Ground Floor

Items
L
Foundation, Excavation work
Corner foundation
Face foundation
Central Foundation
Foundation , PCC volume
Corner foundation
Face foundation
Central Foundation
Rinforcement in foundation
:@0.2% of volume of foundation

D/H

Quantity/unit

1.65
1.75
2.15

1.65
1.75
2.15

1.5
1.5
1.5

4.08375
4.59375
6.93375

1.5
1.6
2

1.5
1.5
1.5

0.5
0.5
0.5

1.125
1.2
1.5

Column PCC
0.77
Reinforcement in column upto plint@2.5%
Tie beam, PCC
along shorter direction, TB1 7.621951
along shorter direction, TB2 3.04878
along longer span, TB3 11.12805
Tie beam,Reinforcement
*@0.3% of volume of Tie beam
First floor column
Column PCC
2.38
Column reinforcement @ 3% of volume

0.3

0.3

0.0693

0.23
0.23
0.23

0.23
0.23
0.23

0.40320122
0.161280488
0.58867378

0.3

0.3

0.2142

along shorter direction, B1 7.621951


along shorter direction, B2 3.04878
along longer span, B3 11.12805

0.23
0.23
0.23

0.35
0.35
0.23

0.613567073
0.245426829
0.58867378

27
40
1080

19
10
190

Column up to plinth level

First floor beam

1080

Unit

Nos

Total Quantity

m3
m3
m3

6
6
2

m3
m3
m3

6
6
2

m3

14

m3
m3
m3

4
2
3

24.5025
27.5625
13.8675
0
6.75
7.2
3

m3
m3
m3
m3
m3
m3

266.115 kg
0
0
0.9702 m3
190.40175 Kg
1.612804878 m3
0.322560976 m3
1.766021341 m3
87.16766845 kg

m3

14

m3
m3
m3

4
2
3

2.9988 m3
706.2174 kg

2.454268293 kg
0.490853659 kg
1.766021341 kg