Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
10
11
12
13
14 Sheet of
15
10
11
12
26500
13
14
15
5300
C
5300
5300
5300
5300
C 00UEL
TOS+7.700m 152UC30
CH S
152UC30
152UC30
152UC30
152UC30
. 1 68
.3 3x6
KEY PLAN
6 .3
3x 68.
HS . 3C
1 68
.3 x
C HS
TOS+5.000m 152UC30
E
152UC30
152UC30
152UC30
152UC30
E
16
8. 3
x6
.3 C
HS
610UB101
610UB101
610UB101
610UB101
610UB101
610UB101
8 16
.3 x
C 6. 3
HS
8 16
.3 x
C 6. 3
HS
0.000m
FOR REVIEW
Project title
PROPOSED ERECTION OF POWER GENERATION PLANT ON LOT 01962A PT MK 34 AT JURONG ISLAND HIGHWAY, JURONG ISLAND FOR M/S GMR ENERGY (SINGAPORE) PTE LTD
OWNER
Siemens AG
E F ES PM Kaiserleistrae 10 63067 Offenbach, Germany
Pte, Ltd.
K
Projekt/Project PKZ/PC
NOTES:
1. FOR GENERAL NOTES, REFER TO DWG No. SIN154-05U-CEB010-010551. 2. ALL DIMENSIONS ARE IN MILLIMETERS (mm) AND ELEVATIONS ARE IN METERS (m). 3. LEVELS: EL 0.00m = POWERPLANT FFL 0.00m =GL + 0.30m = +103.700 = +5.422 CD 4. CONTRACTOR SHALL ENSURE THAT STEEL FRAMES ARE SUFFICIENTLY RESTRAINED AGAINST LATERAL FORCES WITH TEMPORARY PROPPING OR STRUCTURES DURING CONSTRUCTION PRIOR TO INSTALLATION OF BRACING MEMBERS IN THE PERMANENT STAGE. 5. STEEL STRUCTURES SHALL BE COMPLETELY ERECTED, BRACED, AND GROUTED BEFORE COMMISSIONING THE CRANE OR INSTALLATION OF ROOF CLADDING.
SIN154 CLC031
Zhl-Nr. Serial no. Inhaltskennzeichen Contents code
443569454
Variante Variant Ursprung-Nr. Origin no.
Abtlg. Dept.
- 25NOV11
Index Rev. Gewicht Weight Datum gezeich. Drawn bearb. Coord. geprft Checked Datum Date
ECV
bearb. Coord. Format Format Name Mastab Scale
GP
geprft Checked
1:50
Titel/Title
ECV SJK GP
Tekla Structures
SAMSUNG C&T
14
SIN154-00UEL-CLC031-017331
15
Blatt-Nr. Sheet no.
1/5