M/S.VEESONS ENERGY SYSTEMS PVT.LTD.

TRICHY-15

BOILER OPERATING PARAMETERS(WHRB)


CLIENT: PROJECT : S.NO DESCRIPTION
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29

M/s.S.KSARAWAGI CO. (P) LTD. 11 TPH@ 66 Kg/cm(a) 4905 C UNIT

BOILER MAKER NO: SOURCE :

VWH 037 100 TPD SPONGE IRON KILN FLUE GAS

STEAM FLOW TPH STEAM LINE PRESSURE Kg/cm(a) FINAL STEAM TEMP C FEED WATER FLOW TPH FEED LINE PRESSURE Kg/cm DRUM PRESSURE Kg/cm(a) DESIGN GAS FLOW RATE Nm/hr AT RADIANT CHAMBER I/L C AT SCREEN I/L C AT SEC. SUPERHEATER I/L C AT PRI. HEATER I/L C AT EVAPORATOT I I/L C AT EVAPORATOT I O/L C AT EVAPORATOR II I/L C AT EVAPORATOR II O/L C AT ECONOMISER I I/L C AT ECONOMISER I O/L C FEED WATER TEMP. ECO I I/L C FEED WATER TEMP. ECO I O/L C STEAM TEMP. AT PSH I/L C STEAM TEMP. AT PSH O/L C STEAM TEMP. AT DSH I/L C STEAM TEMP. AT DSH O/L C STEAM TEMP. AT SSH I/L C SPRAY CONGNTROLVALVE OPENING % FEED CONTROL VALVE OPEENING % DRUM LEVEL % FEED PUMP 1 POWER 160 KW Amps FEED PUMP 2 POWER 160 KW Amps

BOILER OPERATOR

SHIFT INCHARGE

Potrebbero piacerti anche