Sei sulla pagina 1di 3

Name: ______________________

Group: _________

Date: _________________

Rubric for Class Act


Criteria
Contents: All the parts (student name, date,
group, hour, theme, word of the day
[meaning, translation, sentence], absents)
must be completed correctly
Appearance: Students uniform must be worn
correctly; shirts tucked in and skirts must be
knee length.
Neatness: Paper should not be dirty, torn,
wrinkled at all
Pronunciation: Student must be understood
and speaking, words pronounced correctly.
Grammar: Words must be spelled correctly,
correct use of verbs, punctuation, and
sentence order.

Points Points obtained


10

4
3
4
4

Observations:
_____________________________________________________
_____________________________________________________
_____________________________________________________
_____________________________________________________
_____________________________________________________
_____________________________________________________
______

Class Act
Name: My name is _____________________________________________.
Date: Today is ________________________________________________.
Hour: It is ____________________________________________________.
Theme: Yesterday, the theme was _________________________________.
Word of the day: Yesterdays word of the day was ____________________.
Meaning:
_____________________________________________________________
_____________________________________________________________
Sentence:
_____________________________________________________________
_____________________________________________________________
Absents:
_____________________________________________________________
_____________________________________________________________

Rubric for Word of the day Project

Criteria
Contents: All the words must be included
with its meaning, translation in Spanish,
synonym, antonym, and sentence.
Neatness: Paper should not be dirty, torn or
wrinkled.
Grammar: Words must be spelled correctly,
correct use of verbs, punctuation, and
sentence order.
Punctuality: Hands in project in the date
assigned
Total:

Points Points obtained


75
5
10
10
100

Observations:
_____________________________________________________
_____________________________________________________
_____________________________________________________
_____________________________________________________
_____________________________________________________
_____________________________________________________
______

Potrebbero piacerti anche