Safe Work Procedures at Height

1) Safety Measure WSH Officer shall take the following measure to avoid incident while working at height Barricade all open side, into or through which a person may fall. Ensure proper working platform i.e strong & good materials is used for working platform secure and adequate, not over loaded, not uneven loading etc. Use toe-board to prevent falling objects Use continuous safety nets Erect continuous overhead protection shelter Regular house keeping i.e no accumulation of debris on the working platform. Carry out operation systematically i.e floor by floor to avoid falling object hazard Supply right tools for right job

Proper use of PPE (point of anchorage of life line shall not be lower than the level of his working position, safety belt, safety helmet etc.. ref to Personal Protective Equipment Procedure). 2) Monitoring The workers and sub-contractors shall remove the accumulated concrete or other materials from the work areas so as to prevent the hazard object falling from height. WSH Officer and Supervisor shall take the following measure to avoid incident while working at height. o Barricade all open side, into or through which a person may fall Ensure proper working platform, e.g strong and good materials is used for working platform, working platforms are secure and adequate, do not over loaded, no unbalance loading etc. Use toe-board to prevent falling objects.

Use continuous safety nets where it is necessary (external scaffold) Erect continuous scaffold) overhead protection shelter (external

Regular house keeping e.g no accumulation of debris on the working platform/ work areas is allowed. Ensure tools and loose material are place in toolbox to prevent falling object Ensure safe access to and/ or egress from working area be provided. Monitor the proper use of PPE at site regularly.

Potrebbero piacerti anche