Sheet 6

HOMOGENISATION EVALUATION SCENARIO 5. KILN FEED TO BE PRODUCED FROM THE HOURLY TONNAGE RECLAIMED FROM ONE PRE-HOMOGENISATION STOCKPILE OF LOW GRADE LIMESTONE, HTMSTCK, WITH THE ADDITION OF THE HOURLY TONNAGE, HT , OF HIGH GRADE LIMESTONE (WHICH MAY BE PLACED IN SIMPLE BUFFER STORES OR NOT). THE LOW GRADE LIMESTONE IS DUG FROM AN UPPER 7 M BENCH. THE HIGH GRADE LIMESTONE IS DUG FROM A LOWER 3 M BENCH. MATERIAL FROM THE HIGH GRADE BENCH, WHICH IS BELOW 44.5% CAO IS ENTERED INTO THE PRE-HOM. STOCKPILE.
MI

Low grade Limestone front section:


170 M TL1-200 Digging direction HTMmax Digging direction 7M

High grade Limestone front section:

170 M HTMmin 3M

Lmst. pre-hom. stockpile


HTMstck

Limestone covariance functions for upper 7m bench low grade. Number of layers of this material: 200, L1 to L200. (nugget) Max covar. value (0) 22.7 (h)front direction (0) 22.7 (h)vertical Limestone covariance functions for lower 3m bench high grade. (nugget) Max covar. value (0) 2.5 (h)front direction (0) 2.5 (h)vertical Average CaO, M stck, of hourly low grade requirement, HTMstck: Computed error Mstck on the average grade, Mstck: Maximum average CaO, M max, of hourly high grade requirement, HTMmax: Computed error Mmax on the average grade, Mmax: Minimum average CaO, M min , of hourly high grade requirement, HTMmin: Computed error Mmin on the average grade, Mmin: See proportioning simulation test 4, sheet 10.

(range) (23) (3)

(range) (43) (3)

38.59%CaO 0.37%CaO 47.82%CaO 1.40%CaO 44.93%CaO 1.50%CaO