Sei sulla pagina 1di 1

ICAI

CAAT-TEST

ITT Course

TYPE OF PROJECT
As majority of the students are expected to work out a real life assignment preferably in some industry/research and development laboratories/educational institutions/software companies, it is suggested that the assignment is to be chosen which should have some direct relevance in day to day activities of the candidates in his/her institution. Students are encouraged to work in the areas listed at the end. However, it is not mandatory for a student to work on a real life assignment. The student can formulate an assignment problem with the help of Guide and submit the assignment proposal of the same. If approval, the student can commence working on it. 1. Title of the assignment 2. Introduction and objectives of the assignment 3. Assignment Category a. Real Time b. Simulative 4. Tools/Platform, Hardware and Software requirement specification 5. A complete structure of the program Sname Abinav Prithvi Ashish Kavya Venkatesh College Crescent Engg. Clg Anna University Madras University Sathyabama Engg. Clg Narayana Engg. Clg Assignment Title On-line Reservation City Mapping Guide Bank Management Lead Management System Asset Tracking/HR Platform Java, J2EE ASP .NET Online banking JSP/ .NET

Date of Submiss

28-01-10 02-02-10 12-02-10 18-02-10

Networking with Java As majority of the students are expected to work out a real life assignment preferably in some industry/research and development laboratories/educational institutions/software companies, it is suggested that the assignment is to be chosen which should have some direct

23-03-10

Potrebbero piacerti anche