Responsibility Chart for Civil Designs for Water Conductor System

Sl.No. 1 2 3 4 5 Description of Work Area Hydraulic Designs of WCS Rock Support Design for Tunnels Structural Design of Power Intake Excavation Cut Slope Stability Ananlysis Steel Lining Erection, Backfilling and Grouting Civil Works Design Nandalal Saravanan Nandalal Saravanan Nandalal Review Saravanan Nandalal Saravanan Nandalal Saravanan Mr.Ponraj will provide H&M inputs. Remarks The Design Will be examined with Hydraulic Model Studies

Responsibility Chart for Civil Drawings for Water Conductor System


Sl.No. 1 2 3 4 Description of Work Area Approach Roads Power Intake Structure Tunnel Excavation Steel Lining Erection, Backfilling and Grouting Civil Works Design Saravanan Nandalal Saravanan Saravanan Review Nandalal Saravanan Nandalal Nandalal All the Drawings will be Done by Mr. Shivaji Rai and Mr.Ponraj will provide H&M inputs. Remarks