Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
KANDUNGAN
1. SITE MEMO
GC/10/SEL/9033/SM/1
DATE
ISSUED
22/05/2012
DATE
CLOSED
26/06/2012
GC/10/SEL/9033/SM/2
23/05/2012
24/05/2012
GC/10/SEL/9033/SM/3
GC/10/SEL/9033/SM/4
28/05/2012
GC/10/SEL/9033/SM/5
19/06/2012
NO
SITE MEMO NO
26/05/2012
26/05/2012
DESCRIPTION
30/06/2012
REMARKS
NO.
BLOCK
LOCATION
CONTROL
TOWER
TOWER
CONTROL
TOWER
TOWER
CONTROL
TOWER
TOWER
CONTROL
TOWER
TOWER
CONTROL
TOWER
TOWER
CONTROL
TOWER
TOWER
CONTROL
TOWER
TOWER
CONTROL
TOWER
TOWER
CONTROL
TOWER
TOWER
11
CONTROL
TOWER
TOWER
12
CONTROL
TOWER
TOWER
13
CONTROL
TOWER
TOWER
STRUCTURE
PILECAP
GRADE
SUPPLIER
DATE CAST
40T2
LAFARGE
26/5/2012
23/6/2012
52.90
52.90
51.10
51.10
56.20
61.30
55.60
50.20
47.10
50.70
48.00
51.60
56.00
52.90
51.55
50.00
50.90
49.55
53.90
58.65
54.25
40T2
LAFARGE
5/6/2012
3/7/2012
57.30
53.80
55.55
40T2
LAFARGE
12/6/2012
10/7/2012
58.70
66.70
53.80
59.30
56.25
63.00
40T2
LAFARGE
16/6/2012
14/7/2012
54.40
51.80
53.10
40T2
LAFARGE
20/6/2012
19/7/2012
58.70
53.80
56.25
40T2
LAFARGE
23/6/2012
21/7/2012
40T2
LAFARGE
26/6/2012
24/7/2012
59.80
59.80
58.70
59.10
54.20
57.60
57.80
57.10
52.40
50.20
58.70
58.80
57.90
55.75
52.20
40T2
LAFARGE
29/6/2012
27/7/2012
54.40
53.30
53.85
40T2
LAFARGE
2/7/2012
30/7/2012
40T2
LAFARGE
5/7/2012
2/8/2012
40T2
LAFARGE
7/7/2012
4/8/2012
40T2
LAFARGE
10/7/2012
7/8/2012
57.80
58.20
58.00
53.30
56.00
59.10
56.70
62.70
56.70
56.90
54.70
52.00
54.00
56.40
52.90
55.60
57.25
57.55
56.35
52.65
55.00
57.75
54.80
59.15
NO.
BLOCK
LOCATION
STRUCTURE
GRADE
SUPPLIER
DATE CAST
14
CONTROL
TOWER
TOWER
40T2
LAFARGE
11/7/2012
8/8/2012
15
CONTROL
TOWER
TOWER
40T2
LAFARGE
12/7/2012
9/8/2012
40T2
LAFARGE
14/7/2012
11/8/2012
40N
LAFARGE
16/7/2012
40T2
LAFARGE
16
17
18
CONTROL
TOWER
CONTROL
TOWER
CONTROL
TOWER
TOWER
TOWER
TOWER
CORE WALL
CAST)
(4TH
LIFTCORE WALL
(9TH
CAST)
STAIRCASE LEVEL 1 TO
LEVEL 2
CORE WALL
(5TH
CAST)
64.40
60.00
62.20
64.70
58.90
64.90
66.70
59.60
61.10
59.30
62.20
62.15
60.00
62.10
64.45
13/8/2012
48.90
46.70
47.80
17/7/2012
14/8/2012
68.00
72.00
63.10
64.90
65.55
68.45
19
CONTROL
TOWER
TOWER
40T2
LAFARGE
18/7/2012
15/8/2012
56.70
54.20
55.45
20
CONTROL
TOWER
TOWER
LIFTCORE WALL
(10TH CAST)
40T2
LAFARGE
19/7/2012
16/8/2012
62.20
61.10
61.65
21
CONTROL
TOWER
TOWER
CORE WALL
CAST)
(6TH
40T2
LAFARGE
20/7/2012
27/7/2012
22
CONTROL
TOWER
TOWER
CORE WALL
CAST)
(7TH
40T2
LAFARGE
25/7/2012
23/8/2012
57.80
58.20
63.10
62.20
56.70
57.30
61.30
60.40
57.25
57.75
62.20
61.30
23
CONTROL
TOWER
TOWER
40T2
LAFARGE
25/7/2012
23/8/2012
63.10
61.80
62.45
24
CONTROL
TOWER
TOWER
STAIRCASE LEVEL 3 TO
LEVEL 4
40N
LAFARGE
25/7/2012
23/8/2012
52.70
51.10
51.90
25
CONTROL
TOWER
TOWER
CORE WALL
CAST)
40T2
LAFARGE
28/7/2012
26/8/2012
57.80
56.90
57.35
26
CONTROL
TOWER
TOWER
STAIRCASE LEVEL 4 TO
LEVEL 5
40T2
LAFARGE
28/7/2012
26/8/2012
58.90
60.00
57.80
58.70
58.35
59.35
(8TH
NO.
BLOCK
LOCATION
STRUCTURE
GRADE
SUPPLIER
DATE CAST
27
CONTROL
TOWER
TOWER
40T2
LAFARGE
28/7/2012
26/8/2012
60.00
57.80
59.10
56.90
59.55
57.35
28
CONTROL
TOWER
TOWER
40T2
LAFARGE
30/7/2012
28/8/2012
56.40
55.60
56.00
40T2
LAFARGE
31/7/2012
29/8/2012
62.20
61.30
61.75
40T2
LAFARGE
31/7/2012
29/8/2012
60.40
56.40
58.40
40T2
LAFARGE
1/8/2012
29/8/2012
58.90
57.80
58.35
40T2
LAFARGE
3/8/2012
1/9/2012
52.40
51.10
51.75
40T2
LAFARGE
3/8/2012
1/9/2012
52.40
49.80
51.10
40T2
LAFARGE
4/8/2012
1/9/2012
53.30
55.60
54.45
40T2
LAFARGE
6/8/2012
3/9/2012
61.30
61.10
61.20
40T2
LAFARGE
7/8/2012
4/9/2012
55.80
54.00
54.90
40T2
LAFARGE
9/8/2012
6/9/2012
40T2
LAFARGE
11/8/2012
8/9/2012
64.90
63.30
61.30
60.40
62.20
58.70
60.40
56.90
63.55
61.00
60.85
58.65
40T2
LAFARGE
13/8/2012
10/9/2012
60.70
60.00
60.35
40T2
LAFARGE
14/8/2012
11/9/2012
56.90
55.60
56.00
55.10
56.45
55.35
40T2
LAFARGE
16/8/2012
13/9/2012
59.60
57.80
58.70
29
30
31
CONTROL
TOWER
CONTROL
TOWER
CONTROL
TOWER
TOWER
TOWER
TOWER
32
CONTROL
TOWER
TOWER
33
CONTROL
TOWER
TOWER
34
CONTROL
TOWER
TOWER
35
CONTROL
TOWER
TOWER
36
CONTROL
TOWER
TOWER
37
CONTROL
TOWER
TOWER
38
CONTROL
TOWER
TOWER
39
CONTROL
TOWER
TOWER
40
CONTROL
TOWER
TOWER
41
CONTROL
TOWER
TOWER
CORE WALL
CAST)
(9TH
NO.
BLOCK
LOCATION
STRUCTURE
GRADE
SUPPLIER
DATE CAST
42
CONTROL
TOWER
TOWER
40T2
LAFARGE
16/8/2012
13/9/2012
55.10
53.30
54.20
43
CONTROL
TOWER
TOWER
40T2
LAFARGE
24/8/2012
21/9/2012
60.40
58.70
59.55
44
CONTROL
TOWER
TOWER
40T2
LAFARGE
27/8/2012
24/9/2012
54.70
54.20
54.45
45
CONTROL
TOWER
TOWER
40T2
LAFARGE
27/8/2012
24/9/2012
55.60
55.10
55.35
46
CONTROL
TOWER
TOWER
40T2
LAFARGE
30/8/2012
27/9/2012
59.60
57.80
58.70
47
CONTROL
TOWER
TOWER
40T2
LAFARGE
1/9/2012
29/9/2012
53.80
53.30
53.55
48
CONTROL
TOWER
TOWER
40T2
LAFARGE
1/9/2012
29/9/2012
53.80
53.30
53.55
49
CONTROL
TOWER
TOWER
40T2
LAFARGE
3/9/2012
1/10/2012
61.10
58.70
59.90
50
CONTROL
TOWER
TOWER
40T2
LAFARGE
5/9/2012
3/10/2012
55.60
54.70
55.15
51
CONTROL
TOWER
TOWER
40T2
LAFARGE
5/9/2012
3/10/2012
55.60
54.90
55.25
52
CONTROL
TOWER
TOWER
LIFTCORE WALL
(20TH CAST)
40T2
LAFARGE
7/9/2012
5/10/2012
57.80
56.40
57.10
53
CONTROL
TOWER
TOWER
40T2
LAFARGE
8/9/2012
6/10/2012
54.70
53.30
54.00
54
CONTROL
TOWER
TOWER
LIFTCORE WALL
(21TH CAST)
40T2
LAFARGE
10/9/2012
8/10/2012
53.30
52.90
53.10
55
CONTROL
TOWER
TOWER
40T2
LAFARGE
12/9/2012
10/10/2012
53.30
51.10
52.20
LIFTCORE WALL
(15TH CAST)
CORE WALL
(14TH CAST)
M&E RISER FL43.2
LANDING SLAB FL45.0
STAIRCASE L10 TO L11
LIFTCORE WALL
(16TH CAST)
LIFTCORE WALL
(17TH CAST)
M&E RISER FL46.8
LANDING SLAB FL48.6
STAIRCASE L11 TO L12
LIFTCORE WALL
(18TH CAST)
LIFTCORE WALL
(19TH CAST)
55
CONTROL
TOWER
TOWER
NO.
BLOCK
56
CONTROL
TOWER
LOCATION
TOWER
57
CONTROL
TOWER
TOWER
58
CONTROL
TOWER
TOWER
59
CONTROL
TOWER
TOWER
60
CONTROL
TOWER
TOWER
61
CONTROL
TOWER
TOWER
62
CONTROL
TOWER
TOWER
63
CONTROL
TOWER
TOWER
64
CONTROL
TOWER
TOWER
65
CONTROL
TOWER
TOWER
66
CONTROL
TOWER
TOWER
67
CONTROL
TOWER
TOWER
STRUCTURE
CORE WALL
(15TH CAST)
CORE WALL
(16TH CAST)
M&E RISER FL61.2
LANDING SLAB FL63.0
STAIRCASE L15 TO L16
CORE WALL
(17TH CAST)
M&E RISER FL64.8
LANDING SLAB FL66.6
STAIRCASE L16 TO L17
CORE WALL
(18TH CAST)
M&E RISER FL68.4
LANDING SLAB FL70.2
STAIRCASE L17 TO L18
M&E RISER FL72.0 LIFT
LOBBY FL73.6
STAIRCASE L18 TO L19
CORE WALL
(19TH CAST)
LANDING SLAB FL 77.4
MNE RISER FL75.6
STAIRCASE L19 T0 L20
LANDING SLAB FL 81.0
MNE RISER FL79.2
STAIRCASE L20 T0 L21
CORE WALL
(20TH CAST)
40T2
LAFARGE
12/9/2012
10/10/2012
53.30
51.10
52.20
GRADE
SUPPLIER
DATE CAST
40T2
LAFARGE
13/09/2012
11/10/2012
40T2
LAFARGE
15/09/2012
13/10/2012
40T2
LAFARGE
15/09/2012
40T2
LAFARGE
40T2
58.70
56.00
53.80
53.80
58.20
55.10
52.20
53.60
58.45
55.55
53.00
53.70
13/10/2012
53.30
52.90
53.10
18/09/2012
16/10/2012
50.00
50.20
48.90
48.90
49.45
49.55
LAFARGE
18/09/2012
16/10/2012
50.40
49.80
50.10
40T2
LAFARGE
21/09/2012
19/10/2012
48.90
45.80
47.35
40T2
LAFARGE
21/09/2012
19/10/2012
53.80
52.90
53.35
40T2
LAFARGE
21/09/2012
19/10/2012
53.30
52.90
53.10
40T2
LAFARGE
25/09/2012
23/10/2012
52.00
51.60
50.70
50.20
51.35
50.90
40T2
LAFARGE
26/09/2012
24/10/2012
49.80
48.90
49.35
40T2
LAFARGE
29/09/2012
27/10/2012
53.10
52.20
52.65
40T2
LAFARGE
29/09/2012
27/10/2012
53.30
52.40
52.85
CORE WALL
(20TH CAST)
67
CONTROL
TOWER
68
CONTROL
TOWER
TOWER
LIFTCORE
CAST)
(22
69
CONTROL
TOWER
TOWER
LIFTCORE
CAST)
(23TH
NO.
BLOCK
TOWER
40T2
LAFARGE
29/09/2012
27/10/2012
40T2
LAFARGE
2/10/2012
40T2
LAFARGE
5/10/2012
56.40
55.60
56.00
30/10/2012
53.10
52.20
52.65
2/11/2012
53.80
53.30
53.55
TH
LOCATION
STRUCTURE
GRADE
SUPPLIER
DATE CAST
40T2
LAFARGE
5/10/2012
2/11/2012
53.30
52.90
53.10
40T2
LAFARGE
8/10/2012
5/11/2012
50.00
48.90
49.45
40T2
LAFARGE
8/10/2012
5/11/2012
50.20
48.90
49.55
40T2
LAFARGE
10/10/2012
7/11/2012
54.20
53.30
53.75
70
CONTROL
TOWER
TOWER
71
CONTROL
TOWER
TOWER
72
CONTROL
TOWER
TOWER
73
CONTROL
TOWER
TOWER
74
CONTROL
TOWER
TOWER
40T2
LAFARGE
10/10/2012
7/11/2012
54.20
53.30
53.75
75
CONTROL
TOWER
TOWER
40T2
LAFARGE
12/10/2012
9/11/2012
52.40
52.00
52.20
76
CONTROL
TOWER
TOWER
40T2
LAFARGE
14/10/2012
11/11/2012
56.00
54.70
55.35
77
CONTROL
TOWER
TOWER
40T2
LAFARGE
14/10/2012
11/11/2012
56.40
55.80
56.10
78
CONTROL
TOWER
TOWER
CORBEL LEVEL 28
40T2
LAFARGE
15/10/2012
12/11/2012
52.00
50.70
51.35
79
CONTROL
TOWER
TOWER
40T2
LAFARGE
19/10/2012
16/11/2012
53.30
52.20
52.75
80
CONTROL
TOWER
TOWER
COLUMN LEVEL 28
40T2
LAFARGE
20/10/2012
17/11/2012
52.70
51.10
51.90
STAIRCASE
PRESSURERISATION
FL84.6 & MNE RISER
FL82.8
PRESSURERISATION
FAN ROOM FL91.8 &
MNE RISER FL90.0
80
CONTROL
TOWER
TOWER
COLUMN LEVEL 28
40T2
LAFARGE
20/10/2012
17/11/2012
52.70
51.10
51.90
81
CONTROL
TOWER
TOWER
40T2
LAFARGE
22/10/2012
19/11/2012
52.40
51.10
51.75
82
CONTROL
TOWER
TOWER
40T2
LAFARGE
25/10/2012
22/11/2012
52.40
51.10
51.75
83
CONTROL
TOWER
TOWER
40T2
LAFARGE
25/10/2012
22/11/2012
52.40
50.70
51.55
GRADE
SUPPLIER
DATE CAST
40T2
LAFARGE
27/10/2012
24/11/2012
53.30
52.20
52.75
40T2
LAFARGE
29/10/2012
26/11/2012
48.90
47.80
48.35
40T2
LAFARGE
29/10/2012
26/11/2012
52.40
52.00
52.20
SHEARWALL LEVEL 29
STAIRCASE L27 TO L28
40T2
LAFARGE
31/10/2012
28/11/2012
49.10
48.70
48.90
TOWER
40T2
LAFARGE
3/11/2012
1/12/2012
53.30
52.90
53.10
CONTROL
TOWER
TOWER
40T2
LAFARGE
7/11/2012
5/12/2012
53.80
53.30
53.55
90
CONTROL
TOWER
TOWER
COLUMN LEVEL 30
40T2
LAFARGE
8/11/2012
6/12/2012
50.20
49.80
50.00
91
CONTROL
TOWER
TOWER
COLUMN LEVEL 30
(2ND CAST)
40T2
LAFARGE
10/11/2012
8/12/2012
53.80
52.40
53.10
92
CONTROL
TOWER
TOWER
40T2
LAFARGE
12/11/2012
10/12/2012
53.80
52.90
53.35
93
CONTROL
TOWER
TOWER
40T2
LAFARGE
16/11/2012
14/12/2012
52.70
51.10
51.90
94
CONTROL
TOWER
TOWER
40T2
LAFARGE
17/11/2012
15/12/2012
50.70
48.40
49.55
NO.
BLOCK
LOCATION
84
CONTROL
TOWER
TOWER
85
CONTROL
TOWER
TOWER
86
CONTROL
TOWER
TOWER
87
CONTROL
TOWER
TOWER
88
CONTROL
TOWER
89
STRUCTURE
BEAM AND SLAB LEVEL
29
STAIRCASE L26a TO L27
AND COLUMN LVL
29
LIFT LOBBY FL106.2
MNE RISER FL105.0
94
CONTROL
TOWER
TOWER
40T2
LAFARGE
17/11/2012
15/12/2012
50.70
48.40
49.55
NO.
BLOCK
STRUCTURE
LOCATION
GRADE
SUPPLIER
DATE CAST
CUB
PILECAP
1-10/Aa-E
35N
LAFARGE
4/7/2012
1/8/2012
46.20
45.70
45.95
CUB
GROUND BEAM
E-C/9a-10a
35N
LAFARGE
21/7/2012
18/8/2012
49.10
47.80
48.45
CUB
GROUND BEAM
Aa-C/7-10
35N
LAFARGE
23/7/2012
20/8/2012
44.40
43.30
43.85
CUB
M&E TRENCES
SLAB
35N
LAFARGE
25/7/2012
23/8/2012
42.40
40.90
41.65
CUB
GROUND BEAM
A-B/1-4
35N
LAFARGE
28/7/2012
25/8/2012
48.90
48.00
48.45
CUB
GROUND BEAM
A-B/4-7
35N
LAFARGE
31/7/2012
28/8/2012
44.20
40.00
42.10
DCA
PILECAP
H-K/8-3
35N
LAFARGE
1/8/2012
29/8/2012
43.30
40.20
41.75
DCA
PILECAP
D-H/8-3
35N
LAFARGE
3/8/2012
1/9/2012
42.40
41.30
41.85
DCA
STUMP AND
PILECAP
K-D/1-9
35N
LAFARGE
6/8/2012
3/9/2012
44.40
43.60
44.00
10
CUB
GROUND FLOOR
SLAB
1-7/A-B
35N
LAFARGE
11/8/2012
8/9/2012
45.30
45.80
45.10
45.60
45.20
45.70
11
DCA
GROUND FLOOR
BEAM
H-K/9-4
35N
LAFARGE
14/8/2012
11/9/2012
45.30
44.90
45.10
12
DCA
GROUND FLOOR
BEAM
H-K/5-1
35N
LAFARGE
16/8/2012
13/9/2012
43.10
40.00
41.55
13
CUB
GROUND FLOOR
SLAB
Aa-C/7-10
35N
LAFARGE
25/8/2012
22/9/2012
45.60
44.40
45.00
14
DCA
GROUND FLOOR
BEAM
F-H/7-4
35N
LAFARGE
29/8/2012
26/9/2012
47.60
47.10
47.35
15
DCA
GROUND FLOOR
COLUMN
B/1-8
35N
LAFARGE
29/8/2012
26/9/2012
47.60
47.10
47.35
16
DCA
GROUND FLOOR
SLAB
H-K/8-3
35N
LAFARGE
30/8/2012
27/9/2012
44.90
40.40
42.65
17
DCA
GROUND FLOOR
SLAB
H-K/1-5
35N
LAFARGE
1/9/2012
29/9/2012
44.90
44.20
44.55
NO.
BLOCK
STRUCTURE
LOCATION
GRADE
SUPPLIER
DATE CAST
18
CUB
GROUND FLOOR
SLAB
A/1-7
35N
LAFARGE
1/9/2012
29/9/2012
44.90
44.20
44.55
19
CUB
GROUND FLOOR
COLUMN
A/1-8
35N
LAFARGE
3/9/2012
1/10/2012
44.90
44.00
44.45
20
DCA
GROUND FLOOR
BEAM
D-G/1-9
35N
LAFARGE
4/9/2012
2/10/2012
44.40
44.20
44.30
21
DCA
GROUND FLOOR
SLAB
C-E/5-10
35N
LAFARGE
5/9/2012
3/10/2012
44.40
44.00
44.20
22
DCA
GROUND FLOOR
SLAB
F-H/8-4
35N
LAFARGE
8/9/2012
6/10/2012
41.60
38.40
40.00
23
DCA
GROUND FLOOR
SLAB
F-H/1-8
35N
LAFARGE
10/9/2012
8/10/2012
43.10
43.60
42.70
43.30
42.90
43.45
24
CUB
LOWER ROOF
BEAM AND SLAB
1-5/A-B and
6-7/A-B
35N
LAFARGE
14/09/2012
12/10/2012
41.80
40.40
41.10
25
CUB
WATER TANK
PLINTH
35N
LAFARGE
15/09/2012
13/10/2012
44.00
43.30
43.65
26
DCA
PILECAP
A-C/7-5
35N
LAFARGE
15/09/2012
13/10/2012
44.00
43.30
43.65
27
CUB
UPSTAND BEAM
35N
LAFARGE
18/09/2012
16/09/2012
40.00
39.80
39.90
28
DCA
GROUND FLOOR
SLAB
A-D/7-3
35N
LAFARGE
24/09/2012
22/10/2012
40.00
39.60
39.80
29
CUB
A-E/7-10
35N
LAFARGE
27/09/2012
25/10/2012
43.60
42.20
42.90
30
DCA
GROUND FLOOR
BEAM
A-E/1-4
35N
LAFARGE
27/09/2012
25/10/2012
41.30
41.10
41.20
31
DCA
GROUND FLOOR
COLUMN
K/5-6
35N
LAFARGE
2/10/2012
30/10/2012
43.60
42.40
43.00
32
CUB
ROOF BEAM
A-B/1-7
35N
LAFARGE
3/10/2012
31/10/2012
44.40
44.00
44.20
33
DCA
GROUND FLOOR
SLAB
A-B1/4-2
35N
LAFARGE
4/10/2012
1/11/2012
43.10
42.70
42.90
34
DCA
GROUND FLOOR
COLUMN
G-F/1-7
35N
LAFARGE
5/10/2012
2/11/2012
39.30
38.70
39.00
NO.
BLOCK
STRUCTURE
LOCATION
GRADE
SUPPLIER
DATE CAST
35
DCA
GROUND FLOOR
SLAB
A-E/1-7
35N
LAFARGE
6/10/2012
3/11/2012
38.00
36.20
37.10
36
DCA
GROUND FLOOR
COLUMN
A-D/1-5
35N
LAFARGE
11/10/2012
8/11/2012
42.70
42.20
42.45
37
DCA
GROUND FLOOR
COLUMN
35N
LAFARGE
12/10/2012
9/11/2012
40.00
39.10
39.55
38
DCA
GROUND FLOOR
SLAB
H-J/7-8
35N
LAFARGE
15/10/2012
12/11/2012
40.90
40.00
40.45
39
DCA
G-K/1-9
35N
LAFARGE
23/10/2012
20/11/2012
40.40
40.00
40.20
40
DCA
GROUND FLOOR
COLUMN
A-D/6-9
35N
LAFARGE
24/10/2012
21/11/2012
42.00
41.30
41.65
41
DCA
GROUND FLOOR
COLUMN
A-D/6
35N
LAFARGE
30/10/2012
27/11/2012
40.90
39.80
40.35
42
DCA
GROUND FLOOR
COLUMN
A-C/3-9
35N
LAFARGE
1/11/2012
29/11/2012
42.70
40.20
41.45
43
DCA
DCA RAMP TO
TOWER
35N
LAFARGE
2/11/2012
30/11/2012
40.90
40.00
40.45
44
DCA
GROUND FLOOR
COLUMN
G-K/8
35N
LAFARGE
6/11/2012
4/12/2012
40.20
40.00
40.10
45
DCA
A-C/1-6
35N
LAFARGE
7/11/2012
5/12/2012
42.20
41.10
41.65
46
DCA
GUTTER PARAPET
WALL
G-K/1-8
35N
LAFARGE
8/11/2012
6/12/2012
40.70
40.00
40.35
47
DCA
RC HOOD
G-K/1-8
35N
LAFARGE
15/11/2012
13/12/2012
44.40
43.80
44.10
48
DCA
GUTTER PARAPET
WALL
A-D/1-8
35N
LAFARGE
20/11/2012
18/12/2012
40.40
40.20
40.30
DATE CAST
N0. OF
SAMPLE
1
2
3
26/5/2012
4
5
6
7
5/6/2012
12/6/2012
12/6/2012
10
16/6/2012
11
20/6/2012
12
23/6/2012
13
CUBE
STRENGTH
AT 28 DAY
(N/mm2)
52.90
50.20
52.90
47.10
51.10
50.70
51.10
48.00
56.20
51.60
61.30
56.00
55.60
52.90
57.30
53.80
58.70
53.80
66.70
59.30
54.40
51.80
58.70
53.80
59.80
57.60
SAMPLING REQUIREMENT
TEST
DIFFERENCE
RESULT
VALID/
MEAN
MEAN
INVALID
(%)<15%
2
(N/mm )
COMPRESSIVE STRENGTH
INDIVIDUAL
REQUIREMENT
(A)
MEAN OF TEST
GROUP
RESULT REQUIREMENT
(A)
51.55
5.24
VALID
37
PASS
50.00
11.60
VALID
PASS
SAMPLE 1&2
50.78
50.90
0.79
VALID
PASS
50.82
49.55
6.26
VALID
PASS
50.50
53.90
8.53
VALID
PASS
SAMPLE 2,3,4&5
51.10
58.65
9.04
VALID
PASS
54.25
4.98
VALID
PASS
55.55
6.30
VALID
PASS
56.25
8.71
VALID
PASS
63.00
11.75
VALID
PASS
53.10
4.90
VALID
PASS
56.25
8.71
VALID
PASS
58.70
3.75
VALID
PASS
41
PASS
42
PASS
43
PASS
43
PASS
43
PASS
43
PASS
43
PASS
43
PASS
43
PASS
43
PASS
43
PASS
43
PASS
DATE CAST
N0. OF
SAMPLE
23/6/2012
14
23/6/2012
15
26/6/2012
16
26/6/2012
17
29/6/2012
18
2/7/2012
19
2/7/2012
20
5/7/2012
21
5/7/2012
22
7/7/2012
23
7/7/2012
24
10/7/2012
25
10/7/2012
26
11/7/2012
27
12/7/2012
28
CUBE
STRENGTH
AT 28 DAY
(N/mm2)
59.80
57.80
58.70
57.10
59.10
52.40
54.20
50.20
53.60
53.00
57.80
56.70
58.20
56.90
58.00
54.70
53.30
52.00
56.00
54.00
59.10
56.40
56.70
52.90
62.70
55.60
64.40
60.00
64.70
SAMPLING REQUIREMENT
TEST
DIFFERENCE
RESULT
VALID/
MEAN
MEAN
INVALID
(%)<15%
(N/mm2)
COMPRESSIVE STRENGTH
INDIVIDUAL
REQUIREMENT
(A)
58.80
3.40
VALID
PASS
57.90
2.76
VALID
PASS
55.75
12.02
VALID
PASS
52.20
7.66
VALID
PASS
53.30
1.13
VALID
PASS
57.25
1.92
VALID
PASS
57.55
2.26
VALID
PASS
56.35
5.86
VALID
PASS
52.65
2.47
VALID
PASS
55.00
3.64
VALID
PASS
57.75
4.68
VALID
PASS
54.80
6.93
VALID
PASS
59.15
12.00
VALID
PASS
62.20
7.07
VALID
PASS
62.15
8.21
VALID
PASS
MEAN OF TEST
RESULT
GROUP
REQUIREMENT
(A)
43
PASS
43
PASS
43
PASS
43
PASS
43
PASS
43
PASS
43
PASS
43
PASS
43
PASS
43
PASS
43
PASS
43
PASS
43
PASS
43
PASS
43
PASS
12/7/2012
28
DATE CAST
N0. OF
SAMPLE
12/7/2012
29
14/7/2012
30
14/7/2012
31
16/7/2012
32
17/7/2012
33
17/7/2012
34
18/7/2012
35
19/7/2012
36
20/7/2012
37
20/7/2012
38
25/7/2012
39
25/7/2012
40
25/7/2012
41
59.60
CUBE
STRENGTH
AT 28 DAY
2
(N/mm )
61.10
58.90
64.90
59.30
66.70
62.20
48.90
46.70
68.00
63.10
72.00
64.90
56.70
54.20
62.20
61.10
57.80
56.70
58.20
57.30
63.10
61.30
62.20
60.40
63.10
61.80
62.15
8.21
VALID
SAMPLING REQUIREMENT
TEST
DIFFERENCE
RESULT
VALID/
MEAN
MEAN
INVALID
(%)<15%
2
(N/mm )
PASS
43
PASS
COMPRESSIVE STRENGTH
INDIVIDUAL
REQUIREMENT MEAN OF TEST
(A)
60.00
3.67
VALID
PASS
62.10
9.02
VALID
PASS
64.45
6.98
VALID
PASS
47.80
4.60
VALID
PASS
65.55
7.48
VALID
PASS
68.45
10.37
VALID
PASS
55.45
4.51
VALID
PASS
61.65
1.78
VALID
PASS
57.25
1.92
VALID
PASS
57.75
1.56
VALID
PASS
62.20
2.89
VALID
PASS
61.30
2.94
VALID
PASS
62.45
2.08
VALID
PASS
GROUP
RESULT REQUIREMENT
(A)
43
PASS
43
PASS
43
PASS
43
PASS
43
PASS
43
PASS
43
PASS
43
PASS
43
PASS
43
PASS
43
PASS
43
PASS
43
PASS
25/7/2012
42
28/7/2012
43
DATE CAST
N0. OF
SAMPLE
28/7/2012
44
28/7/2012
45
28/7/2012
46
30/7/2012
47
31/7/2012
48
31/7/2012
49
1/8/2012
50
3/8/2012
51
3/8/2012
52
4/8/2012
53
6/8/2012
54
7/8/2012
55
52.70
51.10
57.80
56.90
CUBE
STRENGTH
AT 28 DAY
(N/mm2)
58.90
57.80
60.00
58.70
60.00
59.10
56.40
55.60
62.20
61.30
60.40
56.40
58.90
57.80
52.40
51.10
52.40
49.80
55.60
53.30
61.30
61.10
55.80
51.90
3.08
VALID
PASS
57.35
1.57
VALID
PASS
SAMPLING REQUIREMENT
TEST
DIFFERENCE
RESULT
VALID/
MEAN
MEAN
INVALID
(%)<15%
2
(N/mm )
43
PASS
43
PASS
COMPRESSIVE STRENGTH
INDIVIDUAL
REQUIREMENT
(A)
58.35
1.89
VALID
PASS
59.35
2.19
VALID
PASS
59.55
1.51
VALID
PASS
56.00
1.43
VALID
PASS
61.75
1.46
VALID
PASS
58.40
6.85
VALID
PASS
58.35
1.89
VALID
PASS
51.75
2.51
VALID
PASS
51.10
5.09
VALID
PASS
54.45
4.22
VALID
PASS
61.20
0.33
VALID
PASS
54.90
3.28
VALID
PASS
MEAN OF TEST
RESULT
GROUP
REQUIREMENT
(A)
SAMPLE 41,42,43& 44
57.51
SAMPLE 42,43,44 & 45
56.74
SAMPLE 43,44,45 & 46
58.65
SAMPLE 44,45,46 & 47
58.31
SAMPLE 45,46,47& 48
59.16
SAMPLE 46,47,48 & 49
58.93
SAMPLE 47,48,49 & 50
58.63
SAMPLE 48,49,50 & 51
57.56
SAMPLE 49,50,51 & 52
54.90
SAMPLE 50,51,52 & 53
53.91
SAMPLE 51,52,53& 54
54.63
SAMPLE 52,53,54 & 55
55.41
43
PASS
43
PASS
43
PASS
43
PASS
43
PASS
43
PASS
43
PASS
43
PASS
43
PASS
43
PASS
43
PASS
43
PASS
7/8/2012
55
9/8/2012
56
9/8/2012
57
11/8/2012
58
DATE CAST
N0. OF
SAMPLE
11/8/2012
59
13/8/2012
60
14/8/2012
61
16/8/2012
62
16/8/2012
63
16/8/2012
64
24/8/2012
65
27/8/2012
66
27/8/2012
67
30/8/2012
68
54.00
64.90
62.20
63.30
58.70
61.30
60.40
CUBE
STRENGTH
AT 28 DAY
(N/mm2)
60.40
56.90
60.70
60.00
56.90
56.00
55.60
55.10
59.60
57.80
55.10
53.30
60.40
58.70
54.70
54.20
55.60
55.10
59.60
57.80
54.90
3.28
VALID
PASS
63.55
4.25
VALID
PASS
61.00
7.54
VALID
PASS
60.85
1.48
VALID
PASS
SAMPLING REQUIREMENT
TEST
DIFFERENCE
RESULT
VALID/
MEAN
MEAN
INVALID
(%)<15%
2
(N/mm )
43
PASS
43
PASS
43
PASS
43
PASS
COMPRESSIVE STRENGTH
INDIVIDUAL
REQUIREMENT MEAN OF TEST
(A)
58.65
5.97
VALID
PASS
60.35
1.16
VALID
PASS
56.45
1.59
VALID
PASS
55.35
0.90
VALID
PASS
58.70
3.07
VALID
PASS
54.20
3.32
VALID
PASS
59.55
2.85
VALID
PASS
54.45
0.92
VALID
PASS
55.35
0.90
VALID
PASS
58.70
3.07
VALID
PASS
GROUP
RESULT REQUIREMENT
(A)
43
PASS
43
PASS
43
PASS
43
PASS
43
PASS
43
PASS
43
PASS
43
PASS
43
PASS
43
PASS
1/9/2012
69
1/9/2012
70
3/9/2012
71
5/9/2012
72
5/9/2012
73
DATE CAST
N0. OF
SAMPLE
7/9/2012
74
8/9/2012
75
10/9/2012
76
12/9/2012
77
13/09/2012
78
13/09/2012
79
15/09/2012
80
15/09/2012
81
53.80
53.30
53.80
53.30
61.10
58.70
55.60
54.70
55.60
54.90
CUBE
STRENGTH
AT 28 DAY
2
(N/mm )
57.80
56.40
54.70
53.30
53.30
52.90
53.30
51.10
58.70
58.20
56.00
55.10
53.80
52.20
53.80
53.60
53.55
0.93
VALID
PASS
53.55
0.93
VALID
PASS
59.90
4.01
VALID
PASS
55.15
1.63
VALID
PASS
55.25
1.27
VALID
PASS
SAMPLING REQUIREMENT
TEST
DIFFERENCE
RESULT
VALID/
MEAN
MEAN
INVALID
(%)<15%
2
(N/mm )
43
PASS
43
PASS
43
PASS
43
PASS
43
PASS
COMPRESSIVE STRENGTH
INDIVIDUAL
REQUIREMENT
(A)
57.10
2.45
VALID
PASS
54.00
2.59
VALID
PASS
53.10
0.75
VALID
PASS
52.20
4.21
VALID
PASS
58.45
0.86
VALID
PASS
55.55
1.62
VALID
PASS
53.00
3.02
VALID
PASS
53.70
0.37
VALID
PASS
GROUP
REQUIREMENT
(A)
43
PASS
43
PASS
43
PASS
43
PASS
43
PASS
43
PASS
43
PASS
43
PASS
15/09/2012
82
18/09/2012
83
18/09/2012
84
18/09/2012
85
21/09/2012
86
21/09/2012
87
21/09/2012
88
DATE CAST
N0. OF
25/09/2012
89
25/09/2012
90
26/09/2012
91
29/09/2012
92
29/09/2012
93
29/09/2012
94
53.30
52.90
50.00
48.90
50.20
48.90
50.40
49.80
48.90
45.80
53.80
52.90
53.30
52.90
CUBE
52.00
50.70
51.60
50.20
49.80
48.90
53.10
52.20
53.30
52.40
56.40
55.60
43
PASS
43
PASS
43
PASS
43
PASS
43
PASS
43
PASS
43
PASS
GROUP
REQUIREMENT
(A)
PASS
43
VALID
PASS
43
1.82
VALID
PASS
43
52.65
1.71
VALID
PASS
43
52.85
1.70
VALID
PASS
43
56.00
1.43
VALID
PASS
43
53.10
0.75
VALID
PASS
49.45
2.22
VALID
PASS
49.55
2.62
VALID
PASS
50.10
1.20
VALID
PASS
47.35
6.55
VALID
PASS
53.35
1.69
VALID
PASS
53.10
0.75
VALID
PASS
SAMPLIN
TEST
RESULT
MEAN
(N/mm2)
DIFFERENCE
MEAN
(%)<15%
VALID/
INVALID
51.35
2.53
VALID
50.90
2.75
49.35
COMPRESSIVE
INDIVIDUAL
REQUIREMENT
(A)
2/10/2012
95
5/10/2012
96
5/10/2012
97
8/10/2012
98
8/10/2012
99
10/10/2012
100
10/10/2012
101
12/10/2012
102
14/10/2012
103
14/10/2012
104
DATE CAST
N0. OF
SAMPLE
15/10/2012
105
19/10/2012
106
20/10/2012
107
22/10/2012
108
53.10
52.20
53.80
53.30
53.30
52.90
50.00
48.90
50.20
48.90
54.20
53.30
54.20
53.30
52.40
52.00
56.00
54.70
56.40
55.80
CUBE
STRENGTH
AT 28 DAY
(N/mm2)
52.00
50.70
53.30
52.20
52.70
51.10
52.40
52.65
1.71
VALID
PASS
43
53.55
0.93
VALID
PASS
43
53.10
0.75
VALID
PASS
43
49.45
2.22
VALID
PASS
43
49.55
2.62
VALID
PASS
43
53.75
1.67
VALID
PASS
SAMPLE 97,98,99&100
43
53.75
1.67
VALID
PASS
SAMPLE 98,99,100&101
43
52.20
0.77
VALID
PASS
SAMPLE 99,100,101&102
52.31
43
55.35
2.35
VALID
PASS
SAMPLE 100,101,102&103
52.31
43
56.10
1.07
VALID
PASS
SAMPLE 101,102,103&104
54.35
43
SAMPLING REQUIREMENT
TEST
DIFFERENCE
RESULT
VALID/
MEAN
MEAN
INVALID
(%)<15%
2
(N/mm )
COMPRESSIVE STRENGTH
INDIVIDUAL
REQUIREMENT
(A)
51.35
2.53
VALID
PASS
SAMPLE 102,103,104&105
53.75
52.75
2.09
VALID
PASS
SAMPLE 103,104,105&106
53.89
51.90
3.08
VALID
PASS
SAMPLE 104,105,106&107
53.03
51.75
2.51
VALID
PASS
SAMPLE 105,106,107&108
51.94
GROUP
REQUIREMENT
(A)
43
PASS
43
PASS
43
PASS
43
PASS
22/10/2012
108
25/10/2012
109
25/10/2012
110
27/10/2012
111
29/10/2012
112
29/10/2012
113
31/10/2012
114
3/11/2012
115
7/11/2012
116
8/11/2012
117
10/11/2012
118
12/11/2012
119
16/11/2012
120
17/11/2012
121
51.10
52.40
51.10
52.40
50.70
53.30
52.20
48.90
47.80
52.40
52.00
49.10
48.70
53.30
52.90
53.80
53.30
50.20
49.80
53.80
52.40
53.80
52.90
52.70
51.10
50.70
48.40
51.75
2.51
VALID
PASS
SAMPLE 105,106,107&108
51.94
51.75
2.51
VALID
PASS
SAMPLE 106,107,108&109
52.04
51.55
3.30
VALID
PASS
SAMPLE 107,108,109&110
51.74
52.75
2.09
VALID
PASS
SAMPLE 108,109,110&111
51.95
48.35
2.28
VALID
PASS
SAMPLE 109,110,111&112
51.10
52.20
0.77
VALID
PASS
SAMPLE 110,111,112&113
51.21
48.90
0.82
VALID
PASS
SAMPLE 111,112,113&114
50.55
53.10
0.75
VALID
PASS
SAMPLE 112,113,114&115
50.64
53.55
0.93
VALID
PASS
SAMPLE 113,114,115&116
51.94
50.00
0.80
VALID
PASS
SAMPLE 114,115,116&117
51.39
53.10
2.64
VALID
PASS
SAMPLE 115,116,117&118
52.44
53.35
1.69
VALID
PASS
SAMPLE 116,117,118&119
52.50
51.90
3.08
VALID
PASS
SAMPLE 117,118,119&120
52.09
49.55
4.64
VALID
PASS
SAMPLE 118,119,120&121
51.98
43
PASS
43
PASS
43
PASS
43
PASS
43
PASS
43
PASS
43
PASS
43
PASS
43
PASS
43
PASS
43
PASS
43
PASS
43
PASS
43
PASS
REMARKS
REMARKS
REMARKS
REMARKS
REMARKS
REMARKS
REMARKS
REMARKS
GROUP RESULT
N0. OF
SAMPLE
28 DAY MEAN
STRENGTH
2
(N/mm )
(x)
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
51.55
50.00
50.90
49.55
53.90
58.65
54.20
55.55
56.25
63.00
53.10
56.25
58.70
58.80
57.90
DATE CAST
26/5/2012
5/6/2012
12/6/2012
16/6/2012
20/6/2012
23/6/2012
26/6/2012
29/6/2012
2/7/2012
5/7/2012
7/7/2012
10/7/2012
11/7/2012
12/7/2012
14/7/2012
16/7/2012
17/7/2012
18/7/2012
19/7/2012
20/7/2012
25/7/2012
55.75
52.20
53.30
57.25
57.55
56.35
52.65
55.00
57.75
54.80
59.15
62.20
62.15
60.00
62.10
64.45
47.80
65.50
68.45
55.45
61.65
57.25
57.75
62.20
61.30
3.77
5.32
4.42
5.77
1.42
3.33
1.12
0.23
0.93
7.68
2.22
0.93
3.38
3.48
2.58
0.43
3.12
2.02
1.93
2.23
1.03
2.67
0.32
2.43
0.52
3.83
6.88
6.83
4.68
6.78
9.13
7.52
10.18
13.13
0.13
6.33
1.93
2.43
6.88
5.98
(X-x)2
14.21
28.30
19.54
33.29
2.02
11.09
1.25
0.05
0.86
58.98
4.93
0.86
11.42
12.11
6.66
0.18
9.73
4.08
3.72
4.97
1.06
7.13
0.10
5.90
0.27
14.67
47.33
46.65
21.90
45.97
83.36
56.55
103.63
172.40
0.02
40.07
3.72
5.90
47.33
35.76
DATE CAST
25/7/2012
28/7/2012
30/7/2012
31/7/2012
1/8/2012
3/8/2012
4/8/2012
6/8/2012
7/8/2012
9/8/2012
11/8/2012
13/8/2012
14/8/2012
16/8/2012
24/8/2012
27/8/2012
30/8/2012
1/9/2012
3/9/2012
5/9/2012
7/9/2012
8/9/2012
10/9/2012
12/9/2012
13/9/2012
15/9/2012
N0. OF
SAMPLE
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
28 DAY MEAN
STRENGTH
(N/mm2)
(x)
62.45
51.90
57.35
58.35
59.35
59.55
56.00
61.75
58.40
58.35
51.75
51.10
54.45
61.20
54.90
63.55
61.00
60.85
58.65
60.35
56.45
55.35
58.70
54.20
59.55
54.45
55.35
58.70
53.55
53.55
59.90
55.15
55.25
57.10
54.00
53.10
52.20
58.45
55.55
53.00
53.70
7.13
3.42
2.03
3.03
4.03
4.23
0.68
6.43
3.08
3.03
3.57
4.22
0.87
5.88
0.42
8.23
5.68
5.53
3.33
5.03
1.13
0.03
3.38
1.12
4.23
0.87
0.03
3.38
1.77
1.77
4.58
0.17
0.07
1.78
1.32
2.22
3.12
3.13
0.23
2.32
1.62
(X-x)2
50.84
11.70
4.12
9.18
16.24
17.89
0.46
41.34
9.49
9.18
12.74
17.81
0.76
34.57
0.18
67.73
32.26
30.58
11.09
25.30
1.28
0.00
11.42
1.25
17.89
0.76
0.00
11.42
3.13
3.13
20.98
0.03
0.00
3.17
1.74
4.93
9.73
9.80
0.05
5.38
2.62
15/9/2012
18/9/2012
DATE CAST
21/9/2012
25/9/2012
26/09/2012
29/09/2012
2/10/2012
5/10/2012
8/10/2012
10/10/2012
12/10/2012
14/10/2012
15/10/2012
19/10/2012
20/10/2012
22/10/2012
25/10/2012
27/10/2012
29/10/2012
31/10/2012
3/11/2012
7/11/2012
8/11/2012
82
83
84
85
53.10
49.45
49.55
50.10
N0. OF
SAMPLE
28 DAY MEAN
STRENGTH
(N/mm2)
(x)
47.35
53.35
53.10
51.35
50.90
49.35
52.65
52.85
56.00
52.65
53.55
53.10
49.45
49.55
53.75
53.75
52.20
55.35
56.10
51.35
52.75
51.90
51.75
51.75
51.55
52.75
48.35
52.20
48.90
53.10
53.55
50.00
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
2.22
5.87
5.77
5.22
7.97
1.97
2.22
3.97
4.42
5.97
2.67
2.47
0.68
2.67
1.77
2.22
5.87
5.77
1.57
1.57
3.12
0.03
0.78
3.97
2.57
3.42
3.57
3.57
3.77
2.57
6.97
3.12
6.42
2.22
1.77
5.32
4.93
34.46
33.29
27.25
(X-x)2
63.52
3.88
4.93
15.76
19.54
35.64
7.13
6.10
0.46
7.13
3.13
4.93
34.46
33.29
2.46
2.46
9.73
0.00
0.61
15.76
6.60
11.70
12.74
12.74
14.21
6.60
48.58
9.73
41.22
4.93
3.13
28.30
10/11/2012
12/11/2012
16/11/2012
17/11/2012
118
119
120
121
53.10
53.35
51.90
49.55
6693.15
2.22
1.97
3.42
5.77
2105.40
x = X / n
= 55.31529
N/mm2
= 55.32
Standard deviation
Current Margin
(2105.40/120)
= 4.19
= 1.64 x 4.19
= 6.87
4.93
3.88
11.70
33.29
1/2
N/mm2
However, Cl 3.2.1 (b) requires current margin not less than 7.5N/mm2
Hence, the Grade of Concrete for the first 121 batch of concrete
fc
= 55.32 6.87
= 48.45
= 48.45 N/mm2 > 40 N/mm2
DATE CAST
N0. OF
SAMPLE
4/7/2012
21/7/2012
23/7/2012
25/7/2012
28/7/2012
31/7/2012
1/8/2012
3/8/2012
6/8/2012
11/8/2012
10
11/8/2012
11
16/8/2012
12
25/8/2012
13
29/8/2012
14
CUBE
STRENGTH
AT 28 DAY
(N/mm2)
46.20
45.70
49.10
47.85
44.40
43.30
42.40
40.90
48.90
48.00
44.20
40.00
43.30
40.20
42.40
41.30
44.40
43.60
45.30
45.10
45.80
45.60
43.10
40.00
45.60
44.40
47.60
47.10
SAMPLING REQUIREMENT
TEST
DIFFERENCE
RESULT
VALID/
MEAN
MEAN
INVALID
(%)<15%
2
(N/mm )
COMPRESSIVE STRENGTH
INDIVIDUAL
GROUP
REQUIREMENT MEAN OF TEST RESULT REQUIREMENT
(A)
(A)
45.95
1.09
VALID
32
PASS
48.48
2.58
VALID
PASS
43.85
2.51
VALID
PASS
41.65
3.60
VALID
PASS
48.45
1.86
VALID
PASS
42.10
9.98
VALID
PASS
41.75
7.43
VALID
PASS
41.85
2.63
VALID
PASS
44.00
1.82
VALID
PASS
45.20
0.44
VALID
PASS
45.70
0.44
VALID
PASS
41.55
7.46
VALID
PASS
45.00
2.67
VALID
PASS
47.35
1.06
VALID
PASS
SAMPLE 1 & 2
47.21
SAMPLE 1,2 & 3
46.09
SAMPLE 1,2,3 & 4
44.98
SAMPLE 2,3,4 & 5
45.61
SAMPLE 3,4,5 & 6
44.01
SAMPLE 4,5,6 & 7
43.49
SAMPLE 5,6,7 & 8
43.54
SAMPLE 6,7,8 & 9
42.43
SAMPLE 7,8,9 & 10
43.20
SAMPLE 8,9,10 & 11
44.19
SAMPLE 9,10,11 & 12
44.11
SAMPLE 10,11,12 & 13
44.36
SAMPLE 11,12,13 & 14
44.90
36
PASS
37
PASS
38
PASS
38
PASS
38
PASS
38
PASS
38
PASS
38
PASS
38
PASS
38
PASS
38
PASS
38
PASS
38
PASS
15
47.60
47.10
DATE CAST
N0. OF
SAMPLE
CUBE
STRENGTH
AT 28 DAY
2
(N/mm )
30/8/2012
16
1/9/2012
17
1/9/2012
18
3/9/2012
19
4/9/2012
20
5/9/2012
21
8/9/2012
22
10/9/2012
23
10/9/2012
24
15/09/2012
25
15/09/2012
26
18/09/2012
27
24/09/2012
28
29/8/2012
44.90
40.40
44.90
44.20
44.90
44.20
44.90
44.00
44.40
44.20
44.40
44.00
41.60
38.40
43.10
42.70
43.60
43.30
44.00
43.30
44.00
43.30
40.00
39.80
40.00
39.60
47.35
1.06
VALID
SAMPLING REQUIREMENT
TEST
DIFFERENCE
RESULT
VALID/
MEAN
MEAN
INVALID
(%)<15%
2
(N/mm )
PASS
38
PASS
COMPRESSIVE STRENGTH
INDIVIDUAL
GROUP
REQUIREMENT MEAN OF TEST RESULT REQUIREMENT
(A)
(A)
42.65
10.55
VALID
PASS
44.55
1.57
VALID
PASS
44.55
1.57
VALID
PASS
44.45
2.02
VALID
PASS
44.30
0.45
VALID
PASS
44.20
0.90
VALID
PASS
40.00
8.00
VALID
PASS
42.90
0.93
VALID
PASS
43.45
0.69
VALID
PASS
43.65
1.60
VALID
PASS
43.65
1.60
VALID
PASS
39.90
0.50
VALID
PASS
39.80
1.01
VALID
PASS
38
PASS
38
PASS
38
PASS
38
PASS
38
PASS
38
PASS
38
PASS
38
PASS
38
PASS
38
PASS
38
PASS
38
PASS
38
PASS
27/09/2012
29
27/09/2012
30
2/10/2012
31
3/10/2012
32
DATE CAST
N0. OF
SAMPLE
4/10/2012
33
5/10/2012
34
6/10/2012
35
11/10/2012
36
12/10/2012
37
15/10/2012
38
23/10/2012
39
24/10/2012
40
30/10/2012
41
1/11/2012
42
43.60
42.20
41.30
41.10
43.60
42.40
44.40
44.00
CUBE
STRENGTH
AT 28 DAY
(N/mm2)
43.10
42.70
39.30
38.70
38.00
36.20
42.70
42.20
40.00
39.10
40.90
40.00
40.40
40.00
42.00
41.30
40.90
39.80
42.70
40.20
42.90
3.26
VALID
PASS
41.20
0.49
VALID
PASS
43.00
2.79
VALID
PASS
44.20
0.90
VALID
PASS
SAMPLING REQUIREMENT
TEST
DIFFERENCE
RESULT
VALID/
MEAN
MEAN
INVALID
(%)<15%
2
(N/mm )
38
PASS
38
PASS
38
PASS
38
PASS
COMPRESSIVE STRENGTH
INDIVIDUAL
GROUP
REQUIREMENT MEAN OF TEST RESULT REQUIREMENT
(A)
(A)
42.90
0.93
VALID
PASS
39.00
1.54
VALID
PASS
37.10
4.85
VALID
PASS
42.45
1.18
VALID
PASS
39.55
2.28
VALID
PASS
40.45
2.22
VALID
PASS
40.20
1.00
VALID
PASS
41.65
1.68
VALID
PASS
40.35
2.73
VALID
PASS
41.45
6.03
VALID
PASS
38
PASS
38
PASS
38
PASS
38
PASS
38
PASS
38
PASS
38
PASS
38
PASS
38
PASS
38
PASS
2/11/2012
43
6/11/2012
44
7/11/2012
45
8/11/2012
46
15/11/2012
47
20/11/2012
48
40.90
40.00
40.20
40.00
42.20
41.10
40.70
40.00
44.40
43.80
40.40
40.20
40.45
2.22
VALID
PASS
40.10
0.50
VALID
PASS
41.65
2.64
VALID
PASS
40.35
1.73
VALID
PASS
44.10
1.36
VALID
PASS
40.30
0.50
VALID
PASS
38
PASS
38
PASS
38
PASS
38
PASS
38
PASS
38
PASS
REMARKS
REMARKS
REMARKS
GROUP RESULT
DATE CAST
N0. OF
SAMPLE
28 DAY MEAN
STRENGTH
(N/mm2)
(x)
4/7/2012
21/7/2012
23/7/2012
25/7/2012
28/7/2012
31/7/2012
1/8/2012
3/8/2012
6/8/2012
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
45.95
48.48
43.85
41.65
48.45
42.10
41.75
41.85
44.00
45.20
45.70
41.55
45.00
47.35
42.65
44.55
44.55
44.55
44.30
44.20
40.00
42.90
43.45
41.10
43.65
43.65
39.90
39.80
42.90
41.20
43.00
44.20
42.90
39.00
37.10
42.45
39.55
40.45
11/8/2012
16/8/2012
25/8/2012
29/8/2012
30/8/2012
1/9/2012
3/9/2012
4/9/2012
5/9/2012
8/9/2012
10/9/2012
15/09/2012
18/09/2012
24/09/2012
27/09/2012
2/10/2012
3/10/2012
4/10/2012
5/10/2012
6/10/2012
11/10/2012
12/10/2012
15/10/2012
3.34
5.87
1.24
0.96
5.84
0.51
0.86
0.76
1.39
2.59
3.09
1.06
2.39
4.74
0.04
1.94
1.94
1.94
1.69
1.59
2.61
0.29
0.84
1.51
1.04
1.04
2.71
2.81
0.29
1.41
0.39
1.59
0.29
3.61
5.51
0.16
3.06
2.16
(X-x)
11.13
34.41
1.53
0.93
34.06
0.26
0.75
0.58
1.92
6.69
9.52
1.13
5.69
22.43
0.00
3.75
3.75
3.75
2.84
2.51
6.83
0.08
0.70
2.29
1.07
1.07
7.37
7.92
0.08
2.00
0.15
2.51
0.08
13.06
30.41
0.03
9.39
4.68
23/10/2012
24/10/2012
30/10/2012
1/11/2012
2/11/2012
6/11/2012
7/11/2012
8/11/2012
15/11/2012
20/11/2012
39
40
41
42
43
44
45
46
47
48
40.20
41.65
40.35
41.45
40.45
40.10
41.65
40.35
44.10
40.30
2045.48
2.41
0.96
2.26
1.16
2.16
2.51
0.96
2.26
1.49
2.31
x = X / n
= 2045.48/48
= 42.61
N/mm2
(275.22/47)1/2
= 2.42
Current Margin
= 1.64 x 2.42
= 3.97
N/mm2
However, Cl 3.2.1 (b) requires current margin not less than 7.5N/mm2
Hence, the Grade of Concrete for the first 48 batch of concrete
fc
= 42.61 3.97
= 38.65
= 38.65 N/mm2 > 35 N/mm2
Standard deviation
5.83
0.93
5.13
1.36
4.68
6.32
0.93
5.13
2.21
5.36
275.22