Sei sulla pagina 1di 1

Tower Crane Drawing Checklist

Exallos Specialist Engineering


Robert Bird Group Pty Ltd ABN 67 010 580 248

Project Number

GENERAL

Project Name Date Client Draftsperson


(Name in full)

Designer
(Name in full)

Design Checker
(Name in full)

Tower Configuration
- In order from bottom to top - Give tower dimensions if unfamiliar

Minimum Clearance Required for Tower Deflection

mm

CONFIGURATION

RLs RL to Top of Base: Crane Details Crane Type: Gravity: Base Type Static / Cruciform: Base Size Length (m): Ballast (tn): Width (m): Jib Length:

RL to Top of Building: HUH Above Base: Pile Cap: Frame Size:


(attach details)

Rock Bolt / Anchor:

Depth (m):

Base Reinforcement Structure Importance Level

N .............................................. @ ................................................... c/c u bars, E/W, top and bottom N .............................................. @ 200 c/c, sides Terrain Category:
insert return period

Region: Ultimate: Working: M= V= Out of Service H= Mstability= ms-1 ms-1 kNm kN kN kNm

WIND

Design Installation Life

V:
insert return period

V: M= V= kNm kN kN kNm kNm kN Tension: kN

LOADS

In Service

H= Mstability= Mslew=

Working Pile Loads Compression: Title: Geotechnical Report Project / Job Number:

Shear:

kN

Date: Allowable Shaft Adhesion:


(if applicable)

FOUNDATION

Allowable Bearing Capacity Required: Slab Penetration Size: General Details Concrete Strength:
(at time of erection)

Levels Applicable:
(ie B1, 1, 2, 3)

mPa

Base Concrete Cover: Piles

mm mm

FRAME

Hold Down / (give example of previous job) Starter Frame Climbing Frame Yes No Lock Off Load kN Part Turn 1/ turn

ATTACH

LOCATION PLAN (CAD FILE) ATTACHED


(TICK)

LOAD / RADIUS CHART ATTACHED


(TICK)

Draw North Arrow:

Page 1 of 1

Potrebbero piacerti anche