Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
APPLICATION SEQUENCE
A. CEMENT WALL OR CEILING 1. Neutralizer 2. Primer (10 sqm/gal) Flat Latex Semi-gloss Depends on Finish 3. Patch Putty Patching Compound 4. Sand Paper 5. Patch Putty Patching Compound 6. Sand Paper 7. First Final Coat (15 sqm/gal) 8. Second Final Coat (15 sqm/gal)
B. GYPSUM WALL OR CEILING 1. 2. 3. 4. Taping Jointing Boral Gypsum Putty Sanding Primer (10 sqm / gal) Flat Latex Semi-gloss Depends on Finish Patch Putty Patching Compound Sanding First Final Coat (15 sqm/gal) Second Final Coat (15 sqm/gal)
5. 6. 7. 8.
Prepared By: Engr. John Paul A. Gallardo Quantity Surveyor Classique Ideas Interior Design, Inc. 9564 Jaime St., Airport Village, Brgy. Vitalez, Paranaque City
Noted By: Arch. Fiel Pugoy Project Architect Classique Ideas Interior Design, Inc. 9564 Jaime St., Airport Village, Brgy. Vitalez, Paranaque City