Sei sulla pagina 1di 2

Design drawings (Architectural, Structural and MEPF) Specifications Bill of Quantities Permits and Insurance 1.

Bonds and Insurance 2. Business permit 3. Building permit 4. Safety Permit 5. DENR Permit 6. Labor Permit Work Breakdown Structure Program of Works with cash flow Milestone dates phase Initial Material delivery schedule Equipment and manpower loading Method statement Material Submittals (Sample with technical data sheet, certifications, standards compliance, approved brand, availability, cost) Mock-up sample Revised Construction schedule adopting actual delivery of materials Ground breaking Actual construction Monitoring 1. Procurement logs 2. Issues Log 3. Work Phase progress 4. Progress accomplishment (for billing and per task status by quantity, amount and duration-imprompto computation of duration to complete the balance work) 5. Material Inspection Log 6. Work Inspection Log 7. Material request Log 8. Material delivery Log 9. Inventory of Stocks 10. Commitment Logs (taken from construciton schedule) 11. Correnpondence Log 12. RFI Log 13. MIR Log 14. Manpower Log 15. Weather Chart Log 16. Absentee Log 17. Actual estimate log 18. Variation works log 19. Deletion works log 20. Addition works log 21. Shop Drawing Log 22. Verbal Instruction Log

23. 1 month Look ahead schedule (delayed and on-time) 24. Work Diary (date, discipline, type submittal, new issue, reminder issue, responce issue, dwg transmittal, doc transmittal, instruction, etc.) 25. Task Start and Completion Logs 26. Billing Logs 27. Milestone dates indicator (General work monitoring) Testing and commisioning Punchlist Log and Form Rectification Turn over and acceptance Occupancy permit

Potrebbero piacerti anche