Sei sulla pagina 1di 5

FIRST YEAR INSPECTION TANJUNG JATI B UNIT 3 INSPECTION RECORD

System Equipment Date Doc No


No

: Turbine EHC System : N2 Accumulator (A, B) : :


Item Result Remark

Equipment No :

Check Pressure

Prepared By (PJBS) Engineer Signature

Checked By (KPJB)

Reviewed By (PJBS) QA / QC Signature

Approved By (KPJB)

First Year Inspection Tanjung Jati B Unit 3 (Inspection Record)


PRESSURE CHECK N2 ACCUMULATOR
Date: 7 September 2012

No

Equipment

Standard

Actual Pressure

Final Pressure (after N2 recharge)

Remark (Photograph)

HP BYPASS SPRAY N2 ACCUMULATOR IHV20-4000/48

80 bar

62 bar

80 bar

HPB HYDRAULIC CONTROL IHV50-4000/48 (actual) IHV50-330/1 (as built document)

80 bar

82 bar

No need addition

HP BYPASS VALVE N2 ACCUMULATOR (Valve Side) IHV32-330-90

80 bar

65 bar

80 bar

LP BYPASS N2 ACCUMULATOR A IHV20-4000/48

80 bar

62 bar

84 bar

LP BYPASS N2 ACCUMULATOR B IHV20-4000/48

80 bar

68 bar

82 bar

EHC N2 ACCUMULATOR A

104 bar

92 bar

104 bar

EHC N2 ACCUMULATOR B

104 bar

92 bar

104 bar

BFPT #3A 1 N2 ACCUMULATOR

6.9 bar

5 bar

7 bar

2 of 5

First Year Inspection Tanjung Jati B Unit 3 (Inspection Record)


PRESSURE CHECK N2 ACCUMULATOR
Date: 7 September 2012

No

Equipment

Standard

Actual Pressure

Final Pressure (after N2 recharge)

Remark (Photograph)

BFPT #3A 2 N2 ACCUMULATOR

6.9 bar

5 bar

7 bar

10

BFPT #3B 1 N2 ACCUMULATOR

6.9 bar

5 bar

7 bar

11

BFPT #3B 2 N2 ACCUMULATOR

6.9 bar

5 bar

7 bar

Prepared By (PJBS)

Checked By (KPJB)

Engineer

Reviewed By (PJBS)

Approved By (KPJB)

QA / QC Signature
3 of 5

First Year Inspection Tanjung Jati B Unit 3 (Inspection Record)


PRESSURE CHECK N2 ACCUMULATOR
Date: 7 September 2012

No

Equipment

Standard

Actual Pressure

Final Pressure (after N2 addition)

Remark (Photograph)

HP BYPASS SPRAY N2 ACCUMULATOR IHV20-4000/48

80 bar

62 bar

HPB HYDRAULIC CONTROL IHV50-4000/48 (actual) IHV50-330/1 (as built document)

80 bar

82 bar

No need addition

HP BYPASS VALVE N2 ACCUMULATOR (Valve Side) IHV32-330-90

80 bar

65 bar

LP BYPASS N2 ACCUMULATOR A IHV20-4000/48

80 bar

62 bar

LP BYPASS N2 ACCUMULATOR B IHV20-4000/48

80 bar

68 bar

EHC N2 ACCUMULATOR A

104 bar

92 bar

EHC N2 ACCUMULATOR B

104 bar

92 bar

BFPT #3A 1 N2 ACCUMULATOR

6.9 bar

5 bar

BFPT #3A 2 N2 ACCUMULATOR

6.9 bar

5 bar

4 of 5

First Year Inspection Tanjung Jati B Unit 3 (Inspection Record)


PRESSURE CHECK N2 ACCUMULATOR
Date: 7 September 2012

No

Equipment

Standard

Actual Pressure

Final Pressure (after N2 addition)

Remark (Photograph)

10

BFPT #3B 1 N2 ACCUMULATOR

6.9 bar

5 bar

11

BFPT #3B 2 N2 ACCUMULATOR

6.9 bar

5 bar

Prepared By (PJBS)

Checked By (KPJB)

Engineer

Reviewed By (PJBS)

Approved By (KPJB)

QA / QC Signature
5 of 5

Potrebbero piacerti anche