Sei sulla pagina 1di 42

AXON

Drawing No.
SR.No.

PAINTING/SLAG BLASTING INSPECTION REPORT


PART DESCRIPTION
PART IDENTIFICATION FINAL PAINTING STATUS(INSIDE- SINGLE COAT/OUTSIDE- DOUBLE COAT) FOUND OK, REFER RFI NO.

PROJECT: Coal Fired 4*360 MW Thermal Power Project, Uchpinda, Chhattisgarh

SLAG BLASTING STATUS(INSIDE & OUTSIDE) FOUND OK, REFER RFI NO.

FLUE DUCT GAS PIPING FOR CHIMNEY

QC CHECK SHEET

NOT APPLICABLE SURFACE DEFECT CHECK OVER LAPPING PHYSICAL COND. SURFACE ROUGHNESS

INSPECTION RESULTS : Inspection passed. Rectification works listed above to be completed and inspection is required after repair works Rectification works listed above to be completed but no further inspection required. Rejected CONTRACTOR SIGNATORY
NAME SIGN DATE NAME SIGN DATE

AXON PRODUCTION
STATUS ACCEPT RECTIFY & RE-OFFER

AXON QA/QC

PAGE NO

WORK ORDER No.:

REPORT NO.

SURFACE DEFECT CHECK SAGGING

ve to be completed and inspection is required after repair works

ve to be completed but no further inspection required.

SGS/TCE
NAME SIGN DATE

PAGE NO.:1 OF 1

RKM
SR.No.

WELD VISUAL INSPECTION REPORT


TRUSS NO
MEMBER NO 1 1 1 1 PART NO 1 2 3 4 1 2 3 4 STAGE FABRICATION FABRICATION FABRICATION FABRICATION FABRICATION FABRICATION FABRICATION FABRICATION X NOT APPLICABLE

PROJECT: Coal Fired 4*360 MW Thermal Power Project, Uchhpinda, Chhattisgarh


WELDING PROCESS MMAW MMAW MMAW MMAW MMAW MMAW MMAW MMAW WELDER NO. Joint Type Fillet/Groove Fillet/Groove Fillet/Groove Fillet/Groove Fillet/Groove Fillet/Groove Fillet/Groove Fillet/Groove

T-1
2 2 2 2

QC CHECK SHEET

CHECKED

WELD VISUAL & SURFACE DEFECT CHECK REINFORCEMENT SPATTER LUMPS / HIGHSPOT SLAG POROSITY / PINHOLES CRACK BEAD APPEARANCE / WEAVING PHYSICAL COND.

RKM PRODUCTION
STATUS ACCEPT RECTIFY & RE-OFFER REJECT

RKM Q.C.
SR. No.

CERTIFY AUTHORITY

NAME SIGN DATE TIME RKMFY/FORM/001 R.0 Dated 02/12/2012

CLIENT: RKM Power Gen Pvt. Limited


FIELD INSPECTION

WORK ORDER REPORT No.: No.:RKMFY/TAxon/WO/014/2 1/001 010


CORRECTION, If Any REMARKS

Discontinuities Found

Rectified

ok

Discontinuities Found

Rectified

ok

DEFECT CHECK

INST. USED Inst. ID No. UNDER CUT WELDSIZE UNDER FILL ARC STRIKE CLEAT MARK

VALIDITY

CERTIFY AUTHORITY

COMPANY

PAGE NO.:1 OF 1

RKM
SR.No.

WELD VISUAL INSPECTION REPORT


TRUSS NO
MEMBER NO 3 3 3 3 PART NO 1 2 3 4 1 2 3 4 STAGE FABRICATION FABRICATION FABRICATION FABRICATION FABRICATION FABRICATION FABRICATION FABRICATION X NOT APPLICABLE

PROJECT: Coal Fired 4*360 MW Thermal Power Project, Uchhpinda, Chhattisgarh


WELDING PROCESS MMAW MMAW MMAW MMAW MMAW MMAW MMAW MMAW

T-1
4 4 4 4

QC CHECK SHEET

CHECKED

WELD VISUAL & SURFACE DEFECT CHECK REINFORCEMENT SPATTER LUMPS / HIGHSPOT SLAG POROSITY / PINHOLES CRACK BEAD APPEARANCE / WEAVING PHYSICAL COND.

RKM PRODUCTION
STATUS ACCEPT RECTIFY & RE-OFFER REJECT NAME SIGN DATE TIME RKMFY/FORM/001 R.0 Dated 02/12/2012

RKM Q.C.
SR. No.

PROJECT: Coal Fired 4*360 MW Thermal Power Project, Uchhpinda, Chhattisgarh


WELDER NO. Joint Type Fillet/Groove

CLIENT: RKM WORK ORDER REPORT Power Gen Pvt. No.: No.:RKMFY/TLimited Axon/WO/014/2 1/001 010
FIELD INSPECTION CORRECTION, If Any REMARKS

Fillet/Groove Discontinuities Found Fillet/Groove Fillet/Groove Fillet/Groove Discontinuities Found Fillet/Groove Fillet/Groove Fillet/Groove

Rectified

ok

Rectified

ok

WELD VISUAL & SURFACE DEFECT CHECK REINFORCEMENT LUMPS / HIGHSPOT POROSITY / PINHOLES

Inst. ID No. UNDER CUT WELDSIZE UNDER FILL ARC STRIKE CLEAT MARK

VALIDITY

CERTIFY AUTHORITY

COMPANY

PAGE NO.:1 OF 1

RKM
SR.No.

WELD VISUAL INSPECTION REPORT


TRUSS NO
MEMBER NO 5 5 5 5 PART NO 1 2 3 4 1 2 3 4 STAGE FABRICATION FABRICATION FABRICATION FABRICATION FABRICATION FABRICATION FABRICATION FABRICATION X NOT APPLICABLE

PROJECT: Coal Fired 4*360 MW Thermal Power Project, Uchhpinda, Chhattisgarh


WELDING PROCESS MMAW MMAW MMAW MMAW MMAW MMAW MMAW MMAW WELDER NO. Joint Type Fillet/Groove Fillet/Groove Fillet/Groove Fillet/Groove

CLIENT: RKM Power Gen Pvt. Limited


FIELD INSPECTION

T-1
6 6 6 6 Fillet/Groove Discontinuities Found Fillet/Groove Discontinuities Found Fillet/Groove Fillet/Groove

QC CHECK SHEET

CHECKED

WELD VISUAL & SURFACE DEFECT CHECK REINFORCEMENT SPATTER LUMPS / HIGHSPOT SLAG POROSITY / PINHOLES CRACK BEAD APPEARANCE / WEAVING PHYSICAL COND.

UNDER CUT WELDSIZE UNDER FILL ARC STRIKE CLEAT MARK

RKM PRODUCTION
STATUS ACCEPT RECTIFY & RE-OFFER REJECT NAME

RKM Q.C.
SR. No.

CERTIFY AUTHORITY

SIGN DATE TIME RKMFY/FORM/001 R.0 Dated 02/12/2012

PAGE NO.:1

WORK ORDER REPORT No.: No.:RKMFY/TAxon/WO/014/2 1/001 010


CORRECTION, If Any REMARKS

Rectified Rectified

Inst. ID No.

VALIDITY

COMPANY

PAGE NO.:1 OF 1

RKM
SR.No.

WELD VISUAL INSPECTION REPORT


TRUSS NO
MEMBER NO 7 7 7 7 PART NO 1 2 3 4 1 2 3 4 STAGE FABRICATION FABRICATION FABRICATION FABRICATION FABRICATION FABRICATION FABRICATION FABRICATION X NOT APPLICABLE

PROJECT: Coal Fired 4*360 MW Thermal Power Project, Uchhpinda, Chhattisgarh


WELDING PROCESS MMAW MMAW MMAW MMAW MMAW MMAW MMAW MMAW WELDER NO. Joint Type Fillet/Groove

CLIENT: RKM Power Gen Pvt. Limited


FIELD INSPECTION

WORK ORDER No.: Axon/WO/014/2 010

Fillet/Groove Discontinuities Found Fillet/Groove Fillet/Groove Fillet/Groove Fillet/Groove Fillet/Groove Fillet/Groove

T-1
8 8 8 8

QC CHECK SHEET

CHECKED

WELD VISUAL & SURFACE DEFECT CHECK REINFORCEMENT SPATTER LUMPS / HIGHSPOT SLAG POROSITY / PINHOLES CRACK BEAD APPEARANCE / WEAVING PHYSICAL COND.

INST. USED UNDER CUT WELDSIZE UNDER FILL ARC STRIKE CLEAT MARK

RKM PRODUCTION
STATUS ACCEPT

RKM Q.C.
SR. No.

CERTIFY AUTHORITY

COMPANY

RECTIFY & RE-OFFER REJECT NAME SIGN DATE TIME RKMFY/FORM/001 R.0 Dated 02/12/2012

PAGE NO

WORK ORDER REPORT No.: No.:RKMFY/TAxon/WO/014/2 1/001 010


CORRECTION, If Any REMARKS

Rectified

Inst. ID No.

VALIDITY

COMPANY

PAGE NO.:1 OF 1

RKM
SR.No.

WELD VISUAL INSPECTION REPORT


TRUSS NO
MEMBER NO 9 9 9 9 10 10 10 10 PART NO 1 2 3 4 1 2 3 4 STAGE FABRICATION FABRICATION FABRICATION FABRICATION FABRICATION FABRICATION FABRICATION FABRICATION X NOT APPLICABLE

PROJECT: Coal Fired 4*360 MW Thermal Power Project, Uchhpinda, Chhattisgarh


WELDING PROCESS MMAW MMAW MMAW MMAW MMAW MMAW MMAW MMAW WELDER NO. Joint Type Fillet/Groove Fillet/Groove Fillet/Groove Fillet/Groove Fillet/Groove Fillet/Groove Fillet/Groove Fillet/Groove

CLIENT: RKM Power Gen Pvt. Limited


FIELD INSPECTION

T-1

QC CHECK SHEET

CHECKED

WELD VISUAL & SURFACE DEFECT CHECK REINFORCEMENT SPATTER LUMPS / HIGHSPOT SLAG POROSITY / PINHOLES CRACK BEAD APPEARANCE / WEAVING PHYSICAL COND.

UNDER CUT WELDSIZE UNDER FILL ARC STRIKE CLEAT MARK

RKM PRODUCTION
STATUS ACCEPT RECTIFY & RE-OFFER REJECT NAME SIGN DATE TIME RKMFY/FORM/001 R.0 Dated 02/12/2012

RKM Q.C.
SR. No.

CERTIFY AUTHORITY

PAGE NO.:1

WORK ORDER REPORT No.: No.:RKMFY/TAxon/WO/014/2 1/001 010


CORRECTION, If Any REMARKS

Inst. ID No.

VALIDITY

COMPANY

PAGE NO.:1 OF 1

RKM
SR.No.

WELD VISUAL INSPECTION REPORT


TRUSS NO
MEMBER NO 11 11 11 11 12 12 12 12 PART NO 1 2 3 4 1 2 3 4 STAGE FABRICATION FABRICATION FABRICATION FABRICATION FABRICATION FABRICATION FABRICATION FABRICATION X NOT APPLICABLE

PROJECT: Coal Fired 4*360 MW Thermal Power Project, Uchhpinda, Chhattisgarh


WELDING PROCESS MMAW MMAW MMAW MMAW MMAW MMAW MMAW MMAW WELDER NO. Joint Type Fillet/Groove Fillet/Groove Fillet/Groove Fillet/Groove Fillet/Groove Fillet/Groove Fillet/Groove Fillet/Groove

CLIENT: RKM Power Gen Pvt. Limited


FIELD INSPECTION

T-1

QC CHECK SHEET

CHECKED

WELD VISUAL & SURFACE DEFECT CHECK REINFORCEMENT SPATTER LUMPS / HIGHSPOT SLAG POROSITY / PINHOLES CRACK BEAD APPEARANCE / WEAVING PHYSICAL COND.

UNDER CUT WELDSIZE UNDER FILL ARC STRIKE CLEAT MARK

RKM PRODUCTION
STATUS ACCEPT RECTIFY & RE-OFFER REJECT NAME SIGN DATE TIME RKMFY/FORM/001 R.0 Dated 02/12/2012

RKM Q.C.
SR. No.

CERTIFY AUTHORITY

PAGE NO.:1

WORK ORDER REPORT No.: No.:RKMFY/TAxon/WO/014/2 1/001 010


CORRECTION, If Any REMARKS

Inst. ID No.

VALIDITY

COMPANY

PAGE NO.:1 OF 1

RKM
SR.No.

WELD VISUAL INSPECTION REPORT


TRUSS NO
MEMBER NO 13 13 13 13 14 14 14 14 PART NO 1 2 3 4 1 2 3 4 STAGE FABRICATION FABRICATION FABRICATION FABRICATION FABRICATION FABRICATION FABRICATION FABRICATION X NOT APPLICABLE

PROJECT: Coal Fired 4*360 MW Thermal Power Project, Uchhpinda, Chhattisgarh


WELDING PROCESS MMAW MMAW MMAW MMAW MMAW MMAW MMAW MMAW WELDER NO.

T-1

QC CHECK SHEET

CHECKED

WELD VISUAL & SURFACE DEFECT CHECK REINFORCEMENT SPATTER LUMPS / HIGHSPOT SLAG POROSITY / PINHOLES CRACK BEAD APPEARANCE / WEAVING PHYSICAL COND.

RKM PRODUCTION
STATUS ACCEPT RECTIFY & RE-OFFER REJECT NAME SIGN DATE TIME RKMFY/FORM/001 R.0 Dated 02/12/2012

RKM Q.C.
SR. No.

oal Fired 4*360 MW er Project, Chhattisgarh


Joint Type Fillet/Groove Fillet/Groove Fillet/Groove Fillet/Groove Fillet/Groove Fillet/Groove Fillet/Groove Fillet/Groove

CLIENT: RKM Power Gen Pvt. Limited


FIELD INSPECTION

WORK ORDER REPORT No.: No.:RKMFY/TAxon/WO/014/2 1/001 010


CORRECTION, If Any REMARKS

SURFACE DEFECT CHECK MENT HSPOT PINHOLES

Inst. ID No. UNDER CUT WELDSIZE UNDER FILL ARC STRIKE CLEAT MARK

VALIDITY

CERTIFY AUTHORITY

COMPANY

PAGE NO.:1 OF 1

RKM
SR.No.

WELD VISUAL INSPECTION REPORT


TRUSS NO
MEMBER NO 15 15 15 15 16 16 16 16 PART NO 1 2 3 4 1 2 3 4 STAGE FABRICATION FABRICATION FABRICATION FABRICATION FABRICATION FABRICATION FABRICATION FABRICATION X NOT APPLICABLE

PROJECT: Coal Fired 4*360 MW Thermal Power Project, Uchhpinda, Chhattisgarh


WELDING PROCESS MMAW MMAW MMAW MMAW MMAW MMAW MMAW MMAW WELDER NO. Joint Type

CLIENT: RKM Power Gen Pvt. Limited


FIELD INSPECTION

Fillet/Groove Discontinuities Found Fillet/Groove Fillet/Groove Fillet/Groove Fillet/Groove Fillet/Groove Fillet/Groove Fillet/Groove

T-1

QC CHECK SHEET

CHECKED

WELD VISUAL & SURFACE DEFECT CHECK REINFORCEMENT SPATTER LUMPS / HIGHSPOT SLAG POROSITY / PINHOLES CRACK BEAD APPEARANCE / WEAVING PHYSICAL COND.

UNDER CUT WELDSIZE UNDER FILL ARC STRIKE CLEAT MARK

RKM PRODUCTION
STATUS ACCEPT RECTIFY & RE-OFFER REJECT NAME SIGN DATE TIME RKMFY/FORM/001 R.0 Dated 02/12/2012

RKM Q.C.
SR. No.

CERTIFY AUTHORITY

PAGE NO.:1

WORK ORDER REPORT No.: No.:RKMFY/TAxon/WO/014/2 1/001 010


CORRECTION, If Any Rectified REMARKS

Inst. ID No.

VALIDITY

COMPANY

PAGE NO.:1 OF 1

RKM
SR.No.

WELD VISUAL INSPECTION REPORT


TRUSS NO
MEMBER NO 17 17 17 17 18 18 18 18 PART NO 1 2 3 4 1 2 3 4 STAGE FABRICATION FABRICATION FABRICATION FABRICATION FABRICATION FABRICATION FABRICATION FABRICATION X NOT APPLICABLE

PROJECT: Coal Fired 4*360 MW Thermal Power Project, Uchhpinda, Chhattisgarh


WELDING PROCESS MMAW MMAW MMAW MMAW MMAW MMAW MMAW MMAW WELDER NO.

T-1

QC CHECK SHEET

CHECKED

WELD VISUAL & SURFACE DEFECT CHECK REINFORCEMENT SPATTER LUMPS / HIGHSPOT SLAG POROSITY / PINHOLES CRACK BEAD APPEARANCE / WEAVING PHYSICAL COND.

RKM PRODUCTION
STATUS ACCEPT RECTIFY & RE-OFFER REJECT NAME SIGN DATE TIME RKMFY/FORM/001 R.0 Dated 02/12/2012

RKM Q.C.
SR. No.

oal Fired 4*360 MW er Project, Chhattisgarh


Joint Type Fillet/Groove Fillet/Groove Fillet/Groove Fillet/Groove Fillet/Groove Fillet/Groove Fillet/Groove Fillet/Groove

CLIENT: RKM Power Gen Pvt. Limited


FIELD INSPECTION

WORK ORDER REPORT No.: No.:RKMFY/TAxon/WO/014/2 1/001 010


CORRECTION, If Any REMARKS

SURFACE DEFECT CHECK MENT HSPOT PINHOLES

Inst. ID No. UNDER CUT WELDSIZE UNDER FILL ARC STRIKE CLEAT MARK

VALIDITY

CERTIFY AUTHORITY

COMPANY

PAGE NO.:1 OF 1

RKM
SR.No.

WELD VISUAL INSPECTION REPORT


TRUSS NO
MEMBER NO 19 19 19 19 20 20 20 20 PART NO 1 2 3 4 1 2 3 4 STAGE FABRICATION FABRICATION FABRICATION FABRICATION FABRICATION FABRICATION FABRICATION FABRICATION X NOT APPLICABLE

PROJECT: Coal Fired 4*360 MW Thermal Power Project, Uchhpinda, Chhattisgarh


WELDING PROCESS MMAW MMAW MMAW MMAW MMAW MMAW MMAW MMAW WELDER NO.

T-1

QC CHECK SHEET

CHECKED

WELD VISUAL & SURFACE DEFECT CHECK REINFORCEMENT SPATTER LUMPS / HIGHSPOT SLAG POROSITY / PINHOLES CRACK BEAD APPEARANCE / WEAVING PHYSICAL COND.

RKM PRODUCTION
STATUS ACCEPT RECTIFY & RE-OFFER REJECT NAME SIGN DATE TIME RKMFY/FORM/001 R.0 Dated 02/12/2012

RKM Q.C.
SR. No.

oal Fired 4*360 MW er Project, Chhattisgarh


Joint Type Fillet/Groove Fillet/Groove Fillet/Groove Fillet/Groove Fillet/Groove Fillet/Groove Fillet/Groove Fillet/Groove

CLIENT: RKM Power Gen Pvt. Limited


FIELD INSPECTION

WORK ORDER REPORT No.: No.:RKMFY/TAxon/WO/014/2 1/001 010


CORRECTION, If Any REMARKS

SURFACE DEFECT CHECK MENT HSPOT PINHOLES

Inst. ID No. UNDER CUT WELDSIZE UNDER FILL ARC STRIKE CLEAT MARK

VALIDITY

CERTIFY AUTHORITY

COMPANY

PAGE NO.:1 OF 1

RKM
SR.No.

WELD VISUAL INSPECTION REPORT


TRUSS NO
MEMBER NO 21 21 21 21 22 22 22 22 PART NO 1 2 3 4 1 2 3 4 STAGE FABRICATION FABRICATION FABRICATION FABRICATION FABRICATION FABRICATION FABRICATION FABRICATION X NOT APPLICABLE

PROJECT: Coal Fired 4*360 MW Thermal Power Project, Uchhpinda, Chhattisgarh


WELDING PROCESS MMAW MMAW MMAW MMAW MMAW MMAW MMAW MMAW WELDER NO.

T-1

QC CHECK SHEET

CHECKED

WELD VISUAL & SURFACE DEFECT CHECK REINFORCEMENT SPATTER LUMPS / HIGHSPOT SLAG POROSITY / PINHOLES CRACK BEAD APPEARANCE / WEAVING PHYSICAL COND.

RKM PRODUCTION
STATUS ACCEPT RECTIFY & RE-OFFER REJECT NAME SIGN DATE TIME RKMFY/FORM/001 R.0 Dated 02/12/2012

RKM Q.C.
SR. No.

oal Fired 4*360 MW er Project, Chhattisgarh


Joint Type Fillet/Groove Fillet/Groove Fillet/Groove Fillet/Groove Fillet/Groove Fillet/Groove Fillet/Groove Fillet/Groove

CLIENT: RKM Power Gen Pvt. Limited


FIELD INSPECTION

WORK ORDER REPORT No.: No.:RKMFY/TAxon/WO/014/2 1/001 010


CORRECTION, If Any REMARKS

SURFACE DEFECT CHECK MENT HSPOT PINHOLES

Inst. ID No. UNDER CUT WELDSIZE UNDER FILL ARC STRIKE CLEAT MARK

VALIDITY

CERTIFY AUTHORITY

COMPANY

PAGE NO.:1 OF 1

RKM
SR.No.

WELD VISUAL INSPECTION REPORT


TRUSS NO
MEMBER NO 23 23 23 23 24 24 24 24 PART NO 1 2 3 4 1 2 3 4 STAGE FABRICATION FABRICATION FABRICATION FABRICATION FABRICATION FABRICATION FABRICATION FABRICATION X NOT APPLICABLE

PROJECT: Coal Fired 4*360 MW Thermal Power Project, Uchhpinda, Chhattisgarh


WELDING PROCESS MMAW MMAW MMAW MMAW MMAW MMAW MMAW MMAW WELDER NO.

T-1

QC CHECK SHEET

CHECKED

WELD VISUAL & SURFACE DEFECT CHECK REINFORCEMENT SPATTER LUMPS / HIGHSPOT SLAG POROSITY / PINHOLES CRACK BEAD APPEARANCE / WEAVING PHYSICAL COND.

RKM PRODUCTION
STATUS ACCEPT RECTIFY & RE-OFFER REJECT NAME SIGN DATE TIME RKMFY/FORM/001 R.0 Dated 02/12/2012

RKM Q.C.
SR. No.

oal Fired 4*360 MW er Project, Chhattisgarh


Joint Type Fillet/Groove Fillet/Groove Fillet/Groove Fillet/Groove Fillet/Groove Fillet/Groove Fillet/Groove Fillet/Groove

CLIENT: RKM Power Gen Pvt. Limited


FIELD INSPECTION

WORK ORDER REPORT No.: No.:RKMFY/TAxon/WO/014/2 1/001 010


CORRECTION, If Any REMARKS

SURFACE DEFECT CHECK MENT HSPOT PINHOLES

INST. USED Inst. ID No. UNDER CUT WELDSIZE UNDER FILL ARC STRIKE CLEAT MARK

VALIDITY

CERTIFY AUTHORITY

COMPANY

PAGE NO.:1 OF 1

RKM
SR.No.

WELD VISUAL INSPECTION REPORT


TRUSS NO
MEMBER NO PART NO STAGE FABRICATION FABRICATION FABRICATION FABRICATION FABRICATION FABRICATION FABRICATION FABRICATION

PROJECT: Coal Fired 4*360 MW Thermal Power Project, Uchhpinda, Chhattisgarh


WELDING WELDER NO. PROCESS MMAW MMAW MMAW MMAW MMAW MMAW MMAW MMAW Joint Type Fillet/Groove Fillet/Groove Fillet/Groove Fillet/Groove Fillet/Groove Fillet/Groove Fillet/Groove Fillet/Groove

CLIENT: RKM Power Gen Pvt. Limited


FIELD INSPECTION

T-1

QC CHECK SHEET

CHECKED

NOT APPLICABLE WELD VISUAL & SURFACE DEFECT CHECK REINFORCEMENT SPATTER LUMPS / HIGHSPOT SLAG POROSITY / PINHOLES CRACK BEAD APPEARANCE / WEAVING PHYSICAL COND. UNDER CUT WELDSIZE UNDER FILL ARC STRIKE CLEAT MARK

RKM PRODUCTION
STATUS ACCEPT RECTIFY & RE-OFFER REJECT NAME SIGN DATE TIME RKMFY/FORM/001 R.0 Dated 02/12/2012

RKM Q.C.
SR. No.

CERTIFY AUTHORITY

PAGE NO.:1 O

WORK ORDER REPORT No.: No.:RKMFY/TAxon/WO/014/2 1/001 010


CORRECTION, If Any REMARKS

Inst. ID No.

VALIDITY

COMPANY

PAGE NO.:1 OF 1

RKM
SR.No.

WELD VISUAL INSPECTION


TRUSS NO
MEMBER NO PART NO STAGE FABRICAT ION FABRICAT ION FABRICAT ION FABRICAT ION FABRICAT ION FABRICAT ION FABRICAT ION FABRICAT ION

PROJECT: Coal Fired 4*360 MW Thermal Power Project, Uchhpinda, Chhattisgarh WELDING
PROCESS MMAW MMAW MMAW MMAW MMAW MMAW MMAW MMAW

WELDER NO.Joint Type

CLIENT : RKM Power Gen

FIELD INSPECTION

WORK ORDER No.: Axon/WO/014/20 10

Fillet/Groove Fillet/Groove Fillet/Groove Fillet/Groove Fillet/Groove Fillet/Groove Fillet/Groove Fillet/Groove

T-1

QC CHECK SHEET

CHECKED

NOT APPLICABLE WELD VISUAL & SURFACE DEFECT CHECK INST. USED

REINFORCEMENT SPATTER LUMPS / HIGHSPOT SLAG POROSITY / PINHOLES CRACK BEAD APPEARANCE / WEAVING PHYSICAL COND.

UNDER CUT WELDSIZE UNDER FILL ARC STRIKE CLEAT MARK

RKM PRODUCTION
STATUS ACCEPT RECTIFY & REOFFER REJECT NAME SIGN DATE TIME RKMFY/FORM/001 R.0 Dated 02/12/2012

RKM Q.C.
SR. No.

CERTIFY AUTHORITY

COMPANY

PAGE N

WORK ORDER No.: Axon/WO/014/20 10 CORRECTI


ON, If Any

REPOR T No.:RK MFY/T-

REMARKS

Inst. ID No. VALIDITY

COMPANY

PAGE NO.:1 OF 1

RKM
SR.No.

WELD VISUAL INSPECTION


TRUSS NO
MEMBER NO PART NO STAGE FABRICAT ION FABRICAT ION FABRICAT ION FABRICAT ION FABRICAT ION FABRICAT ION FABRICAT ION FABRICAT ION

PROJECT: Coal Fired 4*360 MW Thermal Power Project, Uchhpinda, Chhattisgarh WELDING
PROCESS MMAW MMAW MMAW MMAW MMAW MMAW MMAW MMAW

WELDER NO.Joint Type

CLIENT : RKM Power Gen

FIELD INSPECTION

WORK ORDER No.: Axon/WO/014/20 10

Fillet/Groove Fillet/Groove Fillet/Groove Fillet/Groove Fillet/Groove Fillet/Groove Fillet/Groove Fillet/Groove

T-1

QC CHECK SHEET

CHECKED

NOT APPLICABLE WELD VISUAL & SURFACE DEFECT CHECK INST. USED

REINFORCEMENT SPATTER LUMPS / HIGHSPOT SLAG POROSITY / PINHOLES CRACK BEAD APPEARANCE / WEAVING PHYSICAL COND.

UNDER CUT WELDSIZE UNDER FILL ARC STRIKE CLEAT MARK

RKM PRODUCTION
STATUS ACCEPT RECTIFY & REOFFER REJECT NAME SIGN DATE TIME RKMFY/FORM/001 R.0 Dated 02/12/2012

RKM Q.C.
SR. No.

CERTIFY AUTHORITY

COMPANY

PAGE N

WORK ORDER No.: Axon/WO/014/20 10 CORRECTI


ON, If Any

REPOR T No.:RK MFY/T-

REMARKS

Inst. ID No. VALIDITY

COMPANY

PAGE NO.:1 OF 1

RKM
SR.No.

WELD VISUAL INSPECTION


TRUSS NO
MEMBER NO PART NO STAGE FABRICAT ION FABRICAT ION FABRICAT ION FABRICAT ION FABRICAT ION FABRICAT ION FABRICAT ION FABRICAT ION

PROJECT: Coal Fired 4*360 MW Thermal Power Project, Uchhpinda, Chhattisgarh WELDING
PROCESS MMAW MMAW MMAW MMAW MMAW MMAW MMAW MMAW

WELDER NO.Joint Type

CLIENT : RKM Power Gen

FIELD INSPECTION

WORK ORDER No.: Axon/WO/014/20 10

Fillet/Groove Fillet/Groove Fillet/Groove Fillet/Groove Fillet/Groove Fillet/Groove Fillet/Groove Fillet/Groove

T-1

QC CHECK SHEET

CHECKED

NOT APPLICABLE WELD VISUAL & SURFACE DEFECT CHECK INST. USED

REINFORCEMENT SPATTER LUMPS / HIGHSPOT SLAG POROSITY / PINHOLES CRACK BEAD APPEARANCE / WEAVING PHYSICAL COND.

UNDER CUT WELDSIZE UNDER FILL ARC STRIKE CLEAT MARK

RKM PRODUCTION
STATUS ACCEPT RECTIFY & REOFFER REJECT NAME SIGN DATE TIME RKMFY/FORM/001 R.0 Dated 02/12/2012

RKM Q.C.
SR. No.

CERTIFY AUTHORITY

COMPANY

PAGE N

WORK ORDER No.: Axon/WO/014/20 10 CORRECTI


ON, If Any

REPOR T No.:RK MFY/T-

REMARKS

Inst. ID No. VALIDITY

COMPANY

PAGE NO.:1 OF 1

RKM
SR.No.

WELD VISUAL INSPECTION


TRUSS NO
MEMBER NO PART NO STAGE FABRICAT ION FABRICAT ION FABRICAT ION FABRICAT ION FABRICAT ION FABRICAT ION FABRICAT ION FABRICAT ION

PROJECT: Coal Fired 4*360 MW Thermal Power Project, Uchhpinda, Chhattisgarh WELDING
PROCESS MMAW MMAW MMAW MMAW MMAW MMAW MMAW MMAW

WELDER NO.Joint Type

CLIENT : RKM Power Gen

FIELD INSPECTION

WORK ORDER No.: Axon/WO/014/20 10

Fillet/Groove Fillet/Groove Fillet/Groove Fillet/Groove Fillet/Groove Fillet/Groove Fillet/Groove Fillet/Groove

T-1

QC CHECK SHEET

CHECKED

NOT APPLICABLE WELD VISUAL & SURFACE DEFECT CHECK INST. USED

REINFORCEMENT SPATTER LUMPS / HIGHSPOT SLAG POROSITY / PINHOLES CRACK BEAD APPEARANCE / WEAVING PHYSICAL COND.

UNDER CUT WELDSIZE UNDER FILL ARC STRIKE CLEAT MARK

RKM PRODUCTION
STATUS ACCEPT RECTIFY & REOFFER REJECT NAME SIGN DATE TIME RKMFY/FORM/001 R.0 Dated 02/12/2012

RKM Q.C.
SR. No.

CERTIFY AUTHORITY

COMPANY

PAGE N

WORK ORDER No.: Axon/WO/014/20 10 CORRECTI


ON, If Any

REPOR T No.:RK MFY/T-

REMARKS

Inst. ID No. VALIDITY

COMPANY

PAGE NO.:1 OF 1