Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
Units
Control Measures
Mechanical
Screens
Dewatering or perforated plate or trough, provided for ease of maintenance of the screens. First Aid kit and transport to hospital for treatment
Before starting procedures check that maintenance is not being performed. Provision of emergency stop button at a convenient
Screen motor located above the high water level and access provided for maintenance.
Ergonomic
Grit chamber
Provision of grit storage bin or skip with rollers, perforated tray and covers.
Easy access to the grit removal facility by dump trucks and sufficient maneuver space.
to avoid ponding.
Biological
Equalization Tank
Gloves, safety boots, waterproof overalls must be worn so as to reduce risk of contamination.
Physical
Screens
Regular checking of electrical connections by certified electrician and repairing of electric cables in case in contact with faulty electrical equipment/ connections.
REFERENCES: http://www.iwk.my/HAZOP%20Checklist%20for%20Sewage%20Treatment%20Plant.pdf