Sei sulla pagina 1di 11

PRODUCTIVITY RATES FOR ALL PROJECT WORKS: (Rev 0, May 2000)

Item No.

CREW SIZE

Hourly Production Rate

Production Per 10 hrs. SM

FW FW01 FW02 FW03 FW04 FW05 FW06 FW07 FW08 FW09 FW10 FW11 FW12 FW13 FW14 FW15 FW16 FW17 FW18 FW19 FW20 FW21 FW22 FW23 FW24

FORMWORK Formwork to footings Formwork to isolated footings Formwork to rafts Formwork to rafts D>0.75m Formwork to tie beams Formwork to high level tie beams D>0.45M Formwork to Neck Columns Formwork to U/G Water tank Formwork to basement retaining walls Formwork to columns (small size) Formwork to Columns (large size) Formwork to D/S beam internal (shallow) Formwork to D/S beam external (Deep) Formwork to D/S beam external (Shallow) Formwork to D/S beam external (Deep) Formwork to lift walls single core Formwork to lift walls multi core Formwork to slab decking (10ft) hourdi Formwork to slab decking (>10ft) hourdi D/S beams Formwork to slab decking (>10ft) hourdi Formwork to slab decking (>10ft) hourdi Formwork to staircase (non spiral) Formwork to balcony parapets Formwork to roof parapets 2 CARPENTERS, 1 HELPER 2 CARPENTERS, 1 HELPER 2 CARPENTERS, 1 HELPER 2 CARPENTERS, 1 HELPER 2 CARPENTERS, 1 HELPER 2 CARPENTERS, 1 HELPER 2 CARPENTERS, 1 HELPER 2 CARPENTERS, 1 HELPER 2 CARPENTERS, 1 HELPER 2 CARPENTERS, 1 HELPER 2 CARPENTERS, 1 HELPER 2 CARPENTERS, 1 HELPER 2 CARPENTERS, 1 HELPER 2 CARPENTERS, 1 HELPER 2 CARPENTERS, 1 HELPER 2 CARPENTERS, 1 HELPER 2 CARPENTERS, 1 HELPER 2 CARPENTERS, 1 HELPER 2 CARPENTERS, 1 HELPER 2 CARPENTERS, 1 HELPER 2 CARPENTERS, 1 HELPER 2 CARPENTERS, 1 HELPER 2 CARPENTERS, 1 HELPER 2 CARPENTERS, 1 HELPER Page 1 of 7 1.6 1.2 1.2 1 1.2 1.6 1.4 1.8 1 1.2 12 16 14 18 10 12 4 6 9 7 9 6 7 4 6 6 8 16 12 12 10 4 6 8

D = DEPTH U. GR. = UNDERGROUND D/S = DECK - SLAB > = GREATER THAN < = LESS THAN

PRODUCTIVITY RATES FOR ALL PROJECT WORKS: (Rev 0, May 2000)


Item No. FW 25 FW 26 FW 27 FW 28 FW 29 FW 30 FW 31 FW 32 FW 33 FW 34 FW 35 FW 36 FW 37 FW 38 FW 39 FW 40 FW 41 FW 42 FW 43 FW 44 FW 45 FW 46 FW 47 FW 48 FW 49 FW 50 FW 51 FW 53 FW 54 FW 55 FW 56 FW 57 FW 58 FW 59 FW 60 FW 61 FW 62 FW 63 FW 64 shutter Manufacture for pile caps shutter Fix for pile caps Deshutter footings/pile caps Shutter make column necks Shutter fix column necks Deshutter Column necks Shutter make tie beams shutter fix tie beams Column shutter making Column shutter fixing Column deshuttering Walls shutter making Walls shutter fixing De shutter Tie beam shutter Wall formwork deshuttering Staircase formwork making staircase formwork fixing Staircase formwork deshuttering Drop beams formwork making Drop beams formwork fixing Drop beams formwork stipping suspended slab formwork fixing suspended slab formwork deshutter Formwork fixing for sunshades Parapet formwork making Parapets formwork fixing Parapets formwork stripping Fixing of lintle formwork Deshutter lintle formwork Deck formwork fixing Deck Formwork deshuttering Pipe scaffolding erection for slab inverted beam shutter fixing De-Shuttering Manholes, square - circular (Timber) Manhole Shutter erection - square or circular(Timber) Metal Shutter for Manholes Metal Shutter for Precast Beams Metal Shutter for Pile caps Metal Shutters for Pile cap Beams CREW SIZE 1 CARPENTER + 1 HELPER I CARPENTER + 1 HELPER 1 HELPER 1 CARPENTER + 1 HELPER 1 CARPENTER + 1 HELPER 1 HELPER 1 CARPENTER + 1 HELPER 1 CARPENTER + 1 HELPER 1 CARPENTER + 1 HELPER 1 CARPENTER + 1 HELPER 1 HELPER 1 CARPENTER + 1 HELPER 1 CARPENTER + 1 HELPER 1 HELPER 1 HELPER 1 CARPENTER + 1 HELPER 1 CARPENTER + 1 HELPER 1 HELPER 1 CARPENTER + 1 HELPER 1 CARPENTER + 1 HELPER 1 HELPER 1 CARPENTER + 1 HELPER 1 HELPER 1 CARPENTER + 1 HELPER 1 CARPENTER + 1 HELPER 1 CARPENTER + 1 HELPER 1 HELPER 1 CARPENTER + 1 HELPER 1 HELPER 1 CARPENTER + 1 HELPER 1 HELPER 1 SCAFFOLDER 1 CARPENTER + 1 HELPER 1 CARPENTER + 1 HELPER 1 CARPENTER + 1 HELPER 1 CARPENTER + 1 HELPER 2 CARPENTERS + 2 HELPERS 2 CARPENTERS + 2 HELPERS 2 CARPENTERS + 2 HELPERS Hourly Production Rate 2.00 1.50 6.00 1.50 1.20 4.80 1.20 1.00 1.20 1.00 4.00 1.50 0.80 4.00 3.20 0.80 0,8 1,6 1.00 0.80 3.20 1.20 5.00 0.70 1.20 1.00 4.00 0.50 2.00 1.50 6.00 0.85 1.00 4m2 1,5 m2 1m2 3M
2 2

Production Per 10 hrs. 20 30 60 15 12 48 12 10 12 10 40 15 80 40 32 8 8 16 10 8 32 12 50 7 12 10 40 5 20 15 60 85 10 40m2 15m2 10m2 30M2 27M2 30M2 Page 2 of 7

3M 3M2

PRODUCTIVITY RATES FOR ALL PROJECT WORKS: (Rev 0, May 2000)


Item No. CREW SIZE Hourly Production Rate M MBW 01 MBW 02 MBW 03 MBW 04 MPL MPL 01 MPL 02 MPL 03 MPL 04 MPL 05 MPL 06 MPL 07 MPL 08 MPL 09 MPL 10 MPL 11 MPL 12 MPL 13 MPL 14 MPL 15 MPL 16 MPL 17 MPL 18 MCR MCR 01 MCR 02 MCR 03 MCR 04 MCR 05 MCR 06 MCR 07 MCR 08 MCR 09 MCR 10 MCR 11 MCR 12 MCR 13 MASONARY WORKS Hollow Blockwork (100, 150 & 200 mm) Hollow Blockwork (large panels) Solid blockwork Solid Blockwork as Raft forms PLASTERWORK Plaster (internal), walls final coat Plaster (internal), walls rush coat Plaster (internal), walls mesh Plaster (internal), walls hacking Plaster (internal), walls guide point Plaster (internal), walls corner beads Plaster (external), walls with grooves Plaster (external), walls without grooves Plaster (external), walls rush coat Plaster (external), walls mesh Plaster (external), walls hacking Plaster (external), walls guide points Plaster (external), walls corner beads Plastering of Arches/Mullians Floor screed 50mm thick Roof screed 100 mm thick Mosiac floor Tiles fixing Floor Screed 25mm thick CERAMIC WORKS Ceramic tiles to walls by mortar Ceramic tiles to walls, mortar to corridors Ceramic tiles to walls, cut pieces Ceramic tiles to walls grouting Ceramic tiles to walls, by glue Ceramic tiles to walls, corridors, by glue Ceramic tiles to walls, by glue, cut pieces Ceramic tiles to walls, by glue, grouting Ceramic tiles to floors Ceramic tiles to floors in halls Ceramic tiles to floors, cut pieces Ceramic tiles to floors, grouting Marble flooring 1 MASON, 1 HELPER 1 MASON, 1 HELPER 1 MASON 1 HELPER 1 MASON, 1 HELPER 1 MASON, 1 HELPER 1 MASON 1HELPER 1 MASON, 1 HELPER 1 MASON, 1 HELPER 1 MASON 1 HELPER 1 MASON + 1 HELPER 1.2 1 2 5 1,2 1,3 2 5 1 1,2 2 5 0.60 8 SM 9 SM 20 SM 50 SM 12 SM 13 SM 20 SM 50 SM 10 SM 12 SM 20 SM 50 SM 60 1 MASON, 1 HELPER 2 HELPER 1 HELPER 1 HELPER 1 MASON, 1 HELPER 1 MASON, 1 HELPER 1 MASON, 1 HELPER 1 MASON, 1 HELPER 2 HELPER 1 HELPER 1 HELPER 1 MASON, 1 HELPER 1 MASON, 1 HELPER 1 MASON, 1 HELPER 1 MASON, 1 HELPER 1 MASON, 1 HELPER 1 MASON, 1 HELPER 1 Mason + 1 Helper 1 MASON, 1 HELPER 1 MASON, 1 HELPER 1 MASON, 1 HELPER 1 MASON, 1 HELPER 12 Nos 14 Nos. 9,5 11 1.2 1.6 1.4 1.8 1 1.2 10 SM 10 SM 1,2 15 SM 10 SM 10 SM 10 SM 10 SM 0.8 2 1.5 1.6 0,6 16 SM 150 SM 100 SM 100 SM 100 SM 100 SM 10 SM 12 SM 150 SM 100 SM 100 SM 100 SM 100 SM 80 20 15 1.5 6 120 NR 140 NR 95 NR 110 NR Production Per 10 hrs. Per Unit

PRODUCTIVITY RATES FOR ALL PROJECT WORKS: (Rev 0, May 2000)


Item No. CREW SIZE Hourly Production Rate MCR 11 MCR 12 MCR 13 Ceramic tiles to floors, cut pieces Ceramic tiles to floors, grouting Marble flooring 1 MASON 1 HELPER 1 MASON + 1 HELPER 2 5 0.60 Production Per 10 hrs. Per Unit 20 SM 50 SM 60

Page 3 of 7

PRODUCTIVITY RATES FOR ALL PROJECT WORKS: (Rev 0, May 2000)


Item No. CREW SIZE Hourly Production Rate MCR MCR 13 MCR 14 MTW MTW 01 MTW 02 MTW 03 MTW 04 MTW 05 MKP MKP00 MKP01 MKP02 MKP03 MKP04 MKP05 MKP06 DRW DRW 01 DRW 02 DRW 03 DRW 04 DRW 05 DRW 06 DRW 07 DRW 08 MLW MLW01 MLW02 MLW03 MLW04 MLW05 MLW06 MLW07 MLW08 MLW09 MLW10 MLW11 MLW12 MLW13 MLW14 MCW MCW 01 MCW 02 MCW 03 CERAMIC WORKS Ceramic skirting by glue Ceramic skirting by glue to halls, corridors TILING WORKS Mosiac / Terrazo tiles to roofs Mosiac / Terrazo tiles to floors Mosiac skirting to halls Mosiac skirting flush / recessed Grouting / sealing to roof / floor tiles KERBING / BLOCK PAVING WORKS P.C.C. Curve kerb base (to curves) PCC to kerb base (Straight line) Haunching to kerb base (Dumpes) kerbstonse (Without PCC) Interlock paving on pre prepared sub - base Screed works including preparation Haunching ot Kerb Base (Mixing Truck) MANHOLE/ DRAINAGE CONSTRUCTION Excavation for drains / manholes Backfill to drains / manholes Blockwork to manholes Plaster to manholes Benching to manholes Fix covers to manholes Fix gulley traps Laying of P.V.C. sleeves 4" - 12" MISCELLANEOUS LABOUR WORKS Bitumen paint to concrete blockwork surfaces Bitumin painting Bases / piles Hacking of concrete surfaces fixing of flexcell sheets pile cutting/dressing pile cutting/dressing (small diameter) Vertical sealant (12 mm) Horizontal sealant (12 mm) Roof preparation for lw concrete Angle fillet fixing Hourdi block shifting and fixing to slab Polythene sheet fixing Shaping of Soil Blinding Protection Board installation MISCELLANEOUS CARPENTARY WORKS A/C subframe manufacture / fixing Door subframe manufacture / fixing Water bar fixing 1 CARPENTER 1 CARPENTER 1 CARPENTER 2M Page 4 0f 7 5 NOS 4 NOS 20 METRE 1 HELPER 1 HELPER 1 HELPER 1 HELPER 1 HELPER 1 HELPER 1 HELPER 1 HELPER 1 MASON, 1 HELPER 1 MASON, 1 HELPER 2 HELPER 1 HELPER 1 MASON + 1 HELPER 1 CARPENTER + 1 HELPER 2,5 5 5 4 20 3m 1M 8M2 4 7.00 5 40 SM 70 50 SM 6 SM 1 NO 2 NOS 25 METRE 50 EMTRE 50 SM 40 EMTE 200 NOS 30 10M 80M2 1 HELPER 1 HELPER 1 MASON, 1 HELPER 1 MASON, 1 HELPER 1 MASON, 1 HELPER 1 MASON, 1 HELPER 1 MASON, 1 HELPER 4 HELPER 24M 5 CM 10 CM 2 NOS 2 NOS 4 NOS 2 NOS 1 NO 240M 1 MASON, 1 HELPER 1 MASON, 1 HELPER 1 MASON, 1 HELPER 1 MASON, 1 HELPER 1 MASON, 1 HELPER 1 MASON, 1 HELPER 1 MASON, 1 HELPER 1,5 10 M 2,5 3,0 4 1,5 25 METRE 30 METRE 40 METRE 15 METRE 2 SM 15 SM 100M 1 MASON, 1 HELPER 1 MASON, 1 HELPER 1 MASON, 1 HELPER 1 MASON, 1 HELPER 1 HELPER 1,6 1,4 2,5 1,4 2,5 16 SM 14 SM 25 METRE 14 METRE 25 METRE 1 MASON, 1 HELPER 1 MASON, 1 HELPER 2,5 M 3M 25 METRE 30 METRE Production Per 10 hrs. Per Unit

PRODUCTIVITY RATES FOR ALL PROJECT WORKS: (Rev 0, May 2000)


Item No. CREW SIZE Hourly Production Rate CPW CPW01 CPW02 CPW03 CPW04 CPW05 CPW06 CPW07 CPW08 CPW09 CPW10 CPW11 CPW12 CPW13 CPW14 CPW15 CPW16 GLW GLW01 GLW02 GLW03 GLW04 GLW05 GLW06 GLW07 NTRA NTRA01 NTRA02 NTRA03 NTRA04 NTRA05 NTRA06 NTRA07 CONCRETE PLACEMENT WORKS Concrete to pile caps by pump Standard rate 1 man Concrete to PCC blinding (100 mm thick) Concrete to slabs/beams, by pump Concrete to slabs / beams by crane Concrete to walls / columns, by pump Concrete by site mix Concrete Columns Concrete suspended slab (pump) Concrete parapets/staircases Blinding concrete 50 mm (readymix) Blinding concrete 50 mm (sitemix) Concrete footings & pile caps Concrete tiebeams, ground beams Concrete column necks Concrete Ground slab Concrete to precast slabs, beams GENERAL LABOUR WORKS Unloading reinforcement ((Flat Bed Truck) Loading reinforcement to slab (With Crane) Loading blockwork to site (with Wheel Burrow) Loading mortar to site location Mixing mortar for distribution 0, 3 L mixer Site mixing of ready mix for distribution Hand mix Loading ready mix to site location NON TARGET RELATED ACTIVITES Stacking of formwork Curing of Substructure works Curing of beams / slabs Hessiant Water Curing of columns (Hessiant Water) Builders work make good chases Site cleaning Repairs to finished works 1 HELPER 2 HELPERS 2 HELPERS 2 HELPERS 1 MASON + 2 HELPERS 1.6 (L.M) 1.2 (L.M) 25 1 250 M2 36 M 4 HELPER 6M3 3M3 4 HELPERS 4 HELPERS (Flat Bed Truck loads) 1 HELPER 40 Nos. 2 Nos 2 Nos 400 Nos. 1 MASON, 10 HELPERS 6 MASONS, 18 HELPERS, 1 CARPENTER 1 MASON, 6 HELPERS, 0.5 OPERATOR 4 MASONS, 16 HELPERS, 2 CARPENTERS 1 MASON, 12 HELPERS , 0.5 CARPENTER 8 HELPERS 3 MASONS + 6 HELPERS 8 HELPERS 1 MASON + 4 HELPER 1 MASON + 8 HELPER 1 MASON + 4 HELPER 1 MASON + 5 HELPER 8 HELPER 3 MASONS + 6 HELPER 2 MASONS + 1 HELPER 8,10 1.2 1.6 1.40 1.80 1.00 8,0 1.00 12.00 6.00 1.50 1,5 3m3 6 MASONS, 18 HELPERS, 1 CARPENTER 1 hr. 180 CM 10m3 27 CM 180 CM 27 CM 81 CM 9 CM 10 150 7 80 10 120 60 15 15 30 M3 Production Per 10 hrs. Per Unit

Page 5 of 7

PRODUCTIVITY RATES FOR ALL PROJECT WORKS: (Rev 0, May 2000)


Item No. NTRA08 NTRA09 NTRA10 NTRA11 NTRA12 NTRA13 Maintenance of site services Operators for mixers Operators for compaction equipment Office boy Watchman Storekeeper CREW SIZE 2 HELPERS 2/MIXER 1 UNIT ARABTEC 1 / CONSULTANT 1 2 MIN 1/SHIFT Page 6 of 7 NON MEASURABLE

PRODUCTIVITY RATES FOR ALL PROJECT WORKS: (Rev 0, May 2000)


Item No. CREW SIZE Hourly Production Rate RF RF 01 RF 02 RF 03 RF 04 RF 05 RF 01 RF 02 RF 03 RF 04 RF 05 RFC 01 RFC 02 REINFORCEMENT Fix Rebar to footings & tie beams Fix Rebar to walls, columns, beams, solid slabs Fix rebar to ribs of hourdi slab Fix rebar to mesh reinforcement Fix rebar to hidden beams Fix Rebar to footings & tie beams Fix Rebar to walls, columns, beams, solid slabs Fix rebar to ribs of hourdi slab Fix rebar to mesh reinforcement Fix rebar to hidden beams Steel cutting and bending 18.25 mm Steel cutting and bending 8 - 16 mm EXCAVATION Manual Excavation Backfill + levelling Shaping of sloped earth for blinding for bases including compaction 1 STEEL FIXER 1 STEEL FIXER 1 STEEL FIXER 1 STEEL FIXER 1 STEEL FIXER 1 STEEL FIXER 1 STEEL FIXER 1 STEEL FIXER 1 STEEL FIXER 1 STEEL FIXER 1 STEEL FIXER 1 STEEL FIXER 50.00 40.00 25 20 18 15 20 78 38 35 15

EX 1 EX 2 EX 3

1 HELPER 1HELPER 1 MASON + 2 HELPER

PRODUCTIVITY RATES (Rev 0, May 2000) Productivity Rates for Tilling


Size. (Cms) Location Area Manpower Production Rate (Sqm. Per day) Remarks

30 X 30 30 X 30 40 X 40 20 X 20 30 X 60 30 X 30 10 X 10 30 X 60 30 X 30

Floor Floor with pattern Floor Floor Floor Floor + Wall Wall Wall Wall

Kitchen Corridor Bed room Store (small area) Bathroom Bathroom Kitchen Corridor Bathroom

1 Mason, 1 Helper 1 Helper, 2 Masons 1 Mason, 1 Helper 1 Mason, 1 Helper 2 Mason, 1 Helper 2 Mason, 1 Helper 1 Mason, 1 Helper 1 Mason, 1 Helper 2 Mason, 1 Helper

14
10 22-25 10 6 5 8-9 14-15 7

Residential Area by Sub-Contractor Residential Area by Sub-Contractor Residential Area by Sub-Contractor Residential Area by Sub-Contractor Residential Area by Sub-Contractor

Residential Area by Sub-Contractor Residential Area by Sub-Contractor Residential Area by Sub-Contractor Residential Area by Sub-Contractor

Notes: 1. 1 Day = 10 hrs. 2. Gang Size: 1 Mason + 1 Helper for Kitchen and Bedroom. 2 Mason + 1 Helper for Bathroom.