Project: ______________
Location:
Sr. No 1 2 Check Item Level Plumbing
Bldg.
Floor
Criteria
Flat Date:
Done Not Done N.A
Remarks Observation
a) Plat form finished top should be at 32 from F.F.L or as per drawing. b) Plat from top should be in one level. 1.G.I. concealed plumbing work done for sink mixer, geyser, aqua guard & washing machine. 2.PVC outlet for sink and w/m, Nahani fitted. As per drawing. It should be 3 inside the granite face. Check for modifications. As per drawing or any modifications. Check for modifications Date: For platform mount sink mixer PVC sleeve of 4 dia to be provided. Granite chiselled in centre of sink to fit sink mixer later. Check for modification of material type. Void between steel sink and cudappah filled with mortar. Date: Cover granite top with POP to avoid scratches on surface. Do not remove plastic coating before possession.
Checked By: -_______________ Approved By: -______________
3.
Cudappah platform a. Otla b. Cudappah Platform c. Size Kitchen sink Granite top a. Granite top b. Fitting sink After platform work 1. Maintenance of granite top. 2. Maintenance of SS sink
4. 5.
6.