Sei sulla pagina 1di 1

REP Dept.

Daily Work Report (Reliability)


Vibration Engineer: Time
Area to be Visited

10 Feb 2013

DESCRIPTION OF WORK OLCM Job. Vibration collection and analysis. Started writing daily work report. Worked on SKF Machine analyst for PL-1 and PL-2, Emerson PL-3 OLCM. *Attended Office Meeting. Today's SKF readings (abnormalities): PL-1 and PL-2 OLCM Checked. SKF & Emerson are connecting. 551-FN5 NDE (H) Before 32.5 mm/sec Pinion CM-1 DR-1 Pinion Bearing NDE-H pt#10 6.019mm/s and Before 6.551mm/s Pinion CM-1 DR-2 Pinion Bearing DE-H pt# 9 5.116mm/s and Before 5.002mm/s Pinion CM-1 DR-2 Pinion Bearing NDE-H pt# 10 6.252mm/s and Before 5.125mm/s 551-SR1-GB1 input shaft vibration Before 11.495mm/s 552-MD1 GB1 i/p shaft H vibration is 6.407mm/s Today's Emerson readings (abnormalities): Checked Emerson OLCM for PL-3. Compared values on Excel sheet with old record. 473-FN1 cooler vent fan DE side vibration before was 0.395mm/s. Main Fans Vibration readings:[Stopped for Shut down] Kiln Main fan PL-1 421-FN1: DE pt#3 0.212mm/s and Before was 3.824mm/s NDE pt#4 0.083mm/s and Before was 2.578mm/s Kiln Main fan PL-2 462-FN1: DE pt#3 1.433mm/s and yesterday was 1.552mm/s NDE pt#4 3.770mm/s and yesterday was 3.981mm/s Kiln Main fan PL-3 443-FN1 MDE-A 1.215mm/sec and yesterday was 1.393mm/s DE 3.360mm/sec and yesterday was 3.385mm/s NDE 4.617mm/sec and yesterday was 4.608mm/s CM-3 main drive 563-MD1-M1: NDE 2.718mm/sec and yesterday was 2.744mm/s DE 1.825mm/sec and yesterday was 1.816mm/s CM-4 main drive 564-MD1-M1: NDE 1.855mm/sec and Before was 1.903mm/s DE 4.052mm/sec and Before was 4.128mm/s

6:30 To 8:00 8:00 To 8:30

Vibration Engineer

Superintendent

Chief

Potrebbero piacerti anche