Sei sulla pagina 1di 7

VALORIZACION FINAL DE OBRA

CONVENIO

PROYECTO

CORRESPONDIENTE AL MES DE

FEBRERO

FECHA DE PRESENTACION

03 DE MARZO

AGUA POTABLE NUEVA JERUSALEN


MONTO FINANCIADO
FECHA DE INICIO DE OBRA
PLAZO DE EJECUCION
FECHA DE TERMINO PREVISTA
PRESUPUESTO

DESCRIPCION

PARTIDA

Und.

Metrado

Unitario

Parcial

S/.

S/.

ANTERIOR
Metrado

Parcial

AVANCES
ACTUAL
Metrado

:
:
:
:

ACUMULADO

Parcial

Metrado

Parcial

09.00

PILETAS PUBLICAS (O8 UNIDADES)

09.01

TRAZO Y REPLANTEO PRELIMINAR

M2

15.12

0.83

12.55

0.00

0.00

15.12

12.55

15.12

12.55

100.00

09.02

EXCAVACIONES MASIVAS

M3

2.40

3.50

8.40

0.00

0.00

0.60

2.10

0.60

2.10

25.00

09.03

ENCOFRADO Y DESENCOFRADO

M2

21.12

17.87

377.41

0.00

0.00

5.28

94.35

5.28

94.35

25.00

09.04

CONCRETO F'c = 140 Kg/cm2 S/ MEZCLAD.

M3

3.52

226.47

797.17

0.00

0.00

0.88

199.29

0.88

199.29

25.00

09.05

ACERO F' y = 4200 Kg/cm2

KG

19.84

1.89

37.50

0.00

0.00

4.96

9.37

4.96

9.37

25.00

09.06

TARRAJEO MORTERO 1:2, E=1.5 CM

M2

19.04

6.72

127.95

0.00

0.00

0.00

0.00

0.00

0.00

0.00

09.07

TUBERIA PVC SAP CLASE 10, 1/2"

M2

24.00

1.86

44.64

0.00

0.00

6.00

11.16

6.00

11.16

25.00

09.08

TUBERIA PVC SAL 2"-ACCESORIOS-ACCESORIOS

PTO.

12.00

20.64

247.68

0.00

0.00

3.00

61.92

3.00

61.92

25.00

09.09

VALVULA DE BRONCE 1/2" -PILETAS PUBLICAS

UN

8.00

70.97

567.76

0.00

0.00

2.00

141.94

2.00

141.94

25.00

09.10

FILTRO DE GRAVA

M3

8.00

63.55

508.40

0.00

0.00

2.00

127.10

2.00

127.10

25.00

10.00

PASES AEREOS 02*8M., 01*15M., Y 01*30M.)

10.01

TRAZO, NIVELACION Y REPLANTEO DE ZANJAS/ML

ML

61.00

0.94

57.34

0.00

0.00

61.00

57.34

61.00

57.34

100.00

10.02

EXCAVACIONES MASIVAS MANUAL

M3

2.32

3.50

8.12

0.00

0.00

0.00

0.00

0.00

0.00

0.00

10.03

ENCOFRADO Y DESENCOFRADO

M2

4.16

17.87

74.34

0.00

0.00

0.00

0.00

0.00

0.00

0.00

10.04

CONCRETO F'c = 140 Kg/cm2 S/ MEZCLAD.

M3

3.02

226.47

683.94

0.00

0.00

0.00

0.00

0.00

0.00

0.00

10.05

ACERO F' y = 4200 Kg/cm2

KG

24.50

1.89

46.31

0.00

0.00

0.00

0.00

0.00

0.00

0.00

10.06

ACCESORIOS -PARTIDA ESTIMADA

UN

2.00

200.00

400.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

TOTAL PRESUPUESTO 01

**.** 02
01.01.

S/.

01.01.

MODULO DE CAPACITACION EN AGUA POTABLE

MOD

1.00

274.16

274.16

S/.

274.16

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

APORTE COMUNAL
EXCAVACIN MANUAL DE ZANJAS/ML, H=0.80m

ML

2346.74

TOTAL PRESUPUESTO 03

**.** 04

24126.61

MODILO DE CAPACITACION
TOTAL PRESUPUESTO 02

**.** 03

83516.93

1.25
S/.

2933.43

0.00

0.00

2346.74

2,933.43

2346.74

2933.43

2,933.43

100.00

2933.43

FLETES

01.01.

FLETE TERRESTRE

GLB

1.00

3775.63

3775.63

0.00

0.00

0.92

3,473.58

0.92

3,473.58

92.00

00.01

FLETE EN ZONA RURAL (NO AFECTO A IGV)

GLB

1.00

622.40

622.40

0.00

0.00

0.00

0.00

0.00

0.00

0.00

TOTAL PRESUPUESTO 04

S/.

4398.03

3473.58

DE 2011
DE 2011

03 DE MARZO

104,372.00
02/02/00
3.5 MESES
17/06/11

SALDO
Metrado

Parcial

0.00

0.00

0.00

1.80

6.30

75.00

15.84

283.06

75.00

2.64

597.88

75.00

14.88

28.12

75.00

19.04

127.95

100.00

18.00

33.48

75.00

9.00

185.76

75.00

6.00

425.82

75.00

6.00

381.30

75.00

0.00

0.00

0.00

2.32

8.12

100.00

4.16

74.34

100.00

3.02

683.94

100.00

24.50

46.31

100.00

2.00

400.00

100.00

1.00

274.16

100.00

0.00

0.01

0.00

0.08

302.05

8.00

1.00

622.40

100.00

1.2

0.8

0.6

0.4

0.2

0
1

1.2

0.8

0.6

0.4

0.2

0
1

1.2

0.8

0.6

0.4

0.2

0
1

Potrebbero piacerti anche