Building Check-List

Contract No. : Floor


Item

Contract Title : Block :

: Ground / 1 / 2 / 3
Installation (initial if correct/date) Remark

Supply (initial if correct/date)

A) Brickwork

i) Bricks iiii) Exmet iv) Bonding Ties v) Damp Proof

B) Drain Layer

i) Foul Drain ii) Septic Tank iiii) Effluent Drain

C) Pavior

i) Ceramic tiling ii) Cement Screed iiii) Nosing Tiling iv) Wall Tiling

D) Roofer

i) Roofing Sheet ii) Heat Insulation iiii) Sound Insulation

E) Carpentry

i) Timber Truss ii) Door & Frame iiii) Window Frame iv) Chalk Board v) Soft Board vi) Ceiling vii) Timber Fascia vi) Fire-rated Door vi) Mosquito Proofing vi) Furniture vi) Ironmongeries Page 1/3

Building Check-List

Checked: (when complete)

Contract No.

: Floor
Item

Contract Title : Block :

: Ground / 1 / 2 / 3
Installation (initial if correct/date) Remark

Supply (initial if correct/date)

F) Rainwater Plumbing

i) Gutter ii) Down Pipe i) Lourve Holder ii) Burglar-Proof Steel Bar iiii) Chicken Wire Mesh iv) Security Wiremesh v) Collapsible Gate vi) Staircase Handrail

G) Steel & Ironworks

H) Glazier

i) Glass Lourver Blade

I) External Works

i) Hardstanding ii) Surface Water Drain iiii) Fencing iv) Gate v) Flagpoles vi) Grass & Turfing vii) Signboard