Sei sulla pagina 1di 1

PAINTING WORKS

APPLICATION SEQUENCE

A. CEMENT WALL OR CEILING 1. Neutralizer 2. Primer (10 sqm/gal) Flat Latex Semi-gloss Depends on Finish 3. Patch Putty Patching Compound 4. Sand Paper 5. Patch Putty Patching Compound 6. Sand Paper 7. First Final Coat (15 sqm/gal) 8. Second Final Coat (15 sqm/gal)

B. GYPSUM WALL OR CEILING 1. 2. 3. 4. Taping Jointing Boral Gypsum Putty Sanding Primer (10 sqm / gal) Flat Latex Semi-gloss Depends on Finish Patch Putty Patching Compound Sanding First Final Coat (15 sqm/gal) Second Final Coat (15 sqm/gal)

5. 6. 7. 8.

Prepared By: Engr. John Paul A. Gallardo Quantity Surveyor Classique Ideas Interior Design, Inc. 9564 Jaime St., Airport Village, Brgy. Vitalez, Paranaque City

Noted By: Arch. Fiel Pugoy Project Architect Classique Ideas Interior Design, Inc. 9564 Jaime St., Airport Village, Brgy. Vitalez, Paranaque City

Potrebbero piacerti anche