Sei sulla pagina 1di 41

DESIGN OF CIRCULAR WATER TANK

(Rigid joint)

Nameof work:1

Tank capacity

2000

K ltr

2E+06 ltr

Depth of water

11.00

mtr

11000 mm

Free board

0.20

Conrete

scbc

30
10

fy

500

200

unit weight 25000 N/m3


m 9.333

N/mm2

Tensile stress

230

N/mm2

Effective Cover

30

mm

Steel

Nominal Cover

50

mm

Reinforcement
Vertivcal
Hoops Ring

12

mm F

40

mm c/c

upto 25% height

12

mm F

90

mm c/c

upto 50% height

12

mm F

110

mm c/c

upto 75% height

12

mm F

120

mm c/c

upto 100% height

12

mm F

150

mm c/c

mm F

200

mm c/c

Floor

(both direction)

480

15400
12 mm f Ring
150 mm c/c

mm

480

100%
2.75 m

12 mm f Bars
80 mm c/c
12 mm f Ring
120 mm c/c

75%
2.75 m

11000
12 mm f Ring
110 mm c/c

50%
1.80 m

12 mm f Bars
40 mm c/c
12 mm f Ring
90 mm c/c

3.70 m

8 mm f Ring
200 mm c/c
8 mm f Ring
200 mm c/c
480
75

pk_nandwana@yahoo.co.in

DESIGN OF CIRCULAR WATER TANK (Rigid joint)


Nameof work:Tank capacity
Depth of water
Free board
Conrete
Steel

0
2000 K ltr
11.00 m
0.20 m
M
fy
scbc

Nominal cover

30
2
500 N/mm
2
10 N/mm
50 mm

2000000 mm
11000 mm
200
mm

Tensile stess =
m=
Effective cover =

1 Design Constants:- For HYSD Bars

sst =
scbc =
k=

230

N/mm2

10
m*c

N/mm2

m*c+sst
j=1-k/3 =
1
R=1/2xc x j x k = 0.5

Cocrete M =
wt. of concrete

2
230 N/mm
9.333
30 mm

30

2
= 25000 N/mm

m = 9.333

9.333
9.333 x

x
10

0.289

10

0.904

10
+

0.289

0.904

x 0.289 =

1.304

230

2 Dimention of tank:-

Effective depth of tank = 11.00 - 0.20 = 10.80 m


2000000
x 1000
x D2
If D is the inside diameter of tank, we have =
x 10.80 =
4
1000
x 1000

\ from which D

2000
3.143

=
15.35
x 10.80
Provide a diameter of =

15.40

say

15.40

3 Determination of bending moment and hoop tension:= 3H+5 =


3
x 11.00 +
5
= 11.00
x 11.00
H2
=
21
h
= H/3 = 11.00
DT
15.40
x
0.38
The height above base, upto which cantilever action will be there is given by
H/3 or
D
Maximum ring tension at this level, per meter height = w (H-h)
where w
2
15.40
pressure at h/3 = 9800 x ( 11.00 - 3.667 )x
= 553373
N
2
Maximum prerssure at bottom =
wH = 9800 x 11.00 = 107800
N
1
3.67
x #### x 3.667 x
\ maximum cantilever B.M. =
Mf =
2
3

Thickness of wall from empirical formula

38

cm

380

= 3.667

mm
m

1 m which ever is heigher

9800

N/m2

= 241552 N-m/m

4 Design of setion for cantilever action:if d is the effective thickness of tank wall,
241552
1000
Mf
x
D=
=
= 430.00 mm
1000
1.30
1000 R
x
= 430 +
50 =
480 =
say
480 mm
\
Total thickness =d +cover
However, provide a minimum thickness equal to the greater of following;
(I) 150mm (II) 30H+ 50 =
30
x 11.00 +
50 =
380 Hence provide T=
480 mm
Providing
430 mm
50 mm cover to the center of reinforcement,
availble d =
Mf
241552
x 1000
Ast =
Area of steel for cantilever bending is given by=
=
= 2702 mm2
sst . J .d
230 x 0.904 x 430
3.14xdia2
3.14 x 12 x 12
using 12 mm bars
A
=
=
= 113 mm2
4 x100
4
x 100
Spacing of hoop Bars = 1000 x
113 / 2702 =
42
say
= 40 mm
Hence Provided
12 mm F bar, @
40 mm c/c upto height of 3.70 m from base
Above this height, curtail half bars and continue the other half upto top. Let us test this for devlopment length

pk_nandwana@yahoo.co.in

12
x 230
f .sst
=
863
mm say
0.86
m
4
0.8
=
4. tbd
x
3.70 m height above the base. These vertical bars are to be
Hence half bars may be curtailed at
25 mm
provided inner face . Keep a clear cover of =
Ld

5 Design of section for hoops action;


Maximum hoops tension
553373
553373
\
area of ring, Ash =
230 =
2406
/
Let us provide rings atboth faseHence of area of ring in each face=
3.14xdia2
using 12 mm bars
A
=
=
4 x100
Spacing of hoop Bars = 1000 x
113 / 1203 =
Hence Provided 12 mm F bar, @ 90 mm c/c upto height of
and above this, the spacing may be increased
1000 x 113
Actual , Ast
=
2
x
=
90
553373
=
\ sct
90 +( 9.333 1 )x
1000
x
Hoop tension at
9800 x
5.50 x
5.50 m below top =
415030
\
area of ring, Ash =
230 =
1804
/
Let us provide rings atboth faseHence of area of ring in each face=
3.14xdia2
using 12 mm bars
A
=
=
4 x100
Spacing of hoop Bars = 1000 x
113 / 902 =
Hence Provided 12 mm F bar, @ 120 mm c/c upto height of
0.3
At the top, minimum Ash
=
x 1000 x 480 =
100
Spacing of hoop Bars
= 1000 x
113 / 720 =

N
mm2

at

3.67 m above the base

2
1203 mm
3.14 x 12 x 12
= 113
4
x 100
94
say
= 90 mm
3.70 m from base

mm2

2512
2512 =
15.40 /
mm2

4.988

>

2.00 =

1.2
415030

mm2
902
3.14 x 12 x 12
= 113
4
x 100
125
say
= 120 mm
5.50 m from base
1440

mm2

157

720

N/mm2

mm2

mm2

say

150 mm c/c

0.191

6 Distribution reinforcement:Percentage area of distribution reinforcement is

0.30

0.10

480
450

100
100

0.191
x
1000 x 480 = 919
area of steel in each face = 459 mm2
100
However , no additional reinforcement will be provided at inner face since the vertical steel for cantilever action
2
will serve this purpose. Hence provided Ast= 459.4 mm in vertical direction at the outer face.
2
3.14xdia
3.14 x
8
x 8
using 8 mm bars
A
=
=
= 50 mm2
4 x100
4
x 100
Spacing of hoop Bars = 1000 x
50 / 459 =
109
say
= 100 mm
Hence Provided these 8 mm F bar, @100 mm c/c
\

Ash

7 Provision for haunches:It is customary to provide150 mmx150mm haunchesat the junction of wall and base.
A haunches reinforcement of 8 mm f @
100 mm c/c may be provided.
8 Design of tank floor.:Since the tank floor is resting on ground throughout , provide a minimum thickness of 150 mm
0.30
Minimum Ast
=
x
150 x 1000
=
450
mm2 in each direction
100
Provide half the reinfocement near each face, Ast =
225 mm2
2
3.14xdia
3.14 x
8
x 8
using 8 mm bars
A
=
=
= 50 mm2
4 x100
4
x 100
Spacing of hoop Bars = 1000 x
50
/ 225 =
223
say
= 200 mm
However provide 8 mm f bars @ 200 mm c/c in both direction , at top and bottom of floor slab.
The floor slab will rest on
75 mm thick layer of lean concrete covered with a layer of tar felt.
9 Detail of reinforcement :pk_nandwana@yahoo.co.in

The detail shown in drawing.

DESIGN OF CIRCULAR WATER TANK (Rigid joint)


Nameof work:- 0

480

15400
100%
12 mm f Ring
150 mm c/c
12 mm f Bars
80 mm c/c
12 mm f Ring
120 mm c/c

480

2.75 m

75%
2.75 m

50%
12 mm f Ring
110 mm c/c

1.80 m

12 mm f Bars
40 mm c/c
12 mm f Ring
90 mm c/c

11000

3.70 m

8 mm f Ring
200 mm c/c
8 mm f Ring
200 mm c/c
150
75

pk_nandwana@yahoo.co.in

VALUES OF DESIGN CONSTANTS


Grade of concrete
Modular Ratio

M-15
18.67

M-20
13.33

M-25
10.98

M-30
9.33

M-35
8.11

M-40
7.18

scbc N/mm2
m scbc

8.5

10

11.5

13

93.33

93.33

93.33

93.33

93.33

93.33

kc

0.4

0.4

0.4

0.4

0.4

0.4

(a) sst =
140
N/mm2
(Fe 250)

jc

0.867

0.867

0.867

0.867

0.867

0.867

Rc

0.867

1.214

1.474

1.734

1.994

2.254

Pc (%)

0.714

1.214

1.429

1.643

1.857

kc

0.329

0.329

0.329

0.329

0.329

0.329

jc

0.89

0.89

0.89

0.89

0.89

Rc

0.89
0.732

1.025

1.244

1.464

1.684

1.903

Pc (%)

0.433

0.606

0.736

0.866

0.997

1.127

kc

0.289

0.289

0.289

0.289

0.289

0.289

jc

0.904

0.904

0.904

0.904

0.904

0.904

Rc

0.653

0.914

1.11

1.306

1.502

1.698

Pc (%)

0.314

0.44

0.534

0.628

0.722

0.816

kc

0.253

0.253

0.253

0.253

0.253

0.253

jc

0.916

0.916

0.916

0.914

0.916

0.916

Rc

0.579

0.811

0.985

1.159

1.332

1.506

Pc (%)

0.23

0.322

0.391

0.46

0.53

0.599

(b) sst =
190
N/mm2
(c ) sst =
230
N/mm2
(Fe 415)
(d) sst =
275
N/mm2
(Fe 500)

Permissible shear stress Table tv in concrete (IS : 456-2000)


100As
bd
< 0.15
0.25
0.50
0.75
1.00
1.25
1.50
1.75
2.00
2.25
2.50
2.75
3.00 and above

Permissible shear stress in concrete


M-15
M-20
M-25
M-30
0.18
0.18
0.19
0.2
0.22
0.22
0.23
0.23
0.29
0.30
0.31
0.31
0.34
0.35
0.36
0.37
0.37
0.39
0.40
0.41
0.40
0.42
0.44
0.45
0.42
0.45
0.46
0.48
0.44
0.47
0.49
0.50
0.44
0.49
0.51
0.53
0.44
0.51
0.53
0.55
0.44
0.51
0.55
0.57
0.44
0.51
0.56
0.58
0.44
0.51
0.57
0.6

tv N/mm2
M-35
M-40
0.2
0.2
0.23
0.23
0.31
0.32
0.37
0.38
0.42
0.42
0.45
0.46
0.49
0.49
0.52
0.52
0.54
0.55
0.56
0.57
0.58
0.60
0.60
0.62
0.62
0.63

Maximum shear stress tc.max in concrete (IS : 456-2000)


Grade of concrete

tc.max

M-15
1.6

M-20
1.8

M-25
1.9

M-30
2.2

M-35
2.3

M-40
2.5

Grade of concrete
tbd (N / mm2)

Shear stress tc
100As
M-20
bd
0.15
0.18
0.16
0.18
0.17
0.18
0.18
0.19
0.19
0.19
0.2
0.19
0.21
0.2
0.22
0.2
0.23
0.2
0.24
0.21
0.25
0.21
0.26
0.21
0.27
0.22
0.28
0.22
0.29
0.22
0.3
0.23
0.31
0.23
0.32
0.24
0.33
0.24
0.34
0.24
0.35
0.25
0.36
0.25
0.37
0.25
0.38
0.26
0.39
0.26
0.4
0.26
0.41
0.27
0.42
0.27
0.43
0.27
0.44
0.28
0.45
0.28
0.46
0.28
0.47
0.29
0.48
0.29
0.49
0.29
0.5
0.30
0.51
0.30
0.52
0.30
0.53
0.30
0.54
0.30
0.55
0.31
0.56
0.31
0.57
0.31
0.58
0.31
0.59
0.31
0.6
0.32
0.61
0.32
0.62
0.32

Reiforcement %
100As
M-20
bd
0.18
0.15
0.19
0.18
0.2
0.21
0.21
0.24
0.22
0.27
0.23
0.3
0.24
0.32
0.25
0.35
0.26
0.38
0.27
0.41
0.28
0.44
0.29
0.47
0.30
0.5
0.31
0.55
0.32
0.6
0.33
0.65
0.34
0.7
0.35
0.75
0.36
0.82
0.37
0.88
0.38
0.94
0.39
1.00
0.4
1.08
0.41
1.16
0.42
1.25
0.43
1.33
0.44
1.41
0.45
1.50
0.46
1.63
0.46
1.64
0.47
1.75
0.48
1.88
0.49
2.00
0.50
2.13
0.51
2.25

0.63
0.64
0.65
0.66
0.67
0.68
0.69
0.7
0.71
0.72
0.73
0.74
0.75
0.76
0.77
0.78
0.79
0.8
0.81
0.82
0.83
0.84
0.85
0.86
0.87
0.88
0.89
0.9
0.91
0.92
0.93
0.94
0.95
0.96
0.97
0.98
0.99
1.00
1.01
1.02
1.03
1.04
1.05
1.06
1.07
1.08
1.09
1.10
1.11
1.12
1.13
1.14

0.32
0.32
0.33
0.33
0.33
0.33
0.33
0.34
0.34
0.34
0.34
0.34
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.36
0.36
0.36
0.36
0.36
0.36
0.37
0.37
0.37
0.37
0.37
0.37
0.38
0.38
0.38
0.38
0.38
0.38
0.39
0.39
0.39
0.39
0.39
0.39
0.39
0.39
0.4
0.4
0.4
0.4
0.4
0.4
0.4

1.15
1.16
1.17
1.18
1.19
1.20
1.21
1.22
1.23
1.24
1.25
1.26
1.27
1.28
1.29
1.30
1.31
1.32
1.33
1.34
1.35
1.36
1.37
1.38
1.39
1.40
1.41
1.42
1.43
1.44
1.45
1.46
1.47
1.48
1.49
1.50
1.51
1.52
1.53
1.54
1.55
1.56
1.57
1.58
1.59
1.60
1.61
1.62
1.63
1.64
1.65
1.66

0.4
0.41
0.41
0.41
0.41
0.41
0.41
0.41
0.41
0.41
0.42
0.42
0.42
0.42
0.42
0.42
0.42
0.42
0.43
0.43
0.43
0.43
0.43
0.43
0.43
0.43
0.44
0.44
0.44
0.44
0.44
0.44
0.44
0.44
0.44
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.46
0.46
0.46
0.46

1.67
1.68
1.69
1.70
1.71
1.72
1.73
1.74
1.75
1.76
1.77
1.78
1.79
1.80
1.81
1.82
1.83
1.84
1.85
1.86
1.87
1.88
1.89
1.90
1.91
1.92
1.93
1.94
1.95
1.96
1.97
1.98
1.99
2.00
2.01
2.02
2.03
2.04
2.05
2.06
2.07
2.08
2.09
2.10
2.11
2.12
2.13
2.14
2.15
2.16
2.17
2.18

0.46
0.46
0.46
0.46
0.46
0.46
0.46
0.46
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.48
0.48
0.48
0.48
0.48
0.48
0.48
0.48
0.48
0.48
0.48
0.48
0.49
0.49
0.49
0.49
0.49
0.49
0.49
0.49
0.49
0.49
0.49
0.49
0.49
0.50
0.50
0.50
0.50
0.50
0.50

2.19
2.20
2.21
2.22
2.23
2.24
2.25
2.26
2.27
2.28
2.29
2.30
2.31
2.32
2.33
2.34
2.35
2.36
2.37
2.38
2.39
2.40
2.41
2.42
2.43
2.44
2.45
2.46
2.47
2.48
2.49
2.50
2.51
2.52
2.53
2.54
2.55
2.56
2.57
2.58
2.59
2.60
2.61
2.62
2.63
2.64
2.65
2.66
2.67
2.68
2.69
2.70

0.50
0.50
0.50
0.50
0.50
0.50
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51

2.71
2.72
2.73
2.74
2.75
2.76
2.77
2.78
2.79
2.80
2.81
2.82
2.83
2.84
2.85
2.86
2.87
2.88
2.89
2.90
2.91
2.92
2.93
2.94
2.95
2.96
2.97
2.98
2.99
3.00
3.01
3.02
3.03
3.04
3.05
3.06
3.07
3.08
3.09
3.10
3.11
3.12
3.13
3.14
3.15

0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51

Permissible Bond stress Table tbd in concrete (IS : 456-2000)


Grade of concreteM-10
-tbd (N / mm2)

M-15
0.6

M-20
0.8

M-25
0.9

M-30
1

M-35
1.1

M-40
1.2

M-45
1.3

Development Length in tension


Plain M.S. Bars

H.Y.S.D. Bars

Grade of
concrete

tbd (N / mm2)

kd = Ld F

tbd (N / mm2)

kd = Ld F

M 15

0.6

58

0.96

60

M 20

0.8

44

1.28

45

M 25

0.9

39

1.44

40

M 30

35

1.6

36

M 35

1.1

32

1.76

33

M 40

1.2

29

1.92

30

M 45

1.3

27

2.08

28

M 50

1.4

25

2.24

26

Permissible stress in concrete (IS : 456-2000)


Grade of
concrete
M
M
M
M
M
M
M
M
M

10
15
20
25
30
35
40
45
50

Permission stress in compression (N/mm 2) Permissible stress in bond (Average) for


Bending acbc
Direct (acc)
plain bars in tention (N/mm2)
(N/mm2)
3.0
5.0
7.0
8.5
10.0
11.5
13.0
14.5
16.0

Kg/m2
300
500
700
850
1000
1150
1300
1450
1600

(N/mm2)
2.5
4.0
5.0
6.0
8.0
9.0
10.0
11.0
12.0

Kg/m2
250
400
500
600
800
900
1000
1100
1200

(N/mm2)
-0.6
0.8
0.9
1.0
1.1
1.2
1.3
1.4

in kg/m2
-60
80
90
100
110
120
130
140

00)
M-50
1.4

Modification factore

2.0
1.4
1.2
0.8
0.4

0.0

0.4
0.8
Percentage of tension reinforcement

1.2

1.6

2.4

2.8

VALUES OF DESIGN CONSTANTS


Grade of concrete
Modular Ratio

M-15
18.67

M-20
13.33

M-25
10.98

M-30
9.33

M-35
8.11

M-40
7.18

scbc N/mm2
m scbc

8.5

10

11.5

13

(a) sst =
140
N/mm2
(Fe 250)

93.33

93.33

93.33

93.33

93.33

93.33

kc

0.4

0.4

0.4

0.4

0.4

0.4

jc

0.867

0.867

0.867

0.867

0.867

0.867

Rc

0.867

1.214

1.474

1.734

1.994

2.254

Pc (%)

0.714

1.214

1.429

1.643

1.857

kc

0.329

0.329

0.329

0.329

0.329

0.329

0.89

0.89

0.89

0.89

Rc

0.89
0.732

0.89
1.025

1.244

1.464

1.684

1.903

Pc (%)

0.433

0.606

0.736

0.866

0.997

1.127

kc

0.289

0.289

0.289

0.289

0.289

0.289

jc

0.904

0.904

0.904

0.904

0.904

0.904

(b) sst =
190
N/mm2
(c ) sst =
230
N/mm2
(Fe 415)
(d) sst =
275
N/mm2
(Fe 500)

jc

Rc

0.653

0.914

1.11

1.306

1.502

1.698

Pc (%)

0.314

0.44

0.534

0.628

0.722

0.816

kc

0.253

0.253

0.253

0.253

0.253

0.253

jc

0.916

0.916

0.916

0.914

0.916

0.916

Rc

0.579

0.811

0.985

1.159

1.332

1.506

Pc (%)

0.23

0.322

0.391

0.46

0.53

0.599

Permissible shear stress Table tv in concrete (IS : 456-2000)


100As
bd
< 0.15
0.25
0.50
0.75
1.00
1.25
1.50
1.75
2.00
2.25
2.50
2.75
3.00 and above

Permissible shear stress in concrete


M-15
M-20
M-25
M-30
0.18
0.18
0.19
0.2
0.22
0.22
0.23
0.23
0.29
0.30
0.31
0.31
0.34
0.35
0.36
0.37
0.37
0.39
0.40
0.41
0.40
0.42
0.44
0.45
0.42
0.45
0.46
0.48
0.44
0.47
0.49
0.50
0.44
0.49
0.51
0.53
0.44
0.51
0.53
0.55
0.44
0.51
0.55
0.57
0.44
0.51
0.56
0.58
0.44
0.51
0.57
0.6

tv N/mm2
M-35
M-40
0.2
0.2
0.23
0.23
0.31
0.32
0.37
0.38
0.42
0.42
0.45
0.46
0.49
0.49
0.52
0.52
0.54
0.55
0.56
0.57
0.58
0.60
0.60
0.62
0.62
0.63

Maximum shear stress tc.max in concrete (IS : 456-2000)


Grade of concrete

tc.max

Shear stress tc
100As
M-20
bd

M-15
1.6

M-20
1.8

Reiforcement %
100As
M-20
bd

M-25
1.9

M-30
2.2

M-35
2.3

M-40
2.5

Grade of concrete

0.15
0.16
0.17
0.18
0.19
0.2
0.21
0.22
0.23
0.24
0.25
0.26
0.27
0.28
0.29
0.3
0.31
0.32
0.33
0.34
0.35
0.36
0.37
0.38
0.39
0.4
0.41
0.42
0.43
0.44
0.45
0.46
0.47
0.48
0.49
0.5
0.51
0.52
0.53
0.54
0.55
0.56
0.57
0.58
0.59
0.6
0.61
0.62
0.63
0.64
0.65
0.66
0.67
0.68
0.69
0.7

0.18
0.18
0.18
0.19
0.19
0.19
0.2
0.2
0.2
0.21
0.21
0.21
0.22
0.22
0.22
0.23
0.23
0.24
0.24
0.24
0.25
0.25
0.25
0.26
0.26
0.26
0.27
0.27
0.27
0.28
0.28
0.28
0.29
0.29
0.29
0.30
0.30
0.30
0.30
0.30
0.31
0.31
0.31
0.31
0.31
0.32
0.32
0.32
0.32
0.32
0.33
0.33
0.33
0.33
0.33
0.34

0.18
0.19
0.2
0.21
0.22
0.23
0.24
0.25
0.26
0.27
0.28
0.29
0.30
0.31
0.32
0.33
0.34
0.35
0.36
0.37
0.38
0.39
0.4
0.41
0.42
0.43
0.44
0.45
0.46
0.46
0.47
0.48
0.49
0.50
0.51

0.15
0.18
0.21
0.24
0.27
0.3
0.32
0.35
0.38
0.41
0.44
0.47
0.5
0.55
0.6
0.65
0.7
0.75
0.82
0.88
0.94
1.00
1.08
1.16
1.25
1.33
1.41
1.50
1.63
1.64
1.75
1.88
2.00
2.13
2.25

0.71
0.72
0.73
0.74
0.75
0.76
0.77
0.78
0.79
0.8
0.81
0.82
0.83
0.84
0.85
0.86
0.87
0.88
0.89
0.9
0.91
0.92
0.93
0.94
0.95
0.96
0.97
0.98
0.99
1.00
1.01
1.02
1.03
1.04
1.05
1.06
1.07
1.08
1.09
1.10
1.11
1.12
1.13
1.14
1.15
1.16
1.17
1.18
1.19
1.20
1.21
1.22
1.23
1.24
1.25
1.26

0.34
0.34
0.34
0.34
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.36
0.36
0.36
0.36
0.36
0.36
0.37
0.37
0.37
0.37
0.37
0.37
0.38
0.38
0.38
0.38
0.38
0.38
0.39
0.39
0.39
0.39
0.39
0.39
0.39
0.39
0.4
0.4
0.4
0.4
0.4
0.4
0.4
0.4
0.41
0.41
0.41
0.41
0.41
0.41
0.41
0.41
0.41
0.42
0.42

1.27
1.28
1.29
1.30
1.31
1.32
1.33
1.34
1.35
1.36
1.37
1.38
1.39
1.40
1.41
1.42
1.43
1.44
1.45
1.46
1.47
1.48
1.49
1.50
1.51
1.52
1.53
1.54
1.55
1.56
1.57
1.58
1.59
1.60
1.61
1.62
1.63
1.64
1.65
1.66
1.67
1.68
1.69
1.70
1.71
1.72
1.73
1.74
1.75
1.76
1.77
1.78
1.79
1.80
1.81
1.82

0.42
0.42
0.42
0.42
0.42
0.42
0.43
0.43
0.43
0.43
0.43
0.43
0.43
0.43
0.44
0.44
0.44
0.44
0.44
0.44
0.44
0.44
0.44
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.46
0.46
0.46
0.46
0.46
0.46
0.46
0.46
0.46
0.46
0.46
0.46
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47

1.83
1.84
1.85
1.86
1.87
1.88
1.89
1.90
1.91
1.92
1.93
1.94
1.95
1.96
1.97
1.98
1.99
2.00
2.01
2.02
2.03
2.04
2.05
2.06
2.07
2.08
2.09
2.10
2.11
2.12
2.13
2.14
2.15
2.16
2.17
2.18
2.19
2.20
2.21
2.22
2.23
2.24
2.25
2.26
2.27
2.28
2.29
2.30
2.31
2.32
2.33
2.34
2.35
2.36
2.37
2.38

0.47
0.47
0.47
0.47
0.47
0.48
0.48
0.48
0.48
0.48
0.48
0.48
0.48
0.48
0.48
0.48
0.48
0.49
0.49
0.49
0.49
0.49
0.49
0.49
0.49
0.49
0.49
0.49
0.49
0.49
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51

2.39
2.40
2.41
2.42
2.43
2.44
2.45
2.46
2.47
2.48
2.49
2.50
2.51
2.52
2.53
2.54
2.55
2.56
2.57
2.58
2.59
2.60
2.61
2.62
2.63
2.64
2.65
2.66
2.67
2.68
2.69
2.70
2.71
2.72
2.73
2.74
2.75
2.76
2.77
2.78
2.79
2.80
2.81
2.82
2.83
2.84
2.85
2.86
2.87
2.88
2.89
2.90
2.91
2.92
2.93
2.94

0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51

2.95
2.96
2.97
2.98
2.99
3.00
3.01
3.02
3.03
3.04
3.05
3.06
3.07
3.08
3.09
3.10
3.11
3.12
3.13
3.14
3.15

0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51

Permissible Bond stress Table tbd in concrete (IS : 456-2000)


Grade of concrete
2
tbd (N / mm )

M-10
--

M-15
0.6

M-20
0.8

M-25
0.9

M-30
1

M-35
1.1

M-40
1.2

M-45
1.3

Development Length in tension


Grade of
concrete

Plain M.S. Bars


tbd (N / mm2)
kd = Ld F

H.Y.S.D. Bars
tbd (N / mm2)
kd = Ld F

M 15

0.6

58

0.96

60

M 20

0.8

44

1.28

45

M 25

0.9

39

1.44

40

M 30

35

1.6

36

M 35

1.1

32

1.76

33

M 40

1.2

29

1.92

30

M 45

1.3

27

2.08

28

M 50

1.4

25

2.24

26

Permissible stress in concrete (IS : 456-2000)


Grade of
concrete
M
M
M
M
M
M
M
M
M

10
15
20
25
30
35
40
45
50

Permission stress in compression (N/mm2) Permissible stress in bond (Average) for


2
Bending acbc
plain bars in tention (N/mm )
Direct (acc)
(N/mm2)
3.0
5.0
7.0
8.5
10.0
11.5
13.0
14.5
16.0

Kg/m2
300
500
700
850
1000
1150
1300
1450
1600

(N/mm2)
2.5
4.0
5.0
6.0
8.0
9.0
10.0
11.0
12.0

Kg/m2
250
400
500
600
800
900
1000
1100
1200

in kg/m2
-60
80
90
100
110
120
130
140

(N/mm2)
-0.6
0.8
0.9
1.0
1.1
1.2
1.3
1.4

Permissible direct tensile stress in concrete (IS : 456-2000)


Grade of concrete

sct.max

M-10
1.2

M-15
2.0

M-20
2.8

M-25
3.2

M-30
3.6

M-35
4.0

M-40
4.4

6-2000)
M-50
1.4

Potrebbero piacerti anche