Sei sulla pagina 1di 2

METHODSTATEMENTFORCONSTRUCTIONOFBOXCULVERTS

SCOPEOFWORK Ascrossmaindrainagestructures,boxculvertswillbeconstructedatinstructedlocationsbythe SupervisorsRepresentativetoreplacehydraulicallyinadequatepipeculverts. METHOD Asitestorehasbeensetuptostockmaterialsincludingcementandreinforcingsteel.Mobilizationof plantandequipmentwillcommenceuponreceiptofagoahead/siteinstructiontocommenceworkon theculverts. Themainworkswillincludeactivitiessuchassettingout,excavations,blinding,reinforcementand formwork,batching,mixingandcasting,curingandbackfilling. Allworkswillonlycommenceuponacceptanceand/orapprovalofpreviouslycompletedworkatevery stageoftheconstruction. Safetyprecautionsaretobeadheredbyensuringthat,allplantsareoperatedbyauthorizedoperators. Besides,allworkersintheconcretesectionwillbeprovidedwithsafetygearsincludingdustmasks, handgloves,gumboots,helmets,gogglesandothersasapplicable. DESCRIPTIONOFOPERATIONS Activity Settingout Excavations Details/Description Asurveyteamconsistingofonesurveyor, twoassistancesandfourchainmenwill takelevelsandsetouttheexcavation areabyuseofpegstomarkpointsonthe ground. Uponacceptanceofthesettingoutby theS.R,excavationswillbedonebyuse ofabackhoeloadertothesatisfactionof theS.R. Excavatedlevelswillbetakenafter acceptanceofexcavations. Plant 2No.Pickup 1No.backhoe loader labor 1No.surveyor 2No.assistance 4No.chainmen 2No.driver 1No.operator 1No.foreman

Blinding, Reinforcement Formwork Batching Mixingand casting Qualitycontrol

Curingand Backfilling.

Teamsheadedbyaconcreteforemanwill startwithblindingthebasetothe specifiedthicknessusingmaterials complyingwithspecificationsandof approvedmixdesigntotheacceptanceof theS.R. Reinforcementwillbelaidandfixedby adheringtothebarbendingscheduleand anyothersiteinstructionissuedbythe S.Rregardingbendingofsteelbars. Uponapprovalofthereinforcement, formworkusingwroughtandunwrought timberwillbefirmlyfixedtothe satisfactionoftheS.R. Batchingtotheinstructedmixdesignwill bedoneforconcretematerialsthat complywithrelevant Specifications. Uponacceptanceofbatching,concrete mixingwillbedonebymeansofa concretemixerandconcretecastedand compactedusingapokervibratortothe satisfactionoftheS.R. Concretecubesatacceptablebatch intervalswillbecasttomonitorqualityof concretelaid. Similarprocedureswillbeappliedto constructthewalls,endstructuresand finallythedeckalltothesatisfactionand approvaloftheS.R. Ateamledbytheconcreteforemanwill ensurepropercuringofthestructures withadequateportablewater. Aftercuring,ateamheadedbythe earthworksforemanwillensurethat backfillingwithspecificationscompliant materialsisadequatelycompactedand acceptedbytheS.R.

1No.300ltr. Concretemixer Or1No.self propelledmixing plant 3No.pickup 1No.water tanker 1No.tippertruck 1No.poker vibrator

1No.foreman 2No.operator 3No.assistance foremen. 5No.drivers 58No.artisans 1020unskilled

1No.water tanker 1No.roller 1No.tippertruck 2No.pickup 1No.backhoe loader

2No.foremen 2No.operator 4No.drivers 46unskilled

Potrebbero piacerti anche