Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
Date : 10.04.13
Sr.No 1 2 3 4 5 6 7 8 9 10 11 12 13 ACD ID 18845 18783 16561 14977 13073 17929 18786 16337 18689 16514 17915 13018 18714 MLDT NGC UDL MLDT HWH BWN NGC MLDT NGC UDL BWN Shed BWN Problem Observed by Event Log/Control Staff Event Log Event Log Problem Observed Date Of Reporting Problem observed/ Action taken ACD Replaced and rectified Loco ACD dismantled at PTRU checked speedometer upto 20 kmph (foot plating done),noproblem observed Rectified by BWN TEAM PTRU TEAM MLDT team Rectified Location BWN SHED PTRU SHED MLDT shed NGC SHED UDL SHED MLDT shed HWH shed BWN SHED NGC SHED MLDT team NGC TEAM UDL TEAM MLDT shed NGC SHED UDL SHED BWN SHED Date of rectification 07.01.2013 16.01.2013 28.12.12 12.02.13 02.01.2013 01.01.2013 31.12.2012 04.01.2013. 13.02.13 18.02.13 18.02.13 13.02.13 14.02.13 STATUS (OPEN/CL OSE) CLOSE CLOSE CLOSE CLOSE CLOSE CLOSE CLOSE CLOSE CLOSE CLOSE CLOSE CLOSE CLOSE
Event Log Analysis team SPEEDO METER I/P PROBLEM 06.12.12(GHY) Event Log Analysis team RM PROBLEM LOCO Monitoring Team TOGGLE SWITCH BROKEN GHY Event Log Analysis team GPS-2 problem Event Log Analysis team RESTART PROBLEM Event Log Analysis team No Commn Event Log Analysis team GPS-2 problem Event Log Analysis team GPS-input not available Event Log Analysis team R M PROBLEM Event Log Analysis team TOGGLE SWITCH BROKEN Event Log Analysis team ABU Problem 17.12.12(MLG) 19.12.12 20.12.12(GHY) 26.12.12 25.12.12 12.02.13 12.02.13 09.02.13 07.02.13 07.02.13
Planar antenna broken,replaced & rectified NGC TEAM Replaced toggle switch&rectified both gps tested and found ok UDL TEAM MLDT team
No Problem observed on.Kept Loco ACD HWH TEAM under observation for one day at Loco Shed. No Problem Observe on Loco to Loco communication tested No problem observed both gps tested and found ok checked with ATU& 120db attenuator,no problem observed Replaced toggle switch&rectified BWN TEAM
a)ACD replaced due to restart Problem.b) ICS Switch replaced and c) ABU Pulling Knob BWN TEAM replaced
14
18788
BWN
15
16847
MLDT
MLDT TEAM
16.02.13
D.C's having no display. LCD showing getting GPS. ABU having small hissing BWN TEAM BWN SHED sound from foundation O ring. Replaced the ACD & ABU foundation O ring's. As per log, It is observed from 14-02-13 to 16-02-13 41 time brakes applied by L16547. Out of which maximum 38 times are logical ANALYSIS TEAM MLG usual braking and rest 3 cases are unusual braking. But as per log, L16547 found Ok condition.
16.02.13
CLOSE
18.02.13
CLOSE
15
12665
Event Log Analysis team GPS data not available LOCO Monitoring Team ABU Problem-NB NOT OK GHY LOCO MONITORING GHY & LMG GPS not getting
18.02.13(MLG) Checked and found water accumulated in E5 Block of ABU.Rectified by replacing the E5 Block ACD Replaced at NGC Loco Shed on 28.02.2013 ,Problem Rectified Checked all parameters and tightened GPS cable , connections & rectified. A) ACD replaced due to restart problem B) GPS Cable Replaced as preventive maitenance. New LED provided for NB, EB LED connections dry solder observed and rectified by proper soldering Attended on 06.04.13 and replaced EB LED rectified by repalcing Flow Control Valve 08.03.13
OPEN
16 17
20.02.13 23.02.13
05.03.13 24.02.2013
CLOSE CLOSE
20
14130
HWH
28.02.13
HWH TEAM
HWH shed
03.03.2013 10.03.2013
CLOSE
18 19 21 21
LOCO Monitoring Team NB & EB LEDs are not glowing 02.03.13 GHY LOCO MONITORING EB LED is not glowing GHY LOCO Monitoring Team Air Leakage problem in ABU KIR LOCO Monitoring Team - GPS problem and ABU GHY Problem(NB NOTOK) Tx-LED is not glowing & Driver's Console protection Cover is to be replaced 10.03.13 04.03.13
Air leakage Problem rectified by replacing E4 Piston & plunger, both GPS tested and no MLDT team problem observed Loco ACD Replaced and Driver Console Protection Cover provided at KIR Station Air leakage Problem rectified by replacing E4 Piston & plunger MLDT team
MLDT shed
12.03.13
22
18677
MLDT
RDSO visit
MLDT shed
10.03.2013
CLOSE
23
16548
MLDT
MLDT team
MLDT shed
13.03.13
CLOSE
24 25 26 27
LOCO Monitoring Team KEYPAD problem KIR Analysis Team-MLG Analysis Team-MLG Analysis Team-MLG Power fail restart problem Power glitch restart problem Power fail restart problem
Key pad replaced & rectified No Problem Observed on 23.03.2013 at NGC Loco Shed. ACD REPLACED & RECTIFIED attended,checked all parameters and no problem found Attended on 25.03.2013 ,Found ACD Problem and Planar Antenna defective. Replaced the same and problem rectified
28
18589
NGC
LOCO Monitoring Team ACD M condition&commn not GHY&Analysis Team19.03.13, 20.03.13 ok MLG Analysis Team-MLG Power glitch restart problem 21.03.13
NGC TEAM
NGC SHED
26.03.2013
CLOSE
29
18997
BWN
No Problem Found ,Only Restart observe on BWN TEAM 19.03.2013 .Battery Backup Nil. No Problem Observe in GPS .Speed Meter Connectrion found in removal condition.Restored ACD REPLACED & RECTIFIED ACD REPLACED & RECTIFIED GPS and R.M Cable Replaced. ACD REPLACED & RECTIFIED No Problem Observe in GPS .Antenna cleaned and Cable tightned. ACD REPLACED & RECTIFIED ABU Microswitch Connection Loose Tightned it and Rectified. ACD REPLACED & RECTIFIED No Problem observed at HWH Loco Shed ACD Replaced on 05.04.2013 at HWH Loco Shed ACD Replaced on 30.03.2013 at NGC Loco Shed. NGC TEAM MLDT team MLDT team BWN TEAM BWN TEAM MLDT team BWN TEAM MLDT team HWH TEAM HWH TEAM NGC TEAM
BWN SHED
03.04.2013
CLOSE
30 31 32 33 34 35 36 37 38 39 40 41 42 43 44
17875 16681 16007 16409 18875 16517 18595 14020 11317 11296 17813 17953 16467 14840 14761
NGC MLDT MLDT BWN BWN MLDT BWN BWN HWH HWH NGC NGC MLDT NGC MLDT
Analysis Team-MLG
GPS NOT OK
NGC SHED MLDT SHED MLDT SHED BWN SHED BWN SHED MLDT SHED BWN SHED
CLOSE CLOSE CLOSE CLOSE CLOSE CLOSE CLOSE CLOSE CLOSE CLOSE CLOSE OPEN OPEN OPEN OPEN
LOCO Monitoring Team GPS I/P not available. GHY LOCO Monitoring Team Restart Problem GHY Analysis Team-MLG Restart Problem Analysis Team-MLG Analysis Team-MLG GOPAL/APM/FRC, ANALYSIS TEAM-MLG Analysis Team-MLG AMSS BRAKING AMSS BRAKING AMSS BRAKING AMSS BRAKING AMSS BRAKING AMSS BRAKING AMSS BRAKING GPS problem
R.M. problem(TID-FS) at (PJP26.03.13, 27.03.13 GIL) 18: 39 on 25.03.2013 Continuously showing ABU isolate /active Radio commn problem TID-FS TID-FS TID-FS TID-FS TID-FS TID-FS TID-FS 26.03.13 27.03.13 29.03.13 29.03.13 29.03.13 29.03.13 29.03.13 28.03.13 28.03.13
MALDA Station 29.03.2013 HWH shed HWH shed NGC SHED 08.04.2013 05.04.2013 30.03.2013
45 46 47 48 49
AMSS BRAKING Analysis Team-MLG Analysis Team-MLG Analysis Team-MLG Analysis Team-MLG
TID-FS GPS PROBLEM R.M. problem Power glitch restart problem Power glitch restart problem
Manual TID given and event log sent for analysis Both GPS Cable Replaced at Malda Loco Shed R.F.Cable and Plannar Antenna Replaced No Problem found on 12.04.2013 by UDL Maintenance Team.
OPEN MLDT team MLDT team UDL TEAM MLDT Loco Shed MLDT Loco Shed UDL SHED 09.04.2013 07.04.2013 12.04.2013 CLOSE CLOSE CLOSE OPEN
50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67
18589 16467 18586 18689 16069 13234 16086 16578 16446 18874 16819 16359 11404 17875 16086 16517 17962 11313
NGC MLDT MLDT NGC NGC UDL MLDT NGC MLDT HWH NGC JMP HWH NGC MLDT MLDT NGC HWH
Analysis Team-MLG Sys. Admn-MLG Sys. Admn-MLG Sys. Admn-MLG Analysis Team-MLG Sys. Admn-MLG Analysis Team-MLG Analysis Team-MLG Analysis Team-GHY Sys. Admn-MLG Sys. Admn-MLG Sys. Admn-MLG Sys. Admn-MLG Sys. Admn-MLG Sys. Admn-MLG
Power fail restart Problem RM PROBLEM ABU isolated TID-FS Power fail restart problem RM PROBLEM ABU Air Leakage Problem, Power glitch restart problem GPS & RESTART PROBLEM RM Issue ABU Isolated ,RM Issue RM Issue GPS data NA GPS problem
02.04.13 04.04.13 04.04.13 04.04.13 04.04.14 04.04.13 04.04.13 05.04.13,06.04.13 05.04.13 06.04.13 06.04.13 06.04.13 06.04.13 06.04.13 06.04.13
No Problem Found on 08.04.2013 by NGC Maintenance Team,Only Restart observe on NGC TEAM 26.03.2013 .Battery Backup Nil.
NGC SHED
08.04.2013
By Replacing a) E4 Plunger and Spring b) MR Connectors Problem rectified by MLDT MLDT team Team
08.04.2013
CLOSE OPEN
Both GPS Cable Replaced at Malda Loco Shed R.M.Cable Replaced at HWH Loco Shed
09.04.2013 04.04.2013
CLOSE CLOSE OPEN OPEN CLOSE CLOSE CLOSE CLOSE OPEN OPEN
ABU Isolated Analysis Team-MLG Sys. Admn-MLG Analysis Team-MLG Several TID FS (BKRD) RM Issue . GPS NOT OK,restart problem 07.04.13 07.04.13 07.04.13,09.04.13
GPS Antenna and R.F.Cable Replaced at HWH Loco Shed ACD Replaced at KYQ Station by NGC Loco Team By Replacing a) E4 Plunger and Spring b) MR Connectors Problem rectified by MLDT Team RM Antenna and R.M.Cable Replaced at MLDT Loco Shed
HWH shed KYQ Stn. MLDT Loco Shed MLDT Loco Shed
68
16640 MLDT
07.04.13
OPEN Manual TID given and event log sent for analysis
ACD Replaced on 09.04.2013 MLDT team MLDT Loco Shed 09.04.2013
69
70 71 72 73 74
17204
NGC
TID-FS
Power glitch restart problem SPEEDO METER I/P PROBLEM,communication not OK Power Glitch /Restart Problem RM ISSUE ABU isolated
09.04.13
10.04.13 (As per event Log Dated 07.04.2013) 10.04.13 09.04.2013 13.04.13 13.04.13
Remarks