Sei sulla pagina 1di 11

Loco ACD Problems Observation and Rectification Report

Date : 10.04.13
Sr.No 1 2 3 4 5 6 7 8 9 10 11 12 13 ACD ID 18845 18783 16561 14977 13073 17929 18786 16337 18689 16514 17915 13018 18714 MLDT NGC UDL MLDT HWH BWN NGC MLDT NGC UDL BWN Shed BWN Problem Observed by Event Log/Control Staff Event Log Event Log Problem Observed Date Of Reporting Problem observed/ Action taken ACD Replaced and rectified Loco ACD dismantled at PTRU checked speedometer upto 20 kmph (foot plating done),noproblem observed Rectified by BWN TEAM PTRU TEAM MLDT team Rectified Location BWN SHED PTRU SHED MLDT shed NGC SHED UDL SHED MLDT shed HWH shed BWN SHED NGC SHED MLDT team NGC TEAM UDL TEAM MLDT shed NGC SHED UDL SHED BWN SHED Date of rectification 07.01.2013 16.01.2013 28.12.12 12.02.13 02.01.2013 01.01.2013 31.12.2012 04.01.2013. 13.02.13 18.02.13 18.02.13 13.02.13 14.02.13 STATUS (OPEN/CL OSE) CLOSE CLOSE CLOSE CLOSE CLOSE CLOSE CLOSE CLOSE CLOSE CLOSE CLOSE CLOSE CLOSE

SPEEDO METER I/P PROBLEM 01.12.2012(MLG) TID-FS 05.12.12(MLG)

Event Log Analysis team SPEEDO METER I/P PROBLEM 06.12.12(GHY) Event Log Analysis team RM PROBLEM LOCO Monitoring Team TOGGLE SWITCH BROKEN GHY Event Log Analysis team GPS-2 problem Event Log Analysis team RESTART PROBLEM Event Log Analysis team No Commn Event Log Analysis team GPS-2 problem Event Log Analysis team GPS-input not available Event Log Analysis team R M PROBLEM Event Log Analysis team TOGGLE SWITCH BROKEN Event Log Analysis team ABU Problem 17.12.12(MLG) 19.12.12 20.12.12(GHY) 26.12.12 25.12.12 12.02.13 12.02.13 09.02.13 07.02.13 07.02.13

Planar antenna broken,replaced & rectified NGC TEAM Replaced toggle switch&rectified both gps tested and found ok UDL TEAM MLDT team

No Problem observed on.Kept Loco ACD HWH TEAM under observation for one day at Loco Shed. No Problem Observe on Loco to Loco communication tested No problem observed both gps tested and found ok checked with ATU& 120db attenuator,no problem observed Replaced toggle switch&rectified BWN TEAM

a)ACD replaced due to restart Problem.b) ICS Switch replaced and c) ABU Pulling Knob BWN TEAM replaced

14

18788

BWN

Event Log Analysis team power glitch, restart problem 14.02.13

15

16847

MLDT

MLDT TEAM

Unual brakings(event log analysis required

16.02.13

D.C's having no display. LCD showing getting GPS. ABU having small hissing BWN TEAM BWN SHED sound from foundation O ring. Replaced the ACD & ABU foundation O ring's. As per log, It is observed from 14-02-13 to 16-02-13 41 time brakes applied by L16547. Out of which maximum 38 times are logical ANALYSIS TEAM MLG usual braking and rest 3 cases are unusual braking. But as per log, L16547 found Ok condition.

16.02.13

CLOSE

18.02.13

CLOSE

15

12665

SGUJ (EMD LOCO)

Event Log Analysis team GPS data not available LOCO Monitoring Team ABU Problem-NB NOT OK GHY LOCO MONITORING GHY & LMG GPS not getting

18.02.13(MLG) Checked and found water accumulated in E5 Block of ABU.Rectified by replacing the E5 Block ACD Replaced at NGC Loco Shed on 28.02.2013 ,Problem Rectified Checked all parameters and tightened GPS cable , connections & rectified. A) ACD replaced due to restart problem B) GPS Cable Replaced as preventive maitenance. New LED provided for NB, EB LED connections dry solder observed and rectified by proper soldering Attended on 06.04.13 and replaced EB LED rectified by repalcing Flow Control Valve 08.03.13

OPEN

16 17

14914 NGC 13098 UDL

20.02.13 23.02.13

NGC TEAM NGC TEAM

NGC SHED NGC SHED

05.03.13 24.02.2013

CLOSE CLOSE

20

14130

HWH

LOCO Monitoring Team GPS is not getting GHY

28.02.13

HWH TEAM

HWH shed

03.03.2013 10.03.2013

CLOSE

18 19 21 21

16598 18527 14769 16548

MLDT NGC UDL MLDT

LOCO Monitoring Team NB & EB LEDs are not glowing 02.03.13 GHY LOCO MONITORING EB LED is not glowing GHY LOCO Monitoring Team Air Leakage problem in ABU KIR LOCO Monitoring Team - GPS problem and ABU GHY Problem(NB NOTOK) Tx-LED is not glowing & Driver's Console protection Cover is to be replaced 10.03.13 04.03.13

MLDT Team NGC TEAM 06.03.2013

MLDT Team NGC SHED

15.03.13 06.04.13 06.03.2013

CLOSE CLOSE CLOSE CLOSE

Air leakage Problem rectified by replacing E4 Piston & plunger, both GPS tested and no MLDT team problem observed Loco ACD Replaced and Driver Console Protection Cover provided at KIR Station Air leakage Problem rectified by replacing E4 Piston & plunger MLDT team

MLDT shed

12.03.13

22

18677

MLDT

RDSO visit

MLDT shed

10.03.2013

CLOSE

23

16548

MLDT

LOCO Monitoring Team Air Leakage problem in ABU GHY

MLDT team

MLDT shed

13.03.13

CLOSE

24 25 26 27

16544 17625 16681 17839

MLDT NGC MLDT NGC

LOCO Monitoring Team KEYPAD problem KIR Analysis Team-MLG Analysis Team-MLG Analysis Team-MLG Power fail restart problem Power glitch restart problem Power fail restart problem

11.03.13 14.03.13 19.03.03 19.03.03

Key pad replaced & rectified No Problem Observed on 23.03.2013 at NGC Loco Shed. ACD REPLACED & RECTIFIED attended,checked all parameters and no problem found Attended on 25.03.2013 ,Found ACD Problem and Planar Antenna defective. Replaced the same and problem rectified

MLDT team NGC TEAM MLDT team NGC TEAM

MLDT shed NGC SHED MLDT SHED NGC SHED

12.03.13 23.03.2013 23.03.2013 26.03.13

CLOSE CLOSE CLOSE CLOSE

28

18589

NGC

LOCO Monitoring Team ACD M condition&commn not GHY&Analysis Team19.03.13, 20.03.13 ok MLG Analysis Team-MLG Power glitch restart problem 21.03.13

NGC TEAM

NGC SHED

26.03.2013

CLOSE

29

18997

BWN

No Problem Found ,Only Restart observe on BWN TEAM 19.03.2013 .Battery Backup Nil. No Problem Observe in GPS .Speed Meter Connectrion found in removal condition.Restored ACD REPLACED & RECTIFIED ACD REPLACED & RECTIFIED GPS and R.M Cable Replaced. ACD REPLACED & RECTIFIED No Problem Observe in GPS .Antenna cleaned and Cable tightned. ACD REPLACED & RECTIFIED ABU Microswitch Connection Loose Tightned it and Rectified. ACD REPLACED & RECTIFIED No Problem observed at HWH Loco Shed ACD Replaced on 05.04.2013 at HWH Loco Shed ACD Replaced on 30.03.2013 at NGC Loco Shed. NGC TEAM MLDT team MLDT team BWN TEAM BWN TEAM MLDT team BWN TEAM MLDT team HWH TEAM HWH TEAM NGC TEAM

BWN SHED

03.04.2013

CLOSE

30 31 32 33 34 35 36 37 38 39 40 41 42 43 44

17875 16681 16007 16409 18875 16517 18595 14020 11317 11296 17813 17953 16467 14840 14761

NGC MLDT MLDT BWN BWN MLDT BWN BWN HWH HWH NGC NGC MLDT NGC MLDT

Analysis Team-MLG

GPS NOT OK

21.03.13 25.03.13 25.03.13 21.03.13 26.03.13

NGC SHED MLDT SHED MLDT SHED BWN SHED BWN SHED MLDT SHED BWN SHED

31.03.2013 23.03.2013 31.03.2013 28.03.2013 04.04.2013 01.04.2013 03.04.2013

CLOSE CLOSE CLOSE CLOSE CLOSE CLOSE CLOSE CLOSE CLOSE CLOSE CLOSE OPEN OPEN OPEN OPEN

LOCO Monitoring Team GPS I/P not available. GHY LOCO Monitoring Team Restart Problem GHY Analysis Team-MLG Restart Problem Analysis Team-MLG Analysis Team-MLG GOPAL/APM/FRC, ANALYSIS TEAM-MLG Analysis Team-MLG AMSS BRAKING AMSS BRAKING AMSS BRAKING AMSS BRAKING AMSS BRAKING AMSS BRAKING AMSS BRAKING GPS problem

R.M. problem(TID-FS) at (PJP26.03.13, 27.03.13 GIL) 18: 39 on 25.03.2013 Continuously showing ABU isolate /active Radio commn problem TID-FS TID-FS TID-FS TID-FS TID-FS TID-FS TID-FS 26.03.13 27.03.13 29.03.13 29.03.13 29.03.13 29.03.13 29.03.13 28.03.13 28.03.13

MALDA Station 29.03.2013 HWH shed HWH shed NGC SHED 08.04.2013 05.04.2013 30.03.2013

45 46 47 48 49

36083 16446 16517 18994 16681

NGC MLDT MLDT UDL MLDT

AMSS BRAKING Analysis Team-MLG Analysis Team-MLG Analysis Team-MLG Analysis Team-MLG

TID-FS GPS PROBLEM R.M. problem Power glitch restart problem Power glitch restart problem

28.03.13 01.04.13 02.04.13, 04.04.13, 05.04.13 02.04.13 02.04.13

Manual TID given and event log sent for analysis Both GPS Cable Replaced at Malda Loco Shed R.F.Cable and Plannar Antenna Replaced No Problem found on 12.04.2013 by UDL Maintenance Team.

OPEN MLDT team MLDT team UDL TEAM MLDT Loco Shed MLDT Loco Shed UDL SHED 09.04.2013 07.04.2013 12.04.2013 CLOSE CLOSE CLOSE OPEN

50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67

18589 16467 18586 18689 16069 13234 16086 16578 16446 18874 16819 16359 11404 17875 16086 16517 17962 11313

NGC MLDT MLDT NGC NGC UDL MLDT NGC MLDT HWH NGC JMP HWH NGC MLDT MLDT NGC HWH

Analysis Team-MLG Sys. Admn-MLG Sys. Admn-MLG Sys. Admn-MLG Analysis Team-MLG Sys. Admn-MLG Analysis Team-MLG Analysis Team-MLG Analysis Team-GHY Sys. Admn-MLG Sys. Admn-MLG Sys. Admn-MLG Sys. Admn-MLG Sys. Admn-MLG Sys. Admn-MLG

Power fail restart Problem RM PROBLEM ABU isolated TID-FS Power fail restart problem RM PROBLEM ABU Air Leakage Problem, Power glitch restart problem GPS & RESTART PROBLEM RM Issue ABU Isolated ,RM Issue RM Issue GPS data NA GPS problem

02.04.13 04.04.13 04.04.13 04.04.13 04.04.14 04.04.13 04.04.13 05.04.13,06.04.13 05.04.13 06.04.13 06.04.13 06.04.13 06.04.13 06.04.13 06.04.13

No Problem Found on 08.04.2013 by NGC Maintenance Team,Only Restart observe on NGC TEAM 26.03.2013 .Battery Backup Nil.

NGC SHED

08.04.2013

CLOSE OPEN OPEN

Manual TID given and event log sent for analysis

OPEN OPEN OPEN

By Replacing a) E4 Plunger and Spring b) MR Connectors Problem rectified by MLDT MLDT team Team

MLDT Loco Shed

08.04.2013

CLOSE OPEN

Both GPS Cable Replaced at Malda Loco Shed R.M.Cable Replaced at HWH Loco Shed

MLDT team HWH TEAM

MLDT Loco Shed HWH shed

09.04.2013 04.04.2013

CLOSE CLOSE OPEN OPEN CLOSE CLOSE CLOSE CLOSE OPEN OPEN

ABU Isolated Analysis Team-MLG Sys. Admn-MLG Analysis Team-MLG Several TID FS (BKRD) RM Issue . GPS NOT OK,restart problem 07.04.13 07.04.13 07.04.13,09.04.13

GPS Antenna and R.F.Cable Replaced at HWH Loco Shed ACD Replaced at KYQ Station by NGC Loco Team By Replacing a) E4 Plunger and Spring b) MR Connectors Problem rectified by MLDT Team RM Antenna and R.M.Cable Replaced at MLDT Loco Shed

HWH TEAM NGC TEAM MLDT team MLDT team

HWH shed KYQ Stn. MLDT Loco Shed MLDT Loco Shed

07.04.2013 09.04.2013 08.04.2013 07.04.13

68

16640 MLDT

Analysis Team-MLG Sys. Admn-MLG Sys. Admn-MLG Analysis Team-MLG


GHY ACD Control

GPS NOT OK,SPEEDO I/P NA

07.04.13

OPEN Manual TID given and event log sent for analysis
ACD Replaced on 09.04.2013 MLDT team MLDT Loco Shed 09.04.2013

69
70 71 72 73 74

17204

NGC

TID-FS
Power glitch restart problem SPEEDO METER I/P PROBLEM,communication not OK Power Glitch /Restart Problem RM ISSUE ABU isolated

09.04.13
10.04.13 (As per event Log Dated 07.04.2013) 10.04.13 09.04.2013 13.04.13 13.04.13

OPEN OPEN OPEN


OPEN OPEN OPEN

16281 MLDT 17998 NGC 16588 MLDT 16819 14914

Sys. Admn-MLG Sys. Admn-MLG

Remarks

Loco ACD dismantled at PTRU

Awaiting for Loco