1.00 EARTH WORK EXCAVATION Output Per Day(8 Hours)

Sl.No

Description of item

Unit

Skilled

Unskilled

1.1

Earth Work Excavation in all soils upto a depth of 3Mtr from the natural ground level using excavator and carting away the excavatred earth outside the site or dumping the excavated earth as directed by the Engineer in Charge.

Cum

1.2

Earth work Excavation Manually for Foundation Pits , and trenches in all soils up to a depth of 1.5M from the Ground level including a lift of 1.5M and lead of 30Mtrs

1.2.1

In ordinary Soil Trimming the pits excavated by excavator to required level in ordinary soil

Cum

1.00

2.50

1.2.4

Nos

1.00

1.00

1.5

Sand & jelly filling

Cum

1.00

4.00

Page 1 of 11

Mfar Constructions Pvt. Ltd. 118839204.xlsx.ms_office

ITTINA ABBY JOB # 030

2. CONCRETE WORKS Output Per Day(8 Hours)

Sl.No

Description of item

Unit

Skilled

Unskilled

2.1

Laying cast- in situ P.C.C. of specified thickness wherever specified using river sand, 40mm and down size aggregate, manually using concrete mixer and chute including feeding to the mixer, transportation, placement including cleaning, sub grade preparation, leveling, all leads and lifts, compacting, rough finishing at the top surface etc., at all heights and depths as instructed. Foundation , Footing bases of Coluimns , Plinth beams Damp proof Course in specfied thicknesss Flooring ,Flagging concrete, Surkhi concrete and Screeding Concrete up to 100mm thickness Cum Cum Sqm 1.00 1.00 1.00 15.00 12.00 12.00 9.00 8.00 150.00

2.1.1 2.1.2 2.1.3

2.2

Laying cast-in -situ Reinforced Cement concreting of any mix using concrete mixer and chute including feeding to the mixer, transportation, placement, vibrating and finsihing of the concrete as per the directions including all lead and lift.(rate includes all labours and masons for finishing)

2.2.1 2.2.2 2.2.3 2.2.4 2.2.5 2.2.6 2.2.7 2.2.8 2.2.9

Footing , Plinth Beams , and column pededtrals Columns in all Shapes and all Levels Roof Beams at all levels Roof slabs at all levels and heights in any shapes Sloped Chajja , Pardi Gutter Beam Concrete Lintel at all levels Cill Concrete at all levels Staircase in all levels Retaining wall , Drops , lift wall , Ribs upto 150mm thick

Cum. Cum. Cum. Cum. Cum. Cum. Cum. Cum. Cum.

1.00 1.00 1.00 1.00

10.00 6.00 9.00 9.00

7.50 5.00 7.50 7.50

1.00 1.00 1.00

1.00 9.00 9.00

1.00 7.00 5.00

2.2.10

RCC Chajja / Lofts / Kitchen Platform / Counter slabs of 75mm Cum. thick No Rmt

1.00

10.00

1.14

2.2.11 Starter concrete 2.2.13 Starter concreting for water tank

1.00 1.00

1.00 1.00

8.00 20.00

2.3

Laying Ready-mix concrete/concrete supplied by batching plant of any grade using concrete pump including placement, vibrating and finsihing of the concrete as per the directions including all lead and lift.(rate includes all labours and masons for finishing)

2.3.1 2.3.2 2.3.3 2.3.4

Footing , Plinth Beams , and column pededtrals Columns in all Shapes and all Levels Roof Beams at all levels Roof slabs at all levels and heights in any shapes

Cum. Cum. Cum. Cum.

1.00

4.00

30.00

1.00 1.00

4.00 4.00

25.00 30.00

Page 2 of 11

Mfar Constructions Pvt. Ltd. 118839204.xlsx.ms_office

ITTINA ABBY JOB # 030

74.39 7.44 1.49

Page 3 of 11

Mfar Constructions Pvt. Ltd. 118839204.xlsx.ms_office

ITTINA ABBY JOB # 024

3. REINFORCEMENT WORKS Sl.No Description of item Unit Skilled Unskilled Output Per Day(8 Hours)

Fabricating and placing reinforcement steel of high yield strength ribbed bars of various diameters and grade conforming to IS 1786 for reinforced concrete work. The work includes cutting, bending, fabricating, and placing in position 3.1 according to drawings. Cost to include supply and use of 18G black annealed binding wire double fold to tie the bars in position As per IS 786 for each 100kg of reinforcing bars of 100kg of rebar, 1kg. of binding wires should be used.

3.1.1 Up to 12mm Dia Bar ( For Residential Buildings )

MT

1.00

2.00

0.28

3.1.2 Above 12mm Dia Bar ( For Residential Buildings )

MT

1.00

2.00

0.30

3.1.3

Unloading of steel receiving from suppliers at site and stacking at specified places

MT

4.00

20.00

Mfar Constructions Pvt. Ltd. 118839204.xlsx.ms_office

ITTINA ABBY JOB # 030

4. SHUTTERING / FORM WORKS Output Per Day(8 Hours)

Sl.No

Description of item

Unit

Skilled

Unskilled

4.1

Erecting form work at all levels and places wherever needed/specified as per drawing including striking with 12mm Plastic coated, marine resistant waterproof ply or M.S.steel form work with adjustable steel props of acceptable Staging system and with sufficient bracing as approved by site engineer. Deshuttering as the duration as approved by the site engineer etc., complete at all levels, heights and profiles for Footing , Plinth Beams , and column pedestrals Columns in all Shapes and all Levels Sqm. Sqm. Sqm. Sqm. Sqm. deshuttering Sloped Chajja , Pardi Gutter Beam Concrete Lintel at all levels Cill Concrete at all levels Staircase in all levels Retaining wall , Drops , lift wall , Ribs upto 150mm thick Sqm. Sqm. Sqm. Sqm. Sqm. Sqm. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 5.00 15.00 5.00 4.00 10.00 5.00 10.00 15.00 10.00 1.00 2.00 20.00 1.00 1.00 1.00 2.00 2.00 2.00 14.00 15.00 20.00

4.1.1 4.1.2

4.1.3.1 Roof Beams at all levels - shuttering 4.1.3.2 - deshuttering

4.1.4.1 Roof slabs at all levels and heights in any shapes - shuttering 4.1.4.2 4.1.5 4.1.6 4.1.7 4.1.8 4.1.9

4.1.10 RCC Chajja / Lofts / Kitchen Platform / Counter slabs of 75mm thick qm. S 4.1.11 Column Starter 4.1.12 Staging for Columns Ist lift 4.1.13 Staging for Columns II nd lift 4.1.14 Casurina Poles Scaffolding 4.1.15 Scaffolding using horizontals and verticals pipes 4.2 4.2.2 4.2.3 4.2.8 4.2.9 Making of Form Work as per the Design and Drawing Columns in all Shapes and all Levels Roof Beams at all levels Staircase in all levels Retaining wall , Drops , lift wall , Ribs upto 150mm thick Sqm. Sqm. Sqm. Sqm. No No Sqm. Sqm. Sqm. Sqm.

1.00

1.00

50.00

1.00 1.00 1.00 1.00 1.00

1.00 1.00 1.00 1.00 1.00

5.00 10.00 4.00 20.00 8.00

4.2.11 Column Starter

Mfar Constructions Pvt. Ltd. 118839204.xlsx.ms_office

ITTINA ABBY JOB # 030

683.84 56.99 3.80 1053.20 52.66 26.33 2.63

Mfar Constructions Pvt. Ltd. 118839204.xlsx.ms_office

Project : Ittina Abby Job No. 30

5. MASONRY WORKS Output Per Day(8 Hours)

Description of item

Unit

Skilled

Unskilled

5.2

Providing and constructing OF PCC block work at all levels in specfied Mix including curing, scaffolding, staging, leads and lifts. Granite / Size Stone Masonry in foundation Granite / Size Stone Masonry for plinth Laterite Stone Masonry 9" thick Burnt Brick Masonry 4 1/2" thick Burnt Brick Msonry 200mm thick Solid Block Masonry 100mm thick Solid Block Masonry 150mm thick Solid Block Masonry Size stone Masonry with Pointing Brick Tile Masonry (for Managlore zone only) 200mm thick Hollow Block Masonry 100mm thick Hollow Block Masonry 150mm thick Hollow Block Masonry Extra over 5.2.1 for rough dressing in one side Extra over 5.2.1 for rough dressing in both sides Cum Cum Cum Cum Sqm Cum Sqm Sqm Sqm Cum Cum Sqm Sqm No No 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.90 9.50 9.50 30.00 20.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.70 8.50 8.50 1.50 1.00 1.00 1.00 1.00 2.00 2.00

5.2.1 5.2.2 5.2.3 5.2.4 5.2.5 5.2.6 5.2.7 5.2.8 5.2.9 5.2.10 5.2.11 5.2.12 5.2.13 5.2.14 5.2.16

5.2.18

Manually Mixing and placing Concrete approx.0.1m thick in every fifth coarse of Block work

Rmt

1.00

1.00

15.00

5.2.19 5.2.20

Design Work in 4" /6" Block for Elevation Treatment Shifting Blocks From Storage Area to Upper floors

Sqm Per No.

1.00

1.00 1.00

5.00 40.00

Cement Cement Cement Ceiling Wall Ext wall

1;6 1;4 1;4 1;5 1;6

8" 6" 4" Full fine sand Full fine sand

Page 7 of 11

Mfar Constructions Pvt. Ltd. 118839204.xlsx.ms_office

Project : Ittina Abby Job No. 30

6. Plastering Works Output Per Day(8 Hours)

Sl.No

Description of item

Unit

Skilled

Unskilled

6.1

Plastering to ceilings, in specfied cement mortar mix up to 15mm thick, finishing to line and level with lime rendering at all levels & lifts, including lead and lift of materials, hydrating the lime Sqm. 24 hours before starting of work, scaffolding, curing, etc., complete.

1.00

1.00

15.00

6.2

Plastering to Internal Walls, RCC exposed Areas including Beams etc in Specfied cement mortar Mix up to 15mm thick, finishing to line and level with lime rendering at all levels & lifts, Sqm. including lead and lift of materials, hydrating the lime 24 hours before starting of work, scaffolding, curing, etc., complete. Plastering to External Walls Double Coat, RCC exposed Areas including Beams etc in Specfied cement mortar Mix up to Sqm. 25mm thick, finishing to line and level including lead and lift of materials, scaffolding, curing, etc., complete. Plastering to External Walls Single Coat, RCC exposed Areas including Beams etc in Specfied cement mortar Mix up to 18mm Sqm. thick, finishing to line and level including lead and lift of materials, scaffolding, curing, etc., complete. Rough plastering in specfied Mixes as an undercoat (backing plaster 15mm) on walls for fixing tiles, at all levels & lifts, including Sqm. rough finishing to line and plumb, the cost of scaffolding, curing, leads and lifts etc., complete. Providing Plastering Bands / Grooves / Window Fins to the line and level on External walls at all levels for a maximum width of 150mm including finishing to line and plumb, the cost of scaffolding, curing, leads and lifts etc., complete. RM RM

1.00

1.00

12.00

6.3

1.00

1.00

7.50

6.4

1.00

1.00

9.50

6.5

1.00

1.00

10.00

6.6

6.6.1 Up to 12mm thick 6.6.2 Above 12mm thick Fixing in position galvanised chicken/plaster mesh 24 guage/Expanded GI mesh at junctions of concrete and masonry and other locations as called for including fixing using adhesives/ cement paste/ nails as instructed by the project manager.

1.00 1.00

1.00 1.00

35.00 25.00

6.7

RM

1.00

1.00

35.00

6.8

Providing and laying Lath plaster at required places using 6mm dia MS rods with approved quality double layer 24 guage chicken mesh/Expanded GI mesh, CM 1:4 plastering, either sand faced finish/ neeru finish as per requirement, curing, staging, Sqm. scaffolding, work at all heights, welding to the main rods if required as per site conditions, etc., complete as per the instructions of the Project Manager. Finishing of triangular shaped parapet coping with plastering Rmt

1.00

1.00

3.00

6.12

1.00

1.00

7.00

Page 8 of 11

Mfar Constructions Pvt. Ltd. 118839204.xlsx.ms_office

Project : Ittina Abby Job No.: 30

8. Flooring & Finishing Works Sl.No A Description of item Cement Concrete Flooring Providing & laying 40mm thick granolithic flooring laid in panels consisting of consolidating, curing etc. complete. The rate also to include floor hardener of sqm approved make as per specifications and instructions. Ceramic / Vitrified Flooring Providing and laying Ceramic tile / Vitrified Tile / Glazed Tiles of Various Sizes with approved shade over minimum 20mm thick cement mortar bed of 1:4 mix including pointing with the matching colour pigment cement, washing with dilute acid, etc. sqm RM Sqm 1.00 1.00 1.00 1.00 1.00 1.00 20.00 20.00 10.00 Unit Skilled Unskilled Output Per Day(8 Hours)

8.1

1.00

1.00

10.00

8.2

8.2.1 For Flooring 8.2.2 Skirting 8.2.3 Wall Dadooing

Page 9 of 11

Mfar Constructions Pvt.Ltd

118839204.xlsx.ms_office

ITTINA ABBY JOB#030

9. PAINTING WORKS Output Per Day(8 Hours)

Sl.No

Description of item

Unit

Skilled

Unskilled

9.1

Prepare the surface of ceiling, internal walls, beams, column, fins etc., and apply two coats acryllic distemper of approved make and shade over one coat of wall primer painting including necessary sand papering, fully putty work, scaffolding etc., complete.

Sqm.

1.00

30.00

9.2

Applying three coats of water proof cement base paint of approved make and colour (snowcem or equivalent). The surface should be thoroughly cleaned and wetted before painting. The painting and curing should be done as per the manufacturer's specification.

Sqm.

1.00

20.00

9.3

Providing two or more coats of synthetic enamel paint of approved make and shade over one coat of primer for doors, windows, gates, railings, grills, and structural steel work at all levels to give a uniform finish as approved. Wooden Surfaces steel Surfaces Providing three or more coats of white washing to walls, ceiling, etc.in all areas as called for, applied with brushes and brought to approved uniform finish. Prepare the surface of ceiling, internal walls, beams, column, fins etc., and apply two coats of Plastic Emulsion Paint of approved make and shade over one coat of wall primer painting including necessary sand papering, fully putty work, scaffolding etc., complete. Sqm. Sqm. 1.00 1.00 20.32 36.60

9.3.1 9.3.2

9.4

Sqm.

1.00

15.00

9.5

Sqm.

1.00

30.00

Mfar Constructions Pvt. Ltd. 118839204.xlsx.ms_office

Project : Ittina Abby Job No: 30

10. MISCELLANEOUS WORKS Output Per Day(8 Hours)

Sl.No

Description of item

Unit

Skilled

Unskilled

10.1 Joinery Fixing 10.1.1 Door Frame Fixing 10.1.2 Single Panel Window Frame Fixing 10.1.6 Door Shutter Fixing 10.1.7 Window Shutter Fixing 10.1.8 Grill Fixing for windows 10.1.9 Lock Fixing for Doors 10.1.15 Fixing of Door Bush 10.1.16 Fixing of Curtain Rod 10.1.17 Fixing of Door Stopper 10.1.18 Fixing of Door Handle 10.1.19 Fixing of wooden beading on shutters 10.4 Hacking Works With Tools 10.4.1 Column Hacking 10.4.2 Ceiling Hacking 10.4.3 Beam Hacking Sqm Sqm Sqm 1.00 1.00 1.00 50.00 30.00 30.00 No No Sqm Sqm Sqm No No No No No Rmt 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 9.15 5.00 15.00 20.00 20.00 18.00 75.00 1.00 1.00 1.00 1.00 1.00 1.00 4.00 4.00 14.00