Sei sulla pagina 1di 3

bdd/kuittho/2006

Tutorial: MASS HAUL DIAGRAM


885.00 m
Existing
Ground
Level
Proposed
Formation
Level

Distance (m)
Volume (m3)
Cut (m3)
Fill (m3)
Borrow (m3)
Waste (m3)
Haul (m3)

1.
2.
3.
4.

103
7,012

62
3,314

67
3,615

50
3,216

75
4,435

77
4,578

120
9,315

86
5,622

Construct a Mass Haul Diagram.


Complete the table.
Determine the volume of borrow or waste.
Given the following cost estimates, determine the cost of this particular earthwork:
Cost of cutting, hauling and filling = RM 10 per cubic meter
Cost of removing unwanted soil (waste) = RM 3 per cubic meter
Cost of acquiring, hauling and filling of borrow soil = RM 6 per cubic meter

71
4,336

63
3,282

45
2,077

66
3,670

bdd/kuittho/2006

Solution:
885.00 m
Existing
Ground
Level
Proposed
Formation
Level

Cut
Fill

Distance (m)
Volume (m3)
Cut (m3)
Fill (m3)
Borrow (m3)
Waste (m3)
Haul (m3)

1.
2.
3.
4.

103
62
7,012
3,314
10,326

67
3,615

50
3,216

75
77
4,435
4,578
9,013

6,831

6,831
3,495

Refer to diagram
Refer to the table
Borrow = 558 m3
Cut-haul-fill volume = 26,957 m3
Borrow volume = 558 m3

120
9,315

86
5,622

71
63
4,336
3,282
7,618

14,937

9.013

Cost = RM 10 x 26,957 = RM 269,570


Cost = RM 6 x 558 = RM 3,348
Total cost = RM 272,918

45
2,077

66
3,670

5,747
558
5,189
2,429

bdd/kuittho/2006

Distance (m)
3
Volume (m )

0
0

Cumulative
3
Volume (m )

103
7,012

165
3,314

232
-3,615

282
-3,216

357
4,435

434
4,578

554
-9,315

640
-5,622

711
4,336

774
3,282

819
-2,077

885
-3,670

7,012

10,326

6,711

3,495

7,930

12,508

3,193

-2,429

1,907

5,189

3,112

-558

Mass Haul Diagram


14000

Cumulative Volume (cubic meter)

13000
12000
11000
10000
9000
8000
7000
6000
5000
4000
3000
2000
1000
0
-1000

103

165

232

282

357

434

554

-2000
-3000
-4000

Chainage (m)

640

711

774

819

885