Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
, LTD
OLEFINS RECOVERY UNIT OLEFINS CONVERSION UNIT
PROJECT : MOC CRACKER PROJECT LOCATION : MAP TA PHUT, THAILAND
1 0
J.M.Bae J.M.Bae
K.K.Park K.K.Park
Y.K.Kim Y.K.Kim
Lucas Lucas
REV
DATE
DESCRIPTION
MADE BY
CHECKED BY
APP. BY
PM
DOCUMENT NO.
00SE1100-ME101
SAMSUNG JOB NO : SC-2125 ( 68 PAGES INCL. COVER SHEET)
JOB No.
: SC2125
Page 1 of 1
No
MOC's Comment
SECL's Standard B2.102.0, B2.306.2, B2.307.1, B2.402.0, A7.104, A7.107 and A7.112 have been added. SECL's Standard B2.305.0 has been replaced with B2.305.2 MOC's Standard VS-1-2, VS-7-0, VS-8-1, VS-9-0, VS-11-2, VS-12-2, VS-20-1, VS-35-0 and VS-36-1 have been updated.
No
MOC's Comment
JOB No.
: SC2125
Page 1 of 12
JOB No.
: SC2125
Page 2 of 12
JOB No.
: SC2125
Page 3 of 12
JOB No.
: SC2125
Page 4 of 12
JOB No.
: SC2125
Page 5 of 12
JOB No.
: SC2125
Page 6 of 12
JOB No.
: SC2125
Page 7 of 12
JOB No.
: SC2125
Page 8 of 12
JOB No.
: SC2125
Page 9 of 12
JOB No.
: SC2125
Page 10 of 12
JOB No.
: SC2125
Page 11 of 12
JOB No.
: SC2125
Page 12 of 12
CONT :
ANNEX C
REV.0
1 MAY 04
PAGE 1 OF 53
TITLE
PAGE
4 5 6 9 10 11 12 13 14 15 16 17 18 19 20 21 22 24 26 27 28
GENERAL NOTES FOR MISCELLANEOUS PARTS GENERAL NOTES FOR NOZZLE EARTH LUG INTERNAL LADDER RUNG
29 30 31 32
CONT :
ANNEX C
REV.0
1 MAY 04
PAGE 2 OF 53
TITLE
PAGE
33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51
1
GENERAL NOTE FOR GASKET NOZZLE LENGTH (FOR REFERENCE) GENERAL NOTE FOR HEAT EXCHANGER PERFORATED BAFFLE FOR X-TYPE EXCHANGER LADDER AND HANDRAIL FOR TANK
52 50 51 52 53
CONT :
ANNEX C
REV.0
1 MAY 04
PAGE 3 OF 53
HEAT PROOF
SECL
1/4 NPT
65
SPT
1
OR EXT. ATTACHMENT
OR EXT. ATTACHMENT
SPT
SPT
SPT
SPT
1
1 SPT
SPT SPT 1
310
310
65
75
75
85
310
340
65
75
75
85
320
320
330
100
100 130
110
120
410
510 610
90
100
100
120
150
150
130
330
140
160
700
140
160
330
360
150
170
170
190
420
180
205
160 1
1
INSIDE RING
CONTINUOUS RING