Hopper clinker grinders Hopper jets and slurry Ash disposal ponds
RESULTS IN:
Eliminate your ash pond or tank farm Extend time between outages Switch to problematic fuels Reduce maintenance costs Establish a smaller and greener footprint Create a safer working environment
an Alstom SSC is a cost justifiable solution. With over 100 years of power service expertise, Alstom offers the unique ability to interface its ash technologies with every system in the plant. Alstom not only offers innovation, engineering expertise, and material fabrication, we also provide the logistics, project management and ongoing service and parts inventories required to keep your plant online.
ADvANTAgES:
[ ]
THE PYRITES SYSTEM | can be sluiced directly into the SSC while at the same time using the SSCs water bath as a source for the sluicing water. This eliminates once-through water use and pyrites dewatering tanks. ECONOMIZER ASH | can be transported to the SSC on dry drag conveyors for removal along with the boiler bottom ash and pyrites.
A CLOSED LOOP WATER COOLING AND RECIRCULATING | is an option where water consumption must be minimized. With minimum makeup water required, the SSC water can be cooled and recirculated so that a minimum amount of water is used in the entire ash removal process.
COMMERCIAL READY ASH | In some cases the ash that is removed using the SSC can be used as an additional source of a plants revenue.
Step One Enter your site specific information: Total bottom, pyrites & economizer ash Assumed days of operation Water supply cost Internal parasitic energy costs Step Two Customer Energy Usage: Step Three Common Annualized Costs:
18.5 TPH 330 0.005 cents/gallon 0.01 cents/KWH) $11,325 $652,000 $6,000,000
Step Four SSC, pyrites and economizer solution: Example SSC solution acquisition cost ($3,000,000) Example Installation cost ($3,000,000) Step Five Annual Cost Savings: (using an escalation rate of 4.5% and IRR of 7%) Step Six ROI:
Note: the calculation above represents real life site costs. Details of the site information that was input are available upon request.
PSE/BPROB/SBSPCV09/eng/PSER1/10.09/US/6980 2009 Alstom Power Inc. Alstom, the Alstom logo and any alternative version there of are trademarks and service marks of Alstom. The other names mentioned, registered or not, are the property of their respective companies. The technical and other data contained in this document is provided for information only. Alstom reserves the right to revise or change this data at any time without further notice.