OBRA:

VALORIZACIN DE AVANCE DE OBRA N 01


: CONSTRUCCION DE AULA +SS - HH DEL PRONOEI ESTRELLITAS DEL SABER,LIMAC BAJO,DISTRITO DE SAUCEPAMPA-SANTA CRUZ-CAJAMARCA

ENTIDAD EJECUTORA

: ALMAPEC S. R . L.

UBICACIN

: CASERIO LIMAC BAJO.

MODALIDAD DE EJEC.

: SUMA ALZADA.

SUPERVISOR

: ING. JULIO ORTIZ VARGAS.

RESIDENTE

: ARQ. FREDY OMAR GERRERO PADILLA

PLAZO DE EJECUCION

: 60 DIAS CALENDARIOS.

FECHA DE PRESENTACIN:

PRESUPUESTO
PARTIDA

01

DESCRIPCION

1 DIC.- 27 DIC.
27-Dec

CORRESPONDIENTE AL MES DE:


AVANCES
ANTERIOR

Und.

Metrado

P. Unit. S/.

Presup. S/.

ACTUAL

Metrado

Valorizado
S/.

Metrado

SALDO

ACUMULADO

Valorizado
S/.

Metrado

Valorizado
S/.

Metrado

Valorizado
S/.

OBRAS PROVISIONALES

01.01

CARTEL DE IDENTIFICACION DE OBRA DE 3.60 X 2.40M.

und

1.00

523.92

523.92

0.00

0.00

1.00

523.92

1.00

523.92

100.00%

01.02

ALMACEN PARA OBRA

GLB

1.00

100.00

100.00

0.00

0.00

1.00

100.00

1.00

100.00

100.00%

01.03

MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Y HERRAMIENTAS

GLB

1.00

400.00

400.00

0.00

0.00

0.50

200.00

0.50

200.00

50.00%

0.50

200.00

02

TRABAJOS PRELIMINARES

02.01

LIMPIEZA DE TERRENO

m2

101.35

0.45

45.61

0.00

0.00

101.35

45.61

101.35

45.61

100.00%

02.02

TRAZO Y REPLANTEO

m2

101.35

0.91

92.23

0.00

0.00

101.35

92.23

101.35

92.23

100.00%

02.03

CORTE DE TERRENO

m3

45.61

12.22

557.35

0.00

0.00

45.61

557.35

45.61

557.35

100.00%

02.04

DISEO DE MEZCLAS

und

1.00

200.00

200.00

0.00

0.00

1.00

200.00

1.00

200.00

100.00%

03

MOVIMIENTO DE TIERRAS

03.01

NIVELACION Y APISONADO MANUAL

m2

101.35

2.33

236.15

0.00

0.00

101.35

236.15

101.35

236.15

100.00%

03.02

EXCAVACION PARA ZANJAS Y ZAPATAS HASTA 1.20 M.

m3

27.76

52.13

1447.13

0.00

0.00

27.76

1,447.13

27.76

1447.13

100.00%

03.03

RELLENO COMPACTADO CON MATERIAL PROPIO

m3

10.20

8.87

90.47

0.00

0.00

10.20

90.47

10.20

90.47

100.00%

03.04

RELLENO COMPACTADO CON MATERIAL DE PRESTAMO

m3

10.39

113.03

1174.38

0.00

0.00

10.39

1,174.38

10.39

1174.38

100.00%

03.05

ELIMINACION MATERIAL EXCEDENTE HASTA 30.00 MT (A MANO USANDO CARRETILLA)

m3

74.17

8.15

604.49

0.00

0.00

74.17

604.49

74.17

604.49

100.00%

04

OBRAS DE CONCRETO SIMPLE

04.01

CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA

m3

11.28

177.69

2004.34

0.00

0.00

11.28

2,004.34

11.28

2004.34

100.00%

04.02

SOLADO PARA ZAPATAS DE 4" MEZCLA 1:12 CEMENTO-HORMIGON

m2

6.88

16.10

110.77

0.00

0.00

6.88

110.77

6.88

110.77

100.00%

05
05.01

OBRAS DE CONCRETO ARMADO


ZAPATAS

05.01.01

CONCRETO EN ZAPATAS F'C=210 KG/CM2

m3

3.44

329.07

1132.00

0.00

0.00

3.44

1,132.00

3.44

1132.00

100.00%

05.01.02

ACERO Fy=4200Kg/Cm2. EN ZAPATAS

kg

72.38

3.25

235.24

0.00

0.00

72.38

235.24

72.38

235.24

100.00%

05.02

SOBRECIMIENTOS ARMADOS

05.02.01

CONCRETO EN SOBRECIMIENTO ARMADO F'C=210 KG/CM2

m3

4.38

300.18

1314.79

0.00

0.00

4.38

1,314.79

4.38

1314.79

100.00%

05.02.02

ENCOFRADO Y DESENCOFRADO PARA SOBRECIMIENTOS ARMADOS

m2

48.56

24.64

1196.52

0.00

0.00

48.56

1,196.52

48.56

1196.52

100.00%

05.02.03

ACERO Fy= 4200Kg/Cm2. EN SOBRECIMIENTO ARMADO

kg

234.68

3.31

776.79

0.00

0.00

234.68

776.79

234.68

776.79

100.00%

05.03

COLUMNAS

05.03.01

CONCRETO EN COLUMNAS F'C=210 KG/CM2

m3

3.45

329.07

1135.29

0.00

0.00

3.45

1,135.29

3.45

1135.29

100.00%

05.03.02

ENCOFRADO Y DESENCOFRADO EN COLUMNAS

m2

51.43

32.04

1647.82

0.00

0.00

51.43

1,647.82

51.43

1647.82

100.00%

05.03.03

ACERO Fy=4200Kg/Cm2. EN COLUMNAS

kg

683.88

3.25

2222.61

0.00

0.00

683.88

2,222.61

683.88

2222.61

100.00%

05.04

VIGAS

05.04.01

CONCRETO EN VIGAS F'C=210 KG/CM2

m3

3.99

336.78

1343.75

0.00

0.00

3.99

1,343.75

3.99

1343.75

100.00%

05.04.02

ENCOFRADO Y DESENCOFRADO EN VIGAS

m2

43.35

37.72

1635.16

0.00

0.00

43.35

1,635.16

43.35

1635.16

100.00%

05.04.03

ACERO Fy= 4200Kg/Cm2. EN VIGAS

kg

519.75

3.25

1689.19

0.00

0.00

519.75

1,689.19

519.75

1689.19

100.00%

05.05

ESTRUCTURAS DE MADERA EN TECHO

05.05.01

TIJERAL T-1(LONGITUD = 9.40 M)

und

3.00

666.39

1999.17

0.00

0.00

3.00

1,999.17

3.00

1999.17

100.00%

05.05.02

CORREAS Y TIRANTES DE MADERA 2"x 3"

137.10

7.85

1076.24

0.00

0.00

137.10

1,076.24

137.10

1076.24

100.00%

05.05.03

COBERTURA TEJA ANDINA 1.14*.72

m2

117.63

44.74

5262.77

0.00

0.00

117.63

5,262.77

117.63

5262.77

100.00%

05.05.04

CUMBRERA ARTICULADA SUPERIOR E INFERIOR TEJA ANDINA

26.20

42.92

1124.50

0.00

0.00

26.20

1,124.50

26.20

1124.50

100.00%

ARQUITECTURA
01

ALBAILERIA

01.01

MURO DE LADRILLO KK DE 24x12x9 CABEZA, J = 1.5 CM

m2

28.34

63.65

1803.84

0.00

0.00

28.34

1,803.84

28.34

1803.84

100.00%

01.02

MURO DE LADRILLO KK 24x12x9 SOGA, J = 1.5 CM

m2

67.76

37.73

2556.58

0.00

0.00

67.76

2,556.58

67.76

2556.58

100.00%

01.03

ALAMBRE # 8 REFUERZO HORIZONTAL EN MUROS

kg

38.11

4.20

160.06

0.00

0.00

38.11

160.06

38.11

160.06

100.00%

02

REVOQUES Y ENLUCIDOS

02.01

TARRAJEO TIPO PRIMARIO O RAYADO

m2

8.76

11.33

99.25

0.00

0.00

8.76

99.25

8.76

99.25

100.00%

02.02

TARRAJEO EN MUROS INTERIORES

m2

10.71

12.13

129.91

0.00

0.00

3.54

42.94

3.54

42.94

33.05%

7.17

86.97

02.03

TARRAJEO EN MUROS EXTERIORES

m2

90.91

12.13

1102.74

0.00

0.00

0.00

0.00

0.00%

90.91

1,102.74

02.04

TARRAJEO DE VIGAS

m2

36.88

21.34

787.02

0.00

0.00

0.00

0.00

0.00%

36.88

787.02

02.05

TARRAJEO DE COLUMNAS

m2

28.44

17.12

486.89

0.00

0.00

0.00

0.00

0.00%

28.44

486.89

02.06

VESTIDURA DE DERRAMES ANCHO=15 CM.

47.58

8.42

400.62

0.00

0.00

0.00

0.00

0.00%

47.58

400.62

02.07

BRUAS DE 1 cm.

100.50

1.37

137.69

0.00

0.00

0.00

0.00

0.00%

100.50

137.69

m2

94.84

40.22

3814.46

0.00

0.00

0.00

0.00

0.00%

94.84

3,814.46

03
03.01
04

CIELORRASOS
CIELO RASO CON FIBROCEMENTO
PISOS Y PAVIMENTOS

04.01

FALSO PISO DE 4" DE CONCRETO 1:8

m2

55.61

25.90

1440.30

0.00

0.00

55.61

1,440.30

55.61

1440.30

100.00%

04.02

CONTRAPISO DE 40 MM

m2

4.46

45.56

203.20

0.00

0.00

4.46

203.20

4.46

203.20

100.00%

04.03

PISO DE CERAMICA DE COLOR CLARO DE 30X30 CM.

m2

4.46

44.96

200.52

0.00

0.00

0.00

0.00

0.00%

4.46

200.52

04.04

VEREDA DE CONCRETO F'C=140 KG/CM2

m2

41.47

44.47

1844.17

0.00

0.00

0.00

0.00

0.00%

41.47

1,844.17

04.05

ENCOFRADO Y DESENCOFRADO NORMAL VEREDAS

m2

41.47

9.87

409.31

0.00

0.00

0.00

0.00

0.00%

41.47

409.31

04.06

PISO DE CONCRETO PULIDO COLOREADO, e=2", F'C = 140 KG/CM2

m2

51.15

39.95

2043.44

0.00

0.00

51.15

2043.44

100.00%

04.07

BRUAS EN VEREDAS

88.44

2.75

243.21

0.00

0.00

0.00

0.00

0.00%

88.44

243.21

JUNTAS DE TECNOPORT 1"

7.10

1.36

9.66

0.00

0.00

0.00

0.00

0.00%

7.10

9.66

04.08
05

51.15

2,043.44

CONTRAZOCALOS

05.01

CONTRAZOCALO CEMENTO S/COLOREAR H = 20 CM

28.70

5.26

150.96

0.00

0.00

0.00

0.00

0.00%

28.70

150.96

05.02

CONTRAZOCALO CEMENTO S/COLOREAR H = 30 CM

29.30

6.96

203.93

0.00

0.00

0.00

0.00

0.00%

29.30

203.93

m2

8.76

41.85

366.61

0.00

0.00

0.00

0.00

0.00%

8.76

366.61

m2

11.17

122.20

1364.97

0.00

0.00

0.00

0.00

0.00%

11.17

1,364.97

m2

6.02

436.44

2627.37

0.00

0.00

0.00

0.00

0.00%

6.02

2,627.37

06
06.01
07
07.01
08
08.01
09

ZOCALOS
ZOCALO DE CERAMICA 0.30X0.30 , H=1.20M
CARPINTERIA METALICA
VENTANA METALICA
CARPINTERIA DE MADERA
PUERTAS DE MADERA DE CEDRO MACHIEMBRADA
CERRAJERIA

09.01

BISAGRA ALUMINIZADAS CAPUCHINA DE 4" X 4"

pza

9.00

4.05

36.45

0.00

0.00

0.00

0.00

0.00%

9.00

36.45

09.02

CERRADURA PARA PUERTA INTERIORES

pza

3.00

42.42

127.26

0.00

0.00

0.00

0.00

0.00%

3.00

127.26

09.03

MANIJA DE BRONCE PARA PUERTAS

und

3.00

5.98

17.94

0.00

0.00

0.00

0.00

0.00%

3.00

17.94

09.04

MANIJA DE BRONCE PARA VENTANAS

und

12.00

5.98

71.76

0.00

0.00

0.00

0.00

0.00%

12.00

71.76

p2

120.18

2.76

331.70

0.00

0.00

0.00

0.00

0.00%

120.18

331.70

10
10.01
11

VIDRIOS, CRISTALES Y SIMILARES


VIDRIOS SEMIDOBLES INCOLORO CRUDO
PINTURA

11.01

PINTURA SATINADA EN INTERIORES

m2

70.71

8.54

603.86

0.00

0.00

0.00

0.00

0.00%

70.71

603.86

11.02

PINTURA SATINADA EN COLUMNAS,VIGAS Y DERRAMES

m2

112.90

10.55

1191.10

0.00

0.00

0.00

0.00

0.00%

112.90

1,191.10

11.03

PINTURA SATINADA EXTERIORES

m2

90.91

8.54

776.37

0.00

0.00

0.00

0.00

0.00%

90.91

776.37

11.04

PINTURA DE CONTRAZOCALO C/ESMALTE

m2

14.53

2.35

34.15

0.00

0.00

0.00

0.00

0.00%

14.53

34.15

m2

1.00

400.00

400.00

0.00

0.00

0.00

0.00

0.00%

1.00

400.00

12
12.01
13

PIZARRAS
PIZARRA ACRILICA 4.00 X 1.20 M. (INLCL TICERO METALICO)
JUNTAS

13.01

JUNTAS ASFALTICA, E=1"

90.22

4.91

442.98

0.00

0.00

0.00

0.00

0.00%

90.22

442.98

13.02

JUNTAS DE TECNOPORT 1"

16.60

1.36

22.58

0.00

0.00

0.00

0.00

0.00%

16.60

22.58

14

INSTALACIONES SANITARIAS

14.01

CONCRETO Fc= 140 KG/CM2, PARA CUNETA PRINCIPAL

m3

0.55

291.78

160.48

0.00

0.00

0.28

80.24

0.28

80.24

50.00%

0.28

80.24

14.02

ENCOFRADO Y DESENCOFRADO DE CUNETA DE PROTECCION

m2

7.70

21.83

168.09

0.00

0.00

3.85

84.05

3.85

84.05

50.00%

3.85

84.05

14.03

REJILLA METALICA PARA CANALETAS DE PISO

1.20

54.29

65.15

0.00

0.00

0.00

0.00

0.00%

1.20

65.15

14.04

TUBERIAS PVC D= 4"

22.38

5.00

111.90

0.00

0.00

22.38

111.90

22.38

111.90

100.00%

14.05

TUBERIA F G 3"

5.20

9.00

46.80

0.00

0.00

5.20

46.80

5.20

46.80

100.00%

14.06

ACCESORIOS

GLB

1.00

750.00

750.00

0.00

0.00

0.50

375.00

0.50

375.00

50.00%

0.50

375.00

RED DE AGUA

GLB

1.00

250.00

250.00

0.00

0.00

1.00

250.00

1.00

250.00

100.00%

484.20

14.07
15

INSTALACIONES ELECTRICAS

15.01

SALIDA PARA CENTRO DE LUZ

pto

10.00

48.42

484.20

0.00

0.00

0.00

0.00

0.00%

10.00

15.02

SALIDA PARA TOMACORRIENTES

pto

6.00

61.49

368.94

0.00

0.00

6.00

368.94

6.00

368.94

100.00%

15.03

TUBERIAS PVC SAP (ELECTRICAS) D=3/4"

80.00

5.94

475.20

0.00

0.00

40.00

237.60

40.00

237.60

50.00%

40.00

237.60

15.04

CAJA DE PASE FG 4"X4"X1.5"

und

2.00

16.57

33.14

0.00

0.00

2.00

33.14

2.00

33.14

100.00%

15.05

CAJA PORTA MEDIDOR MONOFASICO

und

1.00

103.47

103.47

0.00

0.00

1.00

103.47

1.00

103.47

100.00%

15.06

TABLERO AUTO. 2-2X20, 2-2X15A

pza

1.00

238.48

238.48

0.00

0.00

1.00

238.48

1.00

238.48

100.00%

15.07

LUMINARIA PARA LAMPARAS COLGANTES

und

8.00

101.59

812.72

0.00

0.00

0.00

0.00

0.00%

8.00

812.72

LUMINARIA AHORRADOR

und

2.00

12.00

24.00

0.00

0.00

0.00

0.00

0.00%

2.00

24.00

15.08
16

VARIOS

16.01

FLETE TERRESTRE-CHICLAYO-LA ESPERANZA- MARCOPAMPA

kg

37803.83

0.10

3780.38

0.00

0.00

16.02

PLACA RECORDATORIA

GLB

1.00

400.00

400.00

0.00

0.00

16.03

ROTURA DE PROBETAS

GLB

1.00

200.00

200.00

0.00

0.00

16.04

MOBILIARIO

GLB

1.00

1714.90

1714.90

0.00

0.00

16.05

TANQUE SEPTICO Y POZO PERCOLADOR

GLB

1.00

3000.00

3000.00

0.00

0.00

COSTO DIRECTO

0.50
1.00

2,497.32

24973.21

2497.32

66.06%

12,830.62

1,283.06

0.00

0.00

0.00%

1.00

400.00

100.00

0.50

100.00

50.00%

0.50

100.00

0.00

0.00

0.00%

1.00

1,714.90

1.00

3000.00

100.00%

3,000.00

47,055.22

47,055.22

66.08%

24,154.16

GASTOS GENERALES

9.13 %

6,500.00

4,295.21

4,295.21

66.08%

2,204.79

UTILIDAD

6.50 %

4,628.61

3,058.59

3,058.59

66.08%

1,570.02

IGV

18.00 %

14,820.84

9,793.62

9,793.62

66.08%

5,027.21

64,202.64

64,202.64

66.08%

32,956.18

VALOR REFERENCIAL

71,209.39

24,973.21

97,158.84

RIZACIN DE AVANCE DE OBRA N 01

DEL 2012
DEL 2012
SALDO
%

0.00%
0.00%
50.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00%
0.00%
0.00%
0.00%

0.00%
0.00%
0.00%
0.00%
66.95%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00%
0.00%
100.00%
100.00%
100.00%
0.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
50.00%
50.00%
100.00%
0.00%
0.00%
50.00%
0.00%
100.00%
0.00%
50.00%
0.00%
0.00%
0.00%
100.00%
100.00%
33.94%
100.00%
50.00%
100.00%
0.00%
33.92%
33.92%
33.92%
33.92%
33.92%

OBRA:
ENTIDAD EJECUTORA
UBICACIN
MODALIDAD DE EJEC.
SUPERVISOR
RESIDENTE
PLAZO DE EJECUCION

:
:
:
:
:
:
:

RESUMEN DE VALORIZACION N 01 MES DE DICIEMBRE DE 2012


CONSTRUCCION DE AULA +SS - HH DEL PRONOEI ESTRELLITAS DEL SABER,LIMAC BAJO,DISTRITO DE SAUCEPAMPA-SANTA CRUZ-CAJAMARCA
ALMAPEC S. R . L.
CASERIO LIMAC BAJO.
SUMA ALZADA.
CORRESPONDIENTE AL MES DE:
1 DIC.- 27 DIC.
ING. JULIO ORTIZ VARGAS.
DEL 2012
FECHA DE PRESENTACIN:
ARQ. FREDY OMAR GERRERO PADILLA
27-Dec
DEL 2012
60 DIAS CALENDARIOS.
CALCULO DE VALORIZACIONES

Presupuesto Contrado
Coeficiente de Relacion
Costo Directo
Gastos generales (9.13%)
Utilidad (6.5%)
IGV (18%)

97,158.84
1.00
71,209.39
6,500.00
4,628.61
14,820.84

MONTO TOTAL

AVANCE

SALDO POR

ACUM. AVANC

SALDO POR

ACUMULADO

PRESENTE

ACUMULADO

EJECUTADO

VALORIZAR

EJECUTADO

EJECUTAR

ANTERIOR

MES

ACTUAL

FISICO

S/.

FISICO

FISICO %

66.08%
66.08%
66.08%
66.08%

33.92%
33.92%
33.92%
33.92%

0.00
0.00
0.00
0.00
0.00

47,055.22
4,295.21
3,058.59
9,793.62
64,202.64

47,055.22
4,295.21
3,058.59
9,793.62
64,202.64

66.08%
66.08%
66.08%
66.08%

24,154.17
2,204.79
1,570.02
5,027.22
32,956.20

COMPARACION DE AVANCE PROGRAMADO CON EL EJECUTADO - VALORIZACION N 01 MES DE DICIEMBRE DE 2012


PERIODO DE OBRA
PARTIDA
GLB

1 PROGRAMADO

2 FISICO

DESCRIPCION

UND.

PARCIAL

MES 01

6420.26368

MES 02

CONSTRUCCION DE AULA + SS-HH DEL PRONOEI ESTRELLITAS DEL SABER, LIMAC BAJO, SAUCEPAMPA, SANTA CRUZ-CAJAMARCA

CONSTRUCCION DE AULA +
SS-HH DEL PRONOEI
ESTRELLITAS DEL SABER,
LIMAC BAJO, SAUCEPAMPA,
SANTA CRUZ-CAJAMARCA

CONSTRUCCION DE AULA +
SS-HH DEL PRONOEI
ESTRELLITAS DEL SABER,
LIMAC BAJO, SAUCEPAMPA,
SANTA CRUZ-CAJAMARCA

GLB

GLB

55.00%

45.00%

66.08%

33.92%

97,158.84

97,158.84

2 FISICO

CONSTRUCCION DE AULA +
SS-HH DEL PRONOEI
ESTRELLITAS DEL SABER,
LIMAC BAJO, SAUCEPAMPA,
SANTA CRUZ-CAJAMARCA

OBRA:

VALORIZACIN DE AVANCE DE OBRA N 01


: CONSTRUCCION DE AULA +SS - HH DEL PRONOEI ESTRELLITAS DEL SABER,LIMAC BAJO,DISTRITO DE SAUCEPAMPA-SANTA CRUZ-CAJAMARCA

ENTIDAD EJECUTORA

: ALMAPEC S. R . L.

UBICACIN

: CASERIO LIMAC BAJO.

MODALIDAD DE EJEC.

: SUMA ALZADA.

SUPERVISOR

: ING. JULIO ORTIZ VARGAS.

RESIDENTE

: ARQ. FREDY OMAR GERRERO PADILLA

PLAZO DE EJECUCION

: 60 DIAS CALENDARIOS.

FECHA DE PRESENTACIN:

PRESUPUESTO
PARTIDA

01

DESCRIPCION

ENERO
30-Jan

CORRESPONDIENTE AL MES DE:


AVANCES
ANTERIOR

Und.

Metrado

P. Unit. S/.

Presup. S/.

ACTUAL

Metrado

Valorizado
S/.

Metrado

SALDO

ACUMULADO

Valorizado
S/.

Metrado

Valorizado
S/.

Metrado

Valorizado
S/.

OBRAS PROVISIONALES

01.01

CARTEL DE IDENTIFICACION DE OBRA DE 3.60 X 2.40M.

und

1.00

523.92

523.92

1.00

523.92

0.00

1.00

523.92

100.00%

01.02

ALMACEN PARA OBRA

GLB

1.00

100.00

100.00

1.00

100.00

0.00

1.00

100.00

100.00%

01.03

MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Y HERRAMIENTAS

GLB

1.00

400.00

400.00

0.50

200.00

0.50

200.00

1.00

400.00

100.00%

02

TRABAJOS PRELIMINARES

02.01

LIMPIEZA DE TERRENO

m2

101.35

0.45

45.61

101.35

45.61

0.00

101.35

45.61

100.00%

02.02

TRAZO Y REPLANTEO

m2

101.35

0.91

92.23

101.35

92.23

0.00

101.35

92.23

100.00%

02.03

CORTE DE TERRENO

m3

45.61

12.22

557.35

45.61

557.35

0.00

45.61

557.35

100.00%

02.04

DISEO DE MEZCLAS

und

1.00

200.00

200.00

1.00

200.00

0.00

1.00

200.00

100.00%

03

MOVIMIENTO DE TIERRAS

03.01

NIVELACION Y APISONADO MANUAL

m2

101.35

2.33

236.15

101.35

236.15

0.00

101.35

236.15

100.00%

03.02

EXCAVACION PARA ZANJAS Y ZAPATAS HASTA 1.20 M.

m3

27.76

52.13

1447.13

27.76

1447.13

0.00

27.76

1447.13

100.00%

03.03

RELLENO COMPACTADO CON MATERIAL PROPIO

m3

10.20

8.87

90.47

10.20

90.47

0.00

10.20

90.47

100.00%

03.04

RELLENO COMPACTADO CON MATERIAL DE PRESTAMO

m3

10.39

113.03

1174.38

10.39

1174.38

0.00

10.39

1174.38

100.00%

03.05

ELIMINACION MATERIAL EXCEDENTE HASTA 30.00 MT (A MANO USANDO CARRETILLA)

m3

74.17

8.15

604.49

74.17

604.49

0.00

74.17

604.49

100.00%

04

OBRAS DE CONCRETO SIMPLE

04.01

CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA

m3

11.28

177.69

2004.34

11.28

2004.34

0.00

11.28

2004.34

100.00%

04.02

SOLADO PARA ZAPATAS DE 4" MEZCLA 1:12 CEMENTO-HORMIGON

m2

6.88

16.10

110.77

6.88

110.77

0.00

6.88

110.77

100.00%

05
05.01

OBRAS DE CONCRETO ARMADO


ZAPATAS

05.01.01

CONCRETO EN ZAPATAS F'C=210 KG/CM2

m3

3.44

329.07

1132.00

3.44

1132.00

0.00

3.44

1132.00

100.00%

05.01.02

ACERO Fy=4200Kg/Cm2. EN ZAPATAS

kg

72.38

3.25

235.24

72.38

235.24

0.00

72.38

235.24

100.00%

05.02

SOBRECIMIENTOS ARMADOS

05.02.01

CONCRETO EN SOBRECIMIENTO ARMADO F'C=210 KG/CM2

m3

4.38

300.18

1314.79

4.38

1314.79

0.00

4.38

1314.79

100.00%

05.02.02

ENCOFRADO Y DESENCOFRADO PARA SOBRECIMIENTOS ARMADOS

m2

48.56

24.64

1196.52

48.56

1196.52

0.00

48.56

1196.52

100.00%

05.02.03

ACERO Fy= 4200Kg/Cm2. EN SOBRECIMIENTO ARMADO

kg

234.68

3.31

776.79

234.68

776.79

0.00

234.68

776.79

100.00%

05.03

COLUMNAS

05.03.01

CONCRETO EN COLUMNAS F'C=210 KG/CM2

m3

3.45

329.07

1135.29

3.45

1135.29

0.00

3.45

1135.29

100.00%

05.03.02

ENCOFRADO Y DESENCOFRADO EN COLUMNAS

m2

51.43

32.04

1647.82

51.43

1647.82

0.00

51.43

1647.82

100.00%

05.03.03

ACERO Fy=4200Kg/Cm2. EN COLUMNAS

kg

683.88

3.25

2222.61

683.88

2222.61

0.00

683.88

2222.61

100.00%

05.04

VIGAS

05.04.01

CONCRETO EN VIGAS F'C=210 KG/CM2

m3

3.99

336.78

1343.75

3.99

1343.75

0.00

3.99

1343.75

100.00%

05.04.02

ENCOFRADO Y DESENCOFRADO EN VIGAS

m2

43.35

37.72

1635.16

43.35

1635.16

0.00

43.35

1635.16

100.00%

05.04.03

ACERO Fy= 4200Kg/Cm2. EN VIGAS

kg

519.75

3.25

1689.19

519.75

1689.19

0.00

519.75

1689.19

100.00%

05.05

ESTRUCTURAS DE MADERA EN TECHO

05.05.01

TIJERAL T-1(LONGITUD = 9.40 M)

und

3.00

666.39

1999.17

3.00

1999.17

0.00

3.00

1999.17

100.00%

05.05.02

CORREAS Y TIRANTES DE MADERA 2"x 3"

137.10

7.85

1076.24

137.10

1076.24

0.00

137.10

1076.24

100.00%

05.05.03

COBERTURA TEJA ANDINA 1.14*.72

m2

117.63

44.74

5262.77

117.63

5262.77

0.00

117.63

5262.77

100.00%

05.05.04

CUMBRERA ARTICULADA SUPERIOR E INFERIOR TEJA ANDINA

26.20

42.92

1124.50

26.20

1124.50

0.00

26.20

1124.50

100.00%

ARQUITECTURA
01

ALBAILERIA

01.01

MURO DE LADRILLO KK DE 24x12x9 CABEZA, J = 1.5 CM

m2

28.34

63.65

1803.84

28.34

1803.84

0.00

28.34

1803.84

100.00%

01.02

MURO DE LADRILLO KK 24x12x9 SOGA, J = 1.5 CM

m2

67.76

37.73

2556.58

67.76

2556.58

0.00

67.76

2556.58

100.00%

01.03

ALAMBRE # 8 REFUERZO HORIZONTAL EN MUROS

kg

38.11

4.20

160.06

38.11

160.06

0.00

38.11

160.06

100.00%

02

REVOQUES Y ENLUCIDOS

02.01

TARRAJEO TIPO PRIMARIO O RAYADO

m2

8.76

11.33

99.25

8.76

99.25

0.00

8.76

99.25

100.00%

02.02

TARRAJEO EN MUROS INTERIORES

m2

10.71

12.13

129.91

3.54

42.94

7.17

86.97

10.71

129.91

100.00%

02.03

TARRAJEO EN MUROS EXTERIORES

m2

90.91

12.13

1102.74

0.00

0.00

70.00

849.10

70.00

849.10

77.00%

20.91

253.64

02.04

TARRAJEO DE VIGAS

m2

36.88

21.34

787.02

0.00

0.00

36.88

787.02

36.88

787.02

100.00%

02.05

TARRAJEO DE COLUMNAS

m2

28.44

17.12

486.89

0.00

0.00

28.44

486.89

28.44

486.89

100.00%

02.06

VESTIDURA DE DERRAMES ANCHO=15 CM.

47.58

8.42

400.62

0.00

0.00

20.00

168.40

20.00

168.40

42.03%

27.58

232.22

BRUAS DE 1 cm.

100.50

1.37

137.69

0.00

0.00

56.00

76.72

56.00

76.72

55.72%

44.50

60.97

m2

94.84

40.22

3814.46

0.00

0.00

94.84

3,814.46

94.84

3814.46

100.00%

02.07
03
03.01
04

CIELORRASOS
CIELO RASO CON FIBROCEMENTO
PISOS Y PAVIMENTOS

04.01

FALSO PISO DE 4" DE CONCRETO 1:8

m2

55.61

25.90

1440.30

55.61

1440.30

0.00

55.61

1440.30

100.00%

04.02

CONTRAPISO DE 40 MM

m2

4.46

45.56

203.20

4.46

203.20

0.00

4.46

203.20

100.00%

04.03

PISO DE CERAMICA DE COLOR CLARO DE 30X30 CM.

m2

4.46

44.96

200.52

0.00

0.00

0.00

0.00

0.00

0.00%

4.46

200.52

04.04

VEREDA DE CONCRETO F'C=140 KG/CM2

m2

41.47

44.47

1844.17

0.00

0.00

21.47

954.77

21.47

954.77

51.77%

20.00

889.40

04.05

ENCOFRADO Y DESENCOFRADO NORMAL VEREDAS

m2

41.47

9.87

409.31

0.00

0.00

21.47

211.91

21.47

211.91

51.77%

20.00

197.40

04.06

PISO DE CONCRETO PULIDO COLOREADO, e=2", F'C = 140 KG/CM2

m2

51.15

39.95

2043.44

51.15

2043.44

0.00

51.15

2043.44

100.00%

04.07

BRUAS EN VEREDAS

88.44

2.75

243.21

0.00

0.00

44.22

121.61

44.22

121.61

50.00%

44.22

121.61

JUNTAS DE TECNOPORT 1"

7.10

1.36

9.66

0.00

0.00

7.10

9.66

7.10

9.66

100.00%

04.08
05

CONTRAZOCALOS

05.01

CONTRAZOCALO CEMENTO S/COLOREAR H = 20 CM

28.70

5.26

150.96

0.00

0.00

0.00

0.00

0.00

0.00%

28.70

150.96

05.02

CONTRAZOCALO CEMENTO S/COLOREAR H = 30 CM

29.30

6.96

203.93

0.00

0.00

0.00

0.00

0.00

0.00%

29.30

203.93

m2

8.76

41.85

366.61

0.00

0.00

4.00

167.40

4.00

167.40

45.66%

4.76

199.21

m2

11.17

122.20

1364.97

0.00

0.00

11.17

1,364.97

11.17

1364.97

100.00%

m2

6.02

436.44

2627.37

0.00

0.00

3.00

1,309.32

3.00

1309.32

49.83%

3.02

06
06.01
07
07.01
08
08.01
09

ZOCALOS
ZOCALO DE CERAMICA 0.30X0.30 , H=1.20M
CARPINTERIA METALICA
VENTANA METALICA
CARPINTERIA DE MADERA
PUERTAS DE MADERA DE CEDRO MACHIEMBRADA

1,318.05

CERRAJERIA

09.01

BISAGRA ALUMINIZADAS CAPUCHINA DE 4" X 4"

pza

9.00

4.05

36.45

0.00

0.00

9.00

36.45

9.00

36.45

100.00%

09.02

CERRADURA PARA PUERTA INTERIORES

pza

3.00

42.42

127.26

0.00

0.00

3.00

127.26

3.00

127.26

100.00%

09.03

MANIJA DE BRONCE PARA PUERTAS

und

3.00

5.98

17.94

0.00

0.00

3.00

17.94

3.00

17.94

100.00%

09.04

MANIJA DE BRONCE PARA VENTANAS

und

12.00

5.98

71.76

0.00

0.00

12.00

71.76

12.00

71.76

100.00%

p2

120.18

2.76

331.70

0.00

0.00

0.00

0.00

0.00

0.00%

120.18

331.70

10
10.01
11

VIDRIOS, CRISTALES Y SIMILARES


VIDRIOS SEMIDOBLES INCOLORO CRUDO
PINTURA

11.01

PINTURA SATINADA EN INTERIORES

m2

70.71

8.54

603.86

0.00

0.00

0.00

0.00

0.00

0.00%

70.71

603.86

11.02

PINTURA SATINADA EN COLUMNAS,VIGAS Y DERRAMES

m2

112.90

10.55

1191.10

0.00

0.00

0.00

0.00

0.00

0.00%

112.90

1,191.10

11.03

PINTURA SATINADA EXTERIORES

m2

90.91

8.54

776.37

0.00

0.00

0.00

0.00

0.00

0.00%

90.91

776.37

11.04

PINTURA DE CONTRAZOCALO C/ESMALTE

m2

14.53

2.35

34.15

0.00

0.00

0.00

0.00

0.00

0.00%

14.53

34.15

m2

1.00

400.00

400.00

0.00

0.00

0.00

0.00

0.00

0.00%

1.00

400.00

12
12.01
13

PIZARRAS
PIZARRA ACRILICA 4.00 X 1.20 M. (INLCL TICERO METALICO)
JUNTAS

13.01

JUNTAS ASFALTICA, E=1"

90.22

4.91

442.98

0.00

0.00

45.11

221.49

45.11

221.49

50.00%

45.11

221.49

13.02

JUNTAS DE TECNOPORT 1"

16.60

1.36

22.58

0.00

0.00

8.00

10.88

8.00

10.88

48.19%

8.60

11.70

14

INSTALACIONES SANITARIAS
-

14.01

CONCRETO Fc= 140 KG/CM2, PARA CUNETA PRINCIPAL

m3

0.55

291.78

160.48

0.28

80.24

0.28

80.24

0.55

160.48

100.00%

14.02

ENCOFRADO Y DESENCOFRADO DE CUNETA DE PROTECCION

m2

7.70

21.83

168.09

3.85

84.05

3.85

84.05

7.70

168.09

100.00%

14.03

REJILLA METALICA PARA CANALETAS DE PISO

1.20

54.29

65.15

0.00

0.00

0.00

0.00

0.00

0.00%

1.20

65.15

14.04

TUBERIAS PVC D= 4"

22.38

5.00

111.90

22.38

111.90

0.00

22.38

111.90

100.00%

14.05

TUBERIA F G 3"

5.20

9.00

46.80

5.20

46.80

0.00

5.20

46.80

100.00%

14.06

ACCESORIOS

GLB

1.00

750.00

750.00

0.50

375.00

0.50

375.00

1.00

750.00

100.00%

14.07

RED DE AGUA

GLB

1.00

250.00

250.00

1.00

250.00

0.00

1.00

250.00

100.00%

15

INSTALACIONES ELECTRICAS

15.01

SALIDA PARA CENTRO DE LUZ

pto

10.00

48.42

484.20

0.00

0.00

5.00

242.10

5.00

242.10

50.00%

5.00

242.10

15.02

SALIDA PARA TOMACORRIENTES

pto

6.00

61.49

368.94

6.00

368.94

0.00

6.00

368.94

100.00%

15.03

TUBERIAS PVC SAP (ELECTRICAS) D=3/4"

80.00

5.94

475.20

40.00

237.60

40.00

237.60

80.00

475.20

100.00%

15.04

CAJA DE PASE FG 4"X4"X1.5"

und

2.00

16.57

33.14

2.00

33.14

0.00

2.00

33.14

100.00%

15.05

CAJA PORTA MEDIDOR MONOFASICO

und

1.00

103.47

103.47

1.00

103.47

0.00

1.00

103.47

100.00%

15.06

TABLERO AUTO. 2-2X20, 2-2X15A

pza

1.00

238.48

238.48

1.00

238.48

0.00

1.00

238.48

100.00%

15.07

LUMINARIA PARA LAMPARAS COLGANTES

und

8.00

101.59

812.72

0.00

0.00

8.00

812.72

8.00

812.72

100.00%

15.08

LUMINARIA AHORRADOR

und

2.00

12.00

24.00

0.00

0.00

2.00

24.00

2.00

24.00

100.00%

16

VARIOS

16.01

FLETE TERRESTRE-CHICLAYO-LA ESPERANZA- MARCOPAMPA

kg

37803.83

0.10

3780.38

24973.21

2497.32

11,341.15

36314.36

3631.44

96.06%

1,489.47

148.95

16.02

PLACA RECORDATORIA

GLB

1.00

400.00

400.00

0.00

0.00

0.00

0.00

0.00

0.00%

1.00

400.00

16.03

ROTURA DE PROBETAS

GLB

1.00

200.00

200.00

0.50

100.00

0.50

100.00

1.00

200.00

100.00%

16.04

MOBILIARIO

GLB

1.00

1714.90

1714.90

0.00

0.00

0.50

857.45

0.50

857.45

50.00%

0.50

857.45

16.05

TANQUE SEPTICO Y POZO PERCOLADOR

GLB

1.00

3000.00

3000.00

1.00

3000.00

0.00

1.00

3000.00

100.00%

COSTO DIRECTO

71,209.39

47,055.22

15,417.34

62,472.56

87.73%

8,736.81

GASTOS GENERALES

9.13 %

6,500.00

4,295.21

1,407.30

5,702.50

87.73%

797.50

UTILIDAD

6.50 %

4,628.61

3,058.59

1,002.13

4,060.72

87.73%

567.89

IGV

18.00 %

14,820.84

9,793.62

3,208.82

13,002.44

87.73%

1,818.40

64,202.64

21,035.59

85,238.22

87.73%

11,920.60

VALOR REFERENCIAL

PARTIDA
01
01.01

1,134.11

DESCRIPCION

97,158.84

und.

Metrado

und

0.00

OBRAS PROVISIONALES
CARTEL DE IDENTIFICACION DE OBRA DE 3.60 X 2.40M.

01.02

ALMACEN PARA OBRA

GLB

0.00

01.03

MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Y HERRAMIENTAS

GLB

0.50

02

TRABAJOS PRELIMINARES

02.01

LIMPIEZA DE TERRENO

m2

0.00

02.02

TRAZO Y REPLANTEO

m2

0.00

02.03

CORTE DE TERRENO

m3

0.00

02.04

DISEO DE MEZCLAS

und

0.00

03

MOVIMIENTO DE TIERRAS

03.01

NIVELACION Y APISONADO MANUAL

m2

0.00

03.02

EXCAVACION PARA ZANJAS Y ZAPATAS HASTA 1.20 M.

m3

0.00

03.03

RELLENO COMPACTADO CON MATERIAL PROPIO

m3

0.00

03.04

RELLENO COMPACTADO CON MATERIAL DE PRESTAMO

m3

0.00

03.05

ELIMINACION MATERIAL EXCEDENTE HASTA 30.00 MT (A MANO USANDO CARRETILLA)

m3

0.00

04

OBRAS DE CONCRETO SIMPLE

04.01

CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA

m3

0.00

04.02

SOLADO PARA ZAPATAS DE 4" MEZCLA 1:12 CEMENTO-HORMIGON

m2

0.00

05
05.01

OBRAS DE CONCRETO ARMADO


ZAPATAS

05.01.01

CONCRETO EN ZAPATAS F'C=210 KG/CM2

m3

0.00

05.01.02

ACERO Fy=4200Kg/Cm2. EN ZAPATAS

kg

0.00

05.02

SOBRECIMIENTOS ARMADOS

05.02.01

CONCRETO EN SOBRECIMIENTO ARMADO F'C=210 KG/CM2

m3

0.00

05.02.02

ENCOFRADO Y DESENCOFRADO PARA SOBRECIMIENTOS ARMADOS

m2

0.00

05.02.03

ACERO Fy= 4200Kg/Cm2. EN SOBRECIMIENTO ARMADO

kg

0.00

05.03

COLUMNAS

05.03.01

CONCRETO EN COLUMNAS F'C=210 KG/CM2

m3

0.00

05.03.02

ENCOFRADO Y DESENCOFRADO EN COLUMNAS

m2

0.00

05.03.03

ACERO Fy=4200Kg/Cm2. EN COLUMNAS

kg

0.00

05.04

VIGAS

05.04.01

CONCRETO EN VIGAS F'C=210 KG/CM2

m3

0.00

05.04.02

ENCOFRADO Y DESENCOFRADO EN VIGAS

m2

0.00

05.04.03

ACERO Fy= 4200Kg/Cm2. EN VIGAS

kg

0.00

05.05

ESTRUCTURAS DE MADERA EN TECHO

05.05.01

TIJERAL T-1(LONGITUD = 9.40 M)

und

0.00

05.05.02

CORREAS Y TIRANTES DE MADERA 2"x 3"

0.00

05.05.03

COBERTURA TEJA ANDINA 1.14*.72

m2

0.00

05.05.04

CUMBRERA ARTICULADA SUPERIOR E INFERIOR TEJA ANDINA

0.00

ARQUITECTURA
01

ALBAILERIA

01.01

MURO DE LADRILLO KK DE 24x12x9 CABEZA, J = 1.5 CM

m2

0.00

01.02

MURO DE LADRILLO KK 24x12x9 SOGA, J = 1.5 CM

m2

0.00

01.03

ALAMBRE # 8 REFUERZO HORIZONTAL EN MUROS

kg

0.00

0.00

02

REVOQUES Y ENLUCIDOS

02.01

TARRAJEO TIPO PRIMARIO O RAYADO

m2

02.02

TARRAJEO EN MUROS INTERIORES

m2

7.17

02.03

TARRAJEO EN MUROS EXTERIORES

m2

70.00

02.04

TARRAJEO DE VIGAS

m2

36.88

02.05

TARRAJEO DE COLUMNAS

m2

28.44

02.06

VESTIDURA DE DERRAMES ANCHO=15 CM.

20.00

02.07

BRUAS DE 1 cm.

56.00

m2

94.84

03
03.01
04

CIELORRASOS
CIELO RASO CON FIBROCEMENTO
PISOS Y PAVIMENTOS

04.01

FALSO PISO DE 4" DE CONCRETO 1:8

m2

0.00

04.02

CONTRAPISO DE 40 MM

m2

0.00

04.03

PISO DE CERAMICA DE COLOR CLARO DE 30X30 CM.

m2

0.00

04.04

VEREDA DE CONCRETO F'C=140 KG/CM2

m2

21.47

04.05

ENCOFRADO Y DESENCOFRADO NORMAL VEREDAS

m2

21.47

04.06

PISO DE CONCRETO PULIDO COLOREADO, e=2", F'C = 140 KG/CM2

m2

0.00

04.07

BRUAS EN VEREDAS

44.22

JUNTAS DE TECNOPORT 1"

7.10

04.08
05

CONTRAZOCALOS

05.01

CONTRAZOCALO CEMENTO S/COLOREAR H = 20 CM

0.00

05.02

CONTRAZOCALO CEMENTO S/COLOREAR H = 30 CM

0.00

m2

4.00

m2

11.17

m2

3.00

06
06.01
07
07.01
08
08.01
09

ZOCALOS
ZOCALO DE CERAMICA 0.30X0.30 , H=1.20M
CARPINTERIA METALICA
VENTANA METALICA
CARPINTERIA DE MADERA
PUERTAS DE MADERA DE CEDRO MACHIEMBRADA
CERRAJERIA

09.01

BISAGRA ALUMINIZADAS CAPUCHINA DE 4" X 4"

pza

9.00

09.02

CERRADURA PARA PUERTA INTERIORES

pza

3.00

09.03

MANIJA DE BRONCE PARA PUERTAS

und

3.00

09.04

MANIJA DE BRONCE PARA VENTANAS

und

12.00

p2

0.00

10
10.01
11

VIDRIOS, CRISTALES Y SIMILARES


VIDRIOS SEMIDOBLES INCOLORO CRUDO
PINTURA

11.01

PINTURA SATINADA EN INTERIORES

m2

0.00

11.02

PINTURA SATINADA EN COLUMNAS,VIGAS Y DERRAMES

m2

0.00

11.03

PINTURA SATINADA EXTERIORES

m2

0.00

11.04

PINTURA DE CONTRAZOCALO C/ESMALTE

m2

0.00

m2

0.00

12
12.01
13

PIZARRAS
PIZARRA ACRILICA 4.00 X 1.20 M. (INLCL TICERO METALICO)
JUNTAS

13.01

JUNTAS ASFALTICA, E=1"

45.11

13.02

JUNTAS DE TECNOPORT 1"

8.00

14

INSTALACIONES SANITARIAS

14.01

CONCRETO Fc= 140 KG/CM2, PARA CUNETA PRINCIPAL

m3

0.28

14.02

ENCOFRADO Y DESENCOFRADO DE CUNETA DE PROTECCION

m2

3.85

14.03

REJILLA METALICA PARA CANALETAS DE PISO

0.00

14.04

TUBERIAS PVC D= 4"

0.00

14.05

TUBERIA F G 3"

0.00

14.06

ACCESORIOS

GLB

0.50

14.07

RED DE AGUA

GLB

0.00

5.00

15

INSTALACIONES ELECTRICAS

15.01

SALIDA PARA CENTRO DE LUZ

pto

15.02

SALIDA PARA TOMACORRIENTES

pto

0.00

15.03

TUBERIAS PVC SAP (ELECTRICAS) D=3/4"

40.00

15.04

CAJA DE PASE FG 4"X4"X1.5"

und

2.00

15.05

CAJA PORTA MEDIDOR MONOFASICO

und

1.00

15.06

TABLERO AUTO. 2-2X20, 2-2X15A

pza

1.00

15.07

LUMINARIA PARA LAMPARAS COLGANTES

und

8.00

15.08

LUMINARIA AHORRADOR

und

2.00

16

VARIOS

16.01

FLETE TERRESTRE-CHICLAYO-LA ESPERANZA- MARCOPAMPA

kg

11,341.15

16.02

PLACA RECORDATORIA

GLB

0.00

16.03

ROTURA DE PROBETAS

GLB

0.50

16.04

MOBILIARIO

GLB

0.50

16.05

TANQUE SEPTICO Y POZO PERCOLADOR

GLB

0.00

ZACIN DE AVANCE DE OBRA N 01

DEL 2013
DEL 2013
SALDO
%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00%
0.00%
0.00%
0.00%

0.00%
0.00%
0.00%
0.00%
0.00%
23.00%
0.00%
0.00%
57.97%
44.28%
0.00%
0.00%
0.00%
100.00%
48.23%
48.23%
0.00%
50.00%
0.00%
100.00%
100.00%
54.34%
0.00%
50.17%
0.00%
0.00%
0.00%
0.00%
100.00%

100.00%
100.00%
100.00%
100.00%
100.00%
50.00%
51.81%
0.00%
0.00%
100.00%
0.00%
0.00%
0.00%
0.00%
50.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
3.94%
100.00%
0.00%
50.00%
0.00%
12.27%
12.27%
12.27%
12.27%
12.27%

OBRA:
ENTIDAD EJECUTORA
UBICACIN
MODALIDAD DE EJEC.
SUPERVISOR
RESIDENTE
PLAZO DE EJECUCION

:
:
:
:
:
:
:

RESUMEN DE VALORIZACION N 02 MES DE DICIEMBRE DE 2012


CONSTRUCCION DE AULA +SS - HH DEL PRONOEI ESTRELLITAS DEL SABER,LIMAC BAJO,DISTRITO DE SAUCEPAMPA-SANTA CRUZ-CAJAMARCA
ALMAPEC S. R . L.
CASERIO LIMAC BAJO.
SUMA ALZADA.
CORRESPONDIENTE AL MES DE:
ENERO
ING. JULIO ORTIZ VARGAS.
DEL 2013
FECHA DE PRESENTACIN:
ARQ. FREDY OMAR GERRERO PADILLA
30-Jan
DEL 2013
60 DIAS CALENDARIOS.
CALCULO DE VALORIZACIONES

Presupuesto Contrado
Coeficiente de Relacion
Costo Directo
Gastos generales (9.13%)
Utilidad (6.5%)
IGV (18%)

97,158.84
1.00
71,209.39
6,500.00
4,628.61
14,820.84

MONTO TOTAL

AVANCE

SALDO POR

ACUM. AVANC

SALDO POR

ACUMULADO

PRESENTE

ACUMULADO

EJECUTADO

VALORIZAR

EJECUTADO

EJECUTAR

ANTERIOR

MES

ACTUAL

FISICO

S/.

FISICO

FISICO %

47055.22
4295.21
3058.59
9793.62
64202.64

15417.34
1407.30
1002.13
3208.82
21035.59

62472.56
5702.50
4060.72
13002.44
85238.22

87.73%
87.73%
87.73%
87.73%

8736.83
797.50
567.89
1818.40
11920.62

87.73%
87.73%
87.73%
87.73%

12.27%
12.27%
12.27%
12.27%

COMPARACION DE AVANCE PROGRAMADO CON EL EJECUTADO - VALORIZACION N 01 MES DE DICIEMBRE DE 2012


PERIODO DE OBRA
PARTIDA
GLB

1 PROGRAMADO

2 FISICO

DESCRIPCION

UND.

PARCIAL

MES 01

MES 02

CONSTRUCCION DE AULA + SS-HH DEL PRONOEI ESTRELLITAS DEL SABER, LIMAC BAJO, SAUCEPAMPA, SANTA CRUZ-CAJAMARCA

CONSTRUCCION DE AULA +
SS-HH DEL PRONOEI
ESTRELLITAS DEL SABER,
LIMAC BAJO, SAUCEPAMPA,
SANTA CRUZ-CAJAMARCA

CONSTRUCCION DE AULA +
SS-HH DEL PRONOEI
ESTRELLITAS DEL SABER,
LIMAC BAJO, SAUCEPAMPA,
SANTA CRUZ-CAJAMARCA

GLB

GLB

55.00%

45.00%

66.08%

21.65%

97,158.84

97,158.84

2 FISICO

CONSTRUCCION DE AULA +
SS-HH DEL PRONOEI
ESTRELLITAS DEL SABER,
LIMAC BAJO, SAUCEPAMPA,
SANTA CRUZ-CAJAMARCA

ITEM
a

b
c
d
e
f
g

CONCEPTO
VALORIZACION N 02 SIN IGV
Monto bruto valorizado al 30 de enero del 2013
Amortizacin
Monto total contratado (sin IGV)
Del anticipo:
Monto Facturable
Retencin de Fondo de Garantia 10% de (a)
Retencin
SUB TOTAL (a-b-d)
igv (18%) x (e)
MONTO A PAGAR (inc. IGV): (e) + (f)

GASTOS DE SUPERVICION=

MONTO
S/.

17,826.77

S/.
S/.
S/.

82,338.00
17,826.77

S/.
S/.
S/.
S/.

1,782.68
16,044.09
2,887.94
18,932.03

S/.

3,204.40

2103.55859

8523.82227

S/. 21,035.59

VS N01=
VS N02=

2117.47
693.75

OBRA:

VALORIZACIN DE AVANCE DE OBRA N 01


: CONSTRUCCION DE AULA +SS - HH DEL PRONOEI ESTRELLITAS DEL SABER,LIMAC BAJO,DISTRITO DE SAUCEPAMPA-SANTA CRUZ-CAJAMARCA

ENTIDAD EJECUTORA

: ALMAPEC S. R . L.

UBICACIN

: CASERIO LIMAC BAJO.

MODALIDAD DE EJEC.

: SUMA ALZADA.

SUPERVISOR

: ING. JULIO ORTIZ VARGAS.

RESIDENTE

: ARQ. FREDY OMAR GERRERO PADILLA

PLAZO DE EJECUCION

: 60 DIAS CALENDARIOS.

FECHA DE PRESENTACIN:

PRESUPUESTO
PARTIDA

01

DESCRIPCION

Febrero
13 de Febrero

CORRESPONDIENTE AL MES DE:


AVANCES
ANTERIOR

Und.

Metrado

P. Unit. S/.

Presup. S/.

ACTUAL

Metrado

Valorizado
S/.

Metrado

SALDO

ACUMULADO

Valorizado
S/.

Metrado

Valorizado
S/.

Metrado

Valorizado
S/.

OBRAS PROVISIONALES

01.01

CARTEL DE IDENTIFICACION DE OBRA DE 3.60 X 2.40M.

und

1.00

523.92

523.92

1.00

523.92

0.00

1.00

523.92

100.00%

01.02

ALMACEN PARA OBRA

GLB

1.00

100.00

100.00

1.00

100.00

0.00

1.00

100.00

100.00%

01.03

MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Y HERRAMIENTAS

GLB

1.00

400.00

400.00

1.00

400.00

0.00

1.00

400.00

100.00%

02

TRABAJOS PRELIMINARES

02.01

LIMPIEZA DE TERRENO

m2

101.35

0.45

45.61

101.35

45.61

0.00

101.35

45.61

100.00%

02.02

TRAZO Y REPLANTEO

m2

101.35

0.91

92.23

101.35

92.23

0.00

101.35

92.23

100.00%

02.03

CORTE DE TERRENO

m3

45.61

12.22

557.35

45.61

557.35

0.00

45.61

557.35

100.00%

02.04

DISEO DE MEZCLAS

und

1.00

200.00

200.00

1.00

200.00

0.00

1.00

200.00

100.00%

03

MOVIMIENTO DE TIERRAS

03.01

NIVELACION Y APISONADO MANUAL

m2

101.35

2.33

236.15

101.35

236.15

0.00

101.35

236.15

100.00%

03.02

EXCAVACION PARA ZANJAS Y ZAPATAS HASTA 1.20 M.

m3

27.76

52.13

1447.13

27.76

1447.13

0.00

27.76

1447.13

100.00%

03.03

RELLENO COMPACTADO CON MATERIAL PROPIO

m3

10.20

8.87

90.47

10.20

90.47

0.00

10.20

90.47

100.00%

03.04

RELLENO COMPACTADO CON MATERIAL DE PRESTAMO

m3

10.39

113.03

1174.38

10.39

1174.38

0.00

10.39

1174.38

100.00%

03.05

ELIMINACION MATERIAL EXCEDENTE HASTA 30.00 MT (A MANO USANDO CARRETILLA)

m3

74.17

8.15

604.49

74.17

604.49

0.00

74.17

604.49

100.00%

04

OBRAS DE CONCRETO SIMPLE

04.01

CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA

m3

11.28

177.69

2004.34

11.28

2004.34

0.00

11.28

2004.34

100.00%

04.02

SOLADO PARA ZAPATAS DE 4" MEZCLA 1:12 CEMENTO-HORMIGON

m2

6.88

16.10

110.77

6.88

110.77

0.00

6.88

110.77

100.00%

05
05.01

OBRAS DE CONCRETO ARMADO


ZAPATAS

05.01.01

CONCRETO EN ZAPATAS F'C=210 KG/CM2

m3

3.44

329.07

1132.00

3.44

1132.00

0.00

3.44

1132.00

100.00%

05.01.02

ACERO Fy=4200Kg/Cm2. EN ZAPATAS

kg

72.38

3.25

235.24

72.38

235.24

0.00

72.38

235.24

100.00%

05.02

SOBRECIMIENTOS ARMADOS

05.02.01

CONCRETO EN SOBRECIMIENTO ARMADO F'C=210 KG/CM2

m3

4.38

300.18

1314.79

4.38

1314.79

0.00

4.38

1314.79

100.00%

05.02.02

ENCOFRADO Y DESENCOFRADO PARA SOBRECIMIENTOS ARMADOS

m2

48.56

24.64

1196.52

48.56

1196.52

0.00

48.56

1196.52

100.00%

05.02.03

ACERO Fy= 4200Kg/Cm2. EN SOBRECIMIENTO ARMADO

kg

234.68

3.31

776.79

234.68

776.79

0.00

234.68

776.79

100.00%

05.03

COLUMNAS

05.03.01

CONCRETO EN COLUMNAS F'C=210 KG/CM2

m3

3.45

329.07

1135.29

3.45

1135.29

0.00

3.45

1135.29

100.00%

05.03.02

ENCOFRADO Y DESENCOFRADO EN COLUMNAS

m2

51.43

32.04

1647.82

51.43

1647.82

0.00

51.43

1647.82

100.00%

05.03.03

ACERO Fy=4200Kg/Cm2. EN COLUMNAS

kg

683.88

3.25

2222.61

683.88

2222.61

0.00

683.88

2222.61

100.00%

05.04

VIGAS

05.04.01

CONCRETO EN VIGAS F'C=210 KG/CM2

m3

3.99

336.78

1343.75

3.99

1343.75

0.00

3.99

1343.75

100.00%

05.04.02

ENCOFRADO Y DESENCOFRADO EN VIGAS

m2

43.35

37.72

1635.16

43.35

1635.16

0.00

43.35

1635.16

100.00%

05.04.03

ACERO Fy= 4200Kg/Cm2. EN VIGAS

kg

519.75

3.25

1689.19

519.75

1689.19

0.00

519.75

1689.19

100.00%

05.05

ESTRUCTURAS DE MADERA EN TECHO

05.05.01

TIJERAL T-1(LONGITUD = 9.40 M)

und

3.00

666.39

1999.17

3.00

1999.17

0.00

3.00

1999.17

100.00%

05.05.02

CORREAS Y TIRANTES DE MADERA 2"x 3"

137.10

7.85

1076.24

137.10

1076.24

0.00

137.10

1076.24

100.00%

05.05.03

COBERTURA TEJA ANDINA 1.14*.72

m2

117.63

44.74

5262.77

117.63

5262.77

0.00

117.63

5262.77

100.00%

05.05.04

CUMBRERA ARTICULADA SUPERIOR E INFERIOR TEJA ANDINA

26.20

42.92

1124.50

26.20

1124.50

0.00

26.20

1124.50

100.00%

ARQUITECTURA
01

ALBAILERIA

01.01

MURO DE LADRILLO KK DE 24x12x9 CABEZA, J = 1.5 CM

m2

28.34

63.65

1803.84

28.34

1803.84

0.00

28.34

1803.84

100.00%

01.02

MURO DE LADRILLO KK 24x12x9 SOGA, J = 1.5 CM

m2

67.76

37.73

2556.58

67.76

2556.58

0.00

67.76

2556.58

100.00%

01.03

ALAMBRE # 8 REFUERZO HORIZONTAL EN MUROS

kg

38.11

4.20

160.06

38.11

160.06

0.00

38.11

160.06

100.00%

02

REVOQUES Y ENLUCIDOS

02.01

TARRAJEO TIPO PRIMARIO O RAYADO

m2

8.76

11.33

99.25

8.76

99.25

0.00

8.76

99.25

100.00%

02.02

TARRAJEO EN MUROS INTERIORES

m2

10.71

12.13

129.91

10.71

129.91

0.00

10.71

129.91

100.00%

02.03

TARRAJEO EN MUROS EXTERIORES

m2

90.91

12.13

1102.74

70.00

849.10

20.91

253.64

90.91

1102.74

100.00%

02.04

TARRAJEO DE VIGAS

m2

36.88

21.34

787.02

36.88

787.02

0.00

36.88

787.02

100.00%

02.05

TARRAJEO DE COLUMNAS

m2

28.44

17.12

486.89

28.44

486.89

0.00

28.44

486.89

100.00%

02.06

VESTIDURA DE DERRAMES ANCHO=15 CM.

47.58

8.42

400.62

20.00

168.40

27.58

232.22

47.58

400.62

100.00%

02.07

BRUAS DE 1 cm.

100.50

1.37

137.69

56.00

76.72

44.50

60.97

100.50

137.69

100.00%

m2

94.84

40.22

3814.46

94.84

3814.46

0.00

94.84

3814.46

100.00%

03
03.01
04

CIELORRASOS
CIELO RASO CON FIBROCEMENTO
PISOS Y PAVIMENTOS

04.01

FALSO PISO DE 4" DE CONCRETO 1:8

m2

55.61

25.90

1440.30

55.61

1440.30

0.00

55.61

1440.30

100.00%

04.02

CONTRAPISO DE 40 MM

m2

4.46

45.56

203.20

4.46

203.20

0.00

4.46

203.20

100.00%

04.03

PISO DE CERAMICA DE COLOR CLARO DE 30X30 CM.

m2

4.46

44.96

200.52

0.00

0.00

4.46

200.52

4.46

200.52

100.00%

04.04

VEREDA DE CONCRETO F'C=140 KG/CM2

m2

41.47

44.47

1844.17

21.47

954.77

20.00

889.40

41.47

1844.17

100.00%

04.05

ENCOFRADO Y DESENCOFRADO NORMAL VEREDAS

m2

41.47

9.87

409.31

21.47

211.91

20.00

197.40

41.47

409.31

100.00%

04.06

PISO DE CONCRETO PULIDO COLOREADO, e=2", F'C = 140 KG/CM2

m2

51.15

39.95

2043.44

51.15

2043.44

0.00

51.15

2043.44

100.00%

04.07

BRUAS EN VEREDAS

88.44

2.75

243.21

44.22

121.61

44.22

121.61

88.44

243.21

100.00%

04.08

JUNTAS DE TECNOPORT 1"

7.10

1.36

9.66

7.10

9.66

0.00

7.10

9.66

100.00%

05

CONTRAZOCALOS

05.01

CONTRAZOCALO CEMENTO S/COLOREAR H = 20 CM

28.70

5.26

150.96

0.00

0.00

28.70

150.96

28.70

150.96

100.00%

05.02

CONTRAZOCALO CEMENTO S/COLOREAR H = 30 CM

29.30

6.96

203.93

0.00

0.00

29.30

203.93

29.30

203.93

100.00%

m2

8.76

41.85

366.61

4.00

167.40

4.76

199.21

8.76

366.61

100.00%

m2

11.17

122.20

1364.97

11.17

1364.97

0.00

11.17

1364.97

100.00%

m2

6.02

436.44

2627.37

3.00

1309.32

3.02

6.02

2627.37

100.00%

06
06.01
07
07.01
08
08.01
09

ZOCALOS
ZOCALO DE CERAMICA 0.30X0.30 , H=1.20M
CARPINTERIA METALICA
VENTANA METALICA
CARPINTERIA DE MADERA
PUERTAS DE MADERA DE CEDRO MACHIEMBRADA

1,318.05

CERRAJERIA

09.01

BISAGRA ALUMINIZADAS CAPUCHINA DE 4" X 4"

pza

9.00

4.05

36.45

9.00

36.45

0.00

9.00

36.45

100.00%

09.02

CERRADURA PARA PUERTA INTERIORES

pza

3.00

42.42

127.26

3.00

127.26

0.00

3.00

127.26

100.00%

09.03

MANIJA DE BRONCE PARA PUERTAS

und

3.00

5.98

17.94

3.00

17.94

0.00

3.00

17.94

100.00%

09.04

MANIJA DE BRONCE PARA VENTANAS

und

12.00

5.98

71.76

12.00

71.76

0.00

12.00

71.76

100.00%

p2

120.18

2.76

331.70

0.00

0.00

120.18

331.70

120.18

331.70

100.00%

10
10.01
11

VIDRIOS, CRISTALES Y SIMILARES


VIDRIOS SEMIDOBLES INCOLORO CRUDO
PINTURA

11.01

PINTURA SATINADA EN INTERIORES

m2

70.71

8.54

603.86

0.00

0.00

70.71

603.86

70.71

603.86

100.00%

11.02

PINTURA SATINADA EN COLUMNAS,VIGAS Y DERRAMES

m2

112.90

10.55

1191.10

0.00

0.00

112.90

1,191.10

112.90

1191.10

100.00%

11.03

PINTURA SATINADA EXTERIORES

m2

90.91

8.54

776.37

0.00

0.00

90.91

776.37

90.91

776.37

100.00%

11.04

PINTURA DE CONTRAZOCALO C/ESMALTE

m2

14.53

2.35

34.15

0.00

0.00

14.53

34.15

14.53

34.15

100.00%

m2

1.00

400.00

400.00

0.00

0.00

1.00

400.00

1.00

400.00

100.00%

12
12.01
13

PIZARRAS
PIZARRA ACRILICA 4.00 X 1.20 M. (INLCL TICERO METALICO)
JUNTAS

13.01

JUNTAS ASFALTICA, E=1"

90.22

4.91

442.98

45.11

221.49

45.11

221.49

90.22

442.98

100.00%

13.02

JUNTAS DE TECNOPORT 1"

16.60

1.36

22.58

8.00

10.88

8.60

11.70

16.60

22.58

100.00%

14

INSTALACIONES SANITARIAS

14.01

CONCRETO Fc= 140 KG/CM2, PARA CUNETA PRINCIPAL

m3

0.55

291.78

160.48

0.55

160.48

0.00

0.55

160.48

100.00%

14.02

ENCOFRADO Y DESENCOFRADO DE CUNETA DE PROTECCION

m2

7.70

21.83

168.09

7.70

168.09

0.00

7.70

168.09

100.00%

14.03

REJILLA METALICA PARA CANALETAS DE PISO

1.20

54.29

65.15

0.00

0.00

1.20

65.15

1.20

65.15

100.00%

14.04

TUBERIAS PVC D= 4"

22.38

5.00

111.90

22.38

111.90

0.00

22.38

111.90

100.00%

14.05

TUBERIA F G 3"

5.20

9.00

46.80

5.20

46.80

0.00

5.20

46.80

100.00%

14.06

ACCESORIOS

GLB

1.00

750.00

750.00

1.00

750.00

0.00

1.00

750.00

100.00%

14.07

RED DE AGUA

GLB

1.00

250.00

250.00

1.00

250.00

0.00

1.00

250.00

100.00%

15

INSTALACIONES ELECTRICAS

15.01

SALIDA PARA CENTRO DE LUZ

pto

10.00

48.42

484.20

5.00

242.10

5.00

242.10

10.00

484.20

100.00%

15.02

SALIDA PARA TOMACORRIENTES

pto

6.00

61.49

368.94

6.00

368.94

0.00

6.00

368.94

100.00%

15.03

TUBERIAS PVC SAP (ELECTRICAS) D=3/4"

80.00

5.94

475.20

80.00

475.20

0.00

80.00

475.20

100.00%

15.04

CAJA DE PASE FG 4"X4"X1.5"

und

2.00

16.57

33.14

2.00

33.14

0.00

2.00

33.14

100.00%

15.05

CAJA PORTA MEDIDOR MONOFASICO

und

1.00

103.47

103.47

1.00

103.47

0.00

1.00

103.47

100.00%

15.06

TABLERO AUTO. 2-2X20, 2-2X15A

pza

1.00

238.48

238.48

1.00

238.48

0.00

1.00

238.48

100.00%

15.07

LUMINARIA PARA LAMPARAS COLGANTES

und

8.00

101.59

812.72

8.00

812.72

0.00

8.00

812.72

100.00%

15.08

LUMINARIA AHORRADOR

und

2.00

12.00

24.00

2.00

24.00

0.00

2.00

24.00

100.00%

16

VARIOS

16.01

FLETE TERRESTRE-CHICLAYO-LA ESPERANZA- MARCOPAMPA

kg

37803.83

0.10

3780.38

36314.36

3631.44

1,489.47

148.95

37803.83

3780.38

100.00%

0.00

0.00

16.02

PLACA RECORDATORIA

GLB

1.00

400.00

400.00

0.00

0.00

1.00

400.00

1.00

400.00

100.00%

16.03

ROTURA DE PROBETAS

GLB

1.00

200.00

200.00

1.00

200.00

0.00

1.00

200.00

100.00%

16.04

MOBILIARIO

GLB

1.00

1714.90

1714.90

0.50

857.45

0.50

857.45

1.00

1714.90

100.00%

16.05

TANQUE SEPTICO Y POZO PERCOLADOR

GLB

1.00

3000.00

3000.00

1.00

3000.00

0.00

1.00

3000.00

100.00%

COSTO DIRECTO

62,472.56

8,736.81

71,209.38

100.00%

0.00

GASTOS GENERALES

9.13 %

6,500.00

5,702.50

797.50

6,500.00

100.00%

0.00

UTILIDAD

6.50 %

4,628.61

4,060.72

567.89

4,628.61

100.00%

0.00

IGV

18.00 %

14,820.84

13,002.44

1,818.40

14,820.84

100.00%

0.00

85,238.22

11,920.60

97,158.82

100.00%

0.00

VALOR REFERENCIAL

71,209.39

97,158.84

ZACIN DE AVANCE DE OBRA N 01

DEL 2013
DEL 2013
SALDO
%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00%
0.00%
0.00%
0.00%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

N
1A
2
3
4
5
1B
6A
7
8
9
10
6B
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
25A
27
28
29
30
25B
31
32A
33
34
32B
35
36
37
38
39
40

ACTIVIDAD
ENCOFRADO Y DESENCOFRADO DE CUNETA DE PROTECCION
CONCRETO Fc= 140 KG/CM2, PARA CUNETA PRINCIPAL
REJILLA METALICA PARA CANALETAS DE PISO
JUNTAS DE TECNOPORT 1"
JUNTAS ASFALTICA, E=1"
ENCOFRADO Y DESENCOFRADO DE CUNETA DE PROTECCION
ENCOFRADO Y DESENCOFRADO NORMAL VEREDAS
VEREDA DE CONCRETO F'C=140 KG/CM2
BRUAS EN VEREDAS
JUNTAS DE TECNOPORT 1"
TARRAJEO EN MUROS INTERIORES
ENCOFRADO Y DESENCOFRADO NORMAL VEREDAS
TARRAJEO EN MUROS EXTERIORES
TARRAJEO DE VIGAS
TARRAJEO DE COLUMNAS
VESTIDURA DE DERRAMES ANCHO=15 CM.
BRUAS DE 1 cm.
CONTRAZOCALO CEMENTO S/COLOREAR H = 20 CM

ASIENTO
37
38
39
40
41
42
43
44
45

CONTRAZOCALO CEMENTO S/COLOREAR H = 30 CM


FLETE TERRESTRE-CHICLAYO-LA ESPERANZA- MARCOPAMPA

46

PISO DE CONCRETO PULIDO COLOREADO, e=2", F'C = 140 KG/CM2


PINTURA SATINADA EN INTERIORES
PINTURA SATINADA EN COLUMNAS,VIGAS Y DERRAMES
PINTURA SATINADA EXTERIORES
PINTURA DE CONTRAZOCALO C/ESMALTE

47
48

TUBERIAS PVC SAP (ELECTRICAS) D=3/4"


CAJA DE PASE FG 4"X4"X1.5"

49

CAJA PORTA MEDIDOR MONOFASICO


CIELO RASO CON FIBROCEMENTO
PISO DE CERAMICA DE COLOR CLARO DE 30X30 CM.

50

ZOCALO DE CERAMICA 0.30X0.30 , H=1.20M


LUMINARIA PARA LAMPARAS COLGANTES

51

LUMINARIA AHORRADOR
CIELO RASO CON FIBROCEMENTO
VENTANA METALICA

52

PUERTAS DE MADERA DE CEDRO MACHIEMBRADA


BISAGRA ALUMINIZADAS CAPUCHINA DE 4" X 4"
CERRADURA PARA PUERTA INTERIORES

53

PUERTAS DE MADERA DE CEDRO MACHIEMBRADA


MANIJA DE BRONCE PARA PUERTAS
MANIJA DE BRONCE PARA VENTANAS

54

VIDRIOS SEMIDOBLES INCOLORO CRUDO


PIZARRA ACRILICA 4.00 X 1.20 M. (INLCL TICERO METALICO)
MOBILIARIO
PLACA RECORDATORIA

55