REFERENCIA: PRESUPUESTO CONSTRUCCION BLOQUE DE CANILES
FECHA: BOGOTA, ENERO 7 DE 2013

ITEM

DESCRIPCION ACTIVIDAD

UNIDAD

1 ACTIVIDADES PRELIMINARES GENERALES


1.1 CERRAMIENTO PROVISIONAL EN MALLA VERDE Y REPISA, H=2 MT
1.2
1.3
1.4
1.7
1.8

CAMPAMENTO PROVISIONAL EN MADERA (OFICINA, ALMACEN, CUARTOS )


SUMINISTRO E INSTALACION DE VALLA INFORMATIVA
INSTALACION ELECTRICA PROVISIONAL
LOCALIZACION Y REPLANTEO
SEALIZACION OBRA
TOTAL ACTIVIDADES PRELIMINARES

CANTIDAD VR. UNITARIO

VR. TOTAL

MT

150.00

6,800

1,020,000

M2
M2
ML
M2
GLOB

20.00
1.00
6.00
350.00
1.00

50,000
60,000
45,000
1,900
200,000

1,000,000
60,000
270,000
665,000
200,000
3,215,000

M3
M3
M3
M3
M2
M3
M3
M3
M2
M2
ML
KG
KG
UND

85.00
95.00
95.00
2.08
49.36
9.87
7.40
5.20
294.30
213.50
193.70
1739.80
801.95
25.00

20,500
8,000
42,000
382,000
15,500
276,000
400,000
405,000
48,600
38,400
30,400
2,400
2,600
4,000

M2

280.00

26,800

M2
ML
UND
ML
UND
ML
UND
UND

101.00
3.00
390.00
165.15
16.00
3.50
1.00
2.00

50,300
27,200
1,800
19,800
30,000
12,200
425,000
310,000

M2
ML
ML
ML

525.00
125.00
156.00
7.20

14,300
9,000
3,100
21,000

AREA CANILES
2
2.1
2.2
2.3
2.4
2.5
2.6
2.7
2.8
2.9
2.10
2.11
2.12
2.13
2.14

CIMENTACION Y ESTRUCTURA
EXCAVACION MECANICA
TRASCIEGO MATERIAL DE EXCAVACION, MAX. 1.5 KM
RELLENO EN RECEBO B-200
CONCRETO 3000 PSI PARA ZAPATAS (.40X.40X.25)
CONCRETO POBRE PROTECCION FONDO DE PISO E=5 CM
CONCRETO VIGAS DE CIMENTACION (.20x.20)
CONCRETO VIGAS AEREA (.15x.20)
COLUMNAS EN CONCRETO 3000 PSI (.20X.20)
CONCRETO 3000 PSI, PLACA DE CONTRAPISO MACIZA E=10 CM
CONCRETO 2500 PSI, ANDENES, E= 10 cm
BORDILLO PREFABRICADO EN CONCRETO, CONFINAMIENTO
ACERO DE REFUERZO
MALLA ELECTROSOLDADA 4mm (15x15)
ENSAYOS DE LABORATORIO
TOTAL CIMENTACION Y ESTRUCTURA

3 MAMPOSTERIA
3.1 MAMPOSTERIA EN BLOQUE H=5
MAMPOSTERIA ESTRUCTURAL LADRILLO A LA VISTA TIPO SANTAFE O
3.2 SIMILAR (FACHADA, ALOJAMIENTO, OFICINA, DEPOSITO)
3.3 DINTELES EN CONCRETO DE .15X.20 (INCLUYE ACERO DE REFUERZO)
3.4 SUMINISTRO E INSTALACION DE ANCLAJES DE 3/8" L=.15 MT
3.5 CAUELA PERIMETRAL EN CONCRETO D= 25 CM
3.6 POYOS EN CONCRETO (.35*.80), INCLUYE ACERO DE REFUERZO.
3.7 POYOS EN CONCRETO DE .60 MT (INCLUYE ACERO DE REFUERZO)
3.10 CAJA DE INSPECCION (1.0X1.0) PAETE INTERIOR (A. N)
3.11 CAJA DE INSPECCION (.80X.80) PAETE INTERIOR (A.LL)
TOTAL MAMPOSTERIA
4
4.1
4.2
4.3
4.4

PAETES
PAETE LISO IMPERMEABILIZADO, MORTERO 1:3, E=1.5 CM
PAETE LISO IMPERMEABILIZADO, MORTERO 1:3, E=1.5 CM
FILOS Y DILATACIONES
ALFAGIA EN CONCRETO VENTANAS
TOTAL PAETES

1,742,500
760,000
3,990,000
794,560
765,080
2,724,672
2,961,600
2,106,000
14,302,980
8,198,400
5,888,480
4,175,520
2,085,057
100,000
50,594,849
7,504,000
5,080,300
81,600
702,000
3,269,970
480,000
42,700
425,000
620,000
18,205,570
7,507,500
1,125,000
483,600
151,200
9,267,300

5 PISOS BASES
5.1 AFINADO ENDURECIDO E IMPERMEABILIZADO, MORTERO 1:2, E= 3 CM
MEDIA CAA EN MORTERO 1:2, ENDURECIDO E IMPERMEABILIZADO E= 3
5.2 CM
TOTAL PISOS BASES

M2

173.00

18,300

3,165,900

ML

265.75

4,100

1,089,575
4,255,475
-

ML
M2

180.00
294.00

16,200
28,200

2,916,000
8,290,800

3.3 SUMINISTRO E INSTALACION CABALLETE PARA TEJA TERMOACUSTICA


SUMINISTRO E INSTALACION CANAL GALVANIZADA D= 49 CM, INCLUYE
3.4 ACCESORIOS

ML

33.90

24,600

833,940

ML

92.50

40,500

3,746,250

3.5 SUMINISTRO E INSTALACION BAJANTE PVC, DIAM. 3", INCLUYE ACCESORIOS


TOTAL CUBIERTA

ML

50.40

32,500

3 CUBIERTA
ESTRUCTURA METALICA EN TUBO RECTANGULAR 4X8 CAL. 16, INCLUYE
3.1 ANTICORROSIVO Y PINTURA EN ESMALTE
3.2 SUMINISTRO E INSTALACION TEJA TERMOACUSTICA

6
6.1
6.2
6.3
6.4
6.5
6.6

INSTALACIONES HIDRAULICAS
PUNTO AGUA FRIA DE 1/2"
TUBERIA DE 1/2" PVC , INCLUYE ACCESORIOS
TUBERIA DE 1" PVC, INCLUYE ACCESORIOS
REGISTROS DE 1" RED WHITE
REGISTROS DE 1/2" RED WHITE
TAPA REGISTRO
TOTAL INSTALACIONES HIDRAULICAS

UND
ML
ML
UND
UND
UND

20.00
33.00
104.95
4.00
14.00
18.00

27,400
8,800
14,600
46,000
32,000
12,000

7
7.1
7.2
7.3
7.4
7.5
7.6
7.7

INSTALACIONES DESAGUES AGUAS LLUVIAS Y SANITARIAS


TUBERIA 3" A.LL, INCLUYE ACCESORIOS
REJILLAS 2"
REJILLAS 3"
DESAGUE 2"
DESAGUE 3"
TUBERIA 3" A. N, INCLUYE ACCESORIOS
TUBERIA 2"
TOTAL INSTALACIONES DESAGUES AGUAS LLUVIAS Y SANITARIAS

ML
UND
UND
UND
UND
ML
ML

107.00
1.00
5.00
6.00
3.00
84.00
22.00

21,000
8,800
10,200
9,900
18,900
18,500
11,600

8
8.1
8.2
8.3

INSTALACIONES ELECTRICAS
ACOMETIDA ELECTRICA
SALIDA ILUMINACION
SALIDA TOMACORRIENTE
SALIDA TOMACORRIENTE REGULADA, INCLUYE TAPA DE PROTECCION
INTEMPERIE
SUMINISTRO E INSTALACION BALA HALOGENA (BAOS)
SUMINISTRO E INSTALACION LAMPARA FLUORESCENTE (2X32W)
(AULA,ALOJAMIENTO,ENFERMERIA CANINA, OFICINA)
TABLERO DE 12 CIRCUITOS
BREAKERS DE 20 AMP
BREAKERS DE 50 AMP
TOTAL INSTALACIONES ELECTRICAS

GLOB
UND
UND

1.00
34.00
8.00

1,500,000
29,900
25,800

1,638,000
17,424,990
548,000
290,400
1,532,270
184,000
448,000
216,000
3,218,670
2,247,000
8,800
51,000
59,400
56,700
1,554,000
255,200
4,232,100
1,500,000
1,016,600
206,400

UND
UND

13.00
1.00

32,000
34,400

416,000
34,400

UND
UND
UND
UND

10.00
2.00
12.00
2.00

53,000
210,000
12,600
35,000

530,000
420,000
151,200
70,000
4,344,600
-

UND

20.00

168,000

3,360,000

UND

20.00

69,000

1,380,000
4,740,000

8.4
8.5
8.6
8.7
8.8
8.9

9 CARPINTERIA METALICA
PUERTA METALICA (2.0X.80), MARCO EN TUBO GALVANIZADO Y ANGULO 1
9.1 1/4" Y MALLA ESLABONADA DE 2" CAL 10
VENTANA METALICA (1.20X1.0), MARCO EN ANGULO DE 1 1/4" X 1/8" Y
9.2 MALLA ESLABONADA DE 2" CAL. 10
TOTAL CARPINTERIA METALICA

PINTURA
ESTUCO Y PINTURA MUROS EN ESMALTE, 2 MANOS
PINTURA EPOXICA 2 MANOS MUROS
PINTURA EPOXICA 2 MANOS MUROS
PINTURA EPOXICA 3 MANOS PISOS
PINTURA ESMALTE PARA PUERTAS Y VENTANAS (MALLA ESLABONADA), 2
10.5 CARAS
TOTAL PINTURA
10
10.1
10.2
10.3
10.4

11 VARIOS
SUMINISTRO E INSTALACION POZUELOS EN ACERO INOXIDABLE DIAM.
11.1 CM
11.2 ESTIBAS EN MADERA (1.0X1.0) MT
TOTAL VARIOS

15
15.1
15.2
15.3
15.5

OBRAS EXTERIORES
EXCAVACION MANUAL
CONCRETO CICLOPEO, CONCRETO 2500 PSI (60/40)
CONCRETO VIGAS DE CIMENTACION (.20x.20)
LOSAS PARA SENDERO PEATONAL (.50X1.0) EN CONCRETO
TOTAL OBRAS EXTERIORES

16 GASTOS GENERALES
16.1 ASEO FINAL OBRA
TOTAL GASTOS GENERALES

VALOR TOTAL COSTOS DIRECTOS


ADMINISTRACION
IMPREVISTOS
UTILIDAD
IVA SOBRE UTILIDAD

38.22
525.00
125.00
173.00

6,400
12,000
6,900
16,500

M2

105.20

14,200

1,493,840
11,755,448
-

UND
UND

38.00
16.00

12,600
18,000

478,800
288,000
766,800
-

M2

58.00

13,600

788,800

M2
M2
M2

26.32
12.32
44.00

16,800
43,000
35,400

442,109
529,588
1,557,600

M2

28.00

58,200

1,629,600

M2

77.54

31,500

M3
M3
M3
M2

56.06
37.38
9.34
51.50

14,800
132,000
276,000
34,800

M2

350.00

2,200

2,442,510
7,390,207
829,747
4,933,632
2,578,944
1,792,200
10,134,523
770,000
770,000
-

25

12 ENCHAPE MUROS Y PISOS


AFINADO PARA PISOS, MORTERO 1:2 E= 3 CM (ALOJAMIENTO,OFICINA,
12.1 DEPOSITO)
AFINADO IMPERMEABILIZADO, MORTERO 1:2, E= 3 CM (ORINALES, DUCHAS,
12.2 SANITARIOS, ENFERMERIA CANINA, BAOS)
12.3 ENCHAPE CERAMICO PISOS TRAFICO ALTO (BAOS)
12.4 ENCHAPE TABLETA TIPO MOORE (ALOJAMIENTO, DEPOSITO)
PISO EN TABLETA VIBRO PRENSADA GRANITO DE .30X.30 TIPO ALFA O
12.5 SIMILAR, COLOR BLANCO HUILA (ENFERMERIA CANINA, OFICINA, AULA)
ENCHAPE CERAMICO BLANCO MUROS 20X20 (ORINALES,DUCHAS,
12.6 SANITARIOS,BAOS, ENFERMERIA CANINA)
TOTAL ENCHAPE MUROS Y PISOS

244,608
6,300,000
862,500
2,854,500

ML
M2
ML
M2

150,315,532.36
8%
3%
5%
16%

VALOR TOTAL COSTOS DIRECTOS E INDIRECTOS

ARQ. ROSA MARIA MORENO RODRIGUEZ


MAT. PROF.2570057874 CND

Direccion cra 86 No. 146-61 Suba/ C. R. Suacia Tel. 3208025156 Bogota - (091) 8326637 Girardot
rmmr.arquitecta@gmail.com

12,025,242.59
4,509,465.97
7,515,776.62
1,202,524.26

175,568,541.79

ROSA MARIA MORENO RODRIGUEZ


ARQUITECTA
REFERENCIA: PRESUPUESTO CONSTRUCCION DE UNA UNIDAD DE REPRODUCCION

FECHA: BOGOTA, JUNIO 13 DE 2011

ITEM

DESCRIPCION ACTIVIDAD

UNIDAD

1 ACTIVIDADES PRELIMINARES GENERALES


1.1 CERRAMIENTO PROVISIONAL EN MALLA VERDE Y REPISA, H=2 MT
1.2
1.3
1.4
1.5
1.6
1.7
1.8

CAMPAMENTO PROVISIONAL EN MADERA (OFICINA, ALMACEN, CUARTOS )


SUMINISTRO E INSTALACION DE VALLA INFORMATIVA
INSTALACION ELECTRICA PROVISIONAL
INSTALACION HIDROSANITARIA PROVISIONAL
INSTALACION TELEFONICA PROVISIONAL
LOCALIZACION Y REPLANTEO
SEALIZACION OBRA
TOTAL ACTIVIDADES PRELIMINARES

CANTIDAD VR. UNITARIO

VR. TOTAL

MT

233.60

6,800

1,588,480

M2
M2
ML
ML
ML
M2
GLOB

24.00
2.00
15.00
15.00
15.00
503.83
1.00

50,000
60,000
45,000
40,000
40,000
1,900
200,000

1,200,000
120,000
675,000
600,000
600,000
957,268
200,000
5,940,748

M3
M3
M3
M3
M2
M3
M3
M3
M2
M2
ML
KG
KG
UND

152.34
198.04
101.56
2.08
49.36
9.87
7.40
5.20
294.30
213.50
193.70
1739.80
801.95
25.00

20,500
8,000
42,000
382,000
15,500
276,000
400,000
405,000
48,600
38,400
30,400
2,400
2,600
4,000

M2

390.09

26,800

3,122,970
1,584,336
4,265,520
794,560
765,080
2,724,672
2,961,600
2,106,000
14,302,980
8,198,400
5,888,480
4,175,520
2,085,057
100,000
53,075,175
10,454,345

M2
ML
UND
ML
UND
ML

145.23
3.00
542.00
165.15
16.00
3.50

50,300
27,200
1,800
19,800
30,000
12,200

7,305,220
81,600
975,600
3,269,970
480,000
42,700

M2

1.50

95,000

142,500

ML
UND
UND

7.00
8.00
7.00

78,800
425,000
310,000

551,600
3,400,000
2,170,000
28,873,535

AREA CANILES
2
2.1
2.2
2.3
2.4
2.5
2.6
2.7
2.8
2.9
2.10
2.11
2.12
2.13
2.14

CIMENTACION Y ESTRUCTURA
EXCAVACION MECANICA
TRASCIEGO MATERIAL DE EXCAVACION, MAX. 1.5 KM
RELLENO EN RECEBO B-200
CONCRETO 3000 PSI PARA ZAPATAS (.40X.40X.25)
CONCRETO POBRE PROTECCION FONDO DE PISO E=5 CM
CONCRETO VIGAS DE CIMENTACION (.20x.20)
CONCRETO VIGAS AEREA (.15x.20)
COLUMNAS EN CONCRETO 3000 PSI (.20X.20)
CONCRETO 3000 PSI, PLACA DE CONTRAPISO MACIZA E=10 CM
CONCRETO 2500 PSI, ANDENES, E= 10 cm
BORDILLO PREFABRICADO EN CONCRETO, CONFINAMIENTO
ACERO DE REFUERZO
MALLA ELECTROSOLDADA 4mm (15x15)
ENSAYOS DE LABORATORIO
TOTAL CIMENTACION Y ESTRUCTURA

3 MAMPOSTERIA
3.1 MAMPOSTERIA EN BLOQUE H=5
MAMPOSTERIA ESTRUCTURAL LADRILLO A LA VISTA TIPO SANTAFE O
3.2 SIMILAR (FACHADA, ALOJAMIENTO, OFICINA, DEPOSITO)
3.3 DINTELES EN CONCRETO DE .15X.20 (INCLUYE ACERO DE REFUERZO)
3.4 SUMINISTRO E INSTALACION DE ANCLAJES DE 3/8" L=.15 MT
3.5 CAUELA PERIMETRAL EN CONCRETO D= 25 CM
3.6 POYOS EN CONCRETO (.35*.80), INCLUYE ACERO DE REFUERZO.
3.7 POYOS EN CONCRETO DE .60 MT (INCLUYE ACERO DE REFUERZO)
MESONES EN CONCRETO DE .60 MT (INCLUYE ACERO DE REFUERZO),
3.8 ACABADO EN GRANITO PULIDO
MESONES EN CONCRETO DE .60 MT (INCLUYE ACERO DE REFUERZO),
3.9 ACABADO EN GRANITO PULIDO
3.10 CAJA DE INSPECCION (1.0X1.0) PAETE INTERIOR (A. N)
3.11 CAJA DE INSPECCION (.80X.80) PAETE INTERIOR (A.LL)
TOTAL MAMPOSTERIA

4
4.1
4.2
4.3
4.4

PAETES
PAETE LISO IMPERMEABILIZADO, MORTERO 1:3, E=1.5 CM
PAETE LISO IMPERMEABILIZADO, MORTERO 1:3, E=1.5 CM
FILOS Y DILATACIONES
ALFAGIA EN CONCRETO VENTANAS
TOTAL PAETES

10,637,105
1,360,800
897,760
151,200
13,046,865
-

M2
ML
ML
ML

743.85
151.20
289.60
7.20

14,300
9,000
3,100
21,000

M2

173.00

18,300

3,165,900

ML

265.75

4,100

1,089,575
4,255,475
-

ML
M2

214.35
337.82

16,200
28,200

3,472,470
9,526,510

3.3 SUMINISTRO E INSTALACION CABALLETE PARA TEJA TERMOACUSTICA


SUMINISTRO E INSTALACION CANAL GALVANIZADA D= 49 CM, INCLUYE
3.4 ACCESORIOS

ML

33.90

24,600

833,940

ML

92.50

40,500

3,746,250

3.5 SUMINISTRO E INSTALACION BAJANTE PVC, DIAM. 3", INCLUYE ACCESORIOS


TOTAL CUBIERTA

ML

50.40

32,500

5 PISOS BASES
5.1 AFINADO ENDURECIDO E IMPERMEABILIZADO, MORTERO 1:2, E= 3 CM
MEDIA CAA EN MORTERO 1:2, ENDURECIDO E IMPERMEABILIZADO E= 3
5.2 CM
TOTAL PISOS BASES
3 CUBIERTA
ESTRUCTURA METALICA EN TUBO RECTANGULAR 4X8 CAL. 16, INCLUYE
3.1 ANTICORROSIVO Y PINTURA EN ESMALTE
3.2 SUMINISTRO E INSTALACION TEJA TERMOACUSTICA

6
6.1
6.2
6.3
6.4
6.5
6.6

INSTALACIONES HIDRAULICAS
PUNTO AGUA FRIA DE 1/2"
TUBERIA DE 1/2" PVC , INCLUYE ACCESORIOS
TUBERIA DE 1" PVC, INCLUYE ACCESORIOS
REGISTROS DE 1" RED WHITE
REGISTROS DE 1/2" RED WHITE
TAPA REGISTRO
TOTAL INSTALACIONES HIDRAULICAS

UND
ML
ML
UND
UND
UND

20.00
33.00
104.95
4.00
14.00
18.00

27,400
8,800
14,600
46,000
32,000
12,000

7
7.1
7.2
7.3
7.4
7.5
7.6
7.7

INSTALACIONES DESAGUES AGUAS LLUVIAS Y SANITARIAS


TUBERIA 3" A.LL, INCLUYE ACCESORIOS
REJILLAS 2"
REJILLAS 3"
DESAGUE 2"
DESAGUE 3"
TUBERIA 3" A. N, INCLUYE ACCESORIOS
TUBERIA 2"
TOTAL INSTALACIONES DESAGUES AGUAS LLUVIAS Y SANITARIAS

ML
UND
UND
UND
UND
ML
ML

107.00
1.00
5.00
6.00
3.00
84.00
22.00

21,000
8,800
10,200
9,900
18,900
18,500
11,600

8
8.1
8.2
8.3

INSTALACIONES ELECTRICAS
ACOMETIDA ELECTRICA
SALIDA ILUMINACION
SALIDA TOMACORRIENTE
SALIDA TOMACORRIENTE REGULADA, INCLUYE TAPA DE PROTECCION
INTEMPERIE
SUMINISTRO E INSTALACION BALA HALOGENA (BAOS)
SUMINISTRO E INSTALACION LAMPARA FLUORESCENTE (2X32W)
(AULA,ALOJAMIENTO,ENFERMERIA CANINA, OFICINA)
TABLERO DE 12 CIRCUITOS
BREAKERS DE 20 AMP
BREAKERS DE 50 AMP
TOTAL INSTALACIONES ELECTRICAS

GLOB
UND
UND

1.00
34.00
8.00

1,500,000
29,900
25,800

1,638,000
19,217,170
548,000
290,400
1,532,270
184,000
448,000
216,000
3,218,670
2,247,000
8,800
51,000
59,400
56,700
1,554,000
255,200
4,232,100
1,500,000
1,016,600
206,400

UND
UND

13.00
1.00

32,000
34,400

416,000
34,400

UND
UND
UND
UND

10.00
2.00
12.00
2.00

53,000
210,000
12,600
35,000

530,000
420,000
151,200
70,000
4,344,600
-

8.4
8.5
8.6
8.7
8.8
8.9

9 CARPINTERIA METALICA

PUERTA METALICA (2.0X.80), MARCO EN TUBO GALVANIZADO Y ANGULO 1


9.1 1/4" Y MALLA ESLABONADA DE 2" CAL 10
VENTANA METALICA (1.20X1.0), MARCO EN ANGULO DE 1 1/4" X 1/8" Y
9.2 MALLA ESLABONADA DE 2" CAL. 10
VENTANA EN ALUMINIO PERFIL PROYECTANTE, CON HOJAS DE CORREDERA,
9.3 INCLUYE VIDRIO 4 MM, COLOR BRONCE

UND

25.00

168,000

4,200,000

UND

25.00

69,000

1,725,000

M2

6.10

145,000

884,500

SUMINISTRO E INSTALACION MARCO Y PUERTA EN LAMINA CAL. 20, (2.0X1.0)


9.4 INCLUYE CERRADURA DE PERILLA, ANTICORROSIVO Y PINTURA EN ESMALTE

UND

2.00

380,000

760,000

SUMINISTRO E INSTALACION MARCO Y PUERTA EN LAMINA CAL. 20, (2.0X.80)


9.5 INCLUYE CERRADURA DE PERILLA, ANTICORROSIVO Y PINTURA EN ESMALTE

UND

2.00

360,000

720,000

UND

5.00

340,000

ML
M2
ML
M2

38.22
743.85
151.20
173.00

6,400
12,000
6,900
16,500

1,700,000
9,989,500
244,608
8,926,242
1,043,280
2,854,500

M2

105.20

14,200

1,493,840
14,562,470
-

UND
UND

38.00
16.00

12,600
18,000

478,800
288,000
766,800
-

M2

58.00

13,600

788,800

M2
M2
M2

26.32
12.32
44.00

16,800
43,000
35,400

442,109
529,588
1,557,600

M2

28.00

58,200

1,629,600

M2
ML

77.54
32.03

31,500
14,100

2,442,510
451,623

ML

13.76

25,000

344,000

ML

13.76

22,950

315,792
8,501,622
-

UND

2.00

384,000

768,000

UND

1.00

242,000

242,000

UND
UND

3.00
2.00

175,000
78,000

525,000
156,000

UND

1.00

145,000

145,000

SUMINISTRO E INSTALACION MARCO Y PUERTA EN LAMINA CAL. 20, (2.0X.60)


9.6 INCLUYE CERRADURA DE PERILLA, ANTICORROSIVO Y PINTURA EN ESMALTE
TOTAL CARPINTERIA METALICA
PINTURA
ESTUCO Y PINTURA MUROS EN ESMALTE, 2 MANOS
PINTURA EPOXICA 2 MANOS MUROS
PINTURA EPOXICA 2 MANOS MUROS
PINTURA EPOXICA 3 MANOS PISOS
PINTURA ESMALTE PARA PUERTAS Y VENTANAS (MALLA ESLABONADA), 2
10.5 CARAS
TOTAL PINTURA
10
10.1
10.2
10.3
10.4

11 VARIOS
SUMINISTRO E INSTALACION POZUELOS EN ACERO INOXIDABLE DIAM.
11.1 CM
11.2 ESTIBAS EN MADERA (1.0X1.0) MT
TOTAL VARIOS

25

12 ENCHAPE MUROS Y PISOS


AFINADO PARA PISOS, MORTERO 1:2 E= 3 CM (ALOJAMIENTO,OFICINA,
12.1 DEPOSITO)
AFINADO IMPERMEABILIZADO, MORTERO 1:2, E= 3 CM (ORINALES, DUCHAS,
12.2 SANITARIOS, ENFERMERIA CANINA, BAOS)
12.3 ENCHAPE CERAMICO PISOS TRAFICO ALTO (BAOS)
12.4 ENCHAPE TABLETA TIPO MOORE (ALOJAMIENTO, DEPOSITO)
PISO EN TABLETA VIBRO PRENSADA GRANITO DE .30X.30 TIPO ALFA O
12.5 SIMILAR, COLOR BLANCO HUILA (ENFERMERIA CANINA, OFICINA, AULA)
ENCHAPE CERAMICO BLANCO MUROS 20X20 (ORINALES,DUCHAS,
12.6 SANITARIOS,BAOS, ENFERMERIA CANINA)
12.7 GUARDAESCOBA TIPO MOORE (ALOJAMIENTO, DEPOSITO)
GUARDAESCOBA EN TABLETA VIBRO PRENSADA GRANITO, TIPO ALFA O
12.8 SIMILAR COLOR BLANCO HUILA ( OFICINA)
GUARDAESCOBA MEDIA CAA EN GRANITO PULIDO Y BRILLADO, COLOR
12.9 BLANCO HUILA (ENFERMERIA CANINA)
TOTAL ENCHAPE MUROS Y PISOS
13 APARATOS SANITARIOS Y ACCESORIOS
SUMINISTRO E INSTALACION SANITARIO INSTITUCIONAL CON
13.1 FLUXOMETRO,TIPO CORONA (SANITARIOS ALOJAMIENTO)
SUMINISTRO E INSTALACION SANITARIO ACUACER, INCLUYE GRIFERIA
13.2 (SANITARIOS OFICINA Y ENFERMERIA)
SUMINISTRO E INSTALACION LAVAMANOS DE SOBREPONER, INCLUYE
13.3 GRIFERIA
13.4 SUMNISTRO E INSTALACION DUCHA TIPO GRIVAL
SUMINISTRO E INSTALACION LAVAPLATOS EN ACERO INOXIDABLE, INCLUYE
13.5 GRIFERIA (.60X.40)

TOTAL APARATOS SANITARIOS Y ACCESORIOS


14 CIELO RASOS FALSOS
SUMINISTRO E INSTALACION CIELORASO FALSO, ESTRUCTURA EN ALUMINIO
14.1 Y LAMINA FIBROSINTETICA
TOTAL CIELORASO FALSOS
OBRAS EXTERIORES
EXCAVACION MANUAL
CONCRETO CICLOPEO, CONCRETO 2500 PSI (60/40)
CONCRETO VIGAS DE CIMENTACION (.20x.20)
CERRAMIENTO PERIMETRAL EN TUBO GALVANIZADO DE 2", MARCOS EN
ANGULO DE 2"X1/8", MALLA ESLABONADA 2" CAL. 10, ANTICORROSIVO Y
15.4 PINTURA EN ESMALTE
15.5 LOSAS PARA SENDERO PEATONAL (.50X1.0) EN CONCRETO
15.6 GRAVILLA SUELTA EXTENDIDA, PROM. 1"- 1 1/2"
TOTAL OBRAS EXTERIORES
15
15.1
15.2
15.3

16 GASTOS GENERALES
16.1 ASEO FINAL OBRA
TOTAL GASTOS GENERALES

VALOR TOTAL COSTOS DIRECTOS


ADMINISTRACION
IMPREVISTOS
UTILIDAD
IVA SOBRE UTILIDAD

1,836,000
-

M2

30.32

58,200

M3
M3
M3

56.06
37.38
9.34

14,800
132,000
276,000

MT
M2
VIAJE

233.60
51.50
4.00

132,000
34,800
145,000

M2

503.83

2,200

1,764,391
1,764,391
829,747
4,933,632
2,578,944

30,835,200
1,792,200
580,000
41,549,723
1,108,415
1,108,415
-

216,283,258.91
8%
3%
5%
16%

VALOR TOTAL COSTOS DIRECTOS E INDIRECTOS

ARQ. ROSA MARIA MORENO RODRIGUEZ


MAT. PROF.2570057874 CND

Direccion cra 86 No. 146-61 Suba/ C. R. Suacia Tel. 3208025156 Bogota - (091) 8326637 Girardot
rmmr.arquitecta@gmail.com

17,302,660.71
6,488,497.77
10,814,162.95
1,730,266.07

252,618,846.40

ROSA MARIA MORENO RODRIGUEZ


ARQUITECTA

REFERENCIA: PRESUPUESTO CONSTRUCCION CENTRO CANINO - MODELO BASICO


FECHA: BOGOTA, JUNIO 13 DE 2011
PRESUPUESTO GENERAL PARA LA CONSTRUCCION DE UN CENTRO DE ADIESTRAMIENTO CANINO

ITEM

DESCRIPCION ACTIVIDAD

1
1.1

ACTIVIDADES PRELIMINARES
CERRAMIENTO PROVISIONAL EN MALLA VERDE Y REPISA, H=2 MT

1.2
1.3
1.4
1.5
1.6
1.7
1.8

CAMPAMENTO PROVISIONAL EN MADERA (OFICINA, ALMACEN, CUARTOS )


SUMINISTRO E INSTALACION DE VALLA INFORMATIVA
INSTALACION ELECTRICA PROVISIONAL
INSTALACION HIDROSANITARIA PROVISIONAL
INSTALACION TELEFONICA PROVISIONAL
LOCALIZACION Y REPLANTEO
SEALIZACION OBRA
TOTAL ACTIVIDADES PRELIMINARES

2
2.1
2.2
2.3
2.4
2.5
2.6
2.7
2.8
2.9
2.10
2.11
2.12
2.13
2.14

CIMENTACION Y ESTRUCTURA
EXCAVACION MECANICA
TRASCIEGO MATERIAL DE EXCAVACION, MAX. 1.5 KM
RELLENO EN RECEBO B-200
CONCRETO POBRE PROTECCION FONDO DE PISO E=5 CM
CONCRETO 3000 PSI PARA ZAPATAS (.40X.40X.25)
CONCRETO VIGAS DE CIMENTACION (.20x.20)
CONCRETO VIGAS AEREA (.15x.20)
COLUMNAS EN CONCRETO 3000 PSI (.20X.20)
CONCRETO 3000 PSI, PLACA DE CONTRAPISO MACIZA E=10 CM
CONCRETO 2500 PSI, ANDENES, E= 10 cm
BORDILLO PREFABRICADO EN CONCRETO, CONFINAMIENTO
ACERO DE REFUERZO
MALLA ELECTROSOLDADA 4mm (15x15)
ENSAYOS DE LABORATORIO
TOTAL CIMENTACION Y ESTRUCTURA

MAMPOSTERIA
MAMPOSTERIA EN BLOQUE H=5
MAMPOSTERIA ESTRUCTURAL LADRILLO A LA VISTA TIPO SANTAFE O
3.2 SIMILAR (FACHADA, ALOJAMIENTO, AULA, OFICINA, DEPOSITO)
3.3 DINTELES EN CONCRETO DE .15X.20 (INCLUYE ACERO DE REFUERZO)
3.4 SUMINISTRO E INSTALACION DE ANCLAJES DE 3/8" L=.15 MT
3.5 CAUELA PERIMETRAL EN CONCRETO D= 25 CM
3.6 POYOS EN CONCRETO (.35*.80), INCLUYE ACERO DE REFUERZO.
3.7 POYOS EN CONCRETO DE .60 MT (INCLUYE ACERO DE REFUERZO)
MESONES EN CONCRETO DE .60 MT (INCLUYE ACERO DE REFUERZO),
3.8 ACABADO EN GRANITO PULIDO
MESONES EN CONCRETO DE .60 MT (INCLUYE ACERO DE REFUERZO),
3.9 ACABADO EN GRANITO PULIDO
3.10 CAJA DE INSPECCION (1.0X1.0) PAETE INTERIOR (A. N)
3.11 CAJA DE INSPECCION (.80X.80) PAETE INTERIOR (A.LL)
TOTAL MAMPOSTERIA
3
3.1

UNIDAD

CANTIDAD VR. UNITARIO

VR. TOTAL

MT

361.88

6,800

2,460,784

M2
M2
ML
ML
ML
M2
GLOB

40.00
2.00
20.00
20.00
20.00
1042.31
1.00

50,000
60,000
45,000
40,000
40,000
1,900
200,000

2,000,000
120,000
900,000
800,000
800,000
1,980,394
200,000
9,261,178

M3
M3
M3
M2
M3
M3
M3
M3
M2
M2
ML
KG
KG
UND

1056.50
1373.45
211.30
102.71
3.12
20.54
15.41
7.90
777.94
287.80
287.80
3171.80
2119.83
100.00

20,500
8,000
42,000
15,500
382,000
276,000
400,000
405,000
48,600
38,400
30,400
2,400
2,600
4,000

M2

966.28

26,800

21,658,301
10,987,626
8,874,621
1,592,005
1,191,840
5,669,592
6,162,600
3,199,500
37,808,006
11,051,520
8,749,120
7,612,320
5,511,569
400,000
130,468,620
25,896,170

M2
ML
UND
ML
UND
ML

205.31
3.00
1132.00
287.80
66.00
3.50

50,300
27,200
1,800
19,800
30,000
12,200

10,327,093
81,600
2,037,600
5,698,440
1,980,000
42,700

M2

1.50

95,000

142,500

ML
UND
UND

8.50
16.00
10.00

78,800
425,000
310,000

669,800
6,800,000
3,100,000
56,775,903
-

4
4.1
4.2
4.3
4.4

PAETES
PAETE LISO IMPERMEABILIZADO, MORTERO 1:3, E=1.5 CM
PAETE LISO IMPERMEABILIZADO, MORTERO 1:3, E=1.5 CM
ALFAGIA EN CONCRETO VENTANAS
FILOS Y DILATACIONES
TOTAL PAETES

29,531,538
3,831,300
201,600
2,878,040
36,442,478
-

M2
ML
ML
ML

2065.14
425.70
9.60
928.40

14,300
9,000
21,000
3,100

M2

528.00

18,300

9,662,400

ML

881.66

4,100

3,614,806
13,277,206
-

ML
M2

558.90
875.02

16,200
28,200

9,054,180
24,675,536

SUMINISTRO E INSTALACION CABALLETE PARA TEJA TERMOACUSTICA


SUMINISTRO E INSTALACION CANAL GALVANIZADA D= 49 CM, INCLUYE
ACCESORIOS

ML

93.15

24,600

2,291,490

ML

186.30

40,500

7,545,150

6.5

SUMINISTRO E INSTALACION BAJANTE PVC, DIAM. 3", INCLUYE ACCESORIOS


TOTAL CUBIERTA

ML

108.00

32,500

7
7.1
7.2
7.3
7.4
7.5
7.6

INSTALACIONES HIDRAULICAS
PUNTO AGUA FRIA DE 1/2"
TUBERIA DE 1/2" PVC , INCLUYE ACCESORIOS
TUBERIA DE 1" PVC, INCLUYE ACCESORIOS
REGISTROS DE 1" RED WHITE
REGISTROS DE 1/2" RED WHITE
TAPA REGISTRO
TOTAL INSTALACIONES HIDRAULICAS

UND
ML
ML
UND
UND
UND

53.00
73.50
193.00
8.00
41.00
49.00

27,400
8,800
14,600
46,000
32,000
12,000

8
8.1
8.2
8.3
8.4
8.5
8.6
8.7

INSTALACIONES SANITARIAS
TUBERIA 3" A.LL, INCLUYE ACCESORIOS
TUBERIA 3" A.N
TUBERIA 2"
REJILLAS 2"
REJILLAS 3"
DESAGUE 2"
DESAGUE 3"
TOTAL INSTALACIONES SANITARIAS

ML
ML
ML
UND
UND
UND
UND

154.00
99.00
16.00
2.00
6.00
10.00
4.00

21,000
18,500
11,600
8,800
10,200
9,900
18,900

GLOB
UND
UND
UND

1.00
85.00
6.00
34.00

1,500,000
29,900
25,800
30,200

3,510,000
47,076,356
1,452,200
646,800
2,817,800
368,000
1,312,000
588,000
7,184,800
3,234,000
1,831,500
185,600
17,600
61,200
99,000
75,600
5,504,500
1,500,000
2,541,500
154,800
1,026,800

UND
UND

6.00
2.00

32,000
34,400

192,000
68,800

UND
UND
UND
UND

14.00
2.00
35.00
5.00

53,000
210,000
12,600
35,000

742,000
420,000
441,000
175,000
7,261,900
-

5
5.1
5.2

6
6.1
6.2
6.3
6.4

PISOS BASES
AFINADO ENDURECIDO E IMPERMEABILIZADO, MORTERO 1:2, E= 3 CM
MEDIA CAA EN MORTERO 1:2, ENDURECIDO E IMPERMEABILIZADO E= 3
CM
TOTAL PISOS BASES
CUBIERTA
ESTRUCTURA METALICA EN TUBO RECTANGULAR 4X8 CAL. 16, INCLUYE
ANTICORROSIVO Y PINTURA EN ESMALTE
SUMINISTRO E INSTALACION TEJA TERMOACUSTICA

INSTALACIONES ELECTRICAS
ACOMETIDA ELECTRICA
SALIDA ILUMINACION
SALIDA TOMACORRIENTE MONOFASICA
SALIDA TOMACORRIENTE GFC
SALIDA TOMACORRIENTE REGULADA, INCLUYE TAPA DE PROTECCION
9.5 INTEMPERIE
9.6 SUMINISTRO E INSTALACION BALA HALOGENA (BAOS)
SUMINISTRO E INSTALACION LAMPARA FLUORESCENTE (2X32W)
9.7 (AULA,ALOJAMIENTO,ENFERMERIA CANINA, OFICINA)
9.8 TABLERO DE 12 CIRCUITOS
9.9 BREAKERS DE 20 AMP
9.10 BREAKERS DE 50 AMP
TOTAL INSTALACIONES ELECTRICAS
9
9.1
9.2
9.3
9.4

10

CARPINTERIA METALICA

PUERTA METALICA (2.0X.80), MARCO EN TUBO GALVANIZADO Y ANGULO 1


10.1 1/4" Y MALLA ESLABONADA DE 2" CAL 10
VENTANA METALICA (1.20X1.0), MARCO EN ANGULO DE 1 1/4" X 1/8" Y
10.2 MALLA ESLABONADA DE 2" CAL. 10
VENTANA EN ALUMINIO PERFIL PROYECTANTE, CON HOJAS DE CORREDERA,
10.3 INCLUYE VIDRIO 4 MM, COLOR BRONCE

UND

66.00

168,000

11,088,000

UND

66.00

69,000

4,554,000

M2

13.10

145,000

1,899,500

SUMINISTRO E INSTALACION MARCO Y PUERTA EN LAMINA CAL. 20, (2.0X1.0)


10.4 INCLUYE CERRADURA DE PERILLA, ANTICORROSIVO Y PINTURA EN ESMALTE

UND

3.00

380,000

1,140,000

SUMINISTRO E INSTALACION MARCO Y PUERTA EN LAMINA CAL. 20, (2.0X.80)


10.5 INCLUYE CERRADURA DE PERILLA, ANTICORROSIVO Y PINTURA EN ESMALTE

UND

2.00

360,000

720,000

UND

6.00

340,000

ML
M2
ML
M2

46.32
2065.14
425.70
528.00

6,400
12,000
6,900
16,500

2,040,000
21,441,500
296,448
24,781,710
2,937,330
8,712,000

M2

211.20

14,200

2,999,040
39,726,528
-

UND
UND

132.00
66.00

12,600
18,000

1,663,200
1,188,000
2,851,200
-

M2

125.90

13,200

1,661,880

M2
M2
M2

32.63
18.63
54.85

16,800
43,000
35,400

548,218
801,176
1,941,690

M2

85.05

58,200

4,949,910

M2
ML

105.36
38.14

31,500
14,100

3,318,840
537,774

ML

43.06

25,000

1,076,500

ML

13.76

22,950

315,792
15,151,780
-

UND

2.00

384,000

768,000

UND

2.00

242,000

484,000

UND
UND

6.00
2.00

175,000
78,000

1,050,000
156,000

UND

2.00

320,000

640,000

SUMINISTRO E INSTALACION MARCO Y PUERTA EN LAMINA CAL. 20, (2.0X.60)


10.6 INCLUYE CERRADURA DE PERILLA, ANTICORROSIVO Y PINTURA EN ESMALTE
TOTAL CARPINTERIA METALICA
PINTURA
ESTUCO Y PINTURA MUROS EN ESMALTE, 2 MANOS
PINTURA EPOXICA 2 MANOS MUROS
PINTURA EPOXICA 2 MANOS MUROS
PINTURA EPOXICA 3 MANOS PISOS
PINTURA ESMALTE PARA PUERTAS Y VENTANAS (MALLA ESLABONADA), 2
11.5 CARAS
TOTAL PINTURA
11
11.1
11.2
11.3
11.4

VARIOS
SUMINISTRO E INSTALACION POZUELOS EN ACERO INOXIDABLE DIAM.
12.1 CM
12.2 ESTIBAS EN MADERA (1.0X1.0) MT
TOTAL VARIOS
12

13
13.1
13.2
13.3
13.4

ENCHAPE MUROS Y PISOS


AFINADO PARA PISOS, MORTERO 1:2 E= 3 CM (ALOJAMIENTO,OFICINA,
DEPOSITO, AULA)
AFINADO IMPERMEABILIZADO, MORTERO 1:2, E= 3 CM (ORINALES, DUCHAS,
SANITARIOS, ENFERMERIA CANINA, BAOS)
ENCHAPE CERAMICO PISOS TRAFICO ALTO (BAOS)
ENCHAPE TABLETA TIPO MOORE (ALOJAMIENTO, DEPOSITO)

PISO EN TABLETA VIBRO PRENSADA GRANITO DE .30X.30 TIPO ALFA O


13.5 SIMILAR, COLOR BLANCO HUILA (ENFERMERIA CANINA, OFICINA, AULA)
ENCHAPE CERAMICO BLANCO MUROS 20X20 (ORINALES,DUCHAS,
13.6 SANITARIOS,BAOS, ENFERMERIA CANINA)
13.7 GUARDAESCOBA TIPO MOORE (ALOJAMIENTO, DEPOSITO)
GUARDAESCOBA EN TABLETA VIBRO PRENSADA GRANITO, TIPO ALFA O
13.8 SIMILAR COLOR BLANCO HUILA (AULA Y OFICINA)
GUARDAESCOBA MEDIA CAA EN GRANITO PULIDO Y BRILLADO, COLOR
13.9 BLANCO HUILA (ENFERMERIA CANINA)
TOTAL ENCHAPE MUROS Y PISOS
14
14.1
14.2
14.3
14.4
14.5

25

APARATOS SANITARIOS Y ACCESORIOS


SUMINISTRO E INSTALACION SANITARIO INSTITUCIONAL CON
FLUXOMETRO,TIPO CORONA (SANITARIOS ALOJAMIENTO)
SUMINISTRO E INSTALACION SANITARIO ACUACER, INCLUYE GRIFERIA
(SANITARIOS OFICINA Y ENFERMERIA)
SUMINISTRO E INSTALACION LAVAMANOS DE SOBREPONER, INCLUYE
GRIFERIA
SUMNISTRO E INSTALACION DUCHA TIPO GRIVAL
SUMINISTRO E INSTALACION ORINAL INSTITUCIONAL CON FLUXOMETRO
TIPO CORONA O SIMILAR

SUMINISTRO E INSTALACION LAVAPLATOS EN ACERO INOXIDABLE, INCLUYE


14.6 GRIFERIA (.60X.40)
TOTAL APARATOS SANITARIOS Y ACCESORIOS
CIELO RASOS FALSOS
SUMINISTRO E INSTALACION CIELORASO FALSO, ESTRUCTURA EN ALUMINIO
15.1 Y LAMINA FIBROSINTETICA
TOTAL CIELORASO FALSOS

UND

1.00

145,000

145,000
3,243,000
-

M2

89.68

58,200

M3
M3
M3

86.85
57.90
14.48

14,800
132,000
276,000

5,219,492
5,219,492
1,285,398
7,642,906
3,995,155

MT
M2
VIAJE

361.88
99.00
6.00

132,000
34,800
145,000

M2

1042.31

2,200

15

OBRAS EXTERIORES
EXCAVACION MANUAL
CONCRETO CICLOPEO, CONCRETO 2500 PSI (60/40)
CONCRETO VIGAS DE CIMENTACION (.20x.20)
CERRAMIENTO PERIMETRAL EN TUBO GALVANIZADO , ALTURA 2 MT,
MARCOS EN ANGULO DE 1 1/4"X1/8", MALLA ESLABONADA 2" CAL. 10,
16.4 ANTICORROSIVO Y PINTURA EN ESMALTE
16.5 LOSAS PARA SENDERO PEATONAL (.50X1.0) EN CONCRETO
16.6 GRAVILLA SUELTA EXTENDIDA, PROM. 1"- 1 1/2"
TOTAL OBRAS EXTERIORES
16
16.1
16.2
16.3

17 GASTOS GENERALES
17.1 ASEO FINAL OBRA
TOTAL GASTOS GENERALES

VALOR TOTAL COSTOS DIRECTOS


ADMINISTRACION
IMPREVISTOS
UTILIDAD
IVA SOBRE UTILIDAD

47,768,160
3,445,200
870,000
65,006,819
2,293,088
2,293,088

468,186,346.03
8%
3%
5%
16%

VALOR TOTAL COSTOS DIRECTOS E INDIRECTOS

ARQ. ROSA MARIA MORENO RODRIGUEZ


MAT. PROF.2570057874 CND

Direccion cra 86 No. 146-61 Suba/ C. R. Suacia Tel. 3208025156 Bogota - (091) 8326637 Girardot
rmmr.arquitecta@gmail.com

37,454,907.68
14,045,590.38
23,409,317.30
3,745,490.77

546,841,652.16