PROJECT : Site Lebong

Civil Construction
No

Description

PIC

1 Base Concrete Concentrator Plant


1.1 Pekerjaan gravel urug dipadatkan di bawah pondasi
1.2 Pekerjaan lean concrete t = 5 cm bawah pondasi

Local Civil Contractor

1.3 Pekerjaan pengecoran pondasi K 300


1.4 Pekerjaan Wiremesh 8 mm (16 lembar - 2.1 m x 5.4 m)

SUB TOTAL
2 Pagar Pengaman Concentrator Planty ( 30 m x 25 m x 1.5 m )

Local Civil Contractor

2.1 Instalasi Pagar Pengaman Heap Leach Recovery (Harmonica Fencing)

SUB TOTAL
3 Heavy Equipment to support gravel compaction
1.1 Grader
1.2 Compactor

Local Heavy Equipment


Contractor

SUB TOTAL
TOTAL

SATUAN

VOLUME

HARGA SATUAN
Upah

Material

JUMLAH
Total

TOTAL

m3

75.00

150,000

150,000

11,250,000

m3

8.20

200,000

700,000

900,000

7,380,000

m3

41.00

600,000

2,000,000

2,600,000

106,600,000

Kg

869.0

6,000

12,000

18,000

SUB TOTAL

15,641,280
140,871,280

m2

165

30,000

90,000

120,000

SUB TOTAL

19,800,000
19,800,000

jam

50.00

275,000

247,500

522,500

26,125,000

jam

50.00

150,000

110,000

260,000

13,000,000

SUB TOTAL

39,125,000

TOTAL

199,796,280