Written and Oral Report Guides

Written Design Report (50%) / PPT Presentation (summary of Written Report)


Introduction Feedstock, Operating Conditions , Batch/Continuous & Material of Construction Rationale for equipment Selection type? Material and Energy Balance Equipment Design Theoretical calculations
HE Evaluation of ho, hi, Uo , L, shell as Pressure Vessel (PV) Evaporators Temp distribution, equal Areas, (PV) Gas Absorber Nog, Hog, z, flooding velocity, PV Distillation , Adsorption No of stages, plates design, PV Filters / screens / Settling Tanks (PV) Reactors CSTR, PlugFlow, PV

Heuristics use sparingly ; data cannot be computed theo Equipment Specifications/ Specs Sheets Diagrams (Internal ); Rendered (3D) Deadline: AUGUST 24 (SAT) upload 5 Reports per Group

Oral Presentation (50%)


Schedule
Heat Exchangers August 29 & 30 Evap/Cryst Sep 5 & 6 Mass Transfer Sep 12&13 Mech Sep Sep 19 & 20 Reactors + + Sep 26&27 +++ - Sep 30 (If needed)

MAX of 20 min/presentation with 3 min Q&A Present Highlights of Design / your prototype Bell Timer will cut off any reporter over 20 min Question from any member of class