ALL WELDS TO BE 8 mm.(MIN) FILLET OR BUTT WELDS UNLESS STATED OTHEWISE ALL WELDS TO BE : AS1554 INTERSTITIAL LEAKAGE TEST AT 35 KPA

NOTE: 1: ACTUAL VOLUME: 80,000 L. 2: TANK MASS : 17 t.


DRAWN DATE

PART

FINISH

TOLERANCES:

CK

09-06-2012
DATE

ALL DIMENSION IN MM
DESIGN/CHECKED

TITLE
HT80PB TANK A

APPROVED

DATE

MATERIAL

CK

09-06-2012
DATE SCALE:

DRAWING NO

w wp t idcm w .er n . o o
C
6 5 4

CONFIGURED

HT80PB-48-GA-A01
APPR MASS: SHEET 1 OF REV-0

A3
1

W-W 2428 800 814

814 80

ASSEMBLY AFTER INSTALL

ACCESS HATCH WITH LEDDR

V ( 1 :50 )

EMERGENCY VENT 4"

ACCESS HATCH WITH LEDDR

2721

FILL PIPE

77

2386 14358 V C W INTERNAL LEDDER INTERNAL LEDDER V C

2892

2438

W 2438 4877 4877 2438 LEDDER B

14630
ALL WELDS TO BE 8 mm.(MIN) FILLET OR BUTT WELDS UNLESS STATED OTHEWISE ALL WELDS TO BE : AS1554 INTERSTITIAL LEAKAGE TEST AT 35 KPA

NOTE: 1: ACTUAL VOLUME: 80,031 L. 2. SFL (96.5%) VOLUME: 77,229 L. 3: TANK MASS: 15,728 KGS. 4: MAX. G. W: - KGS

PART

FINISH
ALL DIMENSION IN MM

DRAWN

DATE

DESIGN/CHECKED

DATE

TITLE
A
DRAWING NO

APPROVED

DATE

MATERIAL

w wp t idcm w .er n . o o
C
6 5 4

CONFIGURED

DATE SCALE: APPR MASS: SHEET 1 OF REV-0

A3
1

1197