8 way/12 Way TPMCB sheet steel distribution boards Flush type/Surface type fitted with Bus bars and Neutral links with single /Three phase MCB out goings and separate 4 way provision for accommodating one No. 4 pole incoming MCB /Isolator and another separate 4 way provision for accommodating one No. 4 pole ELCB/RCD (Totally 8 ways in one segment)(3 x 4 ways in each segment) and separate provision for MCB /Isolator)(Totally 12 Nos. ) for sub incomers in 3 segments with label holder and provisions for taking up cable for size not less than 35 sq.mm 1. MODULE TYPE WITH IP 20 PROTECTION Legrand (MDS) No. of ways No. of ways No.of Sub No. of out /HAGER incomer incomer incomers going ways MCB/Isolator ( L & T) Rate in Rs. ELCB/RCD 4 4 12 12 5780/4 4 12 18 6200/4 4 12 24 6580/4 4 12 36 7590/-

Description 4 Ways 3 Phase DB 6 Ways 3 Phase DB 8 Ways 3 Phase DB 12 Ways 3 Phase DB

II.TPMCB DB WITH METAL /ACRYLIC DOOR COVER WITH IP 42 PROTECTION No. of ways No. of ways Legrand (MDS) No.of Sub No. of out incomer /HAGER incomer incomers going ways MCB/Isolator ELCB/RCD ( L & T) Rate in Rs. 4 4 12 12 6140/4 4 12 18 6900/4 4 12 24 7700/4 4 12 36 9800/-

Description 4 Ways 3 Phase DB 6 Ways 3 Phase DB 8 Ways 3 Phase DB 12 Ways 3 Phase DB

XIV SINGLE PHASE DISTRIBUTION BOARD WITH MCBS 4 Way/8 way/12 Way Vertical SPMCB sheet steel distribution boards Flush type/Surface type fitted with Bus bars and Neutral links with single phase MCB out goings and separate 2 way provision for accommodating one No. 2 pole incoming MCB /Isolator and another separate 2 way provision for accommodating one No, 2 pole ELCB/RCD with label holder and provisions for taking up cable for size not less than 35 sq.mm I MODULE TYPE WITH IP 20 PROTECTION Legrand All other makes with ISI No.of ways No. of ways No.of (STD) /HPL/Havells/ (MDS) incomer equivalent) incomer outgoing /HAGER MCB/Isolator ways ( L & T) Rate Rate in Rs. ELCB/RCD in Rs. 2 2 4 705.00 383.00 2 2 8 880.00 485.00 2 2 12 1,045.00 664.00

Description

4 Ways 3 Phase DB 4 Ways 3 Phase DB 4 Ways 3 Phase DB

II. SPMCB DB WITH METAL/ACRYLIC DOOR COVER WITH IP 42 PROTECTION


All other Legrand (MDS)/ HAGER makes with (L&T) ISI (Std) with metal door/ HPL/ With Havell's / With metal ACRYLIC equivalent Door (Rate in door (Rate in Rupees) (Rates in Rupees) Rupees) 1025/1280/1540/1210/1430/1730/670/915/1180/-

Description

No. of ways incomer MCB/Isolator

No. of ways incomer

No.of outgoing ways

ELCB/RCD

4 Ways 3 Phase DB 4 Ways 3 Phase DB 4 Ways 3 Phase DB

2 2 2

2 2 2

4 8 12

III.INDUSTRIAL TYPE TPMCB DB WITH IP 54 PROTECTION. No. of ways No. of ways No.of incomer outgoing incomer MCB/Isolator ways ELCB/RCD 2 2 4 2 2 8 2 2 12 Legrand (MDS) /HAGER ( L & T) Rate in Rs. 3080/3610/4160/-

Description 4 Ways 3 Phase DB 4 Ways 3 Phase DB 4 Ways 3 Phase DB

RATES FOR WORKS

INFILTRATION WORKS Schedule Item No. 1 Description Earthwork excavation above water level in light or sandy or clayey soils for manhole wells, infiltration wells, suction wells etc. including levelling the site with an initial lead of 10 metres. First depth of 2 metres Second depth of 2 metres Third depth of 2 metres Fourth depth of 2 m 2 Erection of Ring well below water level including all incidental charges using special tools and plants such as air compressor helmet etc. complete and including bailing out water. For 0.90 metre dia Ring well (internal) First depth of 2 metres Second depth of 2 m Third depth of 2 m Fourth depth of 2 m Fifth depth of 2 m Sixth depth of 2 m b. For 1.2 metre dia Ring well (internal) First depth of 2 metres Second depth of 2 m Third depth of 2 m Fourth depth of 2 m Fifth depth of 2 m Sixth depth of 2 m c. For 1.50 metre dia Ring well (internal) First depth of 2 metres Second depth of 2 m Third depth of 2 m Fourth depth of 2 m Fifth depth of 2 m Sixth depth of 2 m One metre One metre One metre One metre One metre One metre 400.00 794.00 1570.00 3128.00 6247.00 12440.00 One metre One metre One metre One metre One metre One metre 346.00 692.00 1378.00 2582.00 4792.00 9572.00 One Cubic metre One Cubic metre One Cubic metre One Cubic metre Unit Rate Rs.

39.00 61.00 88.00 123.00

a.

One metre One metre One metre One metre One metre One metre

312.00 574.00 1205.00 2406.00 4739.00 9485.00

Schedule Item No.

Description

Unit

a.

Sinking well below water level including all incidental charges using special tools and plants such as air compressor, helmet etc., complete and including baling out water. For 1.0 metre dia (internal) First depth of 2 metres Second depth of 2 m Third depth of 2 m Fourth depth of 2 m Fifth depth of 2 m Sixth depth of 2 m Seventh depth of 2 m Eighth depth of 2 m Nineth depth of 2 m Tenth depth of 2 m One metre One metre One metre One metre One metre One metre One metre One metre One metre One metre One metre One metre One metre One metre One metre One metre One metre One metre One metre One metre One metre One metre One metre One metre

Rate Rs. Ordinary Silt (or) clay soil (or) pocket loose soil sandy soil

455.00 765.00 1529.00 3018.00 5745.00 10787.00 15828.00 20871.00 25909.00 30951.00 594.00 1189.00 2372.00 4253.00 7517.00 13574.00 19625.00 25680.00 31738.00 37791.00 923.00 1840.00 3671.00 5868.00

656.00 1202.00 2401.00 4794.00 9002.00 16848.00 22902.00 28955.00 35006.00 41060.00 900.00 1802.00 3644.00 6549.00 11618.00 21032.00 30450.00 39865.00 49283.00 58700.00 1484.00 2967.00 5924.00 10857.00

b.

For 1.25 metre dia (internal) First depth of 2 metres Second depth of 2 m Third depth of 2 m Fourth depth of 2 m Fifth depth of 2 m Sixth depth of 2 m Seventh depth of 2 m Eighth depth of 2 m Nineth depth of 2 m Tenth depth of 2 m

c.

For 2.0 metre dia (internal) First depth of 2 metres Second depth of 2 m Third depth of 2 m Fourth depth of 2 m

Schedule Item No.

Description

Unit

Fifth depth of 2 m Sixth depth of 2 m Seventh depth of 2 m Eighth depth of 2 m Nineth depth of 2 m Tenth depth of 2 m d. For 2.5 metre dia (internal) First depth of 2 metres Second depth of 2 m Third depth of 2 m Fourth depth of 2 m Fifth depth of 2 m Sixth depth of 2 m Seventh depth of 2 m Eighth depth of 2 m Nineth depth of 2 m Tenth depth of 2 m e. For 3.00 metre dia (internal) First depth of 2 metres Second depth of 2 m Third depth of 2 m Fourth depth of 2 m Fifth depth of 2 m Sixth depth of 2 m Seventh depth of 2 m Eighth depth of 2 m Nineth depth of 2 m Tenth depth of 2 m f. For 3.50 metre dia (internal) First depth of 2 metres Second depth of 2 m

One metre One metre One metre One metre One metre One metre One metre One metre One metre One metre One metre One metre One metre One metre One metre One metre One metre One metre One metre One metre One metre One metre One metre One metre One metre One metre One metre One metre

Rate Rs. Ordinary Silt (or) clay soil (or) pocket loose soil sandy soil 11471.00 19743.00 22937.00 34401.00 45866.00 57332.00 68795.00 1164.00 2420.00 4836.00 9007.00 16769.00 32385.00 47997.00 63612.00 79224.00 94841.00 1504.00 2980.00 5953.00 11489.00 21473.00 40700.00 59925.00 79151.00 98376.00 117604.00 1913.00 3719.00 36881.00 54035.00 71183.00 88329.00 105475.00 1935.00 3805.00 7580.00 14086.00 26050.00 48784.00 71513.00 94244.00 116974.00 139704.00 2619.00 5092.00 10187.00 19132.00 35727.00 62294.00 88824.00 115374.00 141925.00 168478.00 3068.00 6022.00

Schedule Item No.

Description

Unit

Third depth of 2 m Fourth depth of 2 m Fifth depth of 2 m Sixth depth of 2 m Seventh depth of 2 m Eighth depth of 2 m Nineth depth of 2 m Tenth depth of 2 m g. For 4.00 metre dia (internal) First depth of 2 metres Second depth of 2 m Third depth of 2 m Fourth depth of 2 m Fifth depth of 2 m Sixth depth of 2 m Seventh depth of 2 m Eighth depth of 2 m Nineth depth of 2 m Tenth depth of 2 m h. For 4.50 metre dia (internal) First depth of 2 metres Second depth of 2 m Third depth of 2 m Fourth depth of 2 m Fifth depth of 2 m Sixth depth of 2 m Seventh depth of 2 m Eighth depth of 2 m Nineth depth of 2 m Tenth depth of 2 m

One metre One metre One metre One metre One metre One metre One metre One metre One metre One metre One metre One metre One metre One metre One metre One metre One metre One metre One metre One metre One metre One metre One metre One metre One metre One metre One metre One metre

Rate Rs. Ordinary Silt (or) clay soil (or) pocket loose soil sandy soil 7422.00 12015.00 13896.00 25962.00 49190.00 72416.00 95647.00 118875.00 142104.00 2186.00 4210.00 8389.00 15756.00 29468.00 55870.00 82272.00 108672.00 135091.00 161477.00 2611.00 5119.00 10276.00 17872.00 30978.00 57615.00 84343.00 111029.00 137710.00 164393.00 22521.00 42820.00 79486.00 116155.00 152818.00 189485.00 226153.00 3681.00 7047.00 14081.00 26382.00 49198.00 93124.00 137048.00 180976.00 224599.00 265432.00 4403.00 8756.00 17475.00 32771.00 61280.00 102109.00 142939.00 183768.00 224903.00 268828.00

Schedule Item No.

Description

Unit

i.

For 5.00 metre dia (internal) First depth of 2 metres Second depth of 2 m Third depth of 2 m Fourth depth of 2 m Fifth depth of 2 m Sixth depth of 2 m Seventh depth of 2 m Eighth depth of 2 m Nineth depth of 2 m Tenth depth of 2 m One metre One metre One metre One metre One metre One metre One metre One metre One metre One metre One metre One metre One metre One metre One metre One metre One metre One metre One metre One metre

Rate Rs. Ordinary Silt (or) clay soil (or) pocket loose soil sandy soil 3238.00 6318.00 12568.00 23584.00 42584.00 83271.00 123957.00 164642.00 205331.00 246019.00 4654.00 9022.00 17137.00 33772.00 63124.00 119656.00 176196.00 232730.00 289266.00 345800.00 5461.00 10134.00 20235.00 39627.00 74050.00 140309.00 206568.00 272827.00 339087.00 405347.00 7611.00 14718.00 29421.00 55125.00 102824.00 194550.00 286275.00 378001.00 469725.00 561450.00

j.

For 6.00 metre dia (internal) First depth of 2 metres Second depth of 2 m Third depth of 2 m Fourth depth of 2 m Fifth depth of 2 m Sixth depth of 2 m Seventh depth of 2 m Eighth depth of 2 m Nineth depth of 2 m Tenth depth of 2 m

NOTE:

In case the water table is met with at depth of 2.00 m and below, from the bed level, an extra percentage as under may be allowed over the existing rates for items 3(a) to 3 (j) for the extra lift involved. Where water table is 2.00m, below bed level and upto 4.00 m Where water table is beyond 4.00m and upto 6.00m 15% extra 20% extra

Schedule Item No. 4a.

Description Earthwork excavation above water level in light or sandy soil for infiltration gallery, syphon or connecting pipeline and connected works including refilling complete. First depth of 2 m Second depth of 2 m Third depth of 2 m Fourth depth of 2 m

Unit

Rate in Rupees

b.

Earthwork excavation below water level in light or sandy soil for infiltration gallery, syphon or connecting pipe line and connected works including shoring and strutting and charges for special tools and plants for bailing/ pumping etc., such as air compressor and helmet. First depth of 2 m Second depth of 2 m Third depth of 2 m Fourth depth of 2 m

One cubic metre One cubic metre One cubic metre One cubic metre

44.60 63.90 92.90 124.30

One cubic metre One cubic metre One cubic metre One cubic metre

829.00 1172.00 1757.50 2550.00

Earthwork excavation below water level in clayey soil for infiltration gallery for laying syphon pipe line or connecting pipe and connected works, shoring and strutting and charges for special tools and plants for bailing/pumping etc., such as air compressor and helmet. First depth of 2 m Second depth of 2 m Third depth of 2 m Fourth depth of 2 m

One cubic metre One cubic metre One cubic metre One cubic metre

1378.50 1915.50 2991.50 4478.00

Schedule Item No. d

Description Earthwork excavation below water level in soft disintegrated rock for infiltration gallery, laying syphone pipe line/ connecting pipes etc., including shoring, strutting and charges for special tools and plants. First depth of 2 m Second depth of 2 m Third depth of 2 m Fourth depth of 2 m

Unit

Rate in Rupees

NOTE (i)

For sinking wells in soil mixed with pebbles boulder of size 80 mm to 600 mm mixed with clay and silt below water level, including bailing/ pumping water and charges for special tools and plants etc., complete, an extra 20% (Twenty perentage) over the rates for items 2,3b,3c & 3d in the schedule of rates is allowed. In case the water table is met with at a depth of 2.00m and below from the bed level, an extra percentage as under may be allowed over the existing rates for items 4(b), 4(c) and 4(d) above the extra lift involved

One cubic metre One cubic metre One cubic metre One cubic metre

964.00 1284.50 2000.00 3458.00

ii

Where water table is 2.00m below bed level 10% extra and upto 4.00m. Where water table is beyond 4.00m and upto 6.00m Pipe laying works Laying stoneware pipes and open joint with fillet in the infliltration gallery excluding cost of pipes but including charges of special tools and plant etc., such as air compressor and helmet. 200 mm dia stoneware pipes 225 mm dia stoneware pipes 300 mm dia stoneware pipes 15% extra

5a

I ii iii

One metre One metre One metre

132.50 162.50 190.00

Schedule Item No. iv v vi b

Description 350 mm dia stoneware pipes 375 mm dia stoneware pipes 450 mm dia stoneware pipes

Unit One metre One metre One metre

Rate in Rupees 220.50 273.50 282.00

Laying and jointing PVC slotted pipes in the inflitration gallery excluding cost of pipes but including charges for special tools and plants etc., complete such as air compressor and helmet. 200 mm dia (OD) PVC pipes One metre 315 mm dia (OD) PVC pipes One metre Refilling gallery trench and filter basins with clean excavated sand free from silt and clay One cubic metre Labour charges for laying filter media below water level in all depths as per specfification for infiltration gallery works including screening cleaning and charges for special tools and plant complete such as air compressor, helmets, sheet piles Granite metal 6mm to 40mm One cubic metre

98.50 150.50 10.50

a b

137.00

d.

Coarse sand passing through a sieve of four meshes to 2.5 centimetres and retained in a One cubic metre sieve of ten meshes to 2.5 centimetres and filling it under water Coarse sand passing through a sieve of ten meshes to 2.5 centimetres and retained in a One cubic metre sieve of 200 meshes to 2.5 centimetres and filling it under water Cost of coarse sand D-10 and D-20 for laying gallery media for a lead not exceeding 200m One cubic from the source to the place of stacking metre including stacking etc., complete. Cost of hard granite metal of size (B.S.S.) 6 mm to 12 mm filter media (machine crushed) One cubic metre

679.50

258.00

175.50

e.

923.00

Schedule Item No.

Description (I) NOTE: For 6(a),(b) and (c): The above rates are labour charges for laying the filter media including screening, cleaning etc., for a lead not exceeding 200 metres from the place of stacking to the point of laying the media. The cost of materials and the lead from the source to the place of stacking are to be paid for separately. (ii) NOTE: FOR 6(d): The above rates are applicable to cases where the screened materials is not less than 10% of the collected material. In specific cases where the screened material is less than 10% of the collected material prior orders of the superintending Engineer, TWAD Board are to be obtained in specific cases for increased rate of labour required. (iii) NOTE: FOR 6(e) The above rates are applicable to cases where the screened materials is not less than 20% of the collected materials. In case where the screened materials is less than 20% of the collected material, prior orders of the Superintending Engineer, TWAD are to be obtained in specific cases for increased rate of labour required.

Unit

Rate in Rupees

Schedule Description Item No. 7a Lowering of C.I/ D.I Pipes and specials in the trenches and laying to proper grade and alignment and as directed by the TWAD Officers. For depth upto 2m 80 mm dia C.I/ D.I Pipes and Specials 100 mm dia C.I/ D.I Pipes and Specials 125 mm dia C.I/ D.I Pipes and Specials 150 mm dia C.I/ D.I Pipes and Specials 200 mm dia C.I/ D.I Pipes and Specials 250 mm dia C.I/ D.I Pipes and Specials 300 mm dia C.I/ D.I Pipes and Specials 350 mm dia C.I/ D.I pipes and specials 400 mm dia C.I/ D.I pipes and specials 450 mm dia C.I/ D.I pipes and specials 500 mm dia C.I/ D.I pipes and specials 600 mm dia C.I/ D.I pipes and specials 700 mm dia C.I/ D.I pipes and specials 750 mm dia C.I/ D.I pipes and specials 800 mm dia C.I/ D.I pipes and specials 900 mm dia C.I/ D.I pipes and specials NOTE: i) For depth between 2m & 4m 10% over basic rates and for 4m to 6m 20% over basic rate allowed ii) For work of laying CI connecting pipe/ syphon basic pipe below water, double the above rates shall be allowed. iii) For laying pipes in sewer line except pumping main 10% more is allowed. b Lowering GI pipes and specials in the trenches and laying to proper grade and alignment and as directed by the TWAD Officers 15mm to 40mm dia 50mm to 65mm dia 80mm to 100mm dia 125mm to 150mm dia Disjointing C.I. Tyton S/S pipes and specials, and lifting C.I. Pipes from the trenches and stacking at places shown by the departmental officers. For depth upto 2 m 80 mm dia C.I. Pipes and specials 100mm dia C.I. Pipes and specials 125 mm dia C.I. Pipes and specials 150 mm dia C.I. Pipes and specials 200 mm dia C.I. Pipes and specials 250 mm dia C.I. Pipes and specials 300 mm dia C.I. Pipes and specials 350 mm dia C.I. Pipes and specials 400 mm dia C.I. Pipes and specials

Unit

Rate in Rupees.

One One One One One One One One One One One One One One One One

metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre metre

7.25 8.40 10.80 14.45 18.05 22.85 25.30 31.40 36.20 42.20 45.85 56.70 71.15 79.70 92.90 107.40

One One One One

metre metre metre metre

7.25 7.25 9.65 9.65

One One One One One One One One One

metre metre metre metre metre metre metre metre metre

7.25 8.40 9.65 13.20 14.45 22.85 24.15 31.40 33.80

Schedule Description Item No. 450 mm dia C.I. Pipes and specials 500 mm dia C.I.pipes and specials 600 mm dia C.I.pipes and specials 700 mm dia C.I.pipes and specials 800 mm dia C.I.pipes and specials 825 mm dia C.I.pipes and specials 900 mm dia C.I.pipes and specials NOTE: For depth between

Unit One metre One metre One metre One metre One metre One metre One metre % excess allowed over basic rate 10% 20%

Rate in Rupees. 39.75 43.45 53.10 61.50 67.60 77.25 85.65

2m to 4m 4m to 6m Lowering of M.S pipes and specials into the trenches and laying to proper grade and alignment and as directed by the TWAD officers. Up to 350mm dia 400 mm Dia 450 mm Dia 500 mm Dia 600 mm Dia 700 mm Dia 900 mm Dia 1000 mm Dia 1050 mm Dia 1100 mm Dia 1200 mm Dia 1400 mm Dia 1600 mm Dia NOTE: For depth between

d.

8a

2m to 4m 4m to 6m Jointing the C.I/ D.I - S/S pipes and specials with molten lead and Yarn including caulking the joints and testing to the required pressure with water. (Including cost of jointing materials) For depth upto 2m 80 mm dia C.I/ D.I - S/S pipes and specials 100 mm dia C.I/ D.I - S/S pipes and specials 125 mm dia C.I/ D.I - S/S pipes and specials 150 mm dia C.I/ D.I - S/S pipes and specials 200 mm dia C.I/ D.I - S/S pipes and specials 250 mm dia C.I/ D.I - S/S pipes and specials 300 mm dia C.I/ D.I - S/S pipes and specials 350 mm dia C.I/ D.I - S/S pipes and specials 400 mm dia C.I/ D.I - S/S pipes and specials 450 mm dia C.I/ D.I - S/S pipes and specials 500 mm dia C.I/ D.I - S/S pipes and specials 600 mm dia C.I/ D.I - S/S pipes and specials 700 mm dia C.I/ D.I - S/S pipes and specials

One metre One metre One metre One metre One metre One metre One metre One metre One metre One metre One metre One metre One metre Percentage excess allowed over basic rate 10% 20%

22.85 28.95 31.40 33.80 42.20 54.25 77.25 96.60 101.40 106.25 115.90 170.20 220.80

Each Each Each Each Each Each Each Each Each Each Each Each Each

Joint Joint Joint Joint Joint Joint Joint Joint Joint Joint Joint Joint Joint

243.90 297.05 391.20 458.85 621.80 885.00 959.90 1185.75 1445.30 2161.40 2427.05 2899.15 3273.45

Schedule Description Item No. 750 mm dia C.I/ D.I - S/S pipes and specials NOTE: For depth between

Unit Each Joint Percentage excess allowed over basic rate 10% 15%

Rate in Rupees. 3925.50

8b

2m to 4m 4m to 6m Jointing C.I/ D.I-S/S pipes and specials with rubber gaskets (tyton joint) including cost of lubricants, testing to the required pressure with water (including cost of jointing materials) For depth upto 2m 80 mm dia C.I/ D.I-S/S pipes and specials 100 mm dia C.I/ D.I-S/S pipes and specials 125 mm dia C.I/ D.I-S/S pipes and specials 150 mm dia C.I/ D.I-S/S pipes and specials 200 mm dia C.I/ D.I-S/S pipes and specials 250 mm dia C.I/ D.I-S/S pipes and specials 300 mm dia C.I/ D.I-S/S pipes and specials 350 mm dia C.I/ D.I-S/S pipes and specials 400 mm dia C.I/ D.I-S/S pipes and specials 450 mm dia C.I/ D.I-S/S pipes and specials 500 mm dia C.I/ D.I-S/S pipes and specials 600 mm dia C.I/ D.I-S/S pipes and specials 700 mm dia C.I/ D.I-S/S pipes and specials 750 mm dia C.I/ D.I-S/S pipes and specials 800 mm dia C.I/ D.I-S/S pipes and specials 900 mm dia C.I/ D.I-S/S pipes and specials NOTE: For depth between

8c

2m to 4m 4m to 6m Jointing the C.I/ D.I Double flanged pipes and specials with rubber insertion to the required specifications with M.S. bolts and nuts, complete and testing the pipes to the required pressure with water (including cost of jointing materials) For depth upto 2m For works above water level 80 mm dia C.I/ D.I Double flanged pipes and specials 100 mm dia CI Double flanged pipes and specials 125 mm dia C.I/ D.I Double flanged pipes and specials 150 mm dia CI Double flanged pipes and specials 200 mm dia C.I/ D.I Double flanged pipes and specials 250 mm dia C.I/ D.I Double flanged pipes and specials 300 mm dia C.I/ D.I Double flanged pipes and specials 350 mm dia C.I/ D.I Double flanged pipes and specials 400 mm dia C.I/ D.I Double flanged pipes and specials 450 mm dia C.I/ D.I Double flanged pipes and specials 500 mm dia C.I/ D.I Double flanged pipes and specials 600 mm dia C.I/ D.I Double flanged pipes and specials

Each Joint Each Joint Each Joint Each Joint Each Joint Each Joint Each Joint Each Joint Each Joint Each Joint Each Joint Each Joint Each Joint Each Joint Each Joint Each Joint Percentage excess allowed over basic rate 10% 20%

25.30 31.40 31.40 32.55 57.95 79.70 95.30 103.85 135.20 190.75 235.40 319.90 428.60 534.85 690.65 906.75

Each Each Each Each Each Each Each Each Each Each Each Each

Joint Joint Joint Joint Joint Joint Joint Joint Joint Joint Joint Joint

77.25 133.95 141.20 231.80 254.70 364.60 402.00 524.05 787.25 874.20 1073.40 1468.30

Schedule Description Item No. 700 mm dia C.I/ D.I Double 750 mm dia C.I/ D.I Double 800 mm dia C.I/ D.I Double 900 mm dia C.I/ D.I Double NOTE: For depth between flanged flanged flanged flanged pipes pipes pipes pipes and and and and specials specials specials specials

Unit Each Joint Each Joint Each Joint Each Joint Percentage excess allowed over basic rate 10% 15%

Rate in Rupees. 1544.30 1581.80 1621.60 1842.65

8d

2m to 4m 4m to 6m Jointing C.I/ D.I double flanged pipes and specials with rubber insertion or any equivalent to the required specifications with M.S. bolts and nuts etc., complete and testing the pipes to the required pressure including charges for special tools and plants such as air compressor and helmets and sheet piles. etc (including cost of jointing materials) For depth upto 2m For works below water level 80 mm dia C.I/ D.I Double flanged Pipes and specials 100 mm dia C.I/ D.I Double flanged Pipes and specials 125 mm dia C.I/ D.I Double flanged Pipes and specials 150 mm dia C.I/ D.I Double flanged Pipes and specials 200 mm dia C.I/ D.I Double flanged Pipes and specials 250 mm dia C.I/ D.I Double flanged Pipes and specials 300 mm dia C.I/ D.I Double flanged Pipes and specials 350 mm dia C.I/ D.I Double flanged Pipes and specials 400 mm dia C.I/ D.I Double flanged Pipes and specials 450 mm dia C.I/ D.I Double flanged Pipes and specials 500 mm dia C.I/ D.I Double flanged Pipes and specials 600 mm dia C.I/ D.I Double flanged Pipes and specials NOTE: For depth between

Each Joint Each Joint Each Joint Each Joint Each Joint Each Joint Each Joint Each Joint Each Joint Each Joint Each Joint Each Joint Percentage excess allowed over basic rate 10% 15%

162.95 242.65 270.45 386.40 445.50 608.55 671.35 831.90 1143.45 1272.70 1494.90 2104.60

8e

2m to 4m 4m to 6m Jointing the C.I/ D.I-S/S pipes and specials with neat cement or cement mortar and spun yarn including caulking the joints curing and testing to the required pressure with water (including cost of jointing materials) For depth upto 2m 80mm dia C.I/ D.I-S/S Pipes and Specials 100mm dia C.I/ D.I-S/S Pipes and Specials 125mm dia C.I/ D.I-S/S Pipes and Specials 150mm dia C.I/ D.I-S/S Pipes and Specials 200mm dia C.I/ D.I-S/S Pipes and Specials

Each Joint Each Joint Each Joint Each Joint Each Joint

59.10 61.50 79.70 80.35 141.20

Schedule Description Item No. 250mm dia C.I/ D.I-S/S Pipes and Specials 300mm dia C.I/ D.I-S/S Pipes and Specials 350mm dia C.I/ D.I-S/S Pipes and Specials 400mm dia C.I/ D.I-S/S Pipes and Specials 450mm dia C.I/ D.I-S/S Pipes and Specials 500mm dia C.I/ D.I-S/S Pipes and Specials 600mm dia C.I/ D.I-S/S Pipes and Specials 700mm dia C.I/ D.I-S/S Pipes and Specials NOTE: For depth between

Unit Each Joint Each Joint Each Joint Each Joint Each Joint Each Joint Each Joint Each Joint Percentage excess allowed over basic rate 10% 15%

Rate in Rupees. 164.20 200.45 232.95 275.30 328.40 382.70 469.65 513.10

2m to 4m 4m to 6m Lowering RCC pipes and specials into the trenches and laying to proper grade and alignment For depth upto 2m 150mm dia R.C.C. Pipes and Specials 200mm dia R.C.C. Pipes and Specials 250mm dia R.C.C. Pipes and Specials 300mm dia R.C.C. Pipes and Specials 350mm dia R.C.C. Pipes and Specials 400mm dia R.C.C. Pipes and Specials 450mm dia R.C.C. Pipes and Specials 500mm dia R.C.C. Pipes and Specials 600mm dia R.C.C. Pipes and Specials 700mm dia R.C.C. Pipes and Specials 750mm dia R.C.C. Pipes and Specials 800mm dia R.C.C. Pipes and Specials 900mm dia R.C.C. Pipes and Specials 1000mm dia R.C.C. Pipes and Specials 1100mm dia R.C.C. Pipes and Specials 1200mm dia R.C.C. Pipes and Specials 1300mm dia R.C.C. Pipes and Specials NOTE: For depth between

One metre One metre One metre One metre One metre One metre One metre One metre One metre One metre One metre One metre One metre One metre One metre One metre One metre % excess allowed over basic rate 10% 15%

21.70 22.85 28.95 33.80 42.20 45.85 53.10 61.50 71.15 79.70 83.25 101.40 119.45 137.65 160.50 178.70 196.75

i) ii)

2m to 4m 4m to 6m Each Collar joint is to be treated as one joint only For laying RCC pipes in sewage lines, except pumping main, 5% more is allowed

Schedule Description Item No. 10a Jointing RCC pipes with cement using necessary collars and testing to the required pressure including the cost of jointing materials and conveyance of water for filling the pipes during testing For depth upto 2m 150mm dia R.C.C. Pipes and Specials 200mm dia R.C.C. Pipes and Specials 250mm dia R.C.C. Pipes and Specials 300mm dia R.C.C. Pipes and Specials 350mm dia R.C.C. Pipes and Specials 400mm dia R.C.C. Pipes and Specials 450mm dia R.C.C. Pipes and Specials 500mm dia R.C.C. Pipes and Specials 600mm dia R.C.C. Pipes and Specials 700mm dia R.C.C. Pipes and Specials 750mm dia R.C.C. Pipes and Specials 800mm dia R.C.C. Pipes and Specials 900mm dia R.C.C. Pipes and Specials 1000mm dia R.C.C. Pipes and Specials 1100mm dia R.C.C. Pipes and Specials 1200mm dia R.C.C. Pipes and Specials 1300mm dia R.C.C. Pipes and Specials NOTE: For depth between

Unit

Rate in Rupees.

Each Joint Each Joint Each Joint Each Joint Each Joint Each Joint Each Joint Each Joint Each Joint Each Joint Each Joint Each Joint Each Joint Each Joint Each Joint Each Joint Each Joint % excess allowed over basic rate 10% 15%

117.05 143.60 176.30 198.00 212.50 229.40 269.20 297.05 353.70 411.70 434.70 451.60 513.10 525.20 574.75 637.55 705.15

10b

2m to 4m 4m to 6m Each collar joint is to be treated as one joint only. Jointing RCC pipes with lead and hemp yarn using steel collars and testing to the required pressure including the cost of jointing materials but including caulking the joints and conveyance of water for filling the pipes during testing For depth upto 2m 150mm dia R.C.C. Pipes 200mm dia R.C.C. Pipes 250mm dia R.C.C. Pipes 300mm dia R.C.C. Pipes 350mm dia R.C.C. Pipes 400mm dia R.C.C. Pipes 450mm dia R.C.C. Pipes

Each steel collar Each steel collar Each steel collar Each steel collar Each steel collar Each steel collar Each steel collar

124.30 155.70 184.65 213.65 242.65 252.30 316.35

Schedule Description Item No. 500mm dia R.C.C. Pipes 600mm dia R.C.C. Pipes 700mm dia R.C.C. Pipes 800mm dia R.C.C. Pipes NOTE: For depth between

Unit Each steel collar Each steel collar Each steel collar Each steel collar Percentage excess allowed over basic rate 10% 15%

Rate in Rupees. 353.70 422.60 504.70 621.80

11a

2m to 4m 4m to 6m Lowering AC/ GRP pipes and specials into the trench carefully, laying to proper grade and alignment jointing of A.C/ GRP pipes with simplex joints with rubber rings or with C.I. detachable joints or with M.S. couplers and testing to the required pressure including conveyance of water for filling during testing. For depth upto 2m 80mm dia AC/ GRP Pipes 100mm dia AC/ GRP Pipes 125mm dia AC/ GRP Pipes 150mm dia AC/ GRP Pipes 200mm dia AC/ GRP Pipes 250mm dia AC/ GRP Pipes 300mm dia AC/ GRP Pipes 350mm dia AC/ GRP Pipes 400mm dia AC/ GRP Pipes 450mm dia AC/ GRP Pipes 500mm dia AC/ GRP Pipes 600mm dia AC/ GRP Pipes 700mm dia AC/ GRP Pipes NOTE: For depth between

11b

2m to 4m 4m to 6m Lowering PVC rigid/ HDPE pipes and specials to trench and laying to proper grade and alignment jointing with PVC couplers with cement paste and testing to the required pressure including conveyance of water for filling during testing. For depth upto 2m Upto 40mm dia (OD) PVC/ HDPE pipe 50mm to 75mm dia (OD) PVC/ HDPE pipe 90mm to 110mm dia (OD) PVC/ HDPE pipe 125mm to 160mm dia (OD) PVC/ HDPE pipe 180mm to 250mm dia (OD) PVC/ HDPE pipe Over 250mm to 315mm dia (OD) PVC/ HDPE pipe NOTE: For depth between

One metre One metre One metre One metre One metre One metre One metre One metre One metre One metre One metre One metre One metre % excess allowed over basic rate 15% 30%

10.80 14.45 21.70 24.15 32.55 39.75 50.70 56.70 65.20 76.00 90.50 108.65 133.95

2m to 4m 4m to 6m

One metre One metre One metre One metre One metre One metre Percentage excess allowed over basic rate 15% 30%

4.25 7.25 7.25 10.10 13.00 18.85

Schedule Description Item No. 11c Lowering PSC/ BWSC pipes and specials into the trench and laying to proper grade and alignment and Jointing with rubber gaskets and testing to the required pressure including the cost of conveyance of water for filling during testing.

Unit

Rate in Rupees.

Schedule Description Item No. For depth upto 2m Upto 350mm diameter 400mm diameter 450mm diameter 500mm diameter 600mm diameter 700mm diameter 800mm diameter 900mm diameter 1000mm diameter 1100mm diameter 1200mm diameter 1300mm diameter 1400mm diameter 1500mm diameter NOTE: For depth between

Unit

Rate in Rupees. 56.70 66.35 77.25 90.50 109.80 123.15 133.95 146.05 159.35 171.45 198.00 219.75 252.30 280.10

11d

2m to 4m 4m to 6m Lowering CI collars with flange into the trench and laying to proper grade and alignment and jointing PSC pipes with 2 Nos of conical rubber rings and MS bolts and nuts testing to the required pressure including the cost of conveyance of water for filling during testing but excluding the cost of jointing materials For depth upto 2m Upto 350mm diameter 400mm diameter 450mm diameter 500mm diameter 600mm diameter 700mm diameter 800mm diameter 900mm diameter 1000mm diameter 1100mm diameter 1200mm diameter 1300mm diameter NOTE: For depth between

One metre One metre One metre One metre One metre One metre One metre One metre One metre One metre One metre One metre One metre One metre Percentage excess allowed over basic rate 15% 30%

Each collar Each collar Each collar Each collar Each collar Each collar Each collar Each collar Each collar Each collar Each collar Each collar % excess allowed over basic rate 15% 30%

602.45 705.15 807.75 909.15 1108.45 1410.35 1515.35 1717.05 2016.50 2220.50 2523.65 2830.35

2m to 4m 4m to 6m

Schedule Description Item No. 12a Cutting C.I. Pipes true to axis and filing smoothly and finishing the ends complete 80mm dia CI pipes 100mm dia CI pipes 125mm dia CI pipes 150mm dia CI pipes 175mm dia CI pipes 200mm dia CI pipes 250mm dia CI pipes 300mm dia CI pipes 350mm dia CI pipes 375mm dia CI pipes 400mm dia CI pipes 450mm dia CI pipes 500mm dia CI pipes 525mm dia CI pipes 600mm dia CI pipes 675mm dia CI pipes 700mm dia CI pipes 750mm dia CI pipes 800mm dia CI pipes 825mm dia CI pipes 850mm dia CI pipes 900mm dia CI pipes 12b Cutting A.C. Pipes true to axis and finishing the ends complete 80mm dia AC pipes 100mm dia AC pipes 125mm dia AC pipes 150mm dia AC pipes 200mm dia AC pipes 250mm dia AC pipes 300mm dia AC pipes 350mm dia AC pipes 400mm dia AC pipes 450mm dia AC pipes 500mm dia AC pipes 600mm dia AC pipes 700mm dia AC pipes

Unit

Rate in Rupees.

Each cutting Each cutting Each cutting Each cutting Each cutting Each cutting Each cutting Each cutting Each cutting Each cutting Each cutting Each cutting Each cutting Each cutting Each cutting Each cutting Each cutting Each cutting Each cutting Each cutting Each cutting Each cutting

21.70 24.15 30.10 33.80 39.75 54.25 68.75 77.25 97.75 120.75 126.70 136.35 150.85 182.25 185.95 222.15 234.25 241.50 253.55 276.45 289.80 297.05

Each cutting Each cutting Each cutting Each cutting Each cutting Each cutting Each cutting Each cutting Each cutting Each cutting Each cutting Each cutting Each cutting

8.40 9.65 10.80 13.20 18.05 28.95 30.10 36.20 44.60 50.70 57.95 66.35 73.60

Schedule Description Item No. 12c Cutting P.V.C. rigid pipes and specials true to axis and finishing the ends complete Upto 75mm dia (OD) PVC pipe 90mm dia PVC pipes 110mm dia PVC pipes 125mm dia PVC pipes 140mm dia PVC pipes 160mm dia PVC pipes 180mm dia PVC pipes 200mm dia PVC pipes 250mm dia PVC pipes 315mm dia PVC pipes 12d. a.i ii. b.i ii. c.i ii. d.i ii e.i ii f.i ii. g.i ii h.i ii. i.i ii. j.i. j.ii. 13 Cutting and threading of GI pipes 15mm dia GI pipe, Cutting 15mm dia GI pipe, Threading 20mm dia GI pipe, Cutting 20mm dia GI pipe, Threading 25mm dia GI pipe, Cutting 25mm dia GI pipe, Threading 32mm dia GI pipe, Cutting 32mm dia GI pipe, Threading 40mm dia GI pipe, Cutting 40mm dia GI pipe, Threading 50mm dia GI pipe, Cutting 50mm dia GI pipe, Threading 65mm dia GI pipe, Cutting 65mm dia GI pipe, Threading 80mm dia GI pipe, Cutting 80mm dia GI pipe, Threading 100mm dia GI pipe, Cutting 100mm dia GI pipe, Threading 125mm dia GI pipe, Cutting 125mm dia GI pipe, Threading Cutting R.C.C. Pipes true to axis and finishing the ends complete 150mm dia R.C.C. Pipes 200mm dia R.C.C. Pipes 250mm dia R.C.C. Pipes 300mm dia R.C.C. Pipes 350mm dia R.C.C. Pipes

Unit

Rate in Rupees.

Each cutting Each cutting Each cutting Each cutting Each cutting Each cutting Each cutting Each cutting Each cutting Each cutting Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each

2.85 4.25 4.25 4.25 4.25 7.25 8.60 8.60 10.10 11.50 3.60 5.05 3.60 5.25 4.40 10.55 5.25 14.25 6.95 16.00 8.90 17.85 9.65 21.45 12.50 26.95 17.85 35.70 19.20 38.50

Each cutting Each cutting Each cutting Each cutting Each cutting

30.10 33.80 43.45 56.70 59.10

Schedule Description Item No. 400mm dia R.C.C. Pipes 450mm dia R.C.C. Pipes 500mm dia R.C.C. Pipes 600mm dia R.C.C. Pipes 650mm dia R.C.C. Pipes 700mm dia R.C.C. Pipes 750mm dia R.C.C. Pipes 800mm dia R.C.C. Pipes 900mm dia R.C.C. Pipes 1000mm dia R.C.C. Pipes 1100mm dia R.C.C. Pipes 1200mm dia R.C.C. Pipes 1300mm dia R.C.C. Pipes 14a Removing the burst C.I. pipes from the pipe line and removal of slushy soil and baling out water and replacing the pipeline with sound pipe including jointing and cost of refilling the pipeline with water for retesting the pipe line etc complete. (excluding cost of sound pipe and jointing materials and earth work) and as directed by the TWAD Board officers. For depth upto 2m 80mm dia C.I. Pipes 100mm dia C.I. Pipes 125mm dia C.I. Pipes 150mm dia C.I. Pipes 200mm dia C.I. Pipes 250mm dia C.I. Pipes 300mm dia C.I. Pipes 350mm dia C.I. Pipes 400mm dia C.I. Pipes 450mm dia C.I. Pipes 500mm dia C.I. Pipes 600mm dia C.I. Pipes 700mm dia C.I. Pipes 750mm dia C.I. Pipes 800mm dia C.I. Pipes 825mm dia C.I. Pipes 900mm dia C.I. Pipes NOTE: For depth between

Unit Each cutting Each cutting Each cutting Each cutting Each cutting Each cutting Each cutting Each cutting Each cutting Each cutting Each cutting Each cutting Each cutting

Rate in Rupees. 76.00 83.25 92.90 103.85 108.65 119.45 123.15 135.20 143.60 154.55 165.35 177.45 184.65

Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Percentage excess allowed over basic rate

559.00 701.50 916.40 1155.50 1611.95 2215.70 2819.45 3192.60 4078.90 4443.60 4985.70 6100.25 6659.30 7642.20 8631.20 10235.90 12487.95

Schedule Description Item No. 2m to 4m 4m to 6m

Unit 15% 30%

Rate in Rupees.

Schedule Description Item No. 14b Removing the burst A.C. Pipes from the pipe line and removal of slushy soil and baling out water and replacing the pipe line with sound pipe including jointing and cost of refilling the pipe line with water for retesting the pipe line etc complete (excluding cost of sound pipe and jointing materials and earth work) and as directed by the TWAD Board officers For depth upto 2m 80mm dia AC. Pipes 100mm dia AC. Pipes 125mm dia AC. Pipes 150mm dia AC. Pipes 200mm dia AC. Pipes 250mm dia AC. Pipes 300mm dia AC. Pipes 350mm dia AC. Pipes 375mm dia AC. Pipes 400mm dia AC. Pipes 450mm dia AC. Pipes 500mm dia AC. Pipes 600mm dia AC. Pipes 700mm dia AC. Pipes NOTE: For depth between

Unit

Rate in Rupees.

Each Each Each Each Each Each Each Each Each Each Each Each Each Each % excess allowed over basic rate 15% 30%

323.60 382.70 481.70 616.95 865.70 1107.20 1378.95 1514.20 1703.70 1804.00 1842.65 2023.75 2355.75 2901.55

14c

2m to 4m 4m to 6m Removing the burst P.V.C. Pipes from the pipe line and removal of slushy soil and baling out water and replacing the pipe line with sound pipe including jointing and cost of refilling the pipe line with water for retesting the pipe line etc complete (excluding cost of sound pipe and jointing materials and earth work) and as directed by the TWAD Board officers Upto 63mm dia (OD) PVC Pipes 75mm dia (OD) PVC Pipes 90mm dia (OD) PVC Pipes 110mm dia (OD) PVC Pipes 125mm dia (OD) PVC Pipes 140mm dia to 160mm dia (OD) PVC Pipes 180mm dia to 200mm dia (OD) PVC Pipes 250mm dia to 280mm dia (OD) PVC Pipes 315mm dia (OD) PVC Pipes

Each Each Each Each Each Each Each Each Each

165.35 207.65 276.45 335.65 398.45 491.45 753.00 917.70 1022.70

Schedule Description Item No. NOTE: For depth between

Unit Percentage excess allowed over basic rate 15% 30%

Rate in Rupees.

14d

2m to 4m 4m to 6m Removing the burst R.C.C. pipes from the pipe line and removal of slushy soil and baling out water and replacing the pipe line with sound pipe including jointing and cost of refilling the pipe line with water for retesting the pipe line etc complete. (excluding cost of sound pipe and jointing materials and earth work) and as directed by the TWAD Board officers For depth upto 2m 150mm dia RCC Pipes 200mm dia RCC Pipes 250mm dia RCC Pipes 300mm dia RCC Pipes 350mm dia RCC Pipes 375mm dia RCC Pipes 400mm dia RCC Pipes 450mm dia RCC Pipes 500mm dia RCC Pipes 525mm dia RCC Pipes 600mm dia RCC Pipes 650mm dia RCC Pipes 700mm dia RCC Pipes 800mm dia RCC Pipes 900mm dia RCC Pipes 1000mm dia RCC Pipes 1100mm dia RCC Pipes 1200mm dia RCC Pipes 1300mm dia RCC Pipes NOTE: For depth between

Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Percentage excess allowed over basic rate 15% 30%

898.35 1263.05 1569.75 1864.35 2207.30 2622.65 2821.25 3157.55 3513.80 3999.20 4107.90 4583.65 4675.40 5159.55 5699.40 6230.70 6788.55 7327.10 7686.95

14e

2m to 4m 4m to 6m For sewerline works (Except pumping main) 5% extra over the above rate may be adopted. Charges for fixing MS Stepped split up collar in position in the spigot and socket ends of the PSC pipe carefully and caulking the sides of the collar using hemp yarn cement and hard crete and pouring the cement slurry mixed with use of hard crete in the stepped collar including cost of materials etc. complete but excluding cost of stepped collar as directed by the TWAD Board officers

Schedule Description Item No. Upto 1500mm dia PSC pipes Upto 1000mm dia PSC pipes Upto 800mm dia PSC pipes Upto 700mm dia PSC pipes Upto 600mm dia PSC pipes Upto 500mm dia PSC pipes Note: For lighting arrangements during night works due to emergency actual expenditure incurred based on need for lighting may be given extra as certified by the Executive Engineer incharge of work at site Charges for lowering, positioning and fixing MS steps collars in AC pipe line carefully and caulking the sides of collar using hemp yarn, cement and hard crete into the stepped collar including cost of jointing materials such as cement, yarn, bolt and nuts, MS washers, RI sheet and hard crete etc. but excluding cost of step collar and as directed by TWAD Officers For 500mm dia AC pipe For 600mm dia AC pipe For 700mm dia AC pipe For removing the burst pipe in the maintenance works when burst occurs and replacing it with sound pipes including the cost of refilling the trench and the removal of slushy soil etc., Complete (Pipes and special jointing materials will be supplied with in 200m lead and at the respective TWAD Board divisional stores free of cost).2 times ordinary rate allowed for the works are during day time since the works are done in confined reaches. If the works are done in odd hours (i.e) 8.00 P.M. to 8.00 A.M. of the next day, 3 times of ordinary rate is allowed since the works are done in the confined reaches. Slow Sand / Rapid Sand Filter Works Labour for filling with broken stone of all sizes well washed and cleaned, to be free from impurities, including stacking and laying in bed

Unit Each Each Each Each Each Each

Rate in Rupees. 5910.65 4724.85 2755.50 2720.40 2687.90 2604.50

14f

Each Each Each

1969.35 2164.95 2462.00

i)

ii)

15 a.i)

One cubic metre

63.90

ii)

Labour for filling the coarse sand passing through a sieve One cubic metre of 10 meshes to 2.5 cm and retained in 20 meshes to 2.5 cm well washed and cleaned to be free from impurities including stacking Labour for filling with fine sand passing through a sieve of ten meshes to 2.5cm and retained in a sieve of 40 meshes to 2.5 cm well washed and cleaned to be free from impurities including stacking One cubic metre

120.75

iii)

10.55

Schedule Description Item No. 15 b

Unit

Rate in Rupees. 11.95

Labour for scraping and removing silt only from the One cubic metre surface and sides of the filter basin carrying the same to a distance not exceeding 200 metres Labour for removing dirty sand in layer of 25 mm uniform thickness from the slow sand filter, conveying, dropping the sand in a hopper with a lift of not exceeding 3 metres within a distance of 30 metres and delivering the washed sand in filter bed includ One square metre

15c

14.45

16

DRAINAGE WORKS Laying and jointing with cement mortar stoneware pipes and specials in dry condition and testing with water 100mm diameter stoneware pipes 150mm diameter stoneware pipes 200mm diameter stoneware pipes 225mm diameter stoneware pipes 250mm diameter stoneware pipes 300mm diameter stoneware pipes 375mm diameter stoneware pipes 450mm diameter stoneware pipes NOTE : The rates to be worked out vide standard data appended as Item 17 One metre One metre One metre One metre One metre One metre One metre One metre

STANDARD DATA (RATES FOR ITEM No.16) ITEM No.17. LAYING AND JOINTING STONE WARE PIPES FOR ONE RUNNING METRE Total cost of material and cost of Labour for 30 mts. (Total No. of Column 10 & 15) ( Rs. P) Total cost of laying 4 joints stoneware pipes complete for 1 metre ( Rs. P ) 20 Labour for Laying and jointing Quantity of spun of tarred yarn in Kg Cost of sand required for 50 mortar joints at Rs. Per cum Quantity of sand in cubic meters for 50 mortar joints

Conveyance of pipes from Divisional Stores to site of work

Cost of Labour for a length of 30m of SW pipes (Total No. of column 11,12,13 & 14) (Rs. P.)

1 100mm 150mm 200mm 225mm 250mm 300mm 375mm 450mm Note :

2 60 60 60 60 60 60 60 60 -

4 45 68 98 104 115 150 318 454

5 -

6 0.04 0.07 0.08 0.1 0.11 0.15 0.28 0.34

7 -

8 3.63 5.45 6.9 8.17 8.35 11.34 18.14 27.22

9 -

10 -

11 12 13 14 2 1 5 2 3 2 6 3 4 2 6 3 5 3 7 5 5 3 7 5 6 3 12 6 7 3 14 7 8 3 16 8

Mazdoor Category II

Mazdoor Category I

Mason I Class

Fitter II Class

15 -

16 -

17 -

18 172.00 233.00 236.00 272.00 282.00 359.00 402.00 495.00

1. For other diametre of pipes now manufactured the rates will be fixed in due course after observing data. 2. The rates arrived at adopting the data appended to this schedule of Rates is for works done in the first 2.00m depth extra percentage 5% for 2m to 3m, 10% for 3m to 4m, 20% for above 4m depth over basic rates are allowed. 3. The above data does not include baling charges, baling charges to be added as extra as per rates given in the relevant PWD Schedule of Rates or as per actuals.

Total cost of laying and jointing SW pipes with CM and packing with spun or tarred yarn etc. complete for 30m length (Rs. P ) 19 -

Testing charges including conveyance of water tools and plants etc. ( Rs.)

Quantity of cement in Kg for 50 joints

Total cost of materials (Total of columns 5,7,& 9)

Weight of S.W pipes for 30m

Length of each pipe in cm

Cost of cement required for 50 joints (Rs.)

Cost of yarn at Rs. / Kg

Diameter (in mm)

RATES FOR CONVEYANCE OF MATERIALS

8 a) Rates for Conveyance of Materials by Road in Hills Limestone, Latrite,Brickjelly, wood work,Pond ash (wet /dry),stone dust (One Cubic Metre) Mangalore tiles (1000 Nos.) Machine Pressed Tiles (2000 Nos.) Hydraulically pressed Mosaic Flooring Tiles (1500 Nos.) 7 Bricks II class Chamber burnt Bricks(Table Moulded / Ground Moulded) , Fly Ash Bricks (1000 Nos.) 8 22.00 18.50 16.70 14.00 12.60 Rough Stone, Bond Stone, Cut Stone, Broken Stone jelly, Sand, Gravel, Surki, Earth, Crushed stone sand (One Cubic Metre)

1 Add for every extra 1KM and part there of a 0 to 10 kms b 10 to 20 kms c 20 to 40 kms d 40 to 80 kms e Above 80kms 9.80 8.40 7.40 6.20 5.70 10.80 9.30 8.20 6.90 6.20 15.60 13.40 11.80 9.90 9.00 13.20 11.30 10.00 8.40 7.50 17.60 15.20 13.40 11.20 10.10

Note 1 The above rates do not include stacking charges [as per Circular Memo No.230Wks.IV(2)/62-3 dated 16.06.1962 of Chief Engineer (General)] 2 For Conveyance of Materials on cart track, allow 20% extra over the above rates excluding loading and unloading charges. 3 For Sandy and Slushy soil tracks, add 50% extra over the above rates excluding loading and unloading charges 4 The quantity for Payment towards conveyance of earth in coloumn (5) is for the pit measured quantity at the site of excavation only. 5 For conveyance of laterite, broken stone jelly, etc., through lorries, the rates provided are for the volume with voids. 6 For all materails which finds place in column 3,4,5,6,7 & 8 above, necessary incidental charges, loading charges and unloading charges have been included already under their cost furnished below the head "Rates of Materials" itself. Hence, no separate incidental charges, loading and unloading charges shall be allowed for the above materials.

Third Class Country Bricks ( Kiln Burnt) (1000 Nos.) 6

Distance in Kilometre

Cement and Steel (One metric tonne)

Sl.No

8 b) Rates for Conveyance of Materials by Road in plains Rate in Rupees Rough Stone,Bond stone, Cut Stone, Broken Stone jelly, Sand, Gravel, Surki, Earth, Crushed stone sand (One Cubic Metre) Limestone, Laterite, Brickjelly, wood work, Pond Ash (wet /dry) Stone Dust (One Cubic Metre) Mangalore Tiles (1000 Nos.) Machine Pressed Tiles(2000 Nos.) Hydraulically Pressed Mosaic Flooring Tiles (1500 Nos.) 7 1.80 Bricks II class Chamber burnt Bricks(Table Moulded/ Ground Moulded), Fly Ash Bricks (1000 Nos.) 8 2.25 11.00 9.25 8.35 7.00 6.30 34.35 34.35 32.70 Third Class Country Bricks(Kiln Burnt) (1000 Nos.) 6 1.35 6.60 5.65 5.00 4.20 3.75 34.35 34.35 19.60

Distance in Kilometre

1 1 2

2 Co efficient Add for every extra 1KM and part there of 0 to 10 kms 10 to 20 kms 20 to 40 kms 40 to 80 kms Above 80kms Loading Charges UnLoading Charges Add above extra for inter state works

Cement and Steel (One metric tonne) 3 1.00

S.No

4 1.10

5 1.60

a b c d e 3 4 5 Note:

4.90 4.20 3.70 3.10 2.85 73.10 73.10 14.55

5.40 4.65 4.10 3.45 3.10 34.90 34.90 16.00

7.80 6.70 5.90 4.95 4.50 23.90 23.90 23.25

8.80 7.60 6.70 5.60 5.05 34.35 34.35 26.15

1 The above rates do not include stacking charges [as per Circular Memo No.230Wks.IV(2)/62-3 dated 16.6.1962 of Chief Engineer (General)] 2 For Conveyance of Materials on cart track, allow 20% extra over the above rates excluding loading and unloading charges. 3 For Sandy and Slushy soil tracks, add 50% extra over the above rates excluding loading and unloading charges 4 The quantity for Payment towards conveyance of earth in coloumn (5) is for the pit measured quantity at the site of excavation only. 5 For conveyance of Lateriate, Broken stone jelly, etc. through lorries, the rates provided are for the volume with voids. 6 For all materails which finds place in coloumn 3,4,5,6,7 & 8 above, necessary incidental charges, loading charges and unloading charges have been included already under their cost furnished below the head "Rates of materials" itself. Hence, no separate incidental charges, loading and unloading charges shall be allowed for the above materials.

9) Rates for Conveyance of materials by Head load Rate in Rupees LEAD LIFT

S.No

Description of material

Unit

Add extra Add extra for Above for every every 1m 10m and additional height or part upto 100m or thereof for 100m part more than 2m thereof lift 4 50.40 5 20.95 6 5.50

Rough Stone, Broken Stone Jelly, Cut Stone, RCC Slab, Sand - Cement Block, Wooden Scantling, Wooden plank Lime, Lime Stone, Laterite, Brick Jelly, Earth, Sand,Gravel, Surki, Pond Ash (wet/dry), Crushed Stone Sand, Stone Dust a) Mangalore Tiles b) Machine Pressed Tiles c) Hydraulic Pressed Mosaic Flooring Tiles d) Terrace Bricks, Flat Tiles and Pan Tiles e) Bricks

cu.m

2 3

cu.m 1000 Nos. 2000 Nos. 1500 Nos. 2500 Nos. 1000 Nos. M.T M.T

26.85 54.60 54.60 54.60 54.60 54.60 50.40 84.10

20.95 27.45 27.45 27.45 27.45 27.45 27.45 33.60

4.10 6.95 6.95 6.95 6.95 6.95 5.50 6.95

4 5 Note:

Cement, A.C. Sheet, Bitumen, Asphalt, Tar Steel

1 Fraction of 100 metres to be rounded off to the nearest 100 metres 2 The rates indicated in the table shall be applicable only to inaccessible places (i.e) the places Wherever the Bullock- Carts cannot move [Chief Engineer (General) Memo No.CTO(A) / 38153 / 89 / dated 03.02.1989] 3 For an initial lead of 10m and initial lift of 2m, no charge towards head load is allowable.

RATES FOR MISCELLANEOUS ITEMS

MISCELLANEOUS Schedule Item No. 1. A Description PLUMBING Laying of G.I. Pipes and specials to proper line and level including jointing but excluding cost of pipes and jointing materials for plumbing works for providing water supply and sanitary works in the premises of the building 6 mm to 32 mm dia 40 mm to 50 mm dia 65 mm to 150 mm dia b Bore cap using M.S. Flat of size 1 cm x 3 mm and M.S. sheet on top with bolting arrangements for securing the cap in position (Bore caps with M.S. Couplings need not be made) 5" Casing Pipes 6" Casing Pipes 8 " Casing Pipes 2 a. b. 3 Labour for cutting open road for laying water mains or sewer. B.T. Roads (or) Maccadam road Concrete Roads Labour for drilling, cutting, Threading and Fixing Ferrules in distribution pipes. 10 mm dia 15 mm dia 20mm dia 25 mm dia Labour charges for Painting TWAD Board Emblem in accordance with the size and specifications as approved by the Board on the service reservoirs including cost of all consumables. Drilling holes in C.I/G.I. Dummy Flanges. 12 mm dia 15 mm dia 20 mm dia 22 mm dia 25 mm dia 6 Each Each Each Each Each 13.05 26.20 37.95 51.05 64.15 13.05 Each Each Each Each Sqm 37.15 46.45 58.40 69.00 1302.25 One cubic metre One cubic metre 354.55 496.65 Each Each Each 265.65 281.50 309.45 One metre One metre One metre 8.70 8.70 11.60 Unit Rate in Rupees

Labour for refilling with sand the socket hollows of pipes One cubic metre including conveyance and stacking

Schedule Item No.

Description NOTE : 1) For depth between

Unit Percentage escess allowed over basic rate 15% 30%

Rate in Rupees

2 m to 4 m 4 m to 6 m 7 Lifting and positioning of C.I / G.I Pipes in vertical direction for service reservoir pipe connection 0 to 2 m 2 to 4 m 4 to 6 m 6 m to 8 m 8 m to 10 m 10 m to 12 m 12 m to 14 m 14 m to 16 m 16 m to 18 m 18 m to 20 m 20 m to 22 m 22 m to 24 m DRILLING WORKS Using Hand Bore set 8.a Drilling of borewells of size 4" to 5" dia in Sedimentary formation using hand boresets including insertion of casing pipes and removal of casing pipes etc., including supplying and packing of pebbles and conveyance of hand Boreset including loading and unloading Drilling of borewells of size 6" to 8" dia in sedimentary formation using hand boreset including insertion of casing pipe etc., and supplying and packing of pebbles (Conveyance of hand bore set including loading and unloading to be done by the contractor

Qtl Qtl Qtl Qtl Qtl Qtl Qtl Qtl Qtl Qtl Qtl Qtl

110.15 165.95 260.25 359.95 459.50 557.85 660.10 751.95 851.35 950.90 1048.00 1146.20

One metre

415.70

One metre

488.75

Schedule Description Item No. c Using Hand Bore set (For Investigation purpose) I Drilling of borewells of size 4" to 5" dia in sedimentary formation using hand boresets including insertion of casing pipes and removal of casing pipes etc., including collection of samples as directed by the TWAD Board Officers. Drilling of borewells of size 6" to 8" dia in sedimentary formation using hand boresets including insertion of casing pipes and removal of casing pipes etc., including collection of samples as directed by the TWAD Board Officers. Using calyx Drill d Drilling of 4 1/2" diameter borewell by using calyx Drill including transporting charges and insertion of casing pipes (excluding cost of casing pipe) For Hilly terrain area For Plain area Drilling 4 1/2" dia meter bores by using in-well rigs in hilly areas Reaming from 6" Pilot bore to 12" size bore as directed by the TWAD Board Officers Labour charges for inserting casing pipes assembly (With slot or without slot) in the drilled hole including welding the joint etc., complete and supplying and packing the annular space with pebbles of size and quality as approved by the Executive Engineer a Driving sheet piles for one metre length of gallery each side in sandy soil i. ii iii b First depth of 2 m Second depth of 2 m Third depth of 2 m Removing sheet piles from one metre length of gallery on each side including stacking the sheets piles properly First depth of 2 m Second depth of 2m Third depth of 2 m Drilling of borwell inside well 115mm dia a) vertical b) horizontal

Unit

Rate in Rupees

One metre

309.45

ii

One metre

362.60

i. ii. e f g

One metre One metre One metre One metre

1555.35 1285.70 654.80 171.35

One metre

163.30

One metre One metre One metre

322.65 492.75 925.75

i. ii iii 10

One metre One metre One metre

50.35 76.90 111.55

One metre One metre

357.30 391.80

Schedule Description Item No. 11 Drilling of borewell inside well 150mm dia a) vertical b) horizontal 12

Unit

Rate in Rupees

One metre One metre

447.55 472.75

Drilling of Borewells anywhere in Tamilnadu including transportation from one place to another with in Tamilnadu in alluvial soil sedimentary strata of clay and sand stone shale pebbles boulders etc. By first taking a pilot bore of 140 mm/150mm dia and then enlarging to P.S. to M.D.S.S. Special required dia direct or reverse rotary mud circulation Specifications. method using rotary rigs fuel, labour and drilling bentonite and water required for drilling at site( Site will be shown by the TWAD Board officers) including construction of mud pit. Drilling of 140/150 mm pilot bore Upto 60 m Depth ending below ground level From 60 m Upto 90 m Depth ending from ground level From 90 m upto 120 m Depth ending from ground level From 120 m upto 150 m Depth ending from ground level From 150 m upto 180 m Depth ending from ground level From 180 m upto 210 m Depth ending from ground level From 210 m upto 240 m Depth ending from ground level From 240 m upto 270 m Depth ending from ground level From 270 m upto 300 m Depth ending from ground level From 300 m upto 330 m Depth ending from ground level From 330 m upto 360 m Depth ending from ground level One metre One metre One metre One metre One metre One metre One metre One metre One metre One metre One metre 747.70 808.90 857.90 903.20 917.70 947.00 974.85 1008.05 1030.60 1055.90 1077.20

a. i. ii iii iv v vi vii viii ix x xi

Schedule Description Item No. 12 b Reaming 140/150 mm dia pilot bore to 300mm dia bore as directed by the TWAD Board Officer. i. Upto 60 m depth ending below ground level ii iii iv v vi vii viii ix x xi From 60 m depth and upto 90 mt depth ending below ground level From 90 m upto 120 mt depth ending below ground level From level From level From level From level From level From level From level From level 120 m upto 150 mt depth ending below ground 150 m upto 180 mt depth ending below ground 180 m upto 210 mt depth ending below ground 210 m upto 240 mt depth ending below ground 240 m upto 270 mt depth ending below ground 270 m upto 300 mt depth ending below ground 300 m upto 330 mt depth ending below ground 330 m upto 360 mt depth ending below ground

Unit

Rate in Rupees

One metre One metre One metre One metre One metre One metre One metre One metre One metre One metre One metre

187.20 199.15 212.50 215.15 225.75 237.70 248.25 257.60 270.90 281.50 292.10

12 c Reaming 200 mm dia pilot bore to 350mm dia bore as directed by the TWAD Board Officer. i. Upto 60 m depth ending below ground level ii iii iv v vi vii viii ix From 60 m depth and upto 90 mt depth ending below ground level From 90 m upto 120 m depth ending below ground level From 120 m upto 150 m depth ending below ground level From 150 m upto 180 m depth ending below ground level From 180 m upto 210 m depth ending below ground level From 210 m upto 240 m depth ending below ground level From 240 m upto 270 m depth ending below ground level From 270 m upto 300 m depth ending below ground level

One metre One metre One metre One metre One metre One metre One metre One metre One metre

211.10 223.10 237.70 244.35 252.30 272.20 310.70 318.75 326.60

Schedule Description Item No. xi From 330 m upto 360 m depth ending below ground level 12 d Reaming 300 mm dia pilot bore to 400mm/ 450mm dia bore as directed by the TWAD Board Officer. i. Upto 60 m depth ending below ground level ii iii iv v vi vii viii ix x xi 12 e From 60 m depth and upto 90 m depth ending below ground level From 90 m upto 120 m depth ending below ground level From 120 m upto 150 m depth ending below ground level From 150 m upto 180 m depth ending below ground level From 180 m upto 210 m depth ending below ground level From 210 m upto 240 m depth ending below ground level From 240 m upto 270 m depth ending below ground level From 270 m upto 300 m depth ending below ground level From 300 m upto 330 m depth ending below ground level From 330 m upto 360 m depth ending below ground level Labour Charges for inserting 150 mm/200mm/250 mm dia (M.S. Casing pipes assembly with slots or with out slots) in the drilled hole including welding the joints etc., complete and supplying and packing the annular space with pebbles of size and quality as approved by the Executive Engineers of TWAD Board. 150 mm dia Casing Pipes assembly 200 mm dia Casing Pipes assembly 250 mm dia Casing Pipes assembly

Unit

Rate in Rupees

One metre

345.35

One metre One metre One metre One metre One metre One metre One metre One metre One metre One metre One metre

289.45 324.05 345.35 366.50 381.10 391.80 401.10 419.60 435.60 456.90 472.65

i. ii iii

One metre One metre One metre

168.55 168.55 171.35

Schedule Description Item No. 13 Labour Charges for inserting PVC Casing pipes assembly a (with slots or without slots) in the drilled hole including jointing the pipes with PVC Couplers with Cement paste etc., complete supply and packing the annular space with pebbles of size and quality as approved by the executive engineers of TWAD Board i. 150 mm dia Casing Pipes assembly ii iii 13 b 200 mm dia Casing Pipes assembly 250 mm dia Casing Pipes assembly Charges for developing the Borewell with air compressor of 600 CFM capacity (Minimum 8 Hours) including transportation, labour and fuel charges for compressor as directed by TWAD Officers and conducting yield test by 'V' notch method. Note : I) 150 mm dia bore, reaming should be done upto 300mm dia. II) 200 mm dia bore, reaming should be done upto 300mm dia and thereafter 400,450 etc. Drilling of borewell anywhere in Tamilnadu including transportation from one place to another place within Tamilnadu in alluvial soil or sedimentary strata of clay and sand or sand, stone, shale, pebbles, boulders etc., by first taking a pilot bore of 140 mm/150mm dia and then enlarging to required dia by direct or reverse rotatry mud and circulation method using contractor's rig, fuel, labour, drilling, betonite mud and water required for drilling at the site shown by the TWAD officers including construction of mud pit only calyx drills are to be used. Drilling 140 / 150 mm dia Pilot Bore upto 60 m depth ending below ground level. Reaming from 140/150 mm dia pilot bore to 300 mm dia bore as directed by the TWAD Board Officers upto 60 m Depth ending from ground level Labour charges for inserting 150 mm dia M.S. Casing pipes assembly (With slots or without slots) in the drilled hole including welding the joints and packing annular space with pebbles of size and quality as approved by the Executive Engineer / TWAD Labour Charges for inserting PVC casing pipes assembly (with slots or without slots) in the drilled hole including the jointing the pipes with PVC couplers with cement paste etc. complete 140 mm OD PVC Casing Pipes Assembly

Unit

Rate in Rupees

One metre One metre One metre

163.30 168.55 168.55

One hour

1101.10

14

a. b.

One metre

544.50

One metre

153.95

c.

One metre

138.00

d.

i.

One metre

118.20

Schedule Description Item No. e. Charges for developing the borewell with air compressor of 300 cfm capacity (Minimum 8 Hours) including transportation labour and fuel charges for compressor as directed by TWAD Board officers and conducting yield test by 'V' notch method. f. Drilling of 12" dia vertical borewell so as to have a finished size of 6" dia borewell in boulder area to any required depth as decided by the TWAD Board officers including Transportation from one place to anothr place with in Tamilnadu State by direct or reverse rotary mud circulation method using contractor's rig tools, fuel labourers, bentonite mud and water required for drilling at the site shown by the TWAD Officers including construction of mud pit etc. using only calyx rigs. a. Conveyance of handpumps and its accessories from divisional stores to site of works i. ii ii iv Conveyance upto 10 Kms Conveyance 10 to 20 Kms Conveyance 20 to 40 Kms Conveyance above 40 Kms Note : i) Conveyance of Filter Point, Handpump with GI Pipes and its accessories from divisional stores to site of works. 50% of the rate of conveyance of hand pumps, with its accessories is applicable for this item for the respective leads as indicated above ii) If the Mark II hand pump is conveyed in cart track even for part distance 20 % extra over the above rate shall be adopted. b i. ii c. d. e. i. ii f) Erection of deep well hand pumps upto 40 m Above 40 m Erection of shallow well hand pumps Erection Extra deep well hand pumps Removal of deep well hand pumps from borewell Up to 40 m Above 40 m Attending repairs to deep well handpumps for borewells inclusive of removal of G.I. Pipes, Plunger rods, Cylinder and re-erection of hand pumps inclusive of lowering the GI Pipes Plunger rods cylinder, jointing etc. Upto 30 M

Unit

Rate in Rupees

One metre

856.60

One metre

1048.00

15

338.65 Each handpump and its accessories 425.00 517.95 600.30

Each Each Each Each Each Each

556.45 634.80 245.60 718.50 556.45 701.25

i.

Each

590.95

Schedule Description Item No. 16 Erection of filter point with G.I. Pipes of 32 mm to 65 a mm dia b Removing the chocked filter point with G.I. Pipes of 32 mm to 65 mm dia and re-erecting in another place within 1.00 KM radius after cleaning the filter points G.I. Pipes etc., Complete upto 8.00 m depth 17 (a) ERECTION OF POWER PUMPSET IN BORE/OPENWELL Labour Charges for erection of Horizontal shaft, centrifugal pumpset (Coupled/Monoblock) in bore well/Open well including fixing of suction pipe and foot valve upto a maximum depth of 7 metres and delivery pipes to the required length with valves, pressure gauges upto the exterior wall of pump room and erection of panel Board consisting of TPIC switches starter, voltmeter, Ammeter, Capacitor single phasing preventor and laying and jointing the cables and twin earthing as per IE rules including providing bed blocks etc., complete and operating the pumps and trial run for 10 days including signing of completion of reports as required by EB authorities. i. ii iii 17 b Upto 3 HP Above 3 HP upto 7.5 HP Above 7.5 HP to 20 HP ERECTION OF POWER PUMPS IN BORE WELL Erection of power pumps in borewell labour charges for erection of twin packer duplex type jet pumps in borewells upto 150 mm dia including fixing of Suction pipe regulating valves with jet assembly upto a maximum depth of 30 m and delivery pipe valves pressure gauges upto the exterior wall of pump room and erection of panel board consisting of TPICN switches starter, voltmeter, Ammeter, three indicator lamps capacitor and laying and jointing the cables and twin earthing as per IE rules etc., complete and testing the pumps and trail run for 10 days including signing of completion of reports as required by EB authorities and finishing the pipe holes including the foundation bolts, nuts and earth pits. Upto 3 HP Above 3 HP upto 7.5 HP Beyond 7.5 HP upto 20 HP Note : If depth of erection exceeds beyond 30 m 10% increase over the basic rate is allowed

Unit

Rate in Rupees

Each

160.65

Each

266.90

Each Each Each

3594.90 4627.60 5422.25

i. ii iii

Each Each Each

4809.30 5618.90 6425.05

Schedule Description Item No. 17 Labour charges for the erection of submersible pumpset c in borewell/openwell including fixing and jointing submersible cable withproper clamps upto the starter to required depth and also fixing of riser pipes to the required depth valves erection clamps, pressure gauges upto the exterior wall of pump room and erection of panel board consisting of TPICN switches starter, voltmeter, Ammeter, three pilot (indicating) lamps capacitor single phasing preventor, water level guard and laying and jointing the cables and twin earthing as per IE rules etc., complete and testing the pumpset and trail run for 10 days. i. ii) iii) 17 d Upto 5 HP Above 5.00 HP to 10.00 HP Above 10.00 HP to 20.00 HP Conveyance of power pumpset (centrifugal jet and submersible) and its accessories from divisional stores to site of works. Conveyance upto 10 Kms Conveyance 10 to 20 Kms Conveyance 20 to 40 Kms Conveyance 40 to 60 Kms Conveyance 60 to 80 Kms Conveyance above 80 Kms i. Note : For item 17 (a) (b) and (c) Removal of centrifugal pumpset/ jet pumps/ submersible pumpsets and its accessories from borewell/ open well for attending repairs 50% of the rates mentioned under item 17 (a) (b) and (c) may be allowed for the respective Horse power. Re-erection of centrifugal pumpsets, jet pumpsets and its accessories into the borewell/ openwell after attending the repairs 50% of the rate mentioned under item 17 (a) (b) and (c) may be allowed for respective Horse power. Hire charges : Sheet piles (Larsen) Sheet piles (For dingham) Compartment sheet with Grills (3' -0" Wide) Rate for flushing of borewell of 6" dia requiring less than 4 hours operation using drill rods/ hose with required size of pipes for various capacity compressor including transportation, labour, and fuel charges for compressors as directed by the TWAD Officer and conducting yield test by 'V' notch method if required.

Unit

Rate in Rupees

Each Each Each

4888.65 5601.65 6214.60

Each Power Pump and its accessories -do-do-do-do-do-

737.15 810.15 1199.30 1462.30 1919.20 2200.85

ii

18 a b c d

Per Pile/Per day Per Pile/Per day Per sheet/Per day

2.85 4.30 4.30

Schedule Description Item No. i. 600 Cfm ( 100 /150 PSI) ii) ii) 300/250 Cfm (100 PSI) 125 Cfm (100 PSI) Note : Minimum charges for 8 (eight) hours will be levied if the air compressor issued for other departmental works or if the air compressor is hired to other departments. e f g h i. j k l m 19 Helmet Hand test pump Pile hammer Concrete mixer 5 Cft. With driver (Excluding cost of fuel) Concrete mixer 7 Cft. With driver (Excluding cost of fuel) Hand operated winch Pile cap Hire charges for diesel pumpset upto 3 HP with fuel and crew charges including transportation Hire charges for diesel pumpset above 3 HP to 7.5 HP

Unit 1 hour (or) Part there of 1 hour (or) Part there of 1 hour (or) Part there of

Rate in Rupees

1101.00 856.60 784.95

Per day/8 hours Per day/8 hours Per day/8 hours Per day/8 hours Per day/8 hours Per day/8 hours Per day/8 hours Per hour Per hour One metre One metre

4.30 40.80 4.30 375.80 567.05 37.95 10.15 115.45 160.65 4.30 4.30

a Labour for tying barbed wire fencing horizontally through the holes in RCC posts with required tension. b Labour for tying barbed wire fencing vertically with required tension 20 Labour charges for putting bore holes of size 3" to 4" in river bed in sandy and other loose soils using hand boring sets including the cost of hire charges, conveyance charges of hand boring sets, collection of soil sample at frequent intervals and as directed by TWAD Board Officers. 21

One metre

224.45

Desilting light or sandysoil or silt from infiltration wells below water level including the charges for special T&P One cubic metre and air compressor etc. complete.

892.40

RATES FOR EARTHWORK

EXCAVATION FOR PIPE LAYING WORKS

Sched ule item No 1

Description

Unit

Rate in Rupees

EARTH WORK EXCAVATION FOR PIPE LAYING WORKS Earth work excavation and depositing on bank with initial lead of 10 m and lift of 2 M in narrow trenches for laying of pipes for water supply and sewerage works in the following type of soils as directed by Departmental officers Sand, silt or other loose soil, wet sand or silt not under water light black cotton soil, sandy loam and ordinary One cubic metre soil. Hard stiff clay, stiff black cotton, hard red earth, shales, murram gravel, stoney earth and earth mixed with small One cubic metre size boulders and hard gravelly soil. Dismantling Dismantling, clearing away and carefully stacking materials useful for reuse for any thickness of walls Brick / stone in clay walls under 3 m high 2 3 4 5 6 Brick / stone in clay walls, add for every additional 3 m or part there of over the initial height of 3 m Mud / sun dried brick walls under 3 m high Mud / sun dried brick walls, add for every additional 3 m or part thereof over the initial height of 3 m Brick / stone masonry in lime mortar walls under 3 m high Brick / stone masonry in lime mortar walls, add for every additional 3 m or part thereof over the initial height of 3 m Brick or stone masonry in Cement mortar walls 3 m high under cu.m cu.m cu.m cu.m cu.m 25.65 8.60 17.25 5.05 78.65 70.00

104.63

II

cu.m

8.80

7 8

cu.m

96.40

Brick or stone masonry in Cement mortar walls,add for every additional 3 m or part thereof over the initial height of 3 metre Terracing work in roof or floor Flag stone in roof or floor including lifting Cut stone slab over culverts upto 3.3.m height below ground level Cut stone slab over culverts over 3.3.m height below ground level Removal of cut stone slab / RCC Cover slab Refixing cut stone slabs/ RCC Cover slab Pantile or Mangalore tiled roof without roof timbers Flat and Pan tiles or Mangalore tiles over flat tiles, without roof timbers Asbestos cement sheets roofing without roof timbers Corrugated iron sheet roofing over pan tiles, without roof timbers

cu.m sqm sqm cu.m cu.m sqm sqm sqm sqm sqm sqm

10.35 26.10 13.90 400.80 417.80 176.30 192.00 6.90 9.60 6.30 10.35

9 10 11 12 13 14 15 16 17 18

Sched ule Description item No 19 Old Thatched roof, including tying materials into small bundles for reuse 20 21 22 23 24 25 26 27 Wrought and put up framed timbers in roofs / floors Doors and windows including removal of frames, hinges and fastenings Drystone apron or revetment, stacking within 40 m lead Grouted stones apron or revetment, stacking within 40 m lead Dry stone masonry walls *Dismantling lime concrete *Dismantling plain cement concrete *Dismantling reinforced cement concrete Note * 1) The rate for dismantling lime concrete, cement concrete and R.C. concrete are exclusive of baling charges. The rate is same in all floors. 2) For dismantling below ground level 25% extra over the basic rates (i.e. the rates already available in the schedule of rate) for dismantling is allowed. 28 29 30 31 32 33 34 35 a b c d e f g h Chipping of concrete and roughening the surface Pressed tiles & weathering course One course of pressed tile roof finish in Cement Mortar One course of terrace bricks roof finish in Cement Mortar Two course of flat tiles roof finish in Cement Mortar Mosaic in situ finish in cement mortar in flooring and in wall surface Floor finish and dadooing walls in Cement Mortar with mosaic tiles/ glazed tiles/ cuddapah slabs. 1. Clearing the site Clearing Heavy jungle Clearing Light jungle Clearing Scrub jungle Uprooting and removing large palmyrah/ coconut stumps Uprooting and removing small palmyrah/ coconut stumps Removing weeds in channel and drain Cleaning juliflora jungle with uprooting Cleaning juliflora jungle without uprooting

Unit

Rate in Rupees 3.10 252.30 52.15 44.85 52.15 38.15 122.10 165.60 2515.00

sqm cu.m sqm cu.m cu.m cu.m cu.m cu.m cu.m

sqm sqm sqm sqm sqm sqm sqm

13.90 16.00 8.90 10.35 10.35 21.50 20.80

sqm sqm sqm each each sqm sqm sqm

3.10 2.35 2.15 60.30 43.10 0.90 3.45 2.65

RATES FOR EARTH WORK EXCAVATION AND REFILLING FOR PIPELINE WORKS ON LINEAR MEASUREMENT BASIS

Sched ule item No

Description

Unit

Rate in Rupees

Note : Definition of large and small stumps : The Diameter of Stumps shall be 1/3 of the circumferance at a point 0.6 m above the highest ground level at the stump or the circumferance near the top of the stump if the stump is less than 0.60 m in height (The measurement for circumferance and determination of the diameter will be to the nearest full centimetre). Only stumps with Circumferance of 30 cm and more will be measured for payment. The Sl. No d, is for Stumps of Diameter above 30 cm and Sl. No. e is for stumps of diameter 15 to 30 cm. 36 a b c d e f g h I j k QUARRYING AND BLASTING Hard rock measured in solid including blasting and stacking Removing hard rock by wedging chiselling and trimming to proper shape where blasting is prohibited. Medium rock and dense medium rock requiring blasting Extra for every additional 10 metres lead or part thereof over the initial lead for blasted materials Extra for every additional 1 metre lift or part thereof over the initial lift of 2 m for blasted materials Benching hard rock upto an average 10cm depth Drilling holes in hard granite 40mm diameter Drilling holes in hard granite 45mm diameter Drilling holes in hard granite 50mm diameter Drilling holes in hard granite 75mm diameter Drilling holes in hard granite 32mm diameter Cu.m Cu.m Cu.m Cu.m Cu.m Sq.m RM RM RM RM RM 297.00 594.00 152.00 3.65 3.80 287.00 96.30 112.45 133.95 152.15 82.65

Note : 1) A deduction of 40 percent is to be made for the quantity of voids and stack measurement and payment is for the lesser of two viz. Solid measurement or stack measurements less 40 percent of stack measurement for voids. 2) The rates for extra lead and lift are on the quantity as per the solid measurement or stack measurement less 40 percent for voids whichever is less. These rates are applicable for headload only. 3) Payment for blasting the rock in solid shall be made for the lesser of the two quantities obtained by a) Measurement recorded by levels or measurement and b) by stack measurement less deduction for voids (This foot note is applicable for all items of rock measured in solid)

RATES FOR EARTH WORK EXCAVATION OTHER THAN PIPE LAYING AND WELLS

Type

CI/ DI/ MS

RATES FOR EARTH WORK EXCAVATION AND REFILLING FOR PIPE LINE WORKS ON LINEAR MEASUREMENT BASIS Pipe Width Depth Earth Outer dia Refilling Earth Earth Refilling size in in m in m work of pipe in Qty/cum/ work rate work rate rate/m mm qty. in m m for other for loose cum/m than soil/m loose soil/m Rs. Rs. Rs. Cost of EWE 104.63 Cost of refilling 14.70 Cost of loose soil 70.00 80 100 125 150 200 250 300 350 400 450 500 525 600 700 750 80 100 125 150 200 250 300 350 400 450 500 600 80 100 125 150 200 250 300 350 400 0.75 0.75 0.75 0.75 0.80 0.80 0.80 0.90 0.90 1.00 1.00 1.00 1.10 1.20 1.25 0.75 0.75 0.75 0.75 0.80 0.80 0.80 0.90 0.90 1.00 1.00 1.10 0.75 0.75 0.75 0.75 0.80 0.80 0.80 0.90 0.90 1.05 1.05 1.05 1.05 1.10 1.20 1.35 1.45 1.55 1.70 1.85 1.85 2.05 2.30 2.45 1.05 1.05 1.05 1.05 1.10 1.20 1.35 1.45 1.55 1.70 1.85 2.05 1.05 1.05 1.05 1.05 1.10 1.20 1.35 1.45 1.55 0.79 0.79 0.79 0.79 0.88 0.96 1.08 1.31 1.40 1.70 1.85 1.85 2.26 2.76 3.06 0.79 0.79 0.79 0.79 0.88 0.96 1.08 1.31 1.40 1.70 1.85 2.26 0.79 0.79 0.79 0.79 0.88 0.96 1.08 1.31 1.40 0.098 0.118 0.144 0.170 0.222 0.274 0.326 0.378 0.429 0.480 0.532 0.532 0.635 0.738 0.790 0.104 0.124 0.151 0.178 0.235 0.286 0.340 0.396 0.452 0.502 0.559 0.658 0.104 0.124 0.149 0.175 0.229 0.281 0.333 0.389 0.436 0.780 0.777 0.771 0.765 0.841 0.901 0.997 1.193 1.251 1.519 1.628 1.628 1.938 2.332 2.573 0.779 0.775 0.770 0.763 0.837 0.896 0.989 1.162 1.235 1.502 1.605 1.915 0.779 0.775 0.770 0.763 0.839 0.898 0.993 1.186 1.246 82.66 82.66 82.66 82.66 92.07 100.44 113.00 137.07 146.48 177.87 193.57 193.57 236.46 288.78 320.17 82.66 82.66 82.66 82.66 92.07 100.44 113.00 137.07 146.48 177.87 193.57 236.46 82.66 82.66 82.66 82.66 92.07 100.44 113.00 137.07 146.48 55.30 55.30 55.30 55.30 61.60 67.20 75.60 91.70 98.00 119.00 129.50 129.50 158.20 193.20 214.20 55.30 55.30 55.30 55.30 61.60 67.20 75.60 91.70 98.00 119.00 129.50 158.20 55.30 55.30 55.30 55.30 61.60 67.20 75.60 91.70 98.00 11.47 11.42 11.33 11.25 12.36 13.24 14.66 17.54 18.39 22.33 23.93 23.93 28.49 34.28 37.82 11.45 11.39 11.32 11.22 12.30 13.17 14.54 17.08 18.15 22.08 23.59 28.15 11.45 11.39 11.32 11.22 12.33 13.20 14.60 17.43 18.32

AC Cl 15

AC Cl 10

Type

Pipe Width size in in m mm

Depth in m

Earth work qty. in cum/m

450 500 600 40 50 63 75 90 110 125 140 160 180 200 350 400 450 500 600 700 800 900 1000 1100 1200 15 20 25 32 40 50 65 80

1.00 1.00 1.10 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.75 0.80 0.90 0.90 1.00 1.00 1.10 1.20 1.25 1.40 1.70 1.80 1.90 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75

1.70 1.85 2.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.10 1.45 1.55 1.70 1.85 2.05 2.30 2.45 2.60 2.60 2.75 3.00 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05

1.70 1.85 2.26 0.63 0.63 0.63 0.63 0.63 0.63 0.63 0.63 0.63 0.79 0.88 1.31 1.40 1.70 1.85 2.26 2.76 3.06 3.64 4.42 4.95 5.70 0.790 0.790 0.790 0.790 0.790 0.790 0.790 0.790

Outer dia Refilling Earth Earth of pipe in Qty/cum/ work rate work rate m m for other for loose than soil/m loose soil/m Rs. Rs. 0.486 1.515 177.87 119.00 0.541 0.648 0.040 0.050 0.063 0.075 0.090 0.110 0.125 0.140 0.160 0.180 0.200 0.464 0.514 0.564 0.614 0.724 0.824 0.934 1.054 1.150 1.250 1.350 0.020 0.030 0.030 0.040 0.050 0.060 0.070 0.090 1.620 1.925 0.629 0.628 0.627 0.626 0.624 0.621 0.618 0.615 0.610 0.760 0.850 1.136 1.188 1.450 1.554 1.844 2.227 2.378 2.768 3.381 3.723 4.269 0.787 0.787 0.787 0.786 0.786 0.786 0.784 0.781 193.57 236.46 65.92 65.92 65.92 65.92 65.92 65.92 65.92 65.92 65.92 82.66 92.07 137.07 146.48 177.87 193.57 236.46 288.78 320.17 380.85 462.46 517.92 596.39 82.66 82.66 82.66 82.66 82.66 82.66 82.66 82.66 129.50 158.20 44.10 44.10 44.10 44.10 44.10 44.10 44.10 44.10 44.10 55.30 61.60 91.70 98.00 119.00 129.50 158.20 193.20 214.20 254.80 309.40 346.50 399.00 55.30 55.30 55.30 55.30 55.30 55.30 55.30 55.30

Refilling rate/m

Rs. 22.27 23.81 28.30 9.25 9.23 9.22 9.20 9.17 9.13 9.08 9.04 8.97 11.17 12.50 16.70 17.46 21.32 22.84 27.11 32.74 34.96 40.69 49.70 54.73 62.75 11.57 11.57 11.57 11.55 11.55 11.55 11.52 11.48 11.44 11.35 11.27 out 0.00 by

PVC/ HDPE/ GRP

PSC/ BWSC

GI

100 0.75 1.05 0.790 0.110 0.778 82.66 55.30 125 0.75 1.05 0.790 0.140 0.772 82.66 55.30 150 0.75 1.05 0.790 0.160 0.767 82.66 55.30 0.00 0.00 Note:Earth excavation in SDR, DMR,HR etc., the linear measurement rate may be worked separately and to be approved by the SE concerned after verification of soil classifications putting proper trial pits at closer intervals".( B.P.Ms.No.82/COM Wing/dt.22.8.2008).

EARTH WORK EXCAVATION FOR SEWERAGE WORKS Schedule Item No. Rate in Rupees

Description Earthwork excavating and depositing on bank with an initial lead of 10 meters and initial lift of 2 metres in Sand, silt or other loose soil, wet sand or silt not under water, light black cotton soil sandy loam and ordinary soil including excavated earth SS 20 B Slush and silt under water upto 0.75 metre depth requiring the aid of baskets and vessels SS 20 B Hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS 20B Soft disintegrated rock, laterite, soft rock or kankar, not requiring blasting In loose boulders in excavation of various sizes 150mm to 625mm Medium rock and dense medium rock not requiring blasting QUARRYING AND BLASTING

Unit

Cu.m

28.00

Cu.m

35.00

Cu.m

41.85

4 5 6

Cu.m Cu.m Cu.m

62.30 98.65 109.80

Hard rock measured in solid including blasting and stacking Removing hard rock by wedging chiselling and trimming to proper shape where blasting is prohibited. Medium rock and dense medium rock requiring blasting Extra for every additional 10 metres lead or part thereof over the initial lead for blasted materials Extra for every additional 1 metre lift or part thereof over the initial lift of 2 m for blasted materials Benching hard rock upto an average 10cm depth Drilling holes in hard granite 32mm diameter Drilling holes in hard granite 40mm diameter Drilling holes in hard granite 45mm diameter Drilling holes in hard granite 50mm diameter Drilling holes in hard granite 75mm diameter

Cu.m

297.00

b c d e f g h i j k NOTE:

Cu.m Cu.m Cu.m Cu.m Sq.m RM RM RM RM RM

594.00 152.00 3.65 3.80 287.00 82.65 96.30 112.45 133.95 152.15

Double the relevant rate will apply in excavation in all the soils and rock classifications.

EARTH WORK EXCAVATION OTHER THAN PIPE LAYING WORKS AND WELLS Schedule Item No. Description Earthwork excavating and depositing on bank with an initial lead of 10 meters and initial lift of 2 metres in 1 Sand, silt or other loose soil, wet sand or silt not under water, light black cotton soil sandy loam and ordinary soil including excavated earth SS 20 A Sand, silt or other loose soil, wet sand or silt not under water, light black cotton soil sandy loam and ordinary soil including excavated earth SS 20 B Slush and silt under water upto 0.75 metre depth requiring the aid of baskets and vessels SS 20 B Trimming the bed and side slope of the bank in all soils except hard rock upto a thickness of 7.5 cm and making it ready to receive the concrete. 7.50 cm to 15cm thick Sectioning during forming bunds when earth moving machinery, lorries and rollers are used for consolidation. Hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS 20A Hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS 20B Soft disintegrated rock, laterite, soft rock or kankar, not requiring blasting In loose boulders in excavation of various sizes 150mm to 625mm Medium Rock and Dense Medium Rock not requiring blasting Extra for every additional 10 meters lead or part thereof over the initial lead Extra for every additional 1 meters lift or part thereof over the initial lift Breaking clods, consolidating and sectioning Breaking clods, consolidating and sectioning the earth scooped by bull dozers Add relevant TNDSS No.20A, rates for new tank bunds and closing breaches for extra watering and consolidation. By hand roller By power roller including hire charges Benching old embankment slopes 45cm x 45cm Puddle wall work Turfing in slopes including watering and fixing with initial lead upto 50m. Cu.m Cu.m Cu.m Cu.m Sq.m 8.80 14.70 1.75 69.55 14.70 Cu.m 30.75 Unit Rate in Rupees

Cu.m

28.00

Cu.m

35.00

4 4a 5

Sq.m Sq.m Cu.m

7.25 8.80 5.40

Cu.m

44.60

Cu.m

41.85

8 9 10 11 12 13 14

Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m

62.30 98.65 109.80 5.25 4.25 2.65 7.90

15 a) b) 16 17 18

Schedule Item No. 19a

Description Refilling with excavated sand complying with standard specification for filing in foundation and basement Refilling with excavated soil (other than sand) complying with the standard specification for filing in foundation and basement

Unit Cu.m

Rate in Rupees 13.00

19.b

Cu.m

14.70

The following foot note is applicable for the classifications of soils come under " Quarrying and blasting" and "Earth Work" Note: a) Standard specification No.20-A requires breaking clods, ramming and sectioning of spoil bank for which separate rate will not be paid. b) Standard specification No.20/B does not require breaking clods, ramming and sectioning but requires neat banking in accordance with the standard specifications. c) Double the relevant rate for standard specification No.20-B will apply to excavation in all the soils and rock classification given above for foundation of buildings, piers, wings and returns of bridges, culverts, sluices, regulators and cross masonry works, retaining walls, toe walls, cut-off walls and body walls of anicuts weirs, retaining walls of cause ways, road dam, pits for avenue trees, and pits for poles and towards and catch water pits. d) An extra 50 percent over the rates for ordinary excavation in all the soils and rock classification given above shall be allowed for drains, channels, contour trenches and canals having bed width 1.25 m and below. The extra percentage is applicable any for depth up to 2.00m the depth being measured from the bottom of excavation. e) An extra 25 percent over the rates for ordinary excavation in all the soils and rock classification given shall be allowed for drains, channels and canals having bed width 1.25m to 2.00m. The extra percentage is applicable only for depth up to 2.0m the depth being measured from the bottom of excavation. f) These rates for earth work do not include baling charge. The baling charges are to be paid as per actual in case baling is done departmentally or at actual plus 10 percent extra in case baling is done by other agencies. However for estimate purpose baling charges are to be provided at 10 percent of the rates of respective items of excavation in all soils including medium rock and dense medium rock and at 5 percent of the rates for excavation in hard rock. g) Double the relevant rate for standard specification No.20B for excavation in all soils and rock classification given above shall be allowed for circular trenches for soil and moisture conservation having bed width of 0.25m and below with side slope of 1/2:1 and not less than 0.75 m in depth.

OPEN WELL EXCAVATION Schedule Item No. Description Earth work open well excavation, complying with relevant clauses of T.N.D.S.S. Well sinking and with lead up to 10 metres in sand, silt or other loose soil, Wet sand or silt not under water, light black cotton soil, sandy loam and ordinary soil - First depth of 2 metres. Earth work open well excavation, complying with relevant clauses of T.N.D.S.S. Well sinking and with lead upto 10 metres in Hard stiff clay, stiff black cotton soil, hard red earth, shales murrams gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil - First depth of 2 metres Earth work open well excavation, complying with relevant clauses of T.N.D.S.S. Well sinking and with lead up to 10 metres in soft disintegrated rock, laterite, soft rock or kankar, not requiring blasting - First depth of 2 metres Open well excavation, complying with relevant clauses of T.N.D.S.S. Well sinking and with lead up to 10m in Medium rock and Dense medium rock not requiring blasting. First depth of 2 metres Open well excavation complying with relevant clauses of T.N.D.S.S. well sinking and with lead up to 10m in Medium rock and Dense medium rock requiring blasting. First depth of 2 metres Open well excavation complying with relevant clauses of T.N.D.S.S. well sinking and with lead up to 10m in hard granite measured in solid including blasting and stacking - First depth of 2 metres Sinking well in loose soils, light black cotton soil, sandy loam and ordinary soil under water including bailing or pumping charges if necessary etc., complete - First depth of 2 metres Sinking well in sand, including bailing or pumping charges if necessary etc. complete - First depth of 2 metres Unit Rate in Rupees

Cu.m

28.00

Cu.m

41.75

Cu.m

64.20

Cu.m

104.40

Cu.m

156.95

Cu.m

304.25

Cu.m

43.35

Cu.m

60.75

Sinking well in hard stiff clay, light black cotton soil, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil including bailing or 9 pumping charges if necessary etc. complete - First depth of 2 metres Note : Open well Excavation

Cu.m

60.75

a) Up to 2m diameter of wells 10 percent excess will be allowed over the basic rates for open well excavation. b) The rates do not include baling charges. If the dewatering is to be done departmentally, 10 percent of cost of excavation shall be allowed for dewatering for estimate purposes. Actual or 10 percent whichever is less to be allowed for dewatering charges. For any expenditure above this percentage prior approval of the competent authority should be obtained. c) Stage depth rates for well excavation" The stage depth for adopting the rates from the schedule of rates should be reckoned from ground level only irrespective of the fact, whether there is parapet wall or not. d) For open well excavation for rates up to 12m depth the progression would be x, 2x, 3x, 4x, 5x, and 6x and rate beyond 12 metre depth the progression should be 8x, 10x, 12x, 14x and 16x and so on.

RATE FOR EARTH WORK BY DEPLOYING MACHINERIES Schedule Item No. 1 Description Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete. Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with an extra lead of every 100 metre or part thereof deploying earth moving machineries and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete. Earth work deploying earth moving machineries for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc., complete. Having width up to 3 m Having width up to 3 m 10 m Earth work excavation deploying earth moving machineries for desilting channel having a width of more than 10 m and forming bund on either side and depositing the earth on banks including jungle clearance etc., complete. Lift charges - concrete - Brick or stone Masonry above or below ground level Note: The rate for lime concrete, cement concrete, reinforced cement concrete, brick work and stone masonry worked out as per Standard Data will apply to basement and foundation up to a depth of 1.50 m below ground level only (basic rate) Statement I a) 1 Concrete above ground level Add to the basic rate for works up to 4.50m height in ground floor (height to be reckoned from floor level i.e. plinth level in ground level) Add for works in every upper floor over the rate of preceding floor Brick or stone masonry above ground level Add to the basic rate for works up to 4.50m height in ground floor (height to be reckoned from floor level i.e. plinth level in ground level) Add for works in every upper floor over the rate of preceding floor Cu.m 29.55 Cu.m 44.65 Cu.m Cu.m Cu.m 26.80 32.65 38.10 Unit Cu.m Rate in Rupees 45.30

1.a.

Cu.m

3.65

a. b. 3

2 3 i.

Cu.m

89.00

ii.

Cu.m

59.40

Note: i) For the works above 4.5m height in individual floor the rate of next floor may be taken. The extra rates allowed for building works are applicable to irrigation works and road works also. The extra rates may be allowed for the structures beyond 1.00m above ground level. ii) The extra rates may be allowed considering the ground level as datum in respect of service reservoirs (where there is no plinth level)

Schedule Item No. Statement II a) 1 2 3 B) 1 2 3

Description

Unit

Rate in Rupees

Concrete below ground level Add the basic rate for works above 1.5m depth and up-to 4.5m depth below ground level Add the basic rate for works above 4.5m depth and up-to 9.0 m depth below ground level Add extra over the above item 2 for every additional 4.5m depth beyond 9m depth below ground level Brick or stone masonry below ground level Add the basic rates for works above 1.5m depth and up to 4.5m depth below ground level Add the basic rates for works above 4.5m depth and up to 9.0m depth below ground level Add extra over the above item 2 for every additional 4.5m depth beyond 9m depth below ground level Cu.m Cu.m Cu.m 29.55 59.40 59.40 Cu.m Cu.m Cu.m 44.05 88.35 88.35

Note : 1. The above extra rates are applicable for buildings, irrigations, and road works. 2. First Grade stone includes hard granite, trap, etc. second Grade stone includes gneiss, lime stone etc. 3. The class of materials to be used should always be defined in the items, description in tender schedules, contract schedules etc. 4. For reinforced cement concrete work, only the hardest locally available stone will be used, if it has good bonding surface and is otherwise suitable proportions for concrete are defined in the relevant standard specification. 5. Note under Sl.No.179 to 187 in the standard data book applies to arches over doors and windows. For large arches in bridges and irrigation works, addition to this rate extra cost of centering is to be made. 6. For concrete mix a. Equal mixes (i.e.) 50 percent mortar mixes only should be adopted for plain concrete for foundation, flooring and RC Concrete for roofs, lintels, etc. wherever cement is used with hard broken stones or brick jelly. b. 40 percent or 50 percent mortar mixer may be adopted where lime concrete with brick aggregate is used according to the condition at site.

Schedule Item No.

Description CONCRETE VIBRATORS Where vibrators are specified for consolidation in plain Cement concrete, this rate per cu.m over and above the provision made in the standard data book for consolidation with manual labour may be allowed. Where vibrators are specified for consolidation in RCC this rate per cu. m over and above the provision made in the standard data book for consolidation with manual labour may be allowed. Plastering Clean removal of lime plaster from walls and racking out joints 20mm deep or from terraced roofs racking out joints 12mm deep Clean removal of lime plaster from walls Clean removal of cement plaster from walls Clean removal of cement plaster from walls and racking out joints 20mm deep White washing and colour washing and distempering

Unit

Rate in Rupees

Cu.m

26.20

Cu.m

35.25

sq.m sq.m sq.m sq.m

3.65 2.85 3.05 3.95

2 3 4

1 2

Thorough scrapping of old plastered surface Washing of plastered surface with soap, soda and water( or with soda, lime, brush and water) Painting, Wood Oiling, Tarring, Varnishing, Bee's Waxing etc

sq.m sq.m

1.70 2.10

Removing old paints from doors and windows by blow lamp and scrapping, including removal and refitting of shutters Removing old paints from doors and windows by scrapping and refitting of shutters Removing paints from doors, windows and wood work by manual labour Removing old paint from structural steel by blow lamp or sand paper Re-polishing the mosaic flooring including polishing stone and hire charges for polishing machine but excluding cost of electrical charges. Scrapping and removing old paint from structural steel by manual labour Removing old paint from iron surface with sand paper

sq.m

13.05

2 3 4

sq.m sq.m sq.m

5.55 3.80 7.90

sq.m

7.70

6 7

sq.m sq.m

3.55 3.35

Schedule Item No.

Description Miscellaneous Supplying & filling up the empty cement gunny bag with sand, stitching them conveying the same to site and stacking as directed with in a lead of 10m excluding cost of bags, jute, thread, needle, sand etc. (labour only) Driving piles upto 15 cm dia in river bed Pointing the edge and driving bamboo/ casuarinas/ eucalyptus piles into river bed for the first 1m depth below ground level Driving bamboo/ Casuarinas/ Eucalyptus piles into ground beyond 1m depth from ground level. For every 1m (or) part thereof River Conservancy of Korambu Works

Unit

Rate in Rupees

I.

bag

3.35

ii. iii.

RM Each

10.25 8.80

iv.

RM

8.80

v. vi. vii.

Brush wood bundles one metre girth and one metre long within One an initial lead of 1.6 KM bundle Extra for every additional lead of 1.6 KM (for the above item) Driving casuarinas piles into bed including scaffolding etc., complete Casuarinas walling pieces 40mm to 50mm diameter including fixing with nails and tying with ropes. Labour wrought and put up for doors windows and ventilators One bundle RM

1.75 0.20 4.30

viii.

RM

5.90

Labour wrought and put up in position of frames inclusive of fixing hold fast for doors, windows and ventilators etc. Labour wrought and put up in position of shutters for fully paneled doors (external or internal) moulded panels including labour charges for fixing furniture fittings, complying with standard drawings and standard specifications. Labour wrought and put up in position of shutters for fully paneled doors internal five plywood panels including labour charges for fixing furniture fittings, complying with standard drawings and standard specifications Labour wrought and put up in position of shutters for glazed and paneled doors including labour charges for fixing furniture fittings, complying with standard drawings and standard specifications. Labour wrought and put up in position of shutters for framed and planked doors including labour charges for fixing furniture fittings, complying with standard drawings and standard specifications Labour wrought and put up in position of shutters for ledged and braced and planked doors including labour charges for fixing furniture fittings complying with standard drawings and standard specifications Labour wrought and put up in position of shutters for glazed windows including labour charges for fixing furniture fittings, complying with standard drawings and standard specifications Labour wrought and put up in position of shutters for windows panelled including labour charges for fixing furniture fittings, complying with standard drawings and standard specifications

Cu.m

5117.00

sq.m

577.30

sq.m

480.70

sq.m

537.00

sq.m

447.35

sq.m

303.60

sq.m

537.00

sq.m

577.30

Schedule Item No.

Description

Unit

Rate in Rupees

Labour wrought and put up in position of shutters for windows, ledged braced and planked doors including labour charges for fixing furniture fittings, complying with standard drawings and standard specifications Labour wrought and put up in position frames, shutters for ventilators glazed fixed double frames and with wire netting complete fixed in position in accordance with standard drawing and standard specifications. Labour wrought and put up in position frames shutters for swing ventilators and fixed in position in accordance standard drawing and standard specifications. Labour charges for fixing doors along with frames in position etc. complete(finished work) Labour charges for fixing windows and ventilators along with frames in position etc. complete Labour wrought and put up in position flush shutters for single leaf shutters. Double leaf shutters Labour wrought and put up in position fly proof wire gauge shutters for doors and windows and ventilators Labour wrought and put up for providing teak wood weld mesh screen with frames 3"x3" (0.075mx0.075m) Breaking metals Labour charges for breaking 40mm metal from departmental blasted stones Labour charges for breaking 20mm metal from departmental blasted stones Labour charges for breaking 50mm metal from departmental blasted stones Cement Mortar Grinding Mortar (Special Grinding lime) Grinding Mortar (Ordinary Grinding lime) Mixing Mortar Cement by manual Mixing Mortar- Cement by Machine Mixing Metal & Iron works Petty ironwork for truss, straps etc. (Wrought & fixed) labour only Iron works for trusses & record racks (labour only) Fixing mild steel grills for windows, ventilators, etc. Fixing MS rods round/square for windows Fixing iron bars in windows and ventilators

sq.m

303.60

10

sq.m

480.70

11

sq.m

448.50

12

sq.m

86.25

13 14 15 16

sq.m sq.m sq.m sq.m

108.10 80.20 124.20 287.50

17

sq.m

400.00

i. ii. iii. i. ii. iii. iv. i. ii. iii. iv. v.

Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Kg kg Kg Kg Kg

152.95 228.85 91.40 138.85 105.90 43.35 57.60 20.80 19.25 12.00 11.20 11.20

Potrebbero piacerti anche