0101019 PAVIMENTACION DE LAS CALLES 16,17,19,20,21,26,27,30,31,33 Y 34 DE LA I ETAPA DE LA URBANIZACION IGNACIO MERINO DE LA CIUD

Presupuesto

Fecha presupuesto

Partida

01.01

Rendimiento

u/DIA

Cdigo

Descripcin Recurso

30/09/2010

SUM. Y COLOC. DE CARTEL DE OBRA ( 2.40 m x 3.60 m )


1.0670

EQ. 1.0670
Unidad

Costo unitario directo por : u

689.48

Cuadrilla

Cantidad

Precio S/.

Parcial S/.
93.87

Mano de Obra
0147010002

OPERARIO

hh

1.0000

7.4977

12.52

0147010004

PEON

hh

0.5000

3.7488

10.03

37.60
131.47

Materiales
0202010002

CLAVOS PARA MADERA CON CABEZA DE 2 1/2" kg

0.1200

3.08

0.37

0221000001

CEMENTO PORTLAND TIPO I (42.5 kg)

1.5500

17.98

27.87
19.11

bls

0238000000

HORMIGON (PUESTO EN OBRA)

m3

0.5600

34.12

0239050000

AGUA

m3

0.1000

5.88

0.59

0243040000

MADERA TORNILLO

p2

83.5200

4.75

396.72

0244030022

TRIPLAY DE 4' X 8' X 6 mm

pl

3.0000

33.05

99.15

0254010001

PINTURA ESMALTE SINTETICO

gal

0.3500

29.30

10.26
554.07

Equipos
0337010001

HERRAMIENTAS MANUALES

%MO

3.0000

131.47

3.94
3.94

Partida

01.02

CASETA DE OFICINA, ALMACEN, GUARDIANIA

Rendimiento

m2/DIA

Cdigo

Descripcin Recurso

20.0000

EQ. 20.0000
Unidad

Costo unitario directo por : m2

53.04

Cuadrilla

Cantidad

Precio S/.

Parcial S/.

Mano de Obra
0147010002

OPERARIO

hh

1.0000

0.4000

12.52

5.01

0147010004

PEON

hh

1.0000

0.4000

10.03

4.01
9.02

Materiales
0202010002

CLAVOS PARA MADERA CON CABEZA DE 2 1/2" kg

0.2500

3.08

0.77

0221000001

CEMENTO PORTLAND TIPO I (42.5 kg)

bls

0.1850

17.98

3.33

0238000000

HORMIGON (PUESTO EN OBRA)

m3

0.0630

34.12

2.15

0243040000

MADERA TORNILLO

p2

1.3380

4.75

6.36

0244030021

TRIPLAY DE 4' X 8' X 4 mm

pl

0.8910

22.69

20.22

0256900011

CALAMINA GALVANIZADA DE 12'

pl

0.6170

17.70

10.92
43.75

Equipos
0337010001

HERRAMIENTAS MANUALES

%MO

3.0000

9.02

0.27
0.27

Partida

01.03

SEALIZACIONES DESVIOS DE TRANSITO Y PROTECCION DE OBRA

Rendimiento

u/DIA

Cdigo

Descripcin Recurso

1.0000

EQ. 1.0000
Unidad

Costo unitario directo por : u


Cuadrilla

126.05

Cantidad

Precio S/.

Parcial S/.

1.0000

126.05

126.05

Materiales
0239900099

SEAL VERTICAL PREVENTINA

126.05
Partida

01.04

MOVILIZACION Y DESMOVILIZACION DE EQUIPO

Rendimiento

UND/DIA

Cdigo

Descripcin Recurso

1.0000

Materiales

EQ. 1.0000
Unidad

Costo unitario directo por : UND


Cuadrilla

Cantidad

1 200.00
Precio S/.

Parcial S/.

0232970001

MOVILIZACION Y DESMOVILIZACION DE EQUIPOest

1.0000

1 200

1,200.00
1,200.00

Partida

02.01.01

TRAZO, NIVEL Y REPLANTEO EN AGUA POTABLE

Rendimiento

m/DIA

Cdigo

Descripcin Recurso

250.0000

EQ. 250.0000
Unidad

Costo unitario directo por : m

1.25

Cuadrilla

Cantidad

Precio S/.

Parcial S/.

Mano de Obra
0147000032

TOPOGRAFO

hh

1.0000

0.0320

12.52

0.40

0147010004

PEON

hh

1.0000

0.0320

10.03

0.32
0.72

Materiales
0229060005

YESO DE 28 Kg

bls

0.0300

3.40

0.10

0230990080

WINCHA

0.0020

37.82

0.08

0244010000

ESTACA DE MADERA TORNILLO TRATADA

p2

0.0120

4.75

0.06
0.24

Equipos
0337010001

HERRAMIENTAS MANUALES

%MO

3.0000

0.72

0.02

0349190003

NIVEL TOPOGRAFICO CON TRIPODE

hm

0.5000

0.0160

8.00

0.13

0349880003

TEODOLITO

hm

0.5000

0.0160

8.50

0.14
0.29

Partida

02.02.01

EXCAVACION MANUAL DE ZANJAS PARA AGUA POTABLE (PROF. 1.20M), ANCHO 0.60m

Rendimiento

m/DIA

Cdigo

Descripcin Recurso

10.0000

EQ. 10.0000
Unidad

Costo unitario directo por : m

9.29

Cuadrilla

Cantidad

Precio S/.

Parcial S/.

Mano de Obra
0147010002

OPERARIO

hh

0.1000

0.0800

12.52

1.00

0147010004

PEON

hh

1.0000

0.8000

10.03

8.02
9.02

Equipos
0337010001

HERRAMIENTAS MANUALES

%MO

3.0000

9.02

0.27
0.27

Partida

02.02.02

REFINE Y NIVELACION DE FONDO DE ZANJAS

Rendimiento

m/DIA

Cdigo

Descripcin Recurso

80.0000

EQ. 80.0000
Unidad

Costo unitario directo por : m

1.03

Cuadrilla

Cantidad

Precio S/.

Parcial S/.

1.0000

0.1000

10.03

1.00

Mano de Obra
0147010004

PEON

hh

1.00
Equipos
0337010001

HERRAMIENTAS MANUALES

%MO

3.0000

1.00

0.03
0.03

Partida

02.02.03

RELLENO DE ZANJAS PARA AGUA POTABLE

Rendimiento

m/DIA

Cdigo

Descripcin Recurso

10.0000

EQ. 10.0000
Unidad

Costo unitario directo por : m

6.28

Cuadrilla

Cantidad

Precio S/.

Parcial S/.

Mano de Obra
0147010002

OPERARIO

hh

0.1000

0.0800

12.52

1.00

0147010004

PEON

hh

0.9000

0.4780

10.03

4.79
5.80

Materiales
0239050000

AGUA

m3

0.0270

5.88

0.16
0.16

Equipos
0337010001

HERRAMIENTAS MANUALES

%MO

3.0000

10.63

0.32
0.32

Partida

02.03.01

SUMINISTRO TUBERIA PVC ISO 4422 C 7.5 DN 110mm

Rendimiento

m/DIA

120.0000

Cdigo

Descripcin Recurso

EQ. 120.0000
Unidad

Costo unitario directo por : m


Cuadrilla

16.02

Cantidad

Precio S/.

Parcial S/.

1.0300

15.55

16.02

Materiales
0272000108

TUBERIA PVC UF ISO 4422 110 MM INC. ANILLO m

16.02
Partida

02.03.02

INSTALACION DE TUBERIA PVC ISO 4422 C 7.5 DN 110mm

Rendimiento

m/DIA

Cdigo

Descripcin Recurso

120.0000

EQ. 120.0000
Unidad

Costo unitario directo por : m

3.03

Cuadrilla

Cantidad

Precio S/.

Parcial S/.

Mano de Obra
0147010002

OPERARIO

hh

1.0000

0.0667

12.52

0.84

0147010004

PEON

hh

2.0000

0.1333

10.03

1.34
2.18

Materiales
0201800002

LUBRICANTE PARA TUBERIA PVC UF

gal

0.0250

31.32

0.78
0.78

Equipos
0337010001

HERRAMIENTAS MANUALES

%MO

3.0000

2.18

0.07
0.07

Partida

02.04.06

PRUEBA HIDRAULICA

Rendimiento

m/DIA

Cdigo

Descripcin Recurso

258.0600

EQ. 258.0600
Unidad

Costo unitario directo por : m

1.03

Cuadrilla

Cantidad

Precio S/.

Parcial S/.

Mano de Obra
0147010002

OPERARIO

hh

0.9710

0.0301

12.52

0.38

0147010004

PEON

hh

1.0000

0.0310

10.03

0.31
0.69

Materiales
0239060010

HIPOCLORITO DE CALCIO AL 70%

kg

0.0010

11.14

0.01
0.01

Equipos
0337010001

HERRAMIENTAS MANUALES

3.0000

0.69

0.02

0337020043

BALDE PRUEBA TAPON ABRAZADERA Y ACCES hm

%MO
0.9677

0.0300

6.72

0.20

0348040001

CAMION CISTERNA 4 X 2 (AGUA) 122 HP 1,500 g hm

0.0323

0.0010

110.00

0.11
0.33

Partida

02.05.01

TRAZO, NIVEL Y REPLANTEO EN AGUA POTABLE

Rendimiento

m/DIA

Cdigo

Descripcin Recurso

250.0000

EQ. 250.0000
Unidad

Costo unitario directo por : m

1.25

Cuadrilla

Cantidad

Precio S/.

Parcial S/.

Mano de Obra
0147000032

TOPOGRAFO

hh

1.0000

0.0320

12.52

0.40

0147010004

PEON

hh

1.0000

0.0320

10.03

0.32
0.72

Materiales
0229060005

YESO DE 28 Kg

bls

0.0300

3.40

0.10

0230990080

WINCHA

0.0020

37.82

0.08

0244010000

ESTACA DE MADERA TORNILLO TRATADA

p2

0.0120

4.75

0.06
0.24

Equipos
0337010001

HERRAMIENTAS MANUALES

%MO

3.0000

0.72

0.02

0349190003

NIVEL TOPOGRAFICO CON TRIPODE

hm

0.5000

0.0160

8.00

0.13

0349880003

TEODOLITO

hm

0.5000

0.0160

8.50

0.14
0.29

Partida

02.05.02

Rendimiento

m/DIA

EXCAVACION DE ZANJA PARA RED DE AGUA h=0.60, a=0.40


15.0000

EQ. 15.0000

Costo unitario directo por : m

6.20

Cdigo

Descripcin Recurso

Unidad

Cuadrilla

Cantidad

Precio S/.

Parcial S/.

Mano de Obra
0147010002

OPERARIO

hh

0.1000

0.0533

12.52

0.67

0147010004

PEON

hh

1.0000

0.5333

10.03

5.35
6.02

Equipos
0337010001

HERRAMIENTAS MANUALES

%MO

3.0000

6.02

0.18
0.18

Partida

02.05.03

REFINE Y NIVELACION DE FONDO DE ZANJAS

Rendimiento

m/DIA

Cdigo

Descripcin Recurso

80.0000

EQ. 80.0000
Unidad

Costo unitario directo por : m

1.03

Cuadrilla

Cantidad

Precio S/.

Parcial S/.

1.0000

0.1000

10.03

1.00

Mano de Obra
0147010004

PEON

hh

1.00
Equipos
0337010001

HERRAMIENTAS MANUALES

%MO

3.0000

1.00

0.03
0.03

Partida

02.05.04

CONEXIONES DOMICILIARIAS DN 15mm, L=5.50m

Rendimiento

u/DIA

Cdigo

Descripcin Recurso

8.0000

EQ. 8.0000
Unidad

Costo unitario directo por : u

139.58

Cuadrilla

Cantidad

Precio S/.

Parcial S/.
25.04

Mano de Obra
0147010002

OPERARIO

hh

2.0000

2.0000

12.52

0147010004

PEON

hh

0.5000

0.5000

10.03

5.02
30.06

Materiales
0221030002

CAJA DE CONCRETO PARA MEDIDOR 1/2" - 3/4" u

1.0000

37.52

37.52

0230460013

PEGAMENTO PARA PVC AGUA FORDUIT 1/4 gl u

0.0180

9.30

0.17

0230480032

CINTA TEFLON

0.1600

1.68

0.27

0265240003

MARCO Y TAPA FIERRO GALVANIZADO PARA M u

1.0000

29.41

29.41

0272000104

TUBERIA PVC SAP A-10 DE 1/2"

5.5400

3.51

19.45

0272030019

UNION PVC SAP PARA AGUA SIMPLE PRESION Du

1.0000

0.67

0.67

0272050026

CURVA PVC PARA AGUA DE 1/2"

1.0000

0.75

0.75

0272060010

CODO PVC SAP PARA AGUA CON ROSCA DE 1/2u

2.0000

0.75

1.50

0272330000

CORPORATION RT NIPLE TUERCA EMPAQUE 1/ u

1.0000

6.72

6.72

0272330001

LLAVE PASO RT NIPLE TUERCA EMPAQUE 1/2" u

2.0000

6.08

12.16

pza

108.62
Equipos
0337010001

HERRAMIENTAS MANUALES

%MO

3.0000

30.06

0.90
0.90

Partida

02.05.05

RELLENO COMP.ZANJA TERR.NORMAL"C"-P/TUB.

Rendimiento

m/DIA

Cdigo

Descripcin Recurso

14.0000

EQ. 14.0000
Unidad

Costo unitario directo por : m

6.28

Cuadrilla

Cantidad

Precio S/.

Parcial S/.

Mano de Obra
0147010002

OPERARIO

hh

0.0300

0.0171

12.52

0.21

0147010004

PEON

hh

1.0000

0.5714

10.03

5.73
5.94

Materiales
0239050000

AGUA

m3

0.0270

5.88

0.16
0.16

Equipos
0337010001

HERRAMIENTAS MANUALES

%MO

3.0000

5.94

0.18
0.18

Partida

02.05.06

PRUEBA HIDRAULICA

Rendimiento

m/DIA

Cdigo

Descripcin Recurso

258.0600

EQ. 258.0600
Unidad

Costo unitario directo por : m


Cuadrilla

Cantidad

1.03
Precio S/.

Parcial S/.

Mano de Obra
0147010002

OPERARIO

hh

0.9710

0.0301

12.52

0.38

0147010004

PEON

hh

1.0000

0.0310

10.03

0.31
0.69

Materiales
0239060010

HIPOCLORITO DE CALCIO AL 70%

kg

0.0010

11.14

0.01
0.01

Equipos
0337010001

HERRAMIENTAS MANUALES

3.0000

0.69

0.02

0337020043

BALDE PRUEBA TAPON ABRAZADERA Y ACCES hm

%MO
0.9677

0.0300

6.72

0.20

0348040001

CAMION CISTERNA 4 X 2 (AGUA) 122 HP 1,500 g hm

0.0323

0.0010

110.00

0.11
0.33

Partida

03.01.01

TRAZO,NIVELACION Y REPLANTEO EN PAVIMENTO

Rendimiento

m2/DIA

Cdigo

Descripcin Recurso

400.0000

EQ. 400.0000
Unidad

Costo unitario directo por : m2

1.47

Cuadrilla

Cantidad

Precio S/.

Parcial S/.

Mano de Obra
0147000032

TOPOGRAFO

hh

1.0000

0.0200

12.52

0.25

0147010003

OFICIAL

hh

1.0000

0.0200

11.13

0.22

0147010004

PEON

hh

2.0000

0.0400

10.03

0.40
0.87

Materiales
0229060005

YESO DE 28 Kg

bls

0.0100

3.40

0.03

0230990080

WINCHA

0.0030

37.82

0.11

0244010000

ESTACA DE MADERA TORNILLO TRATADA

p2

0.0200

4.75

0.10
0.24

Equipos
0337010001

HERRAMIENTAS MANUALES

%MO

3.0000

0.87

0.03

0349190003

NIVEL TOPOGRAFICO CON TRIPODE

hm

1.0000

0.0200

8.00

0.16

0349880003

TEODOLITO

hm

1.0000

0.0200

8.50

0.17
0.36

Partida

03.02.01

CORTE DE TERRENO A NIVEL DE SUBRASANTE CON EQUIPO

Rendimiento

m3/DIA

Cdigo

Descripcin Recurso

EQ. 460.0000

460.0000

Unidad

Costo unitario directo por : m3

4.42

Cuadrilla

Cantidad

Precio S/.

Parcial S/.

Mano de Obra
0147010002

OPERARIO

hh

1.0000

0.0174

12.52

0.22

0147010004

PEON

hh

2.0000

0.0348

10.03

0.35
0.57

Equipos
0337010001

HERRAMIENTAS MANUALES

%MO

0349040034

TRACTOR DE ORUGAS DE 190-240 HP

hm

1.0000

3.0000

0.57

0.02

0.0174

220.00

3.83
3.85

Partida

03.02.02

PERFILADO Y COMPACTADO DE SUBRASANTE CON EQUIPO

Rendimiento

m2/DIA

Cdigo

Descripcin Recurso

1,600.0000

EQ. 1,600.0000
Unidad

Costo unitario directo por : m2

2.06

Cuadrilla

Cantidad

Precio S/.

Parcial S/.

3.0000

0.0150

10.03

0.15

Mano de Obra
0147010004

PEON

hh

0.15
Equipos
0337010001

HERRAMIENTAS MANUALES

3.0000

0.15

0348040001

CAMION CISTERNA 4 X 2 (AGUA) 122 HP 1,500 g hm

%MO
1.0000

0.0050

110.00

0.55

0349030013

RODILLO LISO VIBRATORIO AUTOPROPULSADOhm

1.0000

0.0050

120.00

0.60

0349090000

MOTONIVELADORA DE 125 HP

1.0000

0.0050

152.50

0.76

hm

1.91
Partida

03.02.03

Rendimiento

m2/DIA

CONFORMACION DE CAPA SUB BASE e=0.15m


1,300.0000

EQ. 1,300.0000

Costo unitario directo por : m2

8.31

Cdigo

Descripcin Recurso

Unidad

Cuadrilla

Cantidad

Precio S/.

Parcial S/.

Mano de Obra
0147010002

OPERARIO

hh

1.0000

0.0062

12.52

0.08

0147010004

PEON

hh

6.0000

0.0369

10.03

0.37
0.45

Materiales
0205300071

MATERIAL CLASIFICADO PARA SUBASE

m3

0.1800

30.46

5.48
5.48

Equipos
0337010001

HERRAMIENTAS MANUALES

%MO

3.0000

0.45

0348120001

CAMION CISTERNA 4 X 2 (AGUA) 1,500 gl

hm

1.0000

0.0062

110.00

0.68

0349030013

RODILLO LISO VIBRATORIO AUTOPROPULSADOhm

1.0000

0.0062

120.00

0.74

0349090000

MOTONIVELADORA DE 125 HP

1.0000

0.0062

152.50

0.95

hm

0.01

2.38
Partida

03.02.04

CONFORMACION DE CAPA BASE e=0.20m

Rendimiento

m2/DIA

Cdigo

Descripcin Recurso

1,100.0000

EQ. 1,100.0000
Unidad

Costo unitario directo por : m2

11.41

Cuadrilla

Cantidad

Precio S/.

Parcial S/.

Mano de Obra
0147010002

OPERARIO

hh

1.0000

0.0073

12.52

0.09

0147010004

PEON

hh

6.0000

0.0436

10.03

0.44
0.53

Materiales
0205010013

MATERIAL CLASIFICADO PARA BASE

m3

0.2400

33.61

8.07
8.07

Equipos
0337010001

HERRAMIENTAS MANUALES

%MO

3.0000

0.53

0348120001

CAMION CISTERNA 4 X 2 (AGUA) 1,500 gl

hm

1.0000

0.0073

110.00

0.80

0349030013

RODILLO LISO VIBRATORIO AUTOPROPULSADOhm

1.0000

0.0073

120.00

0.88

0349090000

MOTONIVELADORA DE 125 HP

1.0000

0.0073

152.50

1.11

hm

0.02

2.81
Partida

03.02.05

ELIMINACION DE MATERIAL EXCEDENTE D PROM 2.5 KM

Rendimiento

m3/DIA

Cdigo

Descripcin Recurso

400.0000

EQ. 400.0000
Unidad

Costo unitario directo por : m3

6.83

Cuadrilla

Cantidad

Precio S/.

Parcial S/.

1.0000

0.0200

11.13

0.22

Mano de Obra
0147010003

OFICIAL

hh

0.22
Equipos
0337010001

HERRAMIENTAS MANUALES

%MO

3.0000

0.22

0348040027

CAMION VOLQUETE 6 X 4 330 HP 10 m3

hm

2.0000

0.0400

90.00

0.01
3.60

0349040008

CARGADOR SOBRE LLANTAS 100-115 HP 2-2.25 hm

1.0000

0.0200

150.00

3.00
6.61

Partida

03.03.01

EXCAVACION MANUAL DE ZANJAS PARA SARDINEL

Rendimiento

m/DIA

Cdigo

Descripcin Recurso

10.0000

EQ. 10.0000
Unidad

Costo unitario directo por : m

8.26

Cuadrilla

Cantidad

Precio S/.

Parcial S/.

1.0000

0.8000

10.03

8.02

Mano de Obra
0147010004

PEON

hh

8.02
Equipos
0337010001

HERRAMIENTAS MANUALES

%MO

3.0000

8.02

0.24
0.24

Partida

03.03.02

ENCOFRADO Y DESENCOFRADO DE SARDINEL

Rendimiento

m2/DIA

Cdigo

Descripcin Recurso

18.0000

EQ. 18.0000
Unidad

Costo unitario directo por : m2

27.60

Cuadrilla

Cantidad

Precio S/.

Parcial S/.

1.0000

0.4444

12.52

5.56

Mano de Obra
0147010002

OPERARIO

hh

0147010003

OFICIAL

hh

1.0000

0.4444

11.13

0147010004

PEON

hh

1.0000

0.4444

10.03

4.95
4.46
14.97

Materiales
0202000008

ALAMBRE NEGRO RECOCIDO # 8

kg

0.1200

3.00

0202010005

CLAVOS PARA MADERA CON CABEZA DE 3"

kg

0.4000

3.08

0.36
1.23

0243040000

MADERA TORNILLO

p2

2.2300

4.75

10.59
12.18

Equipos
0337010001

HERRAMIENTAS MANUALES

%MO

3.0000

14.97

0.45
0.45

Partida

03.03.04

CONCRETO f'c=175 Kg/cm2 EN SARDINEL PERALTADO

Rendimiento

m3/DIA

Cdigo

Descripcin Recurso

6.5000

EQ. 6.5000

Costo unitario directo por : m3

Unidad

219.88

Cuadrilla

Cantidad

Precio S/.

Parcial S/.
7.10

Mano de Obra
0147010002

OPERARIO

hh

1.0000

0.5667

12.52

0147010003

OFICIAL

hh

1.0000

0.5667

11.13

6.31

0147010004

PEON

hh

4.0000

2.2667

10.03

22.74
36.14

Materiales
0205000004

PIEDRA CHANCADA DE 3/4"

m3

0.6410

49.37

31.65

0205010004

ARENA GRUESA

m3

0.4733

32.10

15.19

0221000001

CEMENTO PORTLAND TIPO I (42.5 kg)

bls

6.0300

17.98

108.42

0239050000

AGUA

m3

0.1970

5.88

1.16
156.42

Equipos
0337010001

HERRAMIENTAS MANUALES

0349100007

MEZCLADORA DE CONCRETO TAMBOR 18 HP 1 hm

%MO
1.0000

3.0000

68.03

2.04

0.9029

28.00

25.28
27.32

Partida

03.03.06

JUNTAS DE DILATACION PARA SARDINEL

Rendimiento

m/DIA

Cdigo

Descripcin Recurso

100.0000

EQ. 100.0000
Unidad

Costo unitario directo por : m

5.38

Cuadrilla

Cantidad

Precio S/.

Parcial S/.

Mano de Obra
0147010003

OFICIAL

hh

1.0000

0.0800

11.13

0.89

0147010004

PEON

hh

3.0000

0.2400

10.03

2.41
3.30

Materiales
0204000000

ARENA FINA

m3

0.0020

28.15

0.06

0213000006

ASFALTO RC-250

gal

0.1330

14.43

1.92
1.98

Equipos
0337010001

HERRAMIENTAS MANUALES

%MO

3.0000

3.30

0.10
0.10

Partida

03.03.07

ELIMINACION DE MATERIAL EXCEDENTE D PROM 2.5 KM

Rendimiento

m3/DIA

Cdigo

Descripcin Recurso

400.0000

EQ. 400.0000
Unidad

Costo unitario directo por : m3

6.83

Cuadrilla

Cantidad

Precio S/.

Parcial S/.

1.0000

0.0200

11.13

0.22

Mano de Obra
0147010003

OFICIAL

hh

0.22
Equipos
0337010001

HERRAMIENTAS MANUALES

%MO

3.0000

0.22

0348040027

CAMION VOLQUETE 6 X 4 330 HP 10 m3

hm

2.0000

0.0400

90.00

0.01
3.60

0349040008

CARGADOR SOBRE LLANTAS 100-115 HP 2-2.25 hm

1.0000

0.0200

150.00

3.00
6.61

Partida

03.03.08

CURADO QUIMICO

Rendimiento

m2/DIA

100.0000

Cdigo

Descripcin Recurso

EQ. 100.0000
Unidad

Costo unitario directo por : m2

1.51

Cuadrilla

Cantidad

Precio S/.

Parcial S/.

1.0000

0.0800

12.52

1.00

Mano de Obra
0147010002

OPERARIO

hh

1.00
Materiales
0229010041

CURADOR MENBRANIL

gal

0.0420

11.54

0.48
0.48

Equipos
0337010001

HERRAMIENTAS MANUALES

%MO

3.0000

1.00

0.03
0.03

Partida

03.04.01

PAVIMENTO CON ADOQUIN VEHICULAR (20x10x8cm)

Rendimiento

m2/DIA

Cdigo

Descripcin Recurso

40.0000

EQ. 40.0000
Unidad

Costo unitario directo por : m2

54.53

Cuadrilla

Cantidad

Precio S/.

Parcial S/.

Mano de Obra
0147010002

OPERARIO

hh

1.0000

0.2000

12.52

2.50

0147010003

OFICIAL

hh

1.0000

0.2000

11.13

2.23

0147010004

PEON

hh

1.0000

0.2000

10.03

2.01
6.74

Materiales
0204000000

ARENA FINA

m3

0.0120

28.15

0205010004

ARENA GRUESA

m3

0.0600

32.10

0.34
1.93

0217020014

BLOQUETA CONCRETO 20 X 10 X 8 cm PARA PA u

51.5000

0.88

45.32
47.59

Equipos
0337010001

HERRAMIENTAS MANUALES

%MO

3.0000

6.74

0.20
0.20

Partida

03.04.02

LIMPIEZA DE FINAL DE OBRA

Rendimiento

m2/DIA

Cdigo

Descripcin Recurso

240.0000

EQ. 240.0000
Unidad

Costo unitario directo por : m2


Cuadrilla

Cantidad

0.38
Precio S/.

Parcial S/.

Mano de Obra
0147010002

OPERARIO

hh

0.1000

0.0033

12.52

0.04

0147010004

PEON

hh

1.0000

0.0333

10.03

0.33
0.37

Equipos
0337010001

HERRAMIENTAS MANUALES

%MO

3.0000

0.37

0.01
0.01

Partida

06.01.01

TRAZO Y REPLANTEO

Rendimiento

m2/DIA

Cdigo

Descripcin Recurso

600.0000

EQ. 600.0000
Unidad

Costo unitario directo por : m2

1.07

Cuadrilla

Cantidad

Precio S/.

Parcial S/.

Mano de Obra
0147000032

TOPOGRAFO

hh

1.0000

0.0133

12.52

0.17

0147010003

OFICIAL

hh

1.0000

0.0133

11.13

0.15

0147010004

PEON

hh

2.0000

0.0267

10.03

0.27
0.59

Materiales
0229060005

YESO DE 28 Kg

bls

0.0100

3.40

0.03

0230990080

WINCHA

0.0030

37.82

0.11

0244010000

ESTACA DE MADERA TORNILLO TRATADA

p2

0.0200

4.75

0.10
0.24

Equipos
0337010001

HERRAMIENTAS MANUALES

%MO

3.0000

0.59

0.02

0349190003

NIVEL TOPOGRAFICO CON TRIPODE

hm

1.0000

0.0133

8.00

0.11

0349880003

TEODOLITO

hm

1.0000

0.0133

8.50

0.11
0.24

Partida

06.01.02

DEMOLICION DE VEREDAS EXISTENTES EN MAL ESTADO

Rendimiento

m2/DIA

Cdigo

Descripcin Recurso

30.0000

EQ. 30.0000
Unidad

Costo unitario directo por : m2

8.87

Cuadrilla

Cantidad

Precio S/.

Parcial S/.

Mano de Obra
0147010003

OFICIAL

hh

2.0000

0.5330

11.13

5.93

0147010004

PEON

hh

1.0000

0.2667

10.03

2.68
8.61

Equipos
0337010001

HERRAMIENTAS MANUALES

%MO

3.0000

8.61

0.26
0.26

Partida

06.02.01

CORTE SUPERFICIAL HASTA 0.10m

Rendimiento

m3/DIA

Cdigo

Descripcin Recurso

6.0000

EQ. 6.0000
Unidad

Costo unitario directo por : m3

13.77

Cuadrilla

Cantidad

Precio S/.

Parcial S/.

1.0000

1.3333

10.03

13.37

Mano de Obra
0147010004

PEON

hh

13.37
Equipos
0337010001

HERRAMIENTAS MANUALES

%MO

3.0000

13.37

0.40
0.40

Partida

06.02.02

REFINE Y NIVELACION CON PLANCHA

Rendimiento

m2/DIA

Cdigo

Descripcin Recurso

100.0000

EQ. 100.0000
Unidad

Costo unitario directo por : m2

3.12

Cuadrilla

Cantidad

Precio S/.

Parcial S/.

Mano de Obra
0147010003

OFICIAL

hh

1.0000

0.0800

11.13

0.89

0147010004

PEON

hh

0.2500

0.0200

10.03

0.20
1.09

Equipos
0337010001

HERRAMIENTAS MANUALES

0349030001

COMPACTADOR VIBRATORIO TIPO PLANCHA 4 hm

%MO
1.0000

3.0000

1.09

0.03

0.0800

25.00

2.00
2.03

Partida

06.02.03

AFIRMADO DE 4" PARA VEREDAS

Rendimiento

m2/DIA

Cdigo

Descripcin Recurso

200.0000

EQ. 200.0000
Unidad

Costo unitario directo por : m2

7.55

Cuadrilla

Cantidad

Precio S/.

Parcial S/.

Mano de Obra
0147010002

OPERARIO

hh

1.0000

0.0400

12.52

0.50

0147010004

PEON

hh

5.0000

0.2000

10.03

2.01
2.51

Materiales
0205010000

AFIRMADO

m3

0.1300

30.46

3.96
3.96

Equipos
0337010001

HERRAMIENTAS MANUALES

0349030001

COMPACTADOR VIBRATORIO TIPO PLANCHA 4 hm

%MO
1.0000

3.0000

2.51

0.08

0.0400

25.00

1.00
1.08

Partida

06.02.04

ELIMINACION DE MATERIAL EXCEDENTE D PROM 2.5 KM

Rendimiento

m3/DIA

Cdigo

Descripcin Recurso

400.0000

EQ. 400.0000
Unidad

Costo unitario directo por : m3

6.83

Cuadrilla

Cantidad

Precio S/.

Parcial S/.

1.0000

0.0200

11.13

0.22

Mano de Obra
0147010003

OFICIAL

hh

0.22
Equipos
0337010001

HERRAMIENTAS MANUALES

%MO

3.0000

0.22

0.01

0348040027

CAMION VOLQUETE 6 X 4 330 HP 10 m3

hm

2.0000

0.0400

90.00

3.60

0349040008

CARGADOR SOBRE LLANTAS 100-115 HP 2-2.25 hm

1.0000

0.0200

150.00

3.00
6.61

Partida

06.03.03

VEREDAS DE CONCRETO f'c=175 kg/cm2 E=10 cm PASTA 1:2 (INC. ENCOFRADO)

Rendimiento

m2/DIA

Cdigo

Descripcin Recurso

120.0000

EQ. 120.0000
Unidad

Costo unitario directo por : m2

29.66

Cuadrilla

Cantidad

Precio S/.

Parcial S/.

Mano de Obra
0147010002

OPERARIO

hh

4.0000

0.2667

12.52

3.34

0147010003

OFICIAL

hh

1.0000

0.0667

11.13

0.74

0147010004

PEON

hh

6.0000

0.4000

10.03

4.01
8.09

Materiales
0204000000

ARENA FINA

m3

0.0130

28.15

0.37

0205000004

PIEDRA CHANCADA DE 3/4"

m3

0.0640

49.37

3.16

0205010004

ARENA GRUESA

m3

0.0473

32.10

1.52

0221000001

CEMENTO PORTLAND TIPO I (42.5 kg)

bls

0.8030

17.98

14.44

0239050000

AGUA

m3

0.0197

5.88

0.12

0243040000

MADERA TORNILLO

p2

0.2400

4.75

1.14
20.75

Equipos
0337010001

HERRAMIENTAS MANUALES

0349100007

MEZCLADORA DE CONCRETO TAMBOR 18 HP 1 hm

%MO
0.2500

3.0000

8.09

0.24

0.0167

35.00

0.58
0.82

Partida

06.03.04

CURADO DE VEREDAS CON ADITIVO

Rendimiento

m2/DIA

Cdigo

Descripcin Recurso

100.0000

EQ. 100.0000
Unidad

Costo unitario directo por : m2

1.51

Cuadrilla

Cantidad

Precio S/.

Parcial S/.

1.0000

0.0800

12.52

1.00

Mano de Obra
0147010002

OPERARIO

hh

1.00
Materiales
0229010041

CURADOR MENBRANIL

gal

0.0420

11.54

0.48
0.48

Equipos
0337010001

HERRAMIENTAS MANUALES

%MO

3.0000

1.00

0.03
0.03

Partida

06.03.05

JUNTAS ASFALTICAS

Rendimiento

m/DIA

Cdigo

Descripcin Recurso

100.0000

EQ. 100.0000
Unidad

Costo unitario directo por : m

5.38

Cuadrilla

Cantidad

Precio S/.

Parcial S/.

Mano de Obra
0147010003

OFICIAL

hh

1.0000

0.0800

11.13

0.89

0147010004

PEON

hh

3.0000

0.2400

10.03

2.41
3.30

Materiales
0204000000

ARENA FINA

m3

0.0020

28.15

0.06

0213000006

ASFALTO RC-250

gal

0.1330

14.43

1.92
1.98

Equipos
0337010001

HERRAMIENTAS MANUALES

%MO

3.0000

3.30

0.10
0.10

Partida

06.04.01

LIMPIEZA DE FINAL DE OBRA

Rendimiento

m2/DIA

Cdigo

Descripcin Recurso

240.0000

EQ. 240.0000
Unidad

Costo unitario directo por : m2

0.38

Cuadrilla

Cantidad

Precio S/.

Parcial S/.

0.1000

0.0033

12.52

0.04

Mano de Obra
0147010002

OPERARIO

hh

0147010004

PEON

hh

1.0000

0.0333

10.03

0.33
0.37

Equipos
0337010001

HERRAMIENTAS MANUALES

%MO

3.0000

0.37

0.01
0.01

Partida

08.01.03

DESMONTAJE DE RED DE DESAGE

Rendimiento

m/DIA

Cdigo

Descripcin Recurso

180.0000

EQ. 180.0000
Unidad

Costo unitario directo por : m

5.04

Cuadrilla

Cantidad

Precio S/.

Parcial S/.

Mano de Obra
0147010002

OPERARIO

hh

3.0000

0.1340

12.52

1.68

0147010004

PEON

hh

8.0000

0.3210

10.03

3.22
4.90

Equipos
0337010001

HERRAMIENTAS MANUALES

%MO

0.0300

4.90

0.15
0.15

Partida

08.02.01

EXCAVACION MANUAL DE ZANJAS PARA AGUA POTABLE (PROF. 1.80M), ANCHO 0.80m

Rendimiento

m/DIA

Cdigo

Descripcin Recurso

5.0000

EQ. 5.0000
Unidad

Costo unitario directo por : m

9.29

Cuadrilla

Cantidad

Precio S/.

Parcial S/.

Mano de Obra
0147010002

OPERARIO

hh

0.0100

0.0660

12.52

0.83

0147010004

PEON

hh

0.4000

0.7900

10.03

7.92
8.75

Equipos
0337010001

HERRAMIENTAS MANUALES

%MO

3.0000

18.05

0.54
0.54

Partida

08.02.02

REFINE Y NIVELACION DE FONDO DE ZANJAS

Rendimiento

m/DIA

Cdigo

Descripcin Recurso

80.0000

EQ. 80.0000
Unidad

Costo unitario directo por : m

1.03

Cuadrilla

Cantidad

Precio S/.

Parcial S/.

1.0000

0.1000

10.03

1.00

Mano de Obra
0147010004

PEON

hh

1.00
Equipos
0337010001

HERRAMIENTAS MANUALES

%MO

3.0000

1.00

0.03
0.03

Partida

08.02.03

RELLENO DE ZANJAS PARA RED DE DESAGUE

Rendimiento

m/DIA

Cdigo

Descripcin Recurso

14.0000

EQ. 14.0000
Unidad

Costo unitario directo por : m

17.65

Cuadrilla

Cantidad

Precio S/.

Parcial S/.

Mano de Obra
0147010002

OPERARIO

hh

0.0300

0.0171

12.52

0.21

0147010004

PEON

hh

3.0000

1.7050

10.03

17.10
17.32

Materiales
0239050000

AGUA

m3

0.0270

5.88

0.16
0.16

Equipos
0337010001

HERRAMIENTAS MANUALES

%MO

0.0300

5.94

0.18
0.18

Partida

08.03.01

SUMINISTRO TUBERIA PVC ISO 4435 S 20 DN 200mm

Rendimiento

m/DIA

Cdigo

Descripcin Recurso

120.0000

Materiales

EQ. 120.0000
Unidad

Costo unitario directo por : m


Cuadrilla

Cantidad

35.98
Precio S/.

Parcial S/.

0272290003

TUBERIA PVC ISO 4435 S-20 DN 200mm (INC. AN u

0.1807

199.14

35.98
35.98

Partida

08.03.02

COLOCACION TUBERIA PVC ISO 4435 S 20 DN 200mm

Rendimiento

m/DIA

Cdigo

Descripcin Recurso

80.0000

EQ. 80.0000

Costo unitario directo por : m

Unidad

4.14

Cuadrilla

Cantidad

Precio S/.

Parcial S/.

Mano de Obra
0147010002

OPERARIO

hh

1.0000

0.1000

12.52

1.25

0147010004

PEON

hh

2.0000

0.2000

10.03

2.01
3.26

Materiales
0201800002

LUBRICANTE PARA TUBERIA PVC UF

gal

0.0250

31.32

0.78
0.78

Equipos
0337010001

HERRAMIENTAS MANUALES

%MO

3.0000

3.26

0.10
0.10

Partida

08.03.03

PRUEBA HIDRAULICA RED DE DESAGE

Rendimiento

m/DIA

Cdigo

Descripcin Recurso

145.5000

EQ. 145.5000
Unidad

Costo unitario directo por : m

1.62

Cuadrilla

Cantidad

Precio S/.

Parcial S/.

Mano de Obra
0147010002

OPERARIO

hh

1.0000

0.0550

12.52

0.69

0147010004

PEON

hh

1.0000

0.0550

10.03

0.55
1.24

Materiales
0239050000

AGUA

m3

0.0570

5.88

0.34
0.34

Equipos
0337010001

HERRAMIENTAS MANUALES

%MO

3.0000

1.24

0.04
0.04

Partida

08.04.01

RECORTE Y NIVELACION DE FUSTE DE BUZON (INC. CAMBIO DE TECHO)

Rendimiento

u/DIA

Cdigo

Descripcin Recurso

4.0000

EQ. 4.0000
Unidad

Costo unitario directo por : u

372.56

Cuadrilla

Cantidad

Precio S/.

Parcial S/.

Mano de Obra
0147010002

OPERARIO

hh

1.5000

2.0170

12.52

25.25

0147010004

PEON

hh

3.4000

6.5000

10.03

65.20
90.45

Materiales
0203020003

ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60kg

16.0000

2.35

37.60

0205000004

PIEDRA CHANCADA DE 3/4"

m3

0.1800

49.37

8.89

0205010005

ARENA GRUESA DE RIO

m3

0.1300

32.10

4.17

0221000001

CEMENTO PORTLAND TIPO I (42.5 kg)

bls

2.1000

17.98

37.76

0221030003

TAPA DE CONCRETO ARMADO PARA BUZON

1.0000

111.79

111.79

0239050000

AGUA

m3

0.0700

5.88

0.41

0243040000

MADERA TORNILLO

p2

7.0000

4.75

33.25

0250030006

MARCO FIERRO FUNDIDO PARA D=0.60 m

1.0000

44.71

44.71
278.58

Equipos
0337010001

HERRAMIENTAS MANUALES

%MO

3.0000

117.80

3.53
3.53

Partida

08.05.01

TRAZO, NIVEL Y REPLANTEO EN RED DE DESAGUE

Rendimiento

m/DIA

Cdigo

Descripcin Recurso

250.0000

EQ. 250.0000
Unidad

Costo unitario directo por : m

1.25

Cuadrilla

Cantidad

Precio S/.

Parcial S/.

Mano de Obra
0147000032

TOPOGRAFO

hh

1.0000

0.0320

12.52

0.40

0147010004

PEON

hh

1.0000

0.0320

10.03

0.32
0.72

Materiales
0229060005

YESO DE 28 Kg

bls

0.0300

3.40

0.10

0230990080

WINCHA

0.0020

37.82

0.08

0244010000

ESTACA DE MADERA TORNILLO TRATADA

p2

0.0120

4.75

0.06
0.24

Equipos
0337010001

HERRAMIENTAS MANUALES

%MO

3.0000

0.72

0.02

0349190003

NIVEL TOPOGRAFICO CON TRIPODE

hm

0.5000

0.0160

8.00

0.13

0349880003

TEODOLITO

hm

0.5000

0.0160

8.50

0.14
0.29

Partida

08.05.02

DESMONTAJE DE RED DE DESAGE

Rendimiento

m/DIA

Cdigo

Descripcin Recurso

180.0000

EQ. 180.0000

Costo unitario directo por : m

Unidad

5.04

Cuadrilla

Cantidad

Precio S/.

Parcial S/.

Mano de Obra
0147010002

OPERARIO

hh

1.0000

0.0440

12.52

0.55

0147010004

PEON

hh

6.0000

0.4333

10.03

4.35
4.90

Equipos
0337010001

HERRAMIENTAS MANUALES

%MO

3.0000

4.90

0.15
0.15

Partida

08.05.03

EXCAVACION MANUAL DE ZANJAS PARA AGUA POTABLE (PROF. 1.80M), ANCHO 0.80m

Rendimiento

m/DIA

Cdigo

Descripcin Recurso

6.0000

EQ. 6.0000

Costo unitario directo por : m

Unidad

15.49

Cuadrilla

Cantidad

Precio S/.

Parcial S/.

Mano de Obra
0147010002

OPERARIO

hh

0.1000

0.1333

12.52

1.67

0147010004

PEON

hh

1.0000

1.3333

10.03

13.37
15.04

Equipos
0337010001

HERRAMIENTAS MANUALES

%MO

3.0000

15.04

0.45
0.45

Partida

08.05.04

REFINE Y NIVELACION DE FONDO DE ZANJAS

Rendimiento

m/DIA

Cdigo

Descripcin Recurso

80.0000

EQ. 80.0000

Costo unitario directo por : m

Unidad

1.03

Cuadrilla

Cantidad

Precio S/.

Parcial S/.

1.0000

0.1000

10.03

1.00

Mano de Obra
0147010004

PEON

hh

1.00
Equipos
0337010001

HERRAMIENTAS MANUALES

%MO

3.0000

1.00

0.03
0.03

Partida

08.05.05

CONEXIONES DOMICILIARIAS DN 160mm

Rendimiento

u/DIA

Cdigo

Descripcin Recurso

16.0000

EQ. 16.0000
Unidad

Costo unitario directo por : u

299.40

Cuadrilla

Cantidad

Precio S/.

Parcial S/.

Mano de Obra
0147010002

OPERARIO

hh

0.9000

0.4200

12.52

5.26

0147010004

PEON

hh

0.5000

0.2440

10.03

2.45
7.71

Materiales
0205010004

ARENA GRUESA

m3

0.0500

32.10

1.61

0210140077

CACHIMBA 160 x 200mm PVC ISO 4435

1.0000

37.82

37.82

0221000001

CEMENTO PORTLAND TIPO I (42.5 kg)

bls

0221030000

CAJA CONCRETO SIMPLE DESAGUE 0.3 X 0.6 m u

0.1000

17.98

1.80

1.0000

84.54

84.54
16.60

0221030004

TAPA CONCRETO ARMADO DESAGUE 0.3 X 0.6 u

1.0000

16.60

0265900008

ALAMBRE GALVANIZADO # 8

kg

0.2500

3.19

0.80

0272130017

Tuberia PVC iso 20 UF 6" INC ANILLO

6.7700

21.90

148.26
291.43

Equipos
0337010001

HERRAMIENTAS MANUALES

%MO

3.0000

8.77

0.26
0.26

Partida

08.05.06

RELLENO DE ZANJAS PARA RED DE DESAGUE

Rendimiento

m/DIA

Cdigo

Descripcin Recurso

8.0000

EQ. 8.0000

Costo unitario directo por : m

Unidad

13.85

Cuadrilla

Cantidad

Precio S/.

Parcial S/.

Mano de Obra
0147010002

OPERARIO

hh

0.1000

0.1000

12.52

1.25

0147010004

PEON

hh

1.2000

1.2000

10.03

12.04
13.29

Materiales
0239050000

AGUA

m3

0.0270

5.88

0.16
0.16

Equipos
0337010001

HERRAMIENTAS MANUALES

%MO

3.0000

13.29

0.40
0.40

Partida

08.05.07

PRUEBA HIDRAULICA RED DE DESAGE

Rendimiento

m/DIA

Cdigo

Descripcin Recurso

145.5000

EQ. 145.5000
Unidad

Costo unitario directo por : m

1.62

Cuadrilla

Cantidad

Precio S/.

Parcial S/.

Mano de Obra
0147010002

OPERARIO

hh

1.0000

0.0550

12.52

0.69

0147010004

PEON

hh

1.0000

0.0550

10.03

0.55
1.24

Materiales
0239050000

AGUA

m3

0.0570

5.88

0.34
0.34

Equipos
0337010001

HERRAMIENTAS MANUALES

%MO

3.0000

1.24

0.04
0.04

Partida

08.06.01

CAJA DE EMPALME A RED DE BUZON

Rendimiento

u/DIA

Cdigo

Descripcin Recurso

2.0000

EQ. 2.0000
Unidad

Costo unitario directo por : u


Cuadrilla

Cantidad

326.85
Precio S/.

Parcial S/.

Mano de Obra
0147010002

OPERARIO

hh

1.0000

4.1000

12.52

51.33

0147010003

OFICIAL

hh

1.0000

4.1000

11.13

45.63

0147010004

PEON

hh

2.0000

7.5650

10.03

75.88
172.84

Materiales
0202000007

ALAMBRE NEGRO RECOCIDO # 16

kg

0.2500

3.00

0202010002

CLAVOS PARA MADERA CON CABEZA DE 2 1/2" kg

0.2500

3.08

0.75
0.77

0203020003

ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60kg

24.7000

2.35

58.05

0205000004

PIEDRA CHANCADA DE 3/4"

m3

0.1210

49.37

5.97

0205010004

ARENA GRUESA

m3

0.0860

32.10

2.76

0221000001

CEMENTO PORTLAND TIPO I (42.5 kg)

bls

1.4280

17.98

25.68

0229060005

YESO DE 28 Kg

bls

0.7500

3.40

2.55

0239050000

AGUA

m3

0.0320

5.88

0.19

0243040000

MADERA TORNILLO

p2

3.2500

4.75

15.44

0265900008

ALAMBRE GALVANIZADO # 8

kg

0.5000

3.19

1.60
113.76

Equipos
0337010001

HERRAMIENTAS MANUALES

0349100007

MEZCLADORA DE CONCRETO TAMBOR 18 HP 1 hm

%MO
0.2500

3.0000

174.84

5.25

1.0000

35.00

35.00
40.25

Fecha :

09/2010 .

DAD DE PIURA

Alternativa 1

VARIACION EN LA INVERSION
VARIACION %
COSTO
INVERSION
30%
20%
10%
0%
-10%
-20%
-30%

VACT

VAE

CE=
VACT/BENE
F.

1,302,993.09

212,056.13

81.78

1,162,392.57

189,174.04

72.96

1,021,792

166,291.95

64.13

881,192

143,409.86

55.31

740,591.00

120,527.78

46.48

599,990.48

97,645.69

37.66

459,389.96

74,763.60

28.83

VARIACION EN LOS COSTOS DE MANTENIMIENTO


VARIACION %
COSTO
MANTENIMIEN
TO
30%
20%
10%
0%
-10%
-20%
-30%

VACT

VAE

CE=
VACT/BENE
F.

930,087.11

151,367.39

58.37

913,788.58

148,714.88

57.35

897,490.05

146,062.37

56.33

881,191.53

153,547.26

55.31

864,893.00

140,757.35

54.28

848,594.47

138,104.84

53.26

832,295.94

135,452.33

52.24

Alternativa 2

VARIACION EN LA INVERSION
VARIACION %
COSTO
INVERSION
30%
20%
10%
0%
-10%
-20%
-30%

VACT

VAE

CE=
VACT/BENE
F.

1,492,208.71

242,850.10

93.66

1,347,139.59

219,240.76

84.55

1,202,070.46

195,631.43

75.45

1,057,001

172,022.10

66.34

911,932.22

148,412.77

57.24

766,863.09

124,803.44

48.13

621,793.97

101,194.10

39.03

VARIACION EN LOS COSTOS DE MANTENIMIENTO


VARIACION %
COSTO
MANTENIMIEN
TO
30%
20%
10%
0%
-10%
-20%
-30%

VACT

VAE

CE=
VACT/BENE
F.

1,145,234.06

186,381.57

71.88

1,115,823.16

181,595.08

70.03

1,086,412.25

176,808.59

68.19

1,057,001.34

172,022.10

66.34

1,027,590.43

167,235.61

64.49

998,179.52

162,449.12

62.65

968,768.61

157,662.63

60.80

Total de Beneficiarios

15933

VARIACION EN LA INVERSION EN PISTAS


VARIACION
% COSTO
INVERSION
30%
20%
10%
0%
-10%
-20%

M2 pavimento

VACP

VAE

CE= VACT/M2
PAVIMENTO

898,183

146,175.17

107.46

787,109

128,098.32

94.17

676,034

110,021.47

80.88

564,960

91,944.62

67.60

453,885

73,867.77

54.31

342,811

55,790.92

41.02

8,358.00

VARIACION EN LA INVERSION EN VEREDAS


VARIACION
% COSTO
INVERSION
30%
20%
10%
0%
-10%
-20%

M2 veredas

VACV

VAE

CE= VACT/M2
PAVIMENTO

411,258

66,930.32

125.05

381,732

62,125.08

116.07

352,206

57,319.85

107.09

322,680

52,514.61

98.11

293,153

47,709.37

89.14

263,627

42,904.13

80.16

3,288.84

SUSTENTO DE METRADOS
"PAVIMENTACION DE LAS CALLES 16,17,19,20,21,26,27,30,31,33,y 34 DE LA I ETAPA DE LA URBANIZACION IGNACIO
MERINO DE LA CIUDAD DE PIURA"
01.00.00

OBRAS PROVISIONALES

01.01.00 SUM. Y COLOC. DE CARTEL DE OBRA ( 2.40 m x 3.60 m )


UNIDAD

ANCHO

ALTURA

1.00

und

SUB TOTAL 1

N VECES

1.00

1.00

1.00

01.02.00 CASETA DE OFICINA, ALMACEN, GUARDIANIA

m2

UNIDAD

LARGO

ANCHO

SUB TOTAL 1

N VECES

1.00

5.00

4.00

20.00

1.00

01.03.00 SEALIZACIONES DESVIOS DE TRANSITO Y PROTECCION DE OBRA


ANCHO

ALTURA

8.00

SUB TOTAL 1

N VECES

8.00

1.00

ANCHO

ALTURA

8.00

Und
SUB TOTAL 1

N VECES

1.00

1.00

SUBTOTAL 2
1.00

TOTAL

02.00.00

SUBTOTAL 2
8.00

01.04.00 MOVILIZACION Y DESMOVILIZACION DE EQUIPO

1.00

20.00

Und

TOTAL

UNIDAD

SUBTOTAL 2
20.00

TOTAL

UNIDAD

SUBTOTAL 2

1.00

AGUA POTABLE

02.01.00 TRABAJOS PRELIMINARES


02.01.01 TRAZO, NIVEL Y REPLANTEO EN AGUA POTABLE
CALLES

ANCHO

UNIDAD

LARGO

SUB TOTAL 1

N VECES

CALLE 16

1.00

140.90

140.90

1.00

SUBTOTAL 2
140.90

CALLE 17

1.00

135.60

135.60

1.00

135.60

CALLE 19

1.00

303.00

303.00

1.00

303.00

CALLE 20

1.00

76.00

76.00

1.00

76.00

CALLE 21

1.00

144.50

144.50

1.00

144.50

CALLE 26

1.00

94.00

94.00

1.00

94.00

CALLE 27

1.00

101.00

101.00

1.00

101.00

CALLE 30

1.00

96.60

96.60

1.00

96.60

CALLE 31

1.00

115.10

115.10

1.00

115.10

CALLE 33

1.00

101.70

101.70

1.00

101.70

CALLE 34

1.00

141.60

141.60

1.00

141.60

TOTAL

1,450.00

02.02.00 MOVIMIENTO DE TIERRAS


02.02.01 EXCAVACION MANUAL DE ZANJAS PARA AGUA POTABLE (PROF. 1.20M), ANCHO 0.60m
CALLES

ANCHO

UNIDAD

LARGO

SUB TOTAL 1

N VECES

CALLE 16

1.00

140.90

140.90

1.00

SUBTOTAL 2
140.90

CALLE 17

1.00

135.60

135.60

1.00

135.60

CALLE 19

1.00

303.00

303.00

1.00

303.00

CALLE 20

1.00

76.00

76.00

1.00

76.00

CALLE 21

1.00

144.50

144.50

1.00

144.50

CALLE 26

1.00

94.00

94.00

1.00

94.00

CALLE 27

1.00

101.00

101.00

1.00

101.00

CALLE 30

1.00

96.60

96.60

1.00

96.60

CALLE 31

1.00

115.10

115.10

1.00

115.10

CALLE 33

1.00

101.70

101.70

1.00

101.70

CALLE 34

1.00

141.60

141.60

1.00

141.60

TOTAL

1,450.00

SUSTENTO DE METRADOS
"PAVIMENTACION DE LAS CALLES 16,17,19,20,21,26,27,30,31,33,y 34 DE LA I ETAPA DE LA URBANIZACION IGNACIO
MERINO DE LA CIUDAD DE PIURA"

SUSTENTO DE METRADOS
"PAVIMENTACION DE LAS CALLES 16,17,19,20,21,26,27,30,31,33,y 34 DE LA I ETAPA DE LA URBANIZACION IGNACIO
MERINO DE LA CIUDAD DE PIURA"
02.02.02 REFINE Y NIVELACION DE FONDO DE ZANJAS
UNIDAD

LARGO

SUB TOTAL 1

N VECES

CALLE 16

CALLES

1.00

140.90

ANCHO

140.90

1.00

SUBTOTAL 2
140.90

CALLE 17

1.00

135.60

135.60

1.00

135.60

CALLE 19

1.00

303.00

303.00

1.00

303.00

CALLE 20

1.00

76.00

76.00

1.00

76.00

CALLE 21

1.00

144.50

144.50

1.00

144.50

CALLE 26

1.00

94.00

94.00

1.00

94.00

CALLE 27

1.00

101.00

101.00

1.00

101.00

CALLE 30

1.00

96.60

96.60

1.00

96.60

CALLE 31

1.00

115.10

115.10

1.00

115.10

CALLE 33

1.00

101.70

101.70

1.00

101.70

CALLE 34

1.00

141.60

141.60

1.00

141.60

TOTAL

02.02.03 RELLENO DE ZANJAS PARA AGUA POTABLE


CALLES

1,450.00

UNIDAD

LARGO

SUB TOTAL 1

N VECES

CALLE 16

1.00

140.90

ANCHO

140.90

1.00

SUBTOTAL 2
140.90

CALLE 17

1.00

135.60

135.60

1.00

135.60

CALLE 19

1.00

303.00

303.00

1.00

303.00

CALLE 20

1.00

76.00

76.00

1.00

76.00

CALLE 21

1.00

144.50

144.50

1.00

144.50

CALLE 26

1.00

94.00

94.00

1.00

94.00

CALLE 27

1.00

101.00

101.00

1.00

101.00

CALLE 30

1.00

96.60

96.60

1.00

96.60

CALLE 31

1.00

115.10

115.10

1.00

115.10

CALLE 33

1.00

101.70

101.70

1.00

101.70

CALLE 34

1.00

141.60

141.60

1.00

141.60

TOTAL

1,450.00

02.03.00 SUMINISTRO E INSTALACION DE TUBERIA PVC


02.03.01 SUMINISTRO TUBERIA PVC ISO 4422 C 7.5 DN 110mm
CALLES

ANCHO

UNIDAD

LARGO

SUB TOTAL 1

N VECES

CALLE 16

1.00

140.90

140.90

1.00

SUBTOTAL 2
140.90

CALLE 17

1.00

135.60

135.60

1.00

135.60

CALLE 19

1.00

303.00

303.00

1.00

303.00

CALLE 20

1.00

76.00

76.00

1.00

76.00

CALLE 21

1.00

144.50

144.50

1.00

144.50

CALLE 26

1.00

94.00

94.00

1.00

94.00

CALLE 27

1.00

101.00

101.00

1.00

101.00

CALLE 30

1.00

96.60

96.60

1.00

96.60

CALLE 31

1.00

115.10

115.10

1.00

115.10

CALLE 33

1.00

101.70

101.70

1.00

101.70

CALLE 34

1.00

141.60

141.60

1.00

141.60

TOTAL

02.03.02 INSTALACION DE TUBERIA PVC ISO 4422 C 7.5 DN 110mm


CALLES

ANCHO

1,450.00

UNIDAD

LARGO

SUB TOTAL 1

N VECES

CALLE 16

1.00

140.90

140.90

1.00

SUBTOTAL 2
140.90

CALLE 17

1.00

135.60

135.60

1.00

135.60

CALLE 19

1.00

303.00

303.00

1.00

303.00

CALLE 20

1.00

76.00

76.00

1.00

76.00

CALLE 21

1.00

144.50

144.50

1.00

144.50

CALLE 26

1.00

94.00

94.00

1.00

94.00

CALLE 27

1.00

101.00

101.00

1.00

101.00

CALLE 30

1.00

96.60

96.60

1.00

96.60

CALLE 31

1.00

115.10

115.10

1.00

115.10

CALLE 33

1.00

101.70

101.70

1.00

101.70

CALLE 34

1.00

141.60

141.60

1.00

141.60

TOTAL

1,450.00

SUSTENTO DE METRADOS
"PAVIMENTACION DE LAS CALLES 16,17,19,20,21,26,27,30,31,33,y 34 DE LA I ETAPA DE LA URBANIZACION IGNACIO
MERINO DE LA CIUDAD DE PIURA"
02.04.00 ACCESORIOS
02.04.01 PRUEBA HIDRAULICA
CALLES

UNIDAD

LARGO

SUB TOTAL 1

N VECES

CALLE 16

1.00

140.90

ANCHO

140.90

1.00

SUBTOTAL 2
140.90

CALLE 17

1.00

135.60

135.60

1.00

135.60

CALLE 19

1.00

303.00

303.00

1.00

303.00

CALLE 20

1.00

76.00

76.00

1.00

76.00

CALLE 21

1.00

144.50

144.50

1.00

144.50

CALLE 26

1.00

94.00

94.00

1.00

94.00

CALLE 27

1.00

101.00

101.00

1.00

101.00

CALLE 30

1.00

96.60

96.60

1.00

96.60

CALLE 31

1.00

115.10

115.10

1.00

115.10

CALLE 33

1.00

101.70

101.70

1.00

101.70

CALLE 34

1.00

141.60

141.60

1.00

141.60

TOTAL

1,450.00

02.05.00 CONEXIONES DOMICILIARIAS


02.05.01 TRAZO, NIVEL Y REPLANTEO EN AGUA POTABLE
CALLES

ANCHO

UNIDAD

LARGO

SUB TOTAL 1

N VECES

CALLE 16

1.00

3.50

3.50

25.00

CALLE 17

1.00

3.50

3.50

25.00

87.50

CALLE 19

1.00

3.50

3.50

57.00

199.50

CALLE 20

1.00

3.50

3.50

31.00

108.50

CALLE 21

1.00

3.50

3.50

24.00

84.00

CALLE 26

1.00

3.50

3.50

10.00

35.00

CALLE 27

1.00

3.50

3.50

19.00

66.50

CALLE 30

1.00

3.50

3.50

19.00

66.50

CALLE 31

1.00

3.50

3.50

21.00

73.50

CALLE 33

1.00

3.50

3.50

14.00

49.00

CALLE 34

1.00

3.50

3.50

15.00

87.50

52.50

TOTAL

02.05.02 EXCAVACION DE ZANJA PARA RED DE AGUA h=0.60, a=0.40


CALLES

ANCHO

SUBTOTAL 2

910.00

UNIDAD

LARGO

SUB TOTAL 1

N VECES

CALLE 16

1.00

3.50

3.50

25.00

CALLE 17

1.00

3.50

3.50

25.00

87.50

CALLE 19

1.00

3.50

3.50

57.00

199.50

CALLE 20

1.00

3.50

3.50

31.00

108.50

CALLE 21

1.00

3.50

3.50

24.00

84.00

CALLE 26

1.00

3.50

3.50

10.00

35.00

CALLE 27

1.00

3.50

3.50

19.00

66.50

CALLE 30

1.00

3.50

3.50

19.00

66.50

CALLE 31

1.00

3.50

3.50

21.00

73.50

CALLE 33

1.00

3.50

3.50

14.00

49.00

CALLE 34

1.00

3.50

3.50

15.00

87.50

52.50

TOTAL

02.05.03 REFINE Y NIVELACION DE FONDO DE ZANJAS


CALLES

ANCHO

SUBTOTAL 2

910.00

UNIDAD

LARGO

SUB TOTAL 1

N VECES

CALLE 16

1.00

3.50

3.50

25.00

SUBTOTAL 2

CALLE 17

1.00

3.50

3.50

25.00

87.50

CALLE 19

1.00

3.50

3.50

57.00

199.50

CALLE 20

1.00

3.50

3.50

31.00

108.50

CALLE 21

1.00

3.50

3.50

24.00

84.00

CALLE 26

1.00

3.50

3.50

10.00

35.00

CALLE 27

1.00

3.50

3.50

19.00

66.50

CALLE 30

1.00

3.50

3.50

19.00

66.50

CALLE 31

1.00

3.50

3.50

21.00

73.50

CALLE 33

1.00

3.50

3.50

14.00

49.00

CALLE 34

1.00

3.50

3.50

15.00

87.50

52.50

TOTAL

910.00

SUSTENTO DE METRADOS
"PAVIMENTACION DE LAS CALLES 16,17,19,20,21,26,27,30,31,33,y 34 DE LA I ETAPA DE LA URBANIZACION IGNACIO
MERINO DE LA CIUDAD DE PIURA"
02.05.04 CONEXIONES DOMICILIARIAS DN 15mm, L=5.50m
CALLES

ANCHO

UNIDAD

LARGO

SUB TOTAL 1

N VECES

CALLE 16

25.00

1.00

25.00

1.00

25.00

CALLE 17

25.00

1.00

25.00

1.00

25.00

CALLE 19

57.00

1.00

57.00

1.00

57.00

CALLE 20

31.00

1.00

31.00

1.00

31.00

CALLE 21

24.00

1.00

24.00

1.00

24.00

CALLE 26

10.00

1.00

10.00

1.00

10.00

CALLE 27

19.00

1.00

19.00

1.00

19.00

CALLE 30

19.00

1.00

19.00

1.00

19.00

CALLE 31

21.00

1.00

21.00

1.00

21.00

CALLE 33

14.00

14.00

1.00

14.00

CALLE 34

15.00

15.00

1.00

15.00

TOTAL

02.05.05 RELLENO DE ZANJAS PARA AGUA POTABLE


CALLES

SUBTOTAL 2

260.00

UNIDAD

LARGO

SUB TOTAL 1

N VECES

CALLE 16

1.00

3.50

ANCHO

3.50

25.00

CALLE 17

1.00

3.50

3.50

25.00

87.50

CALLE 19

1.00

3.50

3.50

57.00

199.50

CALLE 20

1.00

3.50

3.50

31.00

108.50

CALLE 21

1.00

3.50

3.50

24.00

84.00

CALLE 26

1.00

3.50

3.50

10.00

35.00

CALLE 27

1.00

3.50

3.50

19.00

66.50

CALLE 30

1.00

3.50

3.50

19.00

66.50

CALLE 31

1.00

3.50

3.50

21.00

73.50

CALLE 33

1.00

3.50

3.50

14.00

49.00

CALLE 34

1.00

3.50

3.50

15.00

87.50

52.50

TOTAL

02.05.06 PRUEBA HIDRAULICA


CALLES

SUBTOTAL 2

910.00

UNIDAD

LARGO

SUB TOTAL 1

N VECES

CALLE 16

1.00

3.50

ANCHO

3.50

25.00

CALLE 17

1.00

3.50

3.50

25.00

87.50

CALLE 19

1.00

3.50

3.50

57.00

199.50

CALLE 20

1.00

3.50

3.50

31.00

108.50

CALLE 21

1.00

3.50

3.50

24.00

84.00

CALLE 26

1.00

3.50

3.50

10.00

35.00

CALLE 27

1.00

3.50

3.50

19.00

66.50

CALLE 30

1.00

3.50

3.50

19.00

66.50

CALLE 31

1.00

3.50

3.50

21.00

73.50

CALLE 33

1.00

3.50

3.50

14.00

49.00

CALLE 34

1.00

3.50

3.50

15.00

87.50

52.50

TOTAL

03.00.00

SUBTOTAL 2

910.00

PAVIMENTACION CON BLOQUETAS

03.01.00 TRABAJOS PRELIMINARES


03.01.01 TRAZO,NIVELACION Y REPLANTEO EN PAVIMENTO
CALLES

m2

AREA

LARGO

ANCHO

SUB TOTAL 1

N VECES

CALLE 16

810

135.00

6.00

810

1.000

CALLE 17

834

139.00

6.00

834

1.00

834.00

CALLE 19

1992

332.00

6.00

1992

1.00

1,992.00

CALLE 20

432

72.00

6.00

432

1.00

432.00

CALLE 21

828

138.00

6.00

828

1.00

828.00

CALLE 26

570

95.00

6.00

570

1.00

570.00

CALLE 27

570

95.00

6.00

570

1.00

570.00

CALLE 30

534

89.00

6.00

534

1.00

534.00

CALLE 31

606

101.00

6.00

606

1.00

606.00

CALLE 33

570

95.00

6.00

570

1.00

570.00

CALLE 34

612

102.00

6.00

612

1.00
TOTAL

SUBTOTAL 2
810.00

612.00
8,358.00

SUSTENTO DE METRADOS
"PAVIMENTACION DE LAS CALLES 16,17,19,20,21,26,27,30,31,33,y 34 DE LA I ETAPA DE LA URBANIZACION IGNACIO
MERINO DE LA CIUDAD DE PIURA"
03.02.00 MOVIMIENTO DE TIERRAS
03.02.01 CORTE DE TERRENO A NIVEL DE SUBRASANTE CON EQUIPO
CALLES

m3

Espesor

LARGO

ANCHO

SUB TOTAL 1

N VECES

CALLE 16

0.35

135.00

6.00

283.5

1.000

283.50

CALLE 17

0.35

139.00

6.00

291.9

1.00

291.90

CALLE 19

0.35

332.00

6.00

697.2

1.00

697.20

CALLE 20

0.35

72.00

6.00

151.2

1.00

151.20

CALLE 21

0.35

138.00

6.00

289.8

1.00

289.80

CALLE 26

0.35

95.00

6.00

199.5

1.00

199.50

CALLE 27

0.35

95.00

6.00

199.5

1.00

199.50

CALLE 30

0.35

89.00

6.00

186.9

1.00

186.90

CALLE 31

0.35

101.00

6.00

212.1

1.00

212.10

CALLE 33

0.35

95.00

6.00

199.5

1.00

199.50

CALLE 34

0.35

102.00

6.00

214.2

1.00
TOTAL

03.02.02 PERFILADO Y COMPACTADO DE SUBRASANTE CON EQUIPO


CALLES

SUBTOTAL 2

214.20
2,925.30

m2

AREA

LARGO

ANCHO

SUB TOTAL 1

N VECES

CALLE 16

810

135.00

6.00

810

1.000

CALLE 17

834

139.00

6.00

834

1.00

834.00

CALLE 19

1992

332.00

6.00

1992

1.00

1,992.00

CALLE 20

432

72.00

6.00

432

1.00

432.00

CALLE 21

828

138.00

6.00

828

1.00

828.00

CALLE 26

570

95.00

6.00

570

1.00

570.00

CALLE 27

570

95.00

6.00

570

1.00

570.00

CALLE 30

534

89.00

6.00

534

1.00

534.00

CALLE 31

606

101.00

6.00

606

1.00

606.00

CALLE 33

570

95.00

6.00

570

1.00

570.00

CALLE 34

612

102.00

6.00

612

1.00
TOTAL

03.02.03 CONFORMACION DE CAPA SUB BASE e=0.15m


CALLES

SUBTOTAL 2
810.00

612.00
8,358.00

M2

AREA

LARGO

ANCHO

SUB TOTAL 1

N VECES

CALLE 16

810

135.00

6.00

810

1.000

CALLE 17

834

139.00

6.00

834

1.00

834.00

CALLE 19

1992

332.00

6.00

1992

1.00

1,992.00

CALLE 20

432

72.00

6.00

432

1.00

432.00

CALLE 21

828

138.00

6.00

828

1.00

828.00

CALLE 26

570

95.00

6.00

570

1.00

570.00

CALLE 27

570

95.00

6.00

570

1.00

570.00

CALLE 30

534

89.00

6.00

534

1.00

534.00

CALLE 31

606

101.00

6.00

606

1.00

606.00

CALLE 33

570

95.00

6.00

570

1.00

570.00

CALLE 34

612

102.00

6.00

612

1.00
TOTAL

03.02.04 CONFORMACION DE CAPA BASE e=0.20m


CALLES

SUBTOTAL 2
810.00

612.00
8,358.00

M2

AREA

LARGO

ANCHO

SUB TOTAL 1

N VECES

CALLE 16

810

135.00

6.00

810

1.000

CALLE 17

834

139.00

6.00

834

1.00

834.00

CALLE 19

1992

332.00

6.00

1992

1.00

1,992.00

CALLE 20

432

72.00

6.00

432

1.00

432.00

CALLE 21

828

138.00

6.00

828

1.00

828.00

CALLE 26

570

95.00

6.00

570

1.00

570.00

CALLE 27

570

95.00

6.00

570

1.00

570.00

CALLE 30

534

89.00

6.00

534

1.00

534.00

CALLE 31

606

101.00

6.00

606

1.00

606.00

CALLE 33

570

95.00

6.00

570

1.00

570.00

CALLE 34

612

102.00

6.00

612

1.00
TOTAL

SUBTOTAL 2
810.00

612.00
8,358.00

SUSTENTO DE METRADOS
"PAVIMENTACION DE LAS CALLES 16,17,19,20,21,26,27,30,31,33,y 34 DE LA I ETAPA DE LA URBANIZACION IGNACIO
MERINO DE LA CIUDAD DE PIURA"
m3

03.03.05 ELIMINACION DE MATERIAL EXCEDENTE D PROM 15 KM


N VECES

LARGO

ALTO

ANCHO

FACTOR ESPONJ.

CALLE 16

CALLES

1.00

135.00

0.35

6.00

1.30

SUBTOTAL 2
368.55

CALLE 17

1.00

139.00

0.35

6.00

1.30

379.47

CALLE 19

1.00

332.00

0.35

6.00

1.30

906.36

CALLE 20

1.00

72.00

0.35

6.00

1.30

196.56

CALLE 21

1.00

138.00

0.35

6.00

1.30

376.74

CALLE 26

1.00

95.00

0.35

6.00

1.30

259.35

CALLE 27

1.00

95.00

0.35

6.00

1.30

259.35

CALLE 30

1.00

89.00

0.35

6.00

1.30

242.97

CALLE 31

1.00

101.00

0.35

6.00

1.30

275.73

CALLE 33

1.00

95.00

0.35

6.00

1.30

259.35

CALLE 34

102.00

0.35

6.00

1.30

278.46

TOTAL

3,802.89

03.03.00 SARDINELES
03.03.01 EXCAVACION MANUAL DE ZANJAS PARA SARDINEL
CALLES

m3

ESPESOR

LARGO

ANCHO

SUB TOTAL 1

N VECES

CALLE 16

0.15

135.00

0.15

3.04

2.00

SUBTOTAL 2

CALLE 17

0.15

139.00

0.15

3.13

2.00

6.26

CALLE 19

0.15

332.00

0.15

7.47

2.00

14.94

CALLE 20

0.15

72.00

0.15

1.62

2.00

3.24

CALLE 21

0.15

138.00

0.15

3.11

2.00

6.21

CALLE 26

0.15

95.00

0.15

2.14

2.00

4.28

CALLE 27

0.15

95.00

0.15

2.14

2.00

4.28

6.08

CALLE 30

0.15

89.00

0.15

2.00

2.00

4.01

CALLE 31

0.15

101.00

0.15

2.27

2.00

4.55

CALLE 33

0.15

95.00

0.15

2.14

2.00

4.28

CALLE 34

0.15

102.00

0.15

2.30

2.00

4.59

TOTAL

m2

03.03.02 ENCOFRADO Y DESENCOFRADO DE SARDINEL


AREA

LARGO

ALTO

SUB TOTAL 1

N VECES

30.00

200.00

0.15

30.00

2.00

SUBTOTAL 2
60.00

TOTAL

60.00

m3

03.03.03 CONCRETO f'c=175 Kg/cm2 EN SARDINEL


CALLES

62.69

LONGITUD

ANCHO

ALTO

SUB TOTAL 1

N VECES

CALLE 16

135.00

0.15

0.30

6.08

2.00

SUBTOTAL 2
12.15

CALLE 17

139.00

0.15

0.30

6.26

2.00

12.51

CALLE 19

332.00

0.15

0.30

14.94

2.00

29.88

CALLE 20

72.00

0.15

0.30

3.24

2.00

6.48

CALLE 21

138.00

0.15

0.30

6.21

2.00

12.42

CALLE 26

95.00

0.15

0.30

4.28

2.00

8.55

CALLE 27

95.00

0.15

0.30

4.28

2.00

8.55

CALLE 30

89.00

0.15

0.30

4.01

2.00

8.01

CALLE 31

101.00

0.15

0.30

4.55

2.00

9.09

CALLE 33

95.00

0.15

0.30

4.28

2.00

8.55

CALLE 34

102.00

0.15

0.30

4.59

2.00

9.18

TOTAL

125.37

SUSTENTO DE METRADOS
"PAVIMENTACION DE LAS CALLES 16,17,19,20,21,26,27,30,31,33,y 34 DE LA I ETAPA DE LA URBANIZACION IGNACIO
MERINO DE LA CIUDAD DE PIURA"
m3

03.03.05 ELIMINACION DE MATERIAL EXCEDENTE D PROM 15 KM


ESPESOR

LARGO

ANCHO

SUB TOTAL 1

N VECES

CALLE 16

CALLES

0.15

135.00

0.15

3.04

2.00

CALLE 17

0.15

139.00

0.15

3.13

2.00

6.26

CALLE 19

0.15

332.00

0.15

7.47

2.00

14.94

CALLE 20

0.15

72.00

0.15

1.62

2.00

3.24

CALLE 21

0.15

138.00

0.15

3.11

2.00

6.21

CALLE 26

0.15

95.00

0.15

2.14

2.00

4.28

CALLE 27

0.15

95.00

0.15

2.14

2.00

4.28

CALLE 30

0.15

89.00

0.15

2.00

2.00

4.01

CALLE 31

0.15

101.00

0.15

2.27

2.00

4.55

CALLE 33

0.15

95.00

0.15

2.14

2.00

4.28

CALLE 34

0.15

102.00

0.15

2.30

2.00

6.08

4.59

TOTAL

81.49
m2

03.03.06 CURADO QUIMICO


CALLES

SUBTOTAL 2

AREA

LARGO

ANCHO

SUB TOTAL 1

N VECES

CALLE 16

810

135.00

6.00

810

1.000

SUBTOTAL 2

CALLE 17

834

139.00

6.00

834

1.00

834.00

CALLE 19

1992

332.00

6.00

1992

1.00

1,992.00

CALLE 20

432

72.00

6.00

432

1.00

432.00

CALLE 21

828

138.00

6.00

828

1.00

828.00

CALLE 26

570

95.00

6.00

570

1.00

570.00

CALLE 27

570

95.00

6.00

570

1.00

570.00

CALLE 30

534

89.00

6.00

534

1.00

534.00

CALLE 31

606

101.00

6.00

606

1.00

606.00

CALLE 33

570

95.00

6.00

570

1.00

570.00

CALLE 34

612

102.00

6.00

612

1.00

612.00

TOTAL

679.24

810.00

03.04.00 PAVIMENTO CON ADOQUIN


m2

03.04.01 PAVIMENTO CON ADOQUIN VEHICULAR (20x10x8cm)


AREA

LARGO

ANCHO

SUB TOTAL 1

N VECES

CALLE 16

CALLES

810

135.00

6.00

810

1.000

CALLE 17

834

139.00

6.00

834

1.00

834.00

CALLE 19

1992

332.00

6.00

1992

1.00

1,992.00

CALLE 20

432

72.00

6.00

432

1.00

432.00

CALLE 21

828

138.00

6.00

828

1.00

828.00

CALLE 26

570

95.00

6.00

570

1.00

570.00

CALLE 27

570

95.00

6.00

570

1.00

570.00

CALLE 30

534

89.00

6.00

534

1.00

534.00

CALLE 31

606

101.00

6.00

606

1.00

606.00

CALLE 33

570

95.00

6.00

570

1.00

570.00

CALLE 34

612

102.00

6.00

612

1.00
TOTAL

810.00

612.00
8,358.00

m2

03.04.02 LIMPIEZA FINAL DE OBRA


CALLES

SUBTOTAL 2

AREA

LARGO

ANCHO

SUB TOTAL 1

N VECES

CALLE 16

810

135.00

6.00

810

1.000

CALLE 17

834

139.00

6.00

834

1.00

834.00

CALLE 19

1992

332.00

6.00

1992

1.00

1,992.00

CALLE 20

432

72.00

6.00

432

1.00

432.00

CALLE 21

828

138.00

6.00

828

1.00

828.00

CALLE 26

570

95.00

6.00

570

1.00

570.00

CALLE 27

570

95.00

6.00

570

1.00

570.00

CALLE 30

534

89.00

6.00

534

1.00

534.00

CALLE 31

606

101.00

6.00

606

1.00

606.00

CALLE 33

570

95.00

6.00

570

1.00

570.00

CALLE 34

612

102.00

6.00

612

1.00
TOTAL

SUBTOTAL 2
810.00

612.00
8,358.00

SUSTENTO DE METRADOS
"PAVIMENTACION DE LAS CALLES 16,17,19,20,21,26,27,30,31,33,y 34 DE LA I ETAPA DE LA URBANIZACION IGNACIO
MERINO DE LA CIUDAD DE PIURA"
04.00.00

VEREDAS Y RAMPAS

04.01.00 TRABAJOS PRELIMINARES


04.01.01 TRAZO Y REPLANTEO

m2

CALLES

AREA

LARGO

ANCHO

SUB TOTAL 1

N VECES

CALLE 16

323.04

269.2

1.20

323.04

1.000

SUBTOTAL 2
323.04

CALLE 17

332.64

277.2

1.20

332.64

1.000

332.64

CALLE 19

778.92

649.1

1.20

778.92

1.000

778.92

CALLE 20

172.8

144

1.20

172.8

1.000

172.80

CALLE 21

327.6

273

1.20

327.6

1.000

327.60

CALLE 26

223.92

186.6

1.20

223.92

1.000

223.92

CALLE 27

223.92

186.6

1.20

223.92

1.000

223.92

CALLE 30

206.4

172

1.20

206.4

1.000

206.40

CALLE 31

235.2

196

1.20

235.2

1.000

235.20

CALLE 33

226.8

189

1.20

226.8

1.000

226.80

CALLE 34

237.6

198

1.20

237.6

1.000

237.60

TOTAL

04.01.02 DEMOLICION DE VEREDAS EXISTENTES EN MAL ESTADO

3,288.84

m2

CALLES

AREA

LARGO

ANCHO

SUB TOTAL 1

N VECES

CALLE 16

323.04

269.2

1.20

323.04

1.000

SUBTOTAL 2
323.04

CALLE 17

332.64

277.2

1.20

332.64

1.000

332.64

CALLE 19

778.92

649.1

1.20

778.92

1.000

778.92

CALLE 20

172.8

144

1.20

172.8

1.000

172.80

CALLE 21

327.6

273

1.20

327.6

1.000

327.60

CALLE 26

223.92

186.6

1.20

223.92

1.000

223.92

CALLE 27

223.92

186.6

1.20

223.92

1.000

223.92

CALLE 30

206.4

172

1.20

206.4

1.000

206.40

CALLE 31

235.2

196

1.20

235.2

1.000

235.20

CALLE 33

226.8

189

1.20

226.8

1.000

226.80

CALLE 34

237.6

198

1.20

237.6

1.000

237.60

TOTAL

3,288.84

04.02.00 MOVIMIENTO DE TIERRAS


04.02.01 CORTE SUPERFICIAL HASTA 0.10m

De 04.01.00

m3

AREA

ALTO

ANCHO

SUB TOTAL 1

N VECES

3288.84

0.10

1.00

328.88

1.00

328.88

TOTAL

DE ACAD

AREA

ANCHO

ALTURA

SUB TOTAL 1

N VECES

De 04.01.00

3288.84

1.00

1.00

3288.84

1.00

SUBTOTAL 2
3,288.84

TOTAL
04.02.03 AFIRMADO DE 4" PARA VEREDAS

3,288.84
m2

AREA

ANCHO

ALTURA

SUB TOTAL 1

N VECES

3288.84

1.00

1.00

3288.84

1.00

SUBTOTAL 2
3,288.84

TOTAL
04.02.04 ELIMINACION DE MATERIAL EXCEDENTE D PROM 15 KM

De 04.02.01

328.88
m

04.02.02 REFINE Y NIVELACION CON PLANCHA

De 04.01.00

SUBTOTAL 2

3,288.84
m2

AREA

ALTO

VOLUMENT

SUB TOTAL 1

FACTOR DE ESP.

328.88

328.88

1.30

SUBTOTAL 2
427.55

TOTAL

427.55

SUSTENTO DE METRADOS
"PAVIMENTACION DE LAS CALLES 16,17,19,20,21,26,27,30,31,33,y 34 DE LA I ETAPA DE LA URBANIZACION IGNACIO
MERINO DE LA CIUDAD DE PIURA"
04.03.00 VEREDAS DE CONCRETO
04.03.01 VEREDAS DE CONCRETO f'c=175 kg/cm2 E=10 cm PASTA 1:2 (INC. ENCOFRADO)

De 04.01.00

m2

AREA

ALTO

ANCHO

SUB TOTAL 1

N VECES

3288.84

1.00

1.00

3288.84

1.00

3,288.84

TOTAL
04.03.02 CURADO DE VEREDAS CON ADITIVO

De 04.01.00

SUBTOTAL 2

3,288.84
m2

AREA

ALTO

ANCHO

SUB TOTAL 1

N VECES

1462.49

1.00

1.00

1462.49

1.00

SUBTOTAL 2
1,462.49

TOTAL

1,462.49

04.04.00 OTRAS OBRAS


04.04.01 LIMPIEZA FINAL DE OBRA

De 04.01.00

m2

AREA

ALTO

ANCHO

SUB TOTAL 1

N VECES

3,288.84

1.00

1.00

3,288.84

1.00

3,288.84

TOTAL

05.00.00

SUBTOTAL 2

3,288.84

RED DE DESAGE

05.01.00 TRABAJOS PRELIMINARES


05.01.01 TRAZO, NIVEL Y REPLANTEO EN RED DE DESAGE
CALLES
CALLE 16
CALLE 17
CALLE 19
CALLE 20
CALLE 21
CALLE 26
CALLE 27
CALLE 30
CALLE 31
CALLE 33
CALLE 34

UNIDAD
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

LARGO
131.70
112.60
322.80
55.00
133.60
95.35
95.70
99.35
100.60
94.60
108.70

ANCHO

m
SUB TOTAL 1
131.70
112.60
322.80
55.00
133.60
95.35
95.70
99.35
100.60
94.60
108.70

N VECES
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

TOTAL

05.01.02 DESMONTAJE DE RED DE DESAGE


CALLES
CALLE 16
CALLE 17
CALLE 19
CALLE 20
CALLE 21
CALLE 26
CALLE 27
CALLE 30
CALLE 31
CALLE 33
CALLE 34

UNIDAD
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

LARGO
131.70
112.60
322.80
55.00
133.60
95.35
95.70
99.35
100.60
94.60
108.70

SUBTOTAL 2
131.70
112.60
322.80
55.00
133.60
95.35
95.70
99.35
100.60
94.60
108.70

1,350.00

ml
ANCHO

SUB TOTAL 1
131.70
112.60
322.80
55.00
133.60
95.35
95.70
99.35
100.60
94.60
108.70

N VECES
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

TOTAL

SUBTOTAL 2
131.70
112.60
322.80
55.00
133.60
95.35
95.70
99.35
100.60
94.60
108.70

1,350.00

05.02.00 MOVIMIENTO DE TIERRAS


05.02.01 EXCAVACION MANUAL DE ZANJAS PARA AGUA POTABLE (PROF. 1.80M), ANCHO 0.80m
CALLES
CALLE 16
CALLE 17
CALLE 19
CALLE 20
CALLE 21
CALLE 26
CALLE 27
CALLE 30
CALLE 31
CALLE 33
CALLE 34

UNIDAD
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

LARGO
131.70
112.60
322.80
55.00
133.60
95.35
95.70
99.35
100.60
94.60
108.70

ANCHO

SUB TOTAL 1
131.70
112.60
322.80
55.00
133.60
95.35
95.70
99.35
100.60
94.60
108.70

N VECES
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

TOTAL

SUBTOTAL 2
131.70
112.60
322.80
55.00
133.60
95.35
95.70
99.35
100.60
94.60
108.70

1,350.00

SUSTENTO DE METRADOS
"PAVIMENTACION DE LAS CALLES 16,17,19,20,21,26,27,30,31,33,y 34 DE LA I ETAPA DE LA URBANIZACION IGNACIO
MERINO DE LA CIUDAD DE PIURA"
05.02.02 REFINE Y NIVELACION DE FONDO DE ZANJAS
CALLES
UNIDAD
LARGO
ANCHO
CALLE 16
1.00
131.70
CALLE 17
1.00
112.60
CALLE 19
1.00
322.80
CALLE 20
1.00
55.00
CALLE 21
1.00
133.60
CALLE 26
1.00
95.35
CALLE 27
1.00
95.70
CALLE 30
1.00
99.35
CALLE 31
1.00
100.60
CALLE 33
1.00
94.60
CALLE 34
1.00
108.70

SUB TOTAL 1
131.70
112.60
322.80
55.00
133.60
95.35
95.70
99.35
100.60
94.60
108.70

N VECES
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

TOTAL

05.02.03 RELLENO DE ZANJAS PARA RED DE DESAGUE


CALLES
UNIDAD
LARGO
ANCHO
CALLE 16
1.00
131.70
CALLE 17
1.00
112.60
CALLE 19
1.00
322.80
CALLE 20
1.00
55.00
CALLE 21
1.00
133.60
CALLE 26
1.00
95.35
CALLE 27
1.00
95.70
CALLE 30
1.00
99.35
CALLE 31
1.00
100.60
CALLE 33
1.00
94.60
CALLE 34
1.00
108.70

SUB TOTAL 1
131.70
112.60
322.80
55.00
133.60
95.35
95.70
99.35
100.60
94.60
108.70

N VECES
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

TOTAL

m
SUBTOTAL 2
131.70
112.60
322.80
55.00
133.60
95.35
95.70
99.35
100.60
94.60
108.70

1,350.00

m
SUBTOTAL 2
131.70
112.60
322.80
55.00
133.60
95.35
95.70
99.35
100.60
94.60
108.70

1,350.00

05.03.00 SUMINISTRO E INSTALACION DE TUBERIA PVC


05.03.01 SUMINISTRO TUBERIA PVC ISO 4435 S 20 DN 200mm
CALLES
UNIDAD
LARGO
ANCHO
CALLE 16
1.00
131.70
CALLE 17
1.00
112.60
CALLE 19
1.00
322.80
CALLE 20
1.00
55.00
CALLE 21
1.00
133.60
CALLE 26
1.00
95.35
CALLE 27
1.00
95.70
CALLE 30
1.00
99.35
CALLE 31
1.00
100.60
CALLE 33
1.00
94.60
CALLE 34
1.00
108.70

SUB TOTAL 1
131.70
112.60
322.80
55.00
133.60
95.35
95.70
99.35
100.60
94.60
108.70

N VECES
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

TOTAL

05.03.02 COLOCACION TUBERIA PVC ISO 4435 S 20 DN 200mm


CALLES
UNIDAD
LARGO
ANCHO
CALLE 16
1.00
131.70
CALLE 17
1.00
112.60
CALLE 19
1.00
322.80
CALLE 20
1.00
55.00
CALLE 21
1.00
133.60
CALLE 26
1.00
95.35
CALLE 27
1.00
95.70
CALLE 30
1.00
99.35
CALLE 31
1.00
100.60
CALLE 33
1.00
94.60
CALLE 34
1.00
108.70

SUB TOTAL 1
131.70
112.60
322.80
55.00
133.60
95.35
95.70
99.35
100.60
94.60
108.70

N VECES
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

TOTAL

05.03.03 PRUEBA HIDRAULICA RED DE DESAGE


CALLES
CALLE 16
CALLE 17
CALLE 19
CALLE 20
CALLE 21
CALLE 26
CALLE 27
CALLE 30
CALLE 31
CALLE 33
CALLE 34

UNIDAD
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

LARGO
131.70
112.60
322.80
55.00
133.60
95.35
95.70
99.35
100.60
94.60
108.70

m
SUBTOTAL 2
131.70
112.60
322.80
55.00
133.60
95.35
95.70
99.35
100.60
94.60
108.70

1,350.00

m
SUBTOTAL 2
131.70
112.60
322.80
55.00
133.60
95.35
95.70
99.35
100.60
94.60
108.70

1,350.00

m
ANCHO

SUB TOTAL 1
131.70
112.60
322.80
55.00
133.60
95.35
95.70
99.35
100.60
94.60
108.70

N VECES
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

TOTAL

SUBTOTAL 2
131.70
112.60
322.80
55.00
133.60
95.35
95.70
99.35
100.60
94.60
108.70

1,350.00

SUSTENTO DE METRADOS
"PAVIMENTACION DE LAS CALLES 16,17,19,20,21,26,27,30,31,33,y 34 DE LA I ETAPA DE LA URBANIZACION IGNACIO
MERINO DE LA CIUDAD DE PIURA"
05.04.00 BUZONES
05.04.01 RECORTE Y NIVELACION DE FUSTE DE BUZON (INC. CAMBIO DE TECHO)
N VECES
Buzones

UNIDAD
5.00

LARGO

ANCHO

SUB TOTAL 1
5.00

1.00

Und
SUBTOTAL 2
5.00

TOTAL

5.00

05.05.00 CONEXIONES DOMICILIARIAS


05.05.01 TRAZO, NIVEL Y REPLANTEO EN RED DE DESAGE
CALLES
UNIDAD
LARGO
ANCHO
CALLE 16
1.00
3.50
CALLE 17
1.00
3.50
CALLE 19
1.00
3.50
CALLE 20
1.00
3.50
CALLE 21
1.00
3.50
CALLE 26
1.00
3.50
CALLE 27
1.00
3.50
CALLE 30
1.00
3.50
CALLE 31
1.00
3.50
CALLE 33
1.00
3.50
CALLE 34
1.00
3.50

SUB TOTAL 1
3.50
3.50
3.50
3.50
3.50
3.50
3.50
3.50
3.50
3.50
3.50

N VECES
25.00
25.00
57.00
31.00
24.00
10.00
19.00
19.00
21.00
14.00
15.00

TOTAL

05.05.02 DESMONTAJE DE RED DE DESAGE


CALLES
CALLE 16
CALLE 17
CALLE 19
CALLE 20
CALLE 21
CALLE 26
CALLE 27
CALLE 30
CALLE 31
CALLE 33
CALLE 34

UNIDAD
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

LARGO
3.50
3.50
3.50
3.50
3.50
3.50
3.50
3.50
3.50
3.50
3.50

ANCHO

SUB TOTAL 1
3.50
3.50
3.50
3.50
3.50
3.50
3.50
3.50
3.50
3.50
3.50

05.05.03 EXCAVACION DE ZANJA PARA RED DE DESAGUE h=1.20, a=0.60


CALLES
UNIDAD
LARGO
ANCHO
SUB TOTAL 1
CALLE 16
1.00
3.50
3.50
CALLE 17
1.00
3.50
3.50
CALLE 19
1.00
3.50
3.50
CALLE 20
1.00
3.50
3.50
CALLE 21
1.00
3.50
3.50
CALLE 26
1.00
3.50
3.50
CALLE 27
1.00
3.50
3.50
CALLE 30
1.00
3.50
3.50
CALLE 31
1.00
3.50
3.50
CALLE 33
1.00
3.50
3.50
CALLE 34
1.00
3.50
3.50

N VECES
25.00
25.00
57.00
31.00
24.00
10.00
19.00
19.00
21.00
14.00
15.00

N VECES
25.00
25.00
57.00
31.00
24.00
10.00
19.00
19.00
21.00
14.00
15.00

TOTAL

05.05.04 REFINE Y NIVELACION DE FONDO DE ZANJAS


UNIDAD
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

LARGO
3.50
3.50
3.50
3.50
3.50
3.50
3.50
3.50
3.50
3.50
3.50

910.00

TOTAL

CALLES
CALLE 16
CALLE 17
CALLE 19
CALLE 20
CALLE 21
CALLE 26
CALLE 27
CALLE 30
CALLE 31
CALLE 33
CALLE 34

m
SUBTOTAL 2
87.50
87.50
199.50
108.50
84.00
35.00
66.50
66.50
73.50
49.00
52.50

ANCHO

SUBTOTAL 2
87.50
87.50
199.50
108.50
84.00
35.00
66.50
66.50
73.50
49.00
52.50

910.00

m
SUBTOTAL 2
87.50
87.50
199.50
108.50
84.00
35.00
66.50
66.50
73.50
49.00
52.50

910.00

m
SUB TOTAL 1
3.50
3.50
3.50
3.50
3.50
3.50
3.50
3.50
3.50
3.50
3.50

N VECES
25.00
25.00
57.00
31.00
24.00
10.00
19.00
19.00
21.00
14.00
15.00

TOTAL

SUBTOTAL 2
87.50
87.50
199.50
108.50
84.00
35.00
66.50
66.50
73.50
49.00
52.50

910.00

SUSTENTO DE METRADOS
"PAVIMENTACION DE LAS CALLES 16,17,19,20,21,26,27,30,31,33,y 34 DE LA I ETAPA DE LA URBANIZACION IGNACIO
MERINO DE LA CIUDAD DE PIURA"
05.05.05 CONEXIONES DOMICILIARIAS DN 160mm
CALLES
UNIDAD
LARGO
CALLE 16
25.00
1.00
CALLE 17
25.00
1.00
CALLE 19
57.00
1.00
CALLE 20
31.00
1.00
CALLE 21
24.00
1.00
CALLE 26
10.00
1.00
CALLE 27
19.00
1.00
CALLE 30
19.00
1.00
CALLE 31
21.00
1.00
CALLE 33
14.00
CALLE 34
15.00

ANCHO

SUB TOTAL 1
25.00
25.00
57.00
31.00
24.00
10.00
19.00
19.00
21.00
14.00
15.00

N VECES
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

TOTAL

UNIDAD
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

LARGO
3.50
3.50
3.50
3.50
3.50
3.50
3.50
3.50
3.50
3.50
3.50

ANCHO

SUB TOTAL 1
3.50
3.50
3.50
3.50
3.50
3.50
3.50
3.50
3.50
3.50
3.50

N VECES
25.00
25.00
57.00
31.00
24.00
10.00
19.00
19.00
21.00
14.00
15.00

TOTAL

UNIDAD
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

LARGO
3.50
3.50
3.50
3.50
3.50
3.50
3.50
3.50
3.50
3.50
3.50

ANCHO

SUB TOTAL 1
3.50
3.50
3.50
3.50
3.50
3.50
3.50
3.50
3.50
3.50
3.50

N VECES
25.00
25.00
57.00
31.00
24.00
10.00
19.00
19.00
21.00
14.00
15.00

TOTAL

UNIDAD
5.00

910.00

LARGO
1.00

SUBTOTAL 2
87.50
87.50
199.50
108.50
84.00
35.00
66.50
66.50
73.50
49.00
52.50

910.00

05.05.08 CAJA DE EMPALME A RED DE BUZON


DE ACAD
A RED EXISTENTE

SUBTOTAL 2
87.50
87.50
199.50
108.50
84.00
35.00
66.50
66.50
73.50
49.00
52.50

05.05.07 PRUEBA HIDRAULICA


CALLES
CALLE 16
CALLE 17
CALLE 19
CALLE 20
CALLE 21
CALLE 26
CALLE 27
CALLE 30
CALLE 31
CALLE 33
CALLE 34

260.00

05.05.06 RELLENO DE ZANJAS PARA RED DE DESAGE


CALLES
CALLE 16
CALLE 17
CALLE 19
CALLE 20
CALLE 21
CALLE 26
CALLE 27
CALLE 30
CALLE 31
CALLE 33
CALLE 34

Und
SUBTOTAL 2
25.00
25.00
57.00
31.00
24.00
10.00
19.00
19.00
21.00
14.00
15.00

ANCHO

SUB TOTAL 1