Schlumberger

Wireline & Testing

MPBT Operation planning dummy-1


I. Well data
Plug required set depth (top) Perforated interval to isolate Required differential pressure Fluid density / Type Casing: OD" , # lb/ft, ID" Deviation data ft ft psi g/cc 7" 9878

by

BTC

1-Jan-00

Next interval 6,000 1.00 water & oil #29 ft D ft D 11000 282 200 4,969 TBNG data: OD " min ID "
ft Vertical ft Vertical

11390-11452

6.184

1.80 0.0

o 1. ang o 2. ang true vertical depth T.v.ft BHT = Bottom hole temp. F Well head pressure psi Total bottom hole press (est.) psi Casing & Downhole conditions

0.0 <---calc.value <<----- Time to BHT (min) Targe time max.

82.4 112.4

Is casing clean (or cleaning job before) ? Dump on oil or condensate?

Cement strength Reduced !

II. Additional parameters


Plug type to be used Cement type to be used Required cement length CSG cross section area Required cement volume metric MPBT: H-405500 5.88/6.12 2-1/8" P.Diff=1500 & 340F Bond strength = 16.67 HPI: Standard: 100-300F (38-150C) ft 45.7 46.380 <<-Calc.form. 1 ft pulg 30.035 1728 pulg pulg 16471 6.23 gal (metric) gal 59.384 28.316 lts lts 269.907 HPI: Standard: 100-300F (38-150C) lb/gal 1.91 1.91 g/cc Formula range F gal 27.271 lts 6 pulg 2 1/8 Qty : 1 ft/gal 7.46 ft 7.94 gal 1.064 4.836 lts <--- can increase length !!! gal 1.064 <<-- min (bailers , mixed) ft 0.819 9.826 pulg 2 55.81 <<-minimun reco. runs ft 1.64 <== Minimum recommended length is 10 ft !!! 7":

III. Cement preparation :


cement density theoretical mixed volume / kit Dump bailers : nominal OD capacity length tool volume cement volume / run CSG length / run proposed # of runs Expected cement length

= >>> Final Diff.Pres.Design: = >>> Expected top plug >>>


Notes

212 9876.4

psi ft

Long CCL+Tool (ft) = 18.96 CCL - Bot. Tool (ft) = 18.14

Quick formulas (aprox.) Nbailers= (Long.Req) CSID / (ToolID.LongTool) Long.Trrun = ToolLength.Tid / CSID Vol.Tool(lts) = ToolLength.Tid x 0.5 Vol.cement(lts) = CSG Length . CSID x0.5

MinPlugLength = DeltaP.CSID /(48*Strength) Strength = 30% Gas or Oil case Bailer length = 8 ft = 96" = 2.42m
ver 3.1, byJCY. Data sheets from: Aug/97

156467707.xls.ms_office

Pgina 1

Schlumberger

Wireline & Testing

Sombrilla HPI planeamiento de operacion


I.Datos de sombrilla Tipo de sombrilla Dimension A Dimension B (dist.vent tube) Dimension C Apertura maxima sombrilla Diametro eje sombrilla 7": m m m pulg pulg

8-Jul-13

MPBT: H-345099 5.88/6.25 1-11/16" P.Diff=500 & 300F 3.96 pulg = 155.9 1.70 pulg = 66.9 considerar volumen bolitas 0.65 pulg = 25.6 3.500 <=== CSID IS OUT OF RANGE FOR PLUG SIZE ! ! ! 1.375 1 3/8 Diagrama herramienta

II.Cemento requerido: 1era Corrida Tipo de TR Diametro interno TR Capacidad bailers Secc. transversal TR - eje Vol. cemento requerido pulg ft/gal pulg pulg ft gal lts pulg m 7" #32 6.094 11.710 27.682 1853 1.072 6.680 30.360 938.64

Vent Ports

Long. Bailers maxima equivalente a .

23.84
1 11/16

9.9 bailers de:

B A

Presion diff. maxima luego de fraguado

2196

psi

Desarrollo de Operaciones (para usar en el pozo)


distancia CCL-Fondo: _________ m Up/Down D = ______ m

Stop @

| Cima Teorica | | | | | | | | | | | Tope retenedor: _________

Tiempos RIH Dump 11 10 9 8 7 6 5 4 3 2 1


PLUG

Packer system

WHP Anclaje = Long TR/bailers =

1 psi .81 mts 15.4 lts _______ psi _______ lbs

Volumen = D P / 1,000 mts =


Tens @dump =

BHT= _______C

156467707.xls.ms_office

Pgina 2

Schlumberger

Wireline & Testing

Common casing used

nom.ID 4 #13.5 5" #18 5" #21.4 5 #17.7 5 #23 7" #23 7" #29 7" #32 7" #35 7-5/8" #29.7 7-5/8" #39 9-5/8" #47 9-5/8" #53.5 Legend
modificable

3.920 4.276 4.126 4.300 4.670 6.366 6.184 6.094 6.004 6.875 6.625 8.681 8.535

Strength 2 <<--Dureza max.volume H-432144 SLB: Standard: 77-286F (25-141C) AF 65.4 4.48 SLB: Standard: 77-286F (25-141C) AG 57 5.1 H-432145 SLB: HI-Temp: 260-360F (127-182C) AG 60 4.5 HPI: Standard: 100-300F (38-150C) 50 6 HPI: HI-Temp: 300-400F (150-204C) 50 6 extra extra

Cement type

NOTA: La dureza del tapon varia con la revision


del cemento SPT (Dowell) Standard: AD=46, AE=46, AF=65.4 Hi-Temp: AD=60, AE=46, AF=56 Para HPI, la densidad final DEBE estar entre 15.8-16.0 ppg (1.89 - 1.91 g/cc) REVISAR HOJA TECNICA DE CUBETA

Bailers size 2
1 11/16 2 1/8

Retainers / Plugs type Capacity


11.71 7.46 5": 7": 7": 7": 7": 7":

9
4-1/2": MPBT: H-345225 3.50/4.02 1-11/16" P.Diff=1000 & 340F MPBT: H-345226 4.00-4.52 1-11/16" P.Diff=1000 & 340F MPBT: H-345099 5.88/6.25 1-11/16" P.Diff=500 & 300F MPBT: H-345100 6.25/6.62 1-11/16" P.Diff=500 & 300F MPBT: H-405500 5.88/6.12 2-1/8" P.Diff=1500 & 340F MPBT: H-405501 6.12/6.33 2-1/8" MPBT: H-405502 6.33/6.53 2-1/8" P.Diff=1500 & 340F P.Diff=1500 & 340F P.Diff=1000 & 275F P.Diff=500 & 340F (CA !)

Bailers

ft/Metri gal

5-1/2": MPBT: H-345042 4.50/5.02 1-11/16" P.Diff=1000 & 300F

7-5/8": MPBT: H-405320 6.50/7.02 2-1/8" 9-5/8": MPBT: H-345700 8.43/9.01 2-5/8" Sombrilla HIP 1080-350 Sombrilla HIP 1080-400 Sombrilla HIP 1080-450 Sombrilla HIP 1080-500 Sombrilla HIP 1080-550 Sombrilla HIP 1080-700 f/ 3-1/2" f/ 4" f/ 4-1/2" f/ 5" f/ 5-1/2" f/7"

extra Updated 13'apr'98

Schlumberger

Wireline & Testing

156467707.xls.ms_office

Pgina 3

Vent Ports

B A

Packer system

156467707.xls.ms_office

Pgina 4

max.volume

156467707.xls.ms_office

Pgina 5

Schlumberger

Wireline & Testing

Nahuatl, 12 de Setiembre de 1997

PROGRAMA PROPUESTO DE TAPON DE CEMENTO


I. OBJETIVO:

Badri D-4

Aislar el intervalo disparado: 5360-5390 utilizando un tapon de cemento MPBT con corridas de cemento TBT (bailers). El diseo del tapon se basa en que debe ser capaz de soportar una presion diferencial de 2,115 psi. La cima teorica del tapon es de: 5045.4 mts, y el tiempo estimado total de duracion de la operacion es 72 horas, con 2 bajadas de cemento II.DATOS DEL POZO Dimensiones de TR 7" #32 ID nominal: Temperatura de fondo 140 DegC Presion en cabeza 1 psi. (con agua dulce) Desviacion promedio 0 grados Tipo de fluido agua de perforacion Presion diferencial requerida 6,000 psia

6.094 pulgs

Para las condiciones del pozo dadas, utilizando cemento HPI: Standard: 100-300F (38-150C) la longitud minima requerida del tapon es: 4.64 mts III.PREPARACION DEL POZO Para un buen anclaje del retenedor de cemeno MPBT y una buena adherencia del cemento, se recomienda tener las siguientes condiciones en el pozo: TR limpia de asfaltenos y/o limpia de aceite Pozo con seno de agua dulce Presion del pozo estailizada (pozo controlado) EL agua dulce es recomendada para evitar fraguado prematuro del cemento y optimizar la adherencia del mismo a las paredes de la tuberia, sin embargo, el cemento propuesto puede ser utilizado en agua hasta de 50,000 ppm. IV. DATOS DE LA HERRAMIENTA 1. Herramienta MPBT Diametro exterior 1-11/16" lontigud 6.25 + 1.02 = 7.27 m Diametro retenedor POSISET V. PROGRAMA OPERATIVO PROPUESTO Operacion Armado equipo de presion de 10k y prueba del mismo Calibracion 2-1/8" tomando temperatura Bajada y Anclaje retenedor MPBT 10 lechadas de cemento, de 1.05 m c/u ( 4 hrs c/u ) Fraguado cemento Verificacion cima tapon Desarmado equipo de presion Tiempo total

2. TBT (Bailers cemento) diametro exterior longitud aprox. de bailers (m) 2 1/8

1 11/16 12.10

Tiempo estimado (hrs)

4 40 24 4

72 Juan Carlos Yepez Ing. Schlumberger